CN104709656B - Automatic-distributing conveyor line system for steel tube bundles - Google Patents

Automatic-distributing conveyor line system for steel tube bundles Download PDF

Info

Publication number
CN104709656B
CN104709656B CN201510105656.4A CN201510105656A CN104709656B CN 104709656 B CN104709656 B CN 104709656B CN 201510105656 A CN201510105656 A CN 201510105656A CN 104709656 B CN104709656 B CN 104709656B
Authority
CN
China
Prior art keywords
steel pipe
rollgang
pipe bundle
shaped
steel tube
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510105656.4A
Other languages
Chinese (zh)
Other versions
CN104709656A (en
Inventor
贾宝英
程凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hang Xiao Gang Gou Ltd Co
Original Assignee
Hang Xiao Gang Gou Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hang Xiao Gang Gou Ltd Co filed Critical Hang Xiao Gang Gou Ltd Co
Priority to CN201510105656.4A priority Critical patent/CN104709656B/en
Publication of CN104709656A publication Critical patent/CN104709656A/en
Application granted granted Critical
Publication of CN104709656B publication Critical patent/CN104709656B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The invention discloses an automatic-distributing conveyor line system for steel tube bundles. The automatic-distributing conveyor line system comprises a rack, a U-shaped steel tube feeding roll gang, a steel tube distributing rotary roll gang and a steel tube bundle material main roll gang, wherein the U-shaped steel tube feeding roll gang, the steel tube distributing rotary roll gang and the steel tube bundle material main roll gang are sequentially arranged on the rack, and the steel tube distributing rotary roll gang is perpendicular to the U-shaped steel tube feeding roll gang and can turn over by 90 degrees; a plurality of steel tube collecting roll gangs capable of automatically going up and down are arranged in parallel and at intervals at the ends, closed to the U-shaped steel tube feeding roll gang, of the upper portions of the two sides of the steel tube distributing rotary roll gang respectively, and steel tube bundle installing and welding production lines are arranged on the two sides, in the steel tube bundle material conveying direction, of the steel tube bundle material main roll gang respectively. The automatic-distributing conveyor line system is simple in structure, can collect and arrange materials into a set of materials according to the requirement of the steel tube bundle component constituting sequence, and then supplies materials for subsequent welding equipment.

