CN104712150A - Outdoor corridor and transportation method thereof - Google Patents

Outdoor corridor and transportation method thereof Download PDF

Info

Publication number
CN104712150A
CN104712150A CN201310683015.8A CN201310683015A CN104712150A CN 104712150 A CN104712150 A CN 104712150A CN 201310683015 A CN201310683015 A CN 201310683015A CN 104712150 A CN104712150 A CN 104712150A
Authority
CN
China
Prior art keywords
corridor
frame
unit
outdoor
elongated hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201310683015.8A
Other languages
Chinese (zh)
Inventor
杨保同
刘华存
谭雪峰
周强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China International Marine Containers Group Co Ltd
Yangzhou Tonglee Reefer Container Co Ltd
Original Assignee
China International Marine Containers Group Co Ltd
Yangzhou Tonglee Reefer Container Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China International Marine Containers Group Co Ltd, Yangzhou Tonglee Reefer Container Co Ltd filed Critical China International Marine Containers Group Co Ltd
Priority to CN201310683015.8A priority Critical patent/CN104712150A/en
Publication of CN104712150A publication Critical patent/CN104712150A/en
Pending legal-status Critical Current

Links

Landscapes

  • Rigid Containers With Two Or More Constituent Elements (AREA)

Abstract

The invention discloses an outdoor corridor and a transportation method thereof. The outdoor corridor comprises one or more corridor units. Each corridor unit comprises an under frame, a top frame, a side frame and a end frame, wherein the corners of the under frame are provided with bottom corner pieces, the corners of the top frame are provided with top corner pieces, the side frame extends in the longitudinal direction of the corridor unit and is oppositely connected to a set of opposite sides of the under frame and the top frame, and the end frame extends in the transverse direction of the corridor unit and is oppositely connected to the other set of opposite sides of the under frame and the top frame. The outdoor corridor comprises one corridor unit or multiple corridor units which can be mutually distributed and/or stacked, therefore, the outdoor corridor has extensive applicability and flexibility and is especially suitable for container houses, and the transportation cost can be lowered.