Description

Steel pipe bundle automatic blending pipeline system
Technical field
The present invention relates to a kind of steel pipe bundle automatic blending pipeline system.
Background technology
Steel pipe bundle main member is made up through superposition welding of tube material.But steel pipe bundle master In body component assembly welding manufacturing process, need to use material-transporting system, to producing steel pipe bundle Component (tube bank of I shaped steel) after raw material used and welding completes blanking, dispensing and material The work such as conveying.Existing material transfer equipment complicated structure, and need in course of conveying Want manual operation, waste time and energy, there is also certain potential safety hazard.
Summary of the invention
In order to the component after overcoming the existing raw material to producing used by steel pipe bundle and welding is carried out The drawbacks described above that during work such as blanking, dispensing and material conveying, device therefor exists, the present invention carries For a kind of steel pipe bundle automatic blending pipeline system.
The technical solution used in the present invention is:
Steel pipe bundle automatic blending pipeline system, including frame, it is characterised in that: also include depending on The secondary U-shaped steel pipe blanking conveying roller for carrying and support U-shaped steel pipe being arranged in frame Road and U-shaped steel pipe blanking rollgang vertically arranged can 90 ° upset steel pipe dispensings rotation Turn rollgang and the main rollgang of steel pipe bundle material;Described steel pipe dispensing rotates conveying roller If being disposed with near U-shaped steel pipe blanking rollgang end parallel interval respectively above the both sides in road Dry bar can the steel pipe collecting rollgang of automatic lifting, the one of described steel pipe collecting rollgang End is arranged on the side of described U-shaped steel pipe blanking rollgang;It is positioned at steel pipe dispensing to rotate The outside of the outermost steel pipe collecting rollgang of rollgang side is provided with square steel tubing Material rollgang;Along steel pipe bundle material conveying direction on the described main rollgang of steel pipe bundle material Both sides be respectively arranged with steel pipe bundle assembly welding production line, the steel pipe bundle assembly welding production line described in both sides Feeding area be equipped with parallel with the described main rollgang of steel pipe bundle material respectively with discharging area Charging roller and blanking roller-way;Described charging roller and the described main conveying of steel pipe bundle material In frame between roller-way, parallel interval is provided with some steel pipe bundle material storage shelf, the steel of both sides Bundle material storage shelf is oppositely arranged and is configured with moving direction and described steel pipe bundle material The steel pipe bundle material shifting steel dolly that conveying direction is perpendicular;Frame between the blanking roller-way of both sides On to be arranged with some moving directions and described steel pipe bundle material conveying direction in parallel perpendicular For removing dolly, described steel pipe to the steel pipe bundle component of later process conveying steel pipe bundle component Bundle component removal dolly can two-way 90 ° of upsets;Set respectively on the correspondence position of described frame It is equipped with the fortune moved for described steel pipe bundle material shifting steel dolly and steel pipe bundle component removal dolly Row track.
Described U-shaped steel pipe blanking rollgang include being arranged in frame along U-shaped steel pipe Conveying direction arrange horizontal feed roller-way assembly, described horizontal feed roller-way assembly passes through Sprocket wheel is connected with motor-driven and forms the transfer passage of U-shaped steel pipe in the longitudinal direction.
Near one end of U-shaped steel pipe blanking rollgang on described steel pipe collecting rollgang It is provided with 180 ° of turning devices of U-shaped steel pipe;180 ° of turning device bags of described U-shaped steel pipe Include be arranged in frame for receive opening up U-shaped steel pipe the first stirring shift fork, For by the one 90 degree of turning arm of the first stirring shift fork 90-degree rotation counterclockwise, be used for receiving Second stirring shift fork of the U-shaped steel pipe on the first stirring shift fork, for by the second stirring shift fork Counterclockwise the 2nd 90 degree of turning arm of 90-degree rotation, the 2nd 90 degree of described turning arm makes the After two stirring shift fork 90-degree rotations counterclockwise, U-shaped steel pipe is opening down.
It is provided with on described steel pipe collecting rollgang and can make its elevating mechanism moved up and down, The two ends of described steel pipe collecting rollgang are separately positioned on a support, on described support Offer the gathering sill moved up and down for steel pipe collecting rollgang.
Described steel pipe dispensing rotates rollgang and includes the roller on rack-mounted pedestal Road framework, described roller-way framework is furnished with some dispensing rotating rollers along conveying direction parallel Road, the bottom of described roller-way framework is provided with gear driving pair, described gear driving pair with The transmission shaft driven of motor connects the 90 ° of upsets realizing steel pipe dispensing rotation rollgang.? During steel pipe dispensing, steel pipe dispensing rotates rollgang and rests on rollgang main with steel pipe bundle material Vertical position, is carried steel pipe by root by steel pipe collecting rollgang group and is placed on dispensing rotation On transfer roller road.And when tube material dispensing is collected complete, need by the main conveying roller of steel pipe bundle material Road is when each assembly welding production line feed, then dispensing rotating roller and roller-way framework are at motor and gear Under the drive of transmission, opposite base half-twist, keep and the main conveying roller of steel pipe bundle material The position that road is concordant.
In described steel pipe bundle material storage shelf, the one end near charging roller is provided with steel pipe Beam material pushes the poking device of the feeding area of steel pipe bundle assembly welding production line.
The head of described U-shaped steel pipe blanking rollgang and U-shaped steel pipe forming production line Afterbody is connected.
Also include controlling the electric automatic control mechanism that whole system is run.
Described steel pipe bundle component is spliced by the steel pipe that cross section is U-shaped, Mei Gegang Bottom the bending of the U-shaped that the opening part of the U-shaped of pipe splices previous steel pipe, end The opening part of the U-shaped of steel pipe splices the rectangular steel tube wide with the steel pipe of U-shaped.Wherein The steel pipe of U-shaped is to be processed by cold roll forming production line, and rectangular steel tube is then to use outsourcing side Formula feed, but before for steel pipe bundle dispensing, need to enter with plasma cutting machines square shaped steel pipe Row fixed length cutting and through hole cutting work.Steel pipe bundle component is by some single u-shaped steel pipes and Or two rectangular steel tubes rearrange on request.And by U-shaped steel pipe with rectangular steel tube respectively Conveying collected process are referred to as steel pipe dispensing, and this process rotates conveying in steel pipe dispensing Complete on roller-way.
When the present invention needs collection material, by elevating mechanism by steel pipe collecting rollgang along guiding Groove rises, the U-shaped steel pipe of jack-up so that it is depart from U-shaped steel pipe blanking rollgang, and to U 180 ° of turning devices of shape steel tube move.If U-shaped steel pipe is because of element structure requirement, need 180 ° of upsets, then the first stirring shift fork and the second stirring shift fork of turning device will be at motor train Under wheel drive, rotate and drive U-shaped steel pipe to realize upset.If U-shaped steel pipe is not required to upset, Then directly U-shaped steel pipe can be delivered to self afterbody by steel pipe collecting rollgang group, and through roller Road group self declines, and U-shaped steel pipe is placed on steel pipe dispensing and rotates on rollgang, so Back and forth, complete dispensing until all material needed for a steel pipe bundle component and collect.
After dispensing completes, steel pipe bundle material is transported to each assembly welding by the main rollgang of steel pipe bundle material At the feeding station of production line, steel pipe bundle material move steel dolly group from the main conveying of steel pipe bundle material On roller-way, a whole tube material of steel pipe bundle component is taken off in jacking, and is transported also by these materials It is placed in steel pipe bundle material storage shelf.When assembly welding production line needs material, by storage shelf Poking device promote tube material so that it is by root enter assembly welding production line charging roller on, Complete feed task.