Description

Outdoor corridor and transportation resources thereof
Technical field
The present invention relates to a kind of outdoor corridor and transportation resources thereof.
Background technology
Container house becomes now and becomes more and more popular.Therefore, need other servicing unit that research and development and container house case are supporting, comprise outdoor corridor, think that the application of container house provides convenient and promotes the universal of container house.
Summary of the invention
In summary of the invention part, introduce the concept of a series of reduced form, this will further describe in detailed description of the invention part.Summary of the invention part of the present invention does not also mean that the key feature and essential features that will attempt to limit technical scheme required for protection, does not more mean that the protection domain attempting to determine technical scheme required for protection.
In order to solve the problem, the invention discloses a kind of outdoor corridor, it comprises one or more corridors unit, and each described corridor unit comprises: underframe, and the bight of described underframe is provided with bottom corner piece; Upper frame, the bight of described upper frame is provided with angle supporting device; Body side frame, described body side frame along described corridor unit longitudinal extension and be relatively connected on one group of opposite side of described underframe and described upper frame; And end frame, described end frame along described corridor unit horizontal expansion and be relatively connected to described underframe and described upper frame another group opposite side on.
Preferably, described outdoor corridor also comprises: corner fittings linkage, and described corner fittings linkage is used for connecting adjacent described angle supporting device and/or adjacent described bottom corner piece when the arrangement of described corridor unit and/or pile; And transportation corner fittings, described transportation corner fittings is arranged on the bottom surface of described underframe, and is configured to make the lateral separation between the described transportation corner fittings on two described corridor unit be 2438mm when two described corridor unit transverses are placed side by side.
Preferably, the side of described angle supporting device and/or described bottom corner piece is provided with elongated hole, described corner fittings linkage comprises: flap, described flap comprise along described elongated hole longitudinal direction can by described elongated hole and along described elongated hole laterally not by the plate portion of described elongated hole, be connected to described plate portion and in described plate portion along the holding section that can be held in during the described horizontal expansion of described elongated hole in described elongated hole, the screw rod of described holding section is relatively connected to described plate portion, described screw rod can extend to outside corner fittings when described holding section is held in described elongated hole, substrate, described substrate is provided with two through holes, and described through hole can be aimed at the elongated hole on described angle supporting device and/or described bottom corner piece when described substrate is mounted to adjacent described angle supporting device and/or adjacent described bottom corner piece, and nut, described nut can be screw-coupled to described screw rod in the outside of described angle supporting device and/or described bottom corner piece, and described substrate is between described nut and angle supporting device and/or described bottom corner piece.
Preferably, the end relative with described holding section of described screw rod is provided with perforate, and described corner fittings linkage also comprises cottor pin, and described cottor pin can pass described perforate.
Preferably, described holding section is configured to be held in described elongated hole in described corner fittings.
Preferably, described substrate being provided with flange around described through hole, being held in described elongated hole when it is mounted to adjacent described angle supporting device and/or adjacent described bottom corner piece for enabling described substrate.
Preferably, the corresponding position of described underframe and described upper frame is provided with installing hole, described outdoor corridor also comprises bolt assembly, described bolt assembly is used for connecting neighbouring corridor unit when described corridor unit pile, described bolt assembly comprises junction plate and bolt, and described bolt can be connected neighbouring described corridor unit through described installing hole with described junction plate.
Preferably, described underframe, described upper frame, described body side frame and described end frame are the integral pieces formed by welding.