After steel pipe bundle component assembly welding completes, it is transported to the blanking of assembly welding production line by roller-way in machine District, then by realizing the steel pipe bundle component removal dolly group of two-way 90 ° of upsets by steel pipe bundle structure Part unloads from the blanking roller-way of assembly welding production line, then carries it and rotates and lies in a horizontal plane in On the main rollgang of steel pipe bundle material, the main rollgang of steel pipe bundle material the steel that will complete Pipe bundle member, is transported to later process.
Beneficial effects of the present invention is embodied in:
1, simple in construction, whole process can realize automatization, time saving and energy saving, is substantially reduced artificial one-tenth This.
2, can need U-shaped steel pipe is carried out 180 degree of upsets according to element structure: U-shaped steel First stirring shift fork and the second stirring shift fork of 180 ° of turning devices of pipe will drive at motor sprocket Under, rotate and drive U-shaped steel pipe to realize upset.
Accompanying drawing explanation
Fig. 1 is overall structure schematic diagram of the present invention.
Fig. 2 is the A-A view in Fig. 1.
Fig. 3 is the top view of Fig. 2.
Fig. 4 is the E-E view of Fig. 2.
Fig. 5 is the F-F view in Fig. 2.
Fig. 6 a is B-B view in Fig. 1.
Fig. 6 b is the upward view of Fig. 6 a.
Fig. 7 is the C-C view in Fig. 1.
Fig. 8 is the D-D view in Fig. 1.
Fig. 9 a is the structural representation of steel pipe bundle component.
Fig. 9 b is the side view of Fig. 9 a.
Detailed description of the invention
Referring to figs. 1 through Fig. 9 b, steel pipe bundle automatic blending pipeline system, including frame, also Including the U-shaped steel pipe blanking for carrying and support U-shaped steel pipe being successively set in frame Rollgang 2 and U-shaped steel pipe blanking rollgang 2 vertically arranged can 90 ° upset Steel pipe dispensing rotates rollgang 3 and the main rollgang of steel pipe bundle material 7;Described steel pipe Dispensing rotates divides near U-shaped steel pipe blanking rollgang 2 end above the both sides of rollgang 3 Other parallel interval be disposed with some can the steel pipe collecting rollgang 4 of automatic lifting, described One end of steel pipe collecting rollgang 4 is arranged on described U-shaped steel pipe blanking rollgang 2 Side;It is positioned at steel pipe dispensing and rotates the outermost steel pipe collecting conveying of rollgang 3 side The outside of roller-way is provided with square steel tube material conveying roller road 11;Described steel pipe bundle material master is defeated The both sides along steel pipe bundle material conveying direction are sent on roller-way 7 to be respectively arranged with steel pipe bundle assembly welding raw Producing line 9, feeding area and the discharging area of the steel pipe bundle assembly welding production line 9 described in both sides are laid respectively There are the charging roller parallel with described steel pipe bundle material main rollgang 7 and blanking roller-way;Institute In frame between the charging roller stated and the described main rollgang of steel pipe bundle material 7 parallel It is arranged at intervals with some steel pipe bundle material storage shelf 10, the steel pipe bundle material storage shelf 10 of both sides It is oppositely arranged and is configured with moving direction perpendicular with described steel pipe bundle material conveying direction Steel pipe bundle material move steel dolly 6;It is arranged with in parallel in frame between the blanking roller-way of both sides What some moving directions were perpendicular with described steel pipe bundle material conveying direction is used for road work backward The steel pipe bundle component removal dolly 8 of sequence conveying steel pipe bundle component, described steel pipe bundle component removal Dolly 8 can two-way 90 ° of upsets;It is respectively arranged with on the correspondence position of described frame for institute The steel pipe bundle material stated moves steel dolly 6 and steel pipe bundle component removes the operation rail that dolly 8 moves Road.
Described U-shaped steel pipe blanking rollgang 2 include being arranged in frame along U-shaped steel The horizontal feed roller-way assembly 17 that the conveying direction of pipe is arranged, described horizontal feed roller-way group Part 17 is connected with motor-driven by sprocket wheel and is formed the defeated of U-shaped steel pipe in the longitudinal direction Send passage.
Near the one of U-shaped steel pipe blanking rollgang on described steel pipe collecting rollgang 4 End is provided with 180 ° of turning devices 5 of U-shaped steel pipe;Described U-shaped steel pipe 180 ° upset dress Put 5 the first stirrings for receiving opening up U-shaped steel pipe including being arranged in frame Shift fork 141, for by the one 90 degree of rotation of the first stirring shift fork 141 90-degree rotation counterclockwise Pivoted arm 131, the second stirring shift fork of the U-shaped steel pipe being used on reception the first stirring shift fork 141 142, for by the 2nd 90 degree of turning arm of the second stirring shift fork 142 90-degree rotation counterclockwise 132, the 2nd 90 degree of described turning arm 132 makes the second stirring shift fork 142 rotate counterclockwise After 90 degree, U-shaped steel pipe is opening down.
It is provided with on described steel pipe collecting rollgang 4 and can make its elevator moved up and down Structure 15, the two ends of described steel pipe collecting rollgang 4 are separately positioned on a support, institute The gathering sill 16 moved up and down for steel pipe collecting rollgang is offered on the support stated.
Described steel pipe dispensing rotates rollgang 3 and includes on rack-mounted pedestal 23 Roller-way framework 21, described roller-way framework 21 is furnished with some joining along conveying direction parallel Material rotating roller 20, the bottom of described roller-way framework 21 is provided with gear driving pair 22, institute The gear driving pair 22 stated be connected with the transmission shaft driven of motor 24 realize steel pipe dispensing rotate defeated Send 90 ° of upsets of roller-way 3.When steel pipe dispensing, steel pipe dispensing rotates rollgang and stops In the position that rollgang main with steel pipe bundle material is vertical, by steel pipe collecting rollgang group by steel Pipe carries by root and is placed on dispensing rotating roller.And when tube material dispensing is collected complete, Need by the main rollgang of steel pipe bundle material to each assembly welding production line feed time, then dispensing rotating roller Road and roller-way framework under the motor drive with gear driving pair, opposite base 23 half-twist, Keep the position that rollgang main with steel pipe bundle material is concordant.
In described steel pipe bundle material storage shelf 10, the one end near charging roller is provided with steel Bundle material pushes the poking device 25 of the feeding area of steel pipe bundle assembly welding production line.
The head of described U-shaped steel pipe blanking rollgang 2 and U-shaped steel pipe forming production line The afterbody linking of 1.
Also include controlling the electric automatic control mechanism that whole system is run.
Described steel pipe bundle component is spliced by the steel pipe A1 that cross section is U-shaped, each Bottom the bending of the U-shaped that the opening part of the U-shaped of steel pipe splices previous steel pipe, end The opening part splicing of U-shaped of the steel pipe rectangular steel tube A2 wide with the steel pipe of U-shaped. Wherein the steel pipe of U-shaped is to be processed by cold roll forming production line, and rectangular steel tube is then outside employing Purchase mode feed, but before for steel pipe bundle dispensing, need with plasma cutting machines square shaped steel Pipe carries out fixed length cutting and through hole cutting work.Steel pipe bundle component is by some single u-shaped steel pipes Rearrange on request with one or two rectangular steel tube.And by U-shaped steel pipe and rectangular steel tube Conveying collected process are referred to as steel pipe dispensing respectively, and this process rotates in steel pipe dispensing Complete on rollgang.
When the present invention needs collection material, by elevating mechanism by steel pipe collecting rollgang along guiding Groove rises, the U-shaped steel pipe of jack-up so that it is depart from U-shaped steel pipe blanking rollgang, and to U 180 ° of turning devices of shape steel tube move.If U-shaped steel pipe is because of element structure requirement, need 180 ° of upsets, then the first stirring shift fork and the second stirring shift fork of turning device will be at motor train Under wheel drive, rotate and drive U-shaped steel pipe to realize upset.If U-shaped steel pipe is not required to upset, Then directly U-shaped steel pipe can be delivered to self afterbody by steel pipe collecting rollgang group, and through roller Road group self declines, and U-shaped steel pipe is placed on steel pipe dispensing and rotates on rollgang, so Back and forth, complete dispensing until all material needed for a steel pipe bundle component and collect.
After dispensing completes, steel pipe bundle material is transported to each assembly welding by the main rollgang of steel pipe bundle material At the feeding station of production line, steel pipe bundle material move steel dolly group from the main conveying of steel pipe bundle material On roller-way, a whole tube material of steel pipe bundle component is taken off in jacking, and is transported also by these materials It is placed in steel pipe bundle material storage shelf.When assembly welding production line needs material, by storage shelf Poking device promote tube material so that it is by root enter assembly welding production line charging roller on, Complete feed task.