Preferably, described underframe comprises bottom framework and covers floor on described bottom framework, and described bottom framework comprises bottom side beams along the longitudinal extension of described corridor unit and the cross member that is connected between described bottom side beams.Described upper frame comprises top frame and covers top watt on described top frame, and described top frame comprises top beam of laterally along the longitudinal extension of described corridor unit and the head piece that is connected between described top beam of laterally.The corner post that described end frame comprises the threshold being connected to described underframe, the lintel being connected to described upper frame and is connected between described threshold and described lintel, described corner post is positioned at the both sides of described end frame and is connected to described body side frame.Described body side frame comprises the handrail of the column be connected to vertically between described upper frame and described underframe and the bottom being connected to described column.Described outdoor corridor also comprises corner fittings linkage, and described corner fittings linkage is used for connecting adjacent described angle supporting device and/or described bottom corner piece when the arrangement of described corridor unit and/or pile.
The present invention also provides a kind of method for transporting outdoor corridor as above, and described method comprises: by placed side by side for every two transverse directions along described corridor unit in described corridor unit to be transported; Adjacent angle supporting device and adjacent bottom corner piece is connected, to be fixed together by every two described corridor unit by described corner fittings linkage; And be placed on vehicle by the described corridor unit after fixing, and be fixed to described vehicle by described transportation corner fittings.
This outdoor corridor comprises a corridor unit or multiplely can mutually to arrange and/or the corridor unit of pile, therefore has applicability and flexibility widely, is particularly useful for container house.During transport, single corridor unit can be transported separately, according to the actual road conditions of different regions, can also transport after the arrangement of multiple corridors unit or pile, therefore significantly reduce cost of transportation.
Accompanying drawing explanation
The following accompanying drawing of the embodiment of the present invention in this as a part of the present invention for understanding the present invention.Shown in the drawings of embodiments of the present invention and description thereof, be used for explaining principle of the present invention.In the accompanying drawings,
Fig. 1 is the top view in outdoor according to an embodiment of the invention corridor;
Fig. 2 is the elevation of a side in outdoor according to an embodiment of the invention corridor;
Fig. 3 is the elevation of another side in outdoor according to an embodiment of the invention corridor;
Fig. 4 is the elevation of an end face in outdoor according to an embodiment of the invention corridor;
Fig. 5 is the top view in outdoor in accordance with another embodiment of the present invention corridor;
Fig. 6 is the elevation of an end face in outdoor in accordance with another embodiment of the present invention corridor;
Fig. 7 is the zoomed-in view at the B place, region shown in Fig. 6;
Fig. 8 is the schematic diagram that a part for corner fittings linkage according to an embodiment of the invention is contained in corner fittings;
Fig. 9 locks the schematic diagram of adjacent corner fittings for the corner fittings linkage shown in Fig. 8; And
Figure 10 is the zoomed-in view at the A place, region shown in Fig. 2.
Detailed description of the invention
In the following description, a large amount of concrete details is given to provide more thorough understanding of the invention.But, it will be apparent to one skilled in the art that the embodiment of the present invention can be implemented without the need to these details one or more.In other example, in order to avoid obscuring with the embodiment of the present invention, technical characteristics more well known in the art are not described.
In order to thoroughly understand the embodiment of the present invention, by following description, detailed structure is proposed.Obviously, the execution of the embodiment of the present invention is not limited to the specific details that those skilled in the art has the knack of.Preferred embodiment of the present invention is described in detail as follows, but except these are described in detail, the present invention can also have other embodiments.
Fig. 1-4 is the elevation in each face in outdoor corridor according to one embodiment of the present invention respectively.As Figure 1-4, this outdoor corridor comprises one or more corridors unit.In the illustrated embodiment, this outdoor corridor comprises two corridor unit, and these two corridor unit piles form two-layer outdoor corridor.But the present invention is not limited to this, corridor unit only can comprise a corridor unit, also can comprise multiple corridors unit.Multiple corridors unit can become multilayer by pile as shown in figure, also can be arranged into other structure in horizontal plane, such as, can be arranged side by side to provide multiple corridor (as seen in figs. 5-6), also mutually can connect the outdoor corridor forming lengthening.In addition, multiple corridors unit can also be arranged in above-mentioned two kinds of modes, that is, namely arranges in same level, again in the vertical direction pile.Therefore, outdoor corridor provided by the invention can adopt multiple arrangement according to actual needs, to adapt to various application scenario.
As Figure 1-4, each corridor unit 10 comprises upper frame 100, underframe 300, body side frame 200 and end frame 400.Although each corridor unit 10 all contains upper frame 100, underframe 300, body side frame 200 and end frame 400, and do not mean that each corridor unit 10 must have identical structure.To introduce the multiple different embodiment of upper frame 100, underframe 300, body side frame 200 and end frame 400 in detail below, therefore each corridor unit 10 can select suitable structure as respective top and bottom frame and side and end frame from different embodiments.Certainly, the present invention does not get rid of each corridor unit 10 yet and adopts mutually isostructural situation.
In one embodiment, as shown in Figure 1, upper frame 100 comprises top frame and top watts 130.Top frame comprises top beam of laterally 110 along the longitudinal extension of corridor unit 10 and the head piece 120 that is connected between top beam of laterally 110.Top beam of laterally 110 and head piece 120 constitute the top frame with bearing function.Top watts 130 covers on this top frame, for blocking precipitation and Exposure to Sunlight etc., and/or prevents object from falling in the passage of corridor unit 10.Certainly, in other embodiments, upper frame 100 also can not comprise top watts 130, to adapt to the needs of different occasion.Such as, in fig. 2 shown in multi-layer stacking when, the corridor unit 10 of cutting optimal can not comprise this top watts 130, and the corridor unit 10 being only positioned at most top layer utilizes top watt for all corridors unit 10 below it is to block precipitation and Exposure to Sunlight etc., and/or prevent object from falling in the passage of corridor unit 10.
In addition, the bight of upper frame 100 is also provided with angle supporting device 140(see Fig. 2), this angle supporting device 140 is on it and adjacent corridor unit 10 pile and fixing.Angle supporting device 140 can for being applicable to the corner fittings of container.In addition, upper frame 100 can also be arranged top hanging apparatus 150(not shown), such as hanger, during for lifting for this corridor unit 10.
In one embodiment, as shown in Figure 2, underframe 300 comprises bottom framework and floor 330.Bottom framework comprises bottom side beams 310 along the longitudinal extension of corridor unit 10 and the cross member 320 that is connected between bottom side beams 310.Bottom side beams 310 and cross member 320 constitute the bottom framework with bearing function.Floor 330 covers on this bottom framework, for carrying the people walked in parts on it and corridor together with bottom framework.
In addition, the bight of underframe 300 is also provided with bottom corner piece 340(see Fig. 2), this bottom corner piece 340 is for corridor unit 10 pile lower and adjacent with it and fixing.Bottom corner piece 340 can for being applicable to the corner fittings of container.In addition, underframe 300 can also be arranged bottom hanging apparatus 350, such as hanger, during for transporting for this corridor unit 10.
Further, the bottom surface of underframe 300 is also provided with transportation corner fittings 360, this transportation corner fittings 360 is for matching with the corresponding fixture on vehicle.Therefore, the position of transportation corner fittings 360 and structure can according to the shape of the corresponding fixture on vehicle and structure to couplings, outdoor corridor can be fixed on vehicle when adopting this vehicle to transport outdoor corridor provided by the invention.In addition, the arrangement of transportation corner fittings 360 on the unit of each corridor has following characteristics, namely when two corridor unit 10 along its laterally (see Fig. 6) placed side by side time, the lateral separation between the transportation corner fittings on two corridor unit 10 be 2438mm(namely according to the ISO standard).Such as, for the iso standard container of existing 20 feet and 40 feet, its width is 2438mm.Therefore, usually also according to the ISO standard, the horizontal spacing namely between corresponding fixture is 2438mm to the horizontal spacing between the corresponding fixture on the semitrailer transporting them, to match with the corner fittings on iso standard container.So preferred version provided by the invention can use existing vehicle (such as semitrailer or steamer etc.) to transport the outdoor corridor with above-mentioned transportation corner fittings, to reduce cost of transportation when transporting.