After steel pipe bundle component assembly welding completes, it is transported to the blanking of assembly welding production line by roller-way in machine District, then by realizing the steel pipe bundle component removal dolly group of two-way 90 ° of upsets by steel pipe bundle structure Part unloads from the blanking roller-way of assembly welding production line, then carries it and rotates and lies in a horizontal plane in On the main rollgang of steel pipe bundle material, the main rollgang of steel pipe bundle material the steel that will complete Pipe bundle member, is transported to later process.
The functional requirement of concrete dispensing pipeline system is as follows:
1, the blanking of U-shaped steel pipe: according to composition steel pipe bundle component U-shaped steel pipe specification, The technology requirement such as length and quantity, arranges U-shaped steel pipe forming production line automatically to produce by root required The U-shaped steel pipe of quantity, and it is transported to the U-shaped steel pipe blanking rollgang of production line afterbody, etc. Treat blanking and dispensing, will be able to process by the steel pipe collecting rollgang of instruction automatic lifting U-shaped steel pipe is by root jack-up blanking, and is transported to steel pipe dispensing rotation rollgang, with square steel tube Carry out dispensing.
2, dispensing conveying after rectangular steel tube processing: the fixed length of square steel tube and through hole all use etc. from Sub-cutting equipment is processed, and the rectangular steel tube after processing stays on square steel tube material conveying roller road, Carry out after the instruction of dispensing sends with U-shaped steel pipe wait needing, then required rectangular steel tube send automatically On steel pipe collecting rollgang, then it is transferred to the rotation of steel pipe dispensing by steel pipe collecting rollgang Rollgang, with U-shaped steel pipe combination, produces dispensing for steel pipe bundle.
3, steel pipe bundle dispensing feed conveying: when U-shaped steel pipe is with rectangular steel tube dispensing, steel pipe Dispensing rotates the position of rollgang, perpendicular with the position shown in Fig. 1.Treat steel pipe bundle material Expect supporting after, steel pipe dispensing rotate rollgang 90-degree rotation, in the position shown in Fig. 1, Rollgang main with steel pipe bundle material keeps flushing, and the most supporting steel pipe bundle material can pass through steel The main rollgang of bundle material is to each steel pipe bundle assembly welding production line feed.Rotate defeated in steel pipe dispensing When sending roller-way to rotate, steel pipe collecting rollgang must be automatically lowered to rotate defeated with steel pipe dispensing Send the roller-way position without interfering.
4, to each steel pipe bundle assembly welding production line feed: steel pipe bundle material main rollgang conveying steel Tube bank supplementary material, to behind each steel pipe bundle assembly welding production line feeding area, is automatically stopped, by steel pipe bundle Material moves steel dolly group and runs to below the main rollgang of steel pipe bundle material, jack-up supplementary material, And material is transported to need the steel pipe bundle material storage shelf of the steel pipe bundle assembly welding production line of feed On, the preparation of material is completed for the production of steel pipe bundle.When needs feed, by steel pipe bundle U-shaped steel pipe or rectangular steel tube are pushed assembly welding production line by the poking device of material storage shelf automatically Charging roller, can to assembly welding station carry material.
5, the blanking conveying of steel pipe bundle component: complete the steel pipe bundle component of assembly welding, through steel Rollgang in tube bank assembly welding line main, delivers to the discharging area of production line afterbody.Again by Steel pipe is unloaded from the blanking roller-way of production line by steel pipe bundle component removal dolly group, and is transported to On the main rollgang of steel pipe bundle material, steel pipe bundle component can be carried to later process.
Content described in this specification embodiment is only the way of realization to utility model design Enumerate, protection scope of the present invention is not construed as being only limitted to that embodiment stated is concrete Form, protection scope of the present invention is also and in those skilled in the art according to present inventive concept institute energy The equivalent technologies means enough expected.