In one embodiment, as shown in Figures 2 and 3, body side frame 200 along the longitudinal extension of corridor unit 10, and is relatively connected on one group of opposite side of underframe 300 and upper frame 100.Exemplarily, as shown in Figure 2, body side frame 200 can comprise the handrail 220 of the column 210 be connected to vertically between upper frame and underframe and the bottom being connected to column 210.When corridor unit 10 is longer, body side frame 200 can comprise multiple column 210.Handrail 220 is connected to the bottom of column 210 between column 210.In addition, as required, handrail 220 can also be connected between column 220 and end frame 400.Alternatively, as shown in Figure 3, body side frame 200 can not comprise handrail, and column 210 is mainly played a supporting role.When the body side frame 200 of this embodiment may be used for adopting this side against other object (such as wall).
In one embodiment, as shown in Figures 2 and 4, end frame 400 along corridor unit 10 horizontal expansion and be relatively connected to underframe 300 and upper frame 100 another group opposite side on.Exemplarily, end frame 400 corner post 430 that can comprise the threshold 410 being connected to underframe 300, the lintel 420 being connected to upper frame 100 and be connected between threshold 410 and lintel 420.Corner post 430 is positioned at the both sides of end frame 400 and is connected to body side frame 200.
In a preferred embodiment, upper frame 100, underframe 300, body side frame 200 and end frame 400 are the integral pieces formed by welding.This corridor unit 10 is directly transported to the destination of client as a whole from factory, loose mail can be avoided to transport and install the problem brought.If only produce the loose mail needed for installing in factory, and then after utilizing packing frame to be packed in factory by all loose mails, be sent to the installation of destination, client place.Packing frame directly increases the cost of product; The destination of loose mail from factory shipment to client, the link of process is too many, easily causes the loss of loose mail, damage; Owing to needing in-site installation in destination, loose mail is installed and is required a great deal of time the cycle, easily causes the delay of duration, cannot meet the demand of client.The preferred embodiment can avoid above-mentioned various problems.
In order to can by the multiple corridor unit 10(arranged in same level see Fig. 2-3) and/or multiple corridor unit 10(of in the vertical direction pile see Fig. 5-6) couple together, so that use in the destination of client or be convenient to transport, outdoor corridor provided by the invention also comprises corner fittings linkage.See Fig. 7, it is the zoomed-in view of the corner fittings at the B place, region shown in Fig. 6.Although below will for principle of the present invention bottom corner piece, this corner fittings linkage be also applicable to the connection between adjacent angle supporting device and the connection between adjacent angle supporting device and bottom corner piece.As shown in Figure 7, the side of bottom corner piece 340 is provided with elongated hole 341.
Fig. 8 is the schematic diagram that a part for corner fittings linkage according to an embodiment of the invention is contained in corner fittings, and Fig. 9 locks the schematic diagram of adjacent corner fittings for the corner fittings linkage shown in Fig. 8.Corner fittings linkage 500 comprises flap 510, substrate 520 and nut 530.
Flap 510 comprises plate portion 511, holding section 512 and screw rod 513.Plate portion 511 along elongated hole 341 longitudinal direction can by elongated hole 341 and along elongated hole 341 laterally not by elongated hole 341.In other words, as long as plate portion 511 can pass through elongated hole 341 along at least one direction of elongated hole 341, and elongated hole 341 can not be passed through along at least one direction of elongated hole 341.Holding section 512 is connected to plate portion 511, and can be held in elongated hole 341 along during the horizontal expansion of elongated hole 341 in plate portion 511.Holding section 512 can be held in elongated hole 341 in the inside of bottom corner piece 340 as shown in figures 8-9, also can be held in elongated hole 341 in the external card of bottom corner piece 340.This holding section 512 is mainly used in avoiding plate portion 511 to rotate in corner fittings when subsequently nut 530 being threaded to (as hereinafter described) on screw rod 513.Screw rod 513 and plate portion 511 are relatively connected to holding section 512.Screw rod 513 and plate portion 511 are connected to the both sides of holding section 512.Screw rod 513 can extend to outside bottom corner piece 340 when holding section 512 is held in elongated hole 341, can be spirally connected with nut 530.
Substrate 520 is provided with two through holes 521.Through hole 521 can be aimed at the elongated hole on bottom corner piece 340 when substrate 520 is mounted to adjacent bottom corner piece 340.Exemplarily, the side towards bottom corner piece 340 of substrate 520 is provided with flange 522, and this flange 522 is arranged on through hole 521 around, and can be stuck in elongated hole 341 when substrate 520 is mounted to adjacent bottom corner piece 340, so that follow-up installation.In the preferred embodiment, holding section 512 is preferably held in elongated hole 341 in the inside of bottom corner piece 340.
Nut 530 can be screw-coupled to screw rod 513 in the outside of bottom corner piece 340, and substrate 520 is between nut 530 and bottom corner piece 340.Like this, just by substrate 520, adjacent bottom corner piece 340 can be coupled together.
Adjacent corner fittings can firmly link together by this corner fittings linkage 500, and can ensure do not have gap between adjacent corner fittings, improves stability and the safety of the corridor unit after connecting.In addition, this corner fittings linkage 500 simple to operate, only need along the longitudinal of elongated hole 341, the plate body 511 of flap 510 to be inserted in corner fittings, and after 90-degree rotation, flap 510 is pulled outwardly and makes holding section 512 be held in elongated hole 340, then mounting baseplate 520, finally nut 530 is threaded on bolt, to reach connection object.Perform the step contrary with above-mentioned steps, just can like a cork this corner fittings linkage 500 be taken off, adjacent corner fittings is unlocked.
Further, adjacent corner fittings is reliably connected in order to make this corner fittings linkage 500, the end relative with holding section 512 of screw rod 513 is provided with perforate 514, and corner fittings linkage 500 also comprises cottor pin 540, cottor pin 540 can pass perforate 514.As shown in Figure 9, nut 530 cannot separate from screw rod 513.
In order to reinforce the connection between two adjacent corridor unit of in the vertical direction, outdoor corridor provided by the invention also comprises bolt assembly 600, as shown in Figure 10.Correspondingly, the corresponding position of underframe and upper frame, the such as corresponding position of bottom side beams 310 and top beam of laterally 110, be provided with installing hole (not shown).This bolt assembly comprises junction plate 610 and bolt 620.This bolt 620 can be connected neighbouring corridor unit through installing hole with junction plate 610.
The invention provides a kind of outdoor corridor, it comprises a corridor unit or multiplely can mutually to arrange and/or the corridor unit of pile, therefore has applicability and flexibility widely, is particularly useful for container house.During transport, single corridor unit can be transported separately, according to the actual road conditions of different regions, can also transport after the arrangement of multiple corridors unit or pile, therefore significantly reduce cost of transportation.
Lateral separation between the transportation corner fittings that transportation corner fittings 360 is configured to when two corridor unit 10 are laterally placed side by side along it on two corridor unit 10 is 2438mm, the embodiment of the present invention also provides a kind of and existing vehicle can be utilized to transport the method in above-mentioned outdoor corridor.
First, by placed side by side for every two transverse directions along corridor unit in corridor unit to be transported, that is, the body side frame relatively lay out in parallel in two outdoor corridors is made.
Then, connect adjacent angle supporting device and adjacent bottom corner piece by any one corner fittings linkage mentioned above, to be fixed together by every two corridor unit.Every two outdoor corridors can reliably be connected into an entirety by corner fittings linkage by adjacent angle supporting device and adjacent bottom corner piece, greatly can reduce cost of transportation like this.Certainly, in the unallowed situation of road conditions, also each outdoor corridor can be transported individually.
Finally, the corridor unit after fixing is placed on vehicle, and by transportation corner fittings 23(see Fig. 6) the corridor unit after fixing is fixed on vehicle (such as semitrailer or steamer etc.).
The present invention is illustrated by above-described embodiment, but should be understood that, above-described embodiment just for the object of illustrating and illustrate, and is not intended to the present invention to be limited in described scope of embodiments.In addition it will be appreciated by persons skilled in the art that the present invention is not limited to above-described embodiment, more kinds of variants and modifications can also be made according to instruction of the present invention, within these variants and modifications all drop on the present invention's scope required for protection.