Claims (9)

1. steel pipe bundle automatic blending pipeline system, including frame, it is characterised in that: also wrap Include be successively set in frame defeated for the U-shaped steel pipe blanking that carries with support U-shaped steel pipe Send roller-way vertically arranged with U-shaped steel pipe blanking rollgang can 90 ° upset steel pipes join Material rotates rollgang and the main rollgang of steel pipe bundle material;Described steel pipe dispensing rotates defeated Send and arrange near U-shaped steel pipe blanking rollgang end parallel interval respectively above the both sides of roller-way Have some can the steel pipe collecting rollgang of automatic lifting, described steel pipe collecting rollgang One end be arranged on the side of described U-shaped steel pipe blanking rollgang;It is positioned at steel pipe dispensing The outside of the outermost steel pipe collecting rollgang rotating rollgang side is provided with square steel Tube material rollgang;Carry along steel pipe bundle material on the described main rollgang of steel pipe bundle material The both sides in direction are respectively arranged with steel pipe bundle assembly welding production line, and the steel pipe bundle assembly welding described in both sides is raw Feeding area and the discharging area of producing line are equipped with and the described main rollgang of steel pipe bundle material respectively Parallel charging roller and blanking roller-way;Described charging roller and described steel pipe bundle material master In frame between rollgang, parallel interval is provided with some steel pipe bundle material storage shelf, both sides Steel pipe bundle material storage shelf be oppositely arranged and be configured with moving direction and described steel pipe bundle The steel pipe bundle material shifting steel dolly that material conveying direction is perpendicular;Between the blanking roller-way of both sides It is arranged with some moving directions in frame in parallel to hang down mutually with described steel pipe bundle material conveying direction Straight for removing dolly to the steel pipe bundle component of later process conveying steel pipe bundle component, described Steel pipe bundle component removal dolly can two-way 90 ° of upsets;Divide on the correspondence position of described frame It is not provided with and moves for described steel pipe bundle material shifting steel dolly and steel pipe bundle component removal dolly Operation track.
2. steel pipe bundle automatic blending pipeline system as claimed in claim 1, its feature exists In: described U-shaped steel pipe blanking rollgang include being arranged in frame along U-shaped steel pipe Conveying direction arrange horizontal feed roller-way assembly, described horizontal feed roller-way assembly passes through Sprocket wheel is connected with motor-driven and forms the transfer passage of U-shaped steel pipe in the longitudinal direction.
3. steel pipe bundle automatic blending pipeline system as claimed in claim 2, its feature exists In: near one end of U-shaped steel pipe blanking rollgang on described steel pipe collecting rollgang It is provided with 180 ° of turning devices of U-shaped steel pipe;180 ° of turning device bags of described U-shaped steel pipe Include be arranged in frame for receive opening up U-shaped steel pipe the first stirring shift fork, For by the one 90 degree of turning arm of the first stirring shift fork 90-degree rotation counterclockwise, be used for receiving Second stirring shift fork of the U-shaped steel pipe on the first stirring shift fork, for by the second stirring shift fork Counterclockwise the 2nd 90 degree of turning arm of 90-degree rotation, the 2nd 90 degree of described turning arm makes the After two stirring shift fork 90-degree rotations counterclockwise, U-shaped steel pipe is opening down.
4. steel pipe bundle automatic blending pipeline system as claimed in claim 3, its feature exists In: it is provided with on described steel pipe collecting rollgang and can make its elevating mechanism moved up and down, The two ends of described steel pipe collecting rollgang are separately positioned on a support, on described support Offer the gathering sill moved up and down for steel pipe collecting rollgang.
5. steel pipe bundle automatic blending pipeline system as claimed in claim 4, its feature exists In: described steel pipe dispensing rotates rollgang and includes the roller-way on rack-mounted pedestal Framework, described roller-way framework is furnished with some dispensing rotating rollers along conveying direction parallel, The bottom of described roller-way framework is provided with gear driving pair, described gear driving pair and motor Transmission shaft driven connect realize steel pipe dispensing rotate rollgang 90 ° of upsets.
6. steel pipe bundle automatic blending pipeline system as claimed in claim 5, its feature exists In: in described steel pipe bundle material storage shelf, the one end near charging roller is provided with steel pipe bundle Material pushes the poking device of the feeding area of steel pipe bundle assembly welding production line.
7. steel pipe bundle automatic blending pipeline system as claimed in claim 6, its feature exists In: the head of described U-shaped steel pipe blanking rollgang and U-shaped steel pipe forming production line Afterbody is connected.
8. steel pipe bundle automatic blending pipeline system as claimed in claim 7, its feature exists In: also include controlling the electric automatic control mechanism that whole system is run.
9. steel pipe bundle automatic blending pipeline system as claimed in claim 8, its feature exists In: described steel pipe bundle component is spliced by the steel pipe that cross section is U-shaped, Mei Gegang Bottom the bending of the U-shaped that the opening part of the U-shaped of pipe splices previous steel pipe, end The opening part of the U-shaped of steel pipe splices the rectangular steel tube wide with the steel pipe of U-shaped.
CN201510105656.4A 2015-03-11 2015-03-11 Automatic-distributing conveyor line system for steel tube bundles Active CN104709656B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510105656.4A CN104709656B (en) 2015-03-11 2015-03-11 Automatic-distributing conveyor line system for steel tube bundles