Claims (10)

1. an outdoor corridor, is characterized in that, it comprises one or more corridors unit, and each described corridor unit comprises:
Underframe, the bight of described underframe is provided with bottom corner piece;
Upper frame, the bight of described upper frame is provided with angle supporting device;
Body side frame, described body side frame along described corridor unit longitudinal extension and be relatively connected on one group of opposite side of described underframe and described upper frame; And
End frame, described end frame along described corridor unit horizontal expansion and be relatively connected to described underframe and described upper frame another group opposite side on.
2. according to outdoor corridor according to claim 1, it is characterized in that, described outdoor corridor also comprises:
Corner fittings linkage, described corner fittings linkage is used for connecting adjacent described angle supporting device and/or adjacent described bottom corner piece when the arrangement of described corridor unit and/or pile; And
Transportation corner fittings, described transportation corner fittings is arranged on the bottom surface of described underframe, and is configured to make the lateral separation between the described transportation corner fittings on two described corridor unit be 2438mm when two described corridor unit transverses are placed side by side.
3. according to outdoor corridor according to claim 2, it is characterized in that, the side of described angle supporting device and/or described bottom corner piece is provided with elongated hole, and described corner fittings linkage comprises:
Flap, described flap comprise along described elongated hole longitudinal direction can by described elongated hole and along described elongated hole laterally not by described elongated hole plate portion, be connected to described plate portion and in described plate portion along the holding section that can be held in during the described horizontal expansion of described elongated hole in described elongated hole, the screw rod being relatively connected to described holding section with described plate portion, described screw rod can extend to outside corner fittings when described holding section is held in described elongated hole;
Substrate, described substrate is provided with two through holes, and described through hole can be aimed at the elongated hole on described angle supporting device and/or described bottom corner piece when described substrate is mounted to adjacent described angle supporting device and/or adjacent described bottom corner piece; And
Nut, described nut can be screw-coupled to described screw rod in the outside of described angle supporting device and/or described bottom corner piece, and described substrate is between described nut and angle supporting device and/or described bottom corner piece.
4. according to outdoor corridor according to claim 3, it is characterized in that, the end relative with described holding section of described screw rod is provided with perforate, and described corner fittings linkage also comprises cottor pin, and described cottor pin can pass described perforate.
5. according to outdoor corridor according to claim 3, it is characterized in that, described holding section is configured to be held in described elongated hole in described corner fittings.
6. according to outdoor corridor according to claim 5, it is characterized in that, described substrate being provided with flange around described through hole, being held in described elongated hole when it is mounted to adjacent described angle supporting device and/or adjacent described bottom corner piece for enabling described substrate.
7. according to outdoor corridor according to claim 1, it is characterized in that, the corresponding position of described underframe and described upper frame is provided with installing hole, described outdoor corridor also comprises bolt assembly, described bolt assembly is used for connecting neighbouring corridor unit when described corridor unit pile, described bolt assembly comprises junction plate and bolt, and described bolt can be connected neighbouring described corridor unit through described installing hole with described junction plate.
8. according to outdoor corridor according to claim 1, it is characterized in that, described underframe, described upper frame, described body side frame and described end frame are the integral pieces formed by welding.
9., according to outdoor corridor according to claim 1, it is characterized in that,
Described underframe comprises bottom framework and covers floor on described bottom framework, and described bottom framework comprises bottom side beams along the longitudinal extension of described corridor unit and the cross member that is connected between described bottom side beams;
Described upper frame comprises top frame and covers top watt on described top frame, and described top frame comprises top beam of laterally along the longitudinal extension of described corridor unit and the head piece that is connected between described top beam of laterally;
The corner post that described end frame comprises the threshold being connected to described underframe, the lintel being connected to described upper frame and is connected between described threshold and described lintel, described corner post is positioned at the both sides of described end frame and is connected to described body side frame;
Described body side frame comprises the handrail of the column be connected to vertically between described upper frame and described underframe and the bottom being connected to described column.
10. for transporting the method in the outdoor corridor according to any one of claim 2-6, it is characterized in that, described method comprises:
By placed side by side for every two transverse directions along described corridor unit in described corridor unit to be transported;
Adjacent angle supporting device and adjacent bottom corner piece is connected, to be fixed together by every two described corridor unit by described corner fittings linkage; And
Described corridor unit after fixing is placed on vehicle, and is fixed to described vehicle by described transportation corner fittings.
CN201310683015.8A 2013-12-12 2013-12-12 Outdoor corridor and transportation method thereof Pending CN104712150A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310683015.8A CN104712150A (en) 2013-12-12 2013-12-12 Outdoor corridor and transportation method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310683015.8A CN104712150A (en) 2013-12-12 2013-12-12 Outdoor corridor and transportation method thereof

Publications (1)

Publication Number Publication Date
CN104712150A true CN104712150A (en) 2015-06-17

Family

ID=53411837

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310683015.8A Pending CN104712150A (en) 2013-12-12 2013-12-12 Outdoor corridor and transportation method thereof

Country Status (1)

Country Link
CN (1) CN104712150A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106609601A (en) * 2015-10-21 2017-05-03 扬州通利冷藏集装箱有限公司 Container modularized building
CN109629856A (en) * 2018-08-08 2019-04-16 中冶天工集团有限公司 A kind of container house and its installation method using closed corridor

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3881571A (en) * 1973-10-19 1975-05-06 Michael Maldwyn Moulton Building unit for scaffolding or a trestle
CN2379443Y (en) * 1999-07-05 2000-05-24 常州新华昌国际集装箱有限公司 Detachably connected container
CN102030164A (en) * 2009-09-25 2011-04-27 胜狮货柜技术研发(上海)有限公司 Container
CN102191852A (en) * 2010-02-25 2011-09-21 约翰·克莱门特·普雷斯顿 scaffold
CN202170648U (en) * 2011-07-29 2012-03-21 中国建筑第二工程局有限公司 Container safety channel
CN102803085A (en) * 2010-03-19 2012-11-28 Nec显示器解决方案株式会社 Package unit and loading method and loading structure therefor
CN203669417U (en) * 2013-12-12 2014-06-25 扬州通利冷藏集装箱有限公司 Outdoor corridor

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3881571A (en) * 1973-10-19 1975-05-06 Michael Maldwyn Moulton Building unit for scaffolding or a trestle
CN2379443Y (en) * 1999-07-05 2000-05-24 常州新华昌国际集装箱有限公司 Detachably connected container
CN102030164A (en) * 2009-09-25 2011-04-27 胜狮货柜技术研发(上海)有限公司 Container
CN102191852A (en) * 2010-02-25 2011-09-21 约翰·克莱门特·普雷斯顿 scaffold
CN102803085A (en) * 2010-03-19 2012-11-28 Nec显示器解决方案株式会社 Package unit and loading method and loading structure therefor
CN202170648U (en) * 2011-07-29 2012-03-21 中国建筑第二工程局有限公司 Container safety channel
CN203669417U (en) * 2013-12-12 2014-06-25 扬州通利冷藏集装箱有限公司 Outdoor corridor

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106609601A (en) * 2015-10-21 2017-05-03 扬州通利冷藏集装箱有限公司 Container modularized building
CN106609601B (en) * 2015-10-21 2019-11-12 扬州通利冷藏集装箱有限公司 Container modular architectural
CN109629856A (en) * 2018-08-08 2019-04-16 中冶天工集团有限公司 A kind of container house and its installation method using closed corridor

Similar Documents

Publication Publication Date Title
AU2008222455B2 (en) Connector system for building modules
CN203669417U (en) Outdoor corridor
CN102619702A (en) Lifting system and method for lifting rotor blades of wind turbines
CN104340535B (en) Multifunctional supporting device for display screen
US11085181B2 (en) Structural module tie
CN104712150A (en) Outdoor corridor and transportation method thereof
US9822548B1 (en) Barrier wall system and method
US20230286445A1 (en) Side pack with channels
JP6348714B2 (en) Hoist platform and container unit
CN106608458A (en) A corner connecting component for containers and a container modularization building with the same
CN205203870U (en) Angle coupling assembling of container and have its container modularization building
CN203682275U (en) Hoisting beam for non-standard container and non-standard container
US8347585B2 (en) Modular seismically restrained distribution system and method of installing the same
JP2022133711A (en) container structure
CN201424702Y (en) Container trailer coach convenient for package and transportation
KR20180058959A (en) Detachable Container House Roof
CN207844822U (en) A kind of embedded LED light mounting structure of staircase and staircase
KR101295412B1 (en) Asphalt mat using lifting joint plate
CN202201360U (en) Movable container house and container house transport mould
CN206735567U (en) Top layer mounting platform without scaffold installation elevator
JP2022019405A (en) Container house
CN205294546U (en) Elevator steel frame hoistway
CN204846898U (en) Mainboard container
CN207658244U (en) A kind of LED display transport trolley structure
CN203655134U (en) Assembly-type cargo stacking ladder

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150617

RJ01 Rejection of invention patent application after publication