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510105656.4A CN104709656B (en) 2015-03-11 2015-03-11 Automatic-distributing conveyor line system for steel tube bundles

Publications (2)

Publication Number Publication Date
CN104709656A CN104709656A (en) 2015-06-17
CN104709656B true CN104709656B (en) 2017-01-11

Family

ID=53409482

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510105656.4A Active CN104709656B (en) 2015-03-11 2015-03-11 Automatic-distributing conveyor line system for steel tube bundles

Country Status (1)

Country Link
CN (1) CN104709656B (en)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106783122B (en) * 2017-02-13 2018-06-29 盐城工学院 The case of transformer is along process equipment and the automatic processing system of transformer
CN107697702B (en) * 2017-10-30 2023-12-22 金华市胜昌科技股份有限公司 Paper core feeding device of rewinder
CN107717193B (en) * 2017-11-20 2022-12-02 无锡华联科技集团有限公司 Numerical control steel pipe bundle cutting machine
CN108820730B (en) * 2018-05-09 2020-03-17 佛山市法比澳挤压机械科技有限公司 Full-automatic aluminum product conveying system
CN114769970B (en) * 2022-05-25 2023-09-29 中国科学院合肥物质科学研究院 Automatic assembling mechanism of steel tube bundle welding system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2058362U (en) * 1989-03-10 1990-06-20 辽河石油勘探局淮建一公司 Mechanically-driven device for butt-welding of steel tube
CN101024229A (en) * 2006-02-20 2007-08-29 李铁铎 Continuous casting, continuous solling production method and apparatus for stainless steel seamless composite pipe
CN104325346A (en) * 2014-10-22 2015-02-04 浙江杭萧钢构股份有限公司 Directional transfer device for U-shaped steel tube
CN204568576U (en) * 2015-03-11 2015-08-19 杭萧钢构股份有限公司 Steel pipe bundle automatic blending travel line system

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS56161203A (en) * 1980-05-14 1981-12-11 Nagasaki Kiki Seisakusho:Kk Solid housing equipment
JPH09328205A (en) * 1996-06-12 1997-12-22 Nippon Yusoki Co Ltd Automated storage and retrieval system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2058362U (en) * 1989-03-10 1990-06-20 辽河石油勘探局淮建一公司 Mechanically-driven device for butt-welding of steel tube
CN101024229A (en) * 2006-02-20 2007-08-29 李铁铎 Continuous casting, continuous solling production method and apparatus for stainless steel seamless composite pipe
CN104325346A (en) * 2014-10-22 2015-02-04 浙江杭萧钢构股份有限公司 Directional transfer device for U-shaped steel tube
CN204568576U (en) * 2015-03-11 2015-08-19 杭萧钢构股份有限公司 Steel pipe bundle automatic blending travel line system

Also Published As

Publication number Publication date
CN104709656A (en) 2015-06-17

Similar Documents

Publication Publication Date Title
CN104709656B (en) Automatic-distributing conveyor line system for steel tube bundles
CN203936514U (en) Online docking reinforcing bar cage seam welding
CN103639252B (en) A kind of flexible full-automatic roll bending production line
CN105460623A (en) Automatic stacking conveying line
CN110480221A (en) A kind of longitudinal direction short muscle feeding cloth muscle devices and methods therefor when welded reinforcement mesh sheet
CN110405386B (en) Numerical control full-automatic welding machine for steel bar welding mesh
KR100978100B1 (en) Steel-frame automatic bending and transfer device
CN113000740B (en) Flexible steel bar net automatic production line and production method
CN105947541A (en) Pipe conveying device
CN105059960B (en) A kind of feed device
CN113492319A (en) Section steel automatic molding production line
CN204568576U (en) Steel pipe bundle automatic blending travel line system
CN104986491A (en) Magic cube multi-column vertical rotary cabinet
CN211589124U (en) Supporting roller frame for manifold welding system
CN107673066A (en) A kind of material bending preprocessing system
CN108941396A (en) A kind of production system of pipe pile reinforcing bar cage
CN206126052U (en) Transmission roll table synchronous lifting gear is repaiied to drilling tool car
CN110877206B (en) Reinforcing rib cold roll forming production line
CN205087532U (en) Long tube material sequencing feeder
CN217799425U (en) Automatic mantle fiber device of steel pipe
CN108941391A (en) A kind of bar cutting, conveying, pier nose all-in-one machine
CN209156990U (en) A kind of bar cutting, conveying, pier nose all-in-one machine
CN207827309U (en) A kind of stirring feed system with tracking traverse moving function
CN213387714U (en) Silo wears reinforcing bar and uses conveying rail set
CN104668586A (en) Novel automatic feeding device for numerically controlled lathe

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant