CN104695594B - Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete - Google Patents

Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete Download PDF

Info

Publication number
CN104695594B
CN104695594B CN201510090061.6A CN201510090061A CN104695594B CN 104695594 B CN104695594 B CN 104695594B CN 201510090061 A CN201510090061 A CN 201510090061A CN 104695594 B CN104695594 B CN 104695594B
Authority
CN
China
Prior art keywords
shear wall
wall
tough
concrete
ultra
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510090061.6A
Other languages
Chinese (zh)
Other versions
CN104695594A (en
Inventor
章红梅
吕西林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tongji University
Original Assignee
Tongji University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tongji University filed Critical Tongji University
Priority to CN201510090061.6A priority Critical patent/CN104695594B/en
Publication of CN104695594A publication Critical patent/CN104695594A/en
Application granted granted Critical
Publication of CN104695594B publication Critical patent/CN104695594B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Bearing And Curtain Walls (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The invention relates to a superimposed shear wall based on semi-prefabricated super-tough reinforced concrete. The superimposed shear wall comprises a core wall and edge components of shear walls, wherein the core wall is formed by performing on-site pouring on common concrete; the edge components of shear walls are formed by prefabricating super-tough concrete and are arranged on both edges of the core wall, the upper ends and the lower ends of the edge components are connected through connectors to improve the tensile property and the anti-cracking property of edges and corners of the superimposed shear wall and improve the deforming capability of the superimposed shear wall. Compared with the prior art, the superimposed shear wall disclosed by the invention has the advantages that the core wall of the main body is formed by performing on-site pouring on common concrete, and both edges of the core wall are formed by prefabricating super-tough concrete, so that the toughness and the tensile property of the edges and the corners of the shear wall can be greatly improved; under the effects of horizontal external force of wind and earthquake, the superimposed shear wall disclosed by the invention greatly reduces the possibility of cracks, the degree of the damage to edges can be greatly reduced, and the possibility that buildings can be used without repair or with minor repair under the effects of strong wind and strong shock is increased.

Description

A kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete
Technical field
The present invention relates to a kind of shear wall, cut more particularly, to a kind of overlapping for being based on half prefabricated ultra-tough armored concrete Power wall.
Background technology
China is many earthquake countries, and bulk of property loss and life security are both from the failure of structure.Shear wall It is a kind of good anti-seismic structure component, good antidetonation effect can be played in building structure particularly high-level structure.Example As the A of Chinese patent CN 104018599 disclose a kind of shear wall structure, including side plate, side plate interior sides are provided with end shear wall, End shear wall side is provided with shear wall between seam, is connected by connecting tube between shear wall between side plate, end shear wall and seam, and Connecting tube one end extends in side plate outside, and one end that connecting tube is located on the outside of side plate is provided with pipe clamp, pipe clamp be used for by side plate, Shear wall is fixed between end shear wall and seam, and shear wall outside is provided with reinforcing plate, shear wall between reinforcing plate and seam between seam Between be fixedly connected by built-in screw, steel plate for sealing water, steel plate for sealing water more than one are provided with side plate, and steel plate for sealing water bottom is equal Ribbed stiffener is transversely provided with, sealing gasket is connected between ribbed stiffener and steel plate for sealing water bottom.But, the corner of the shear wall structure exists Earthquake is usually damaged when occurring by unrepairable, even if house does not collapse in earthquake, but but causes that structure cannot Repair and produce huge property loss.
And for example the A of Chinese patent CN 103452235 disclose a kind of precast shear wall wallboard and shear wall and shear wall Construction method.Precast shear wall wallboard, wallboard includes two panels;The inner surface of every piece of panel is provided with multiple grooves, every piece Panel upper and lower ends face is provided with multiple slots;Extend transversely through muscle two ends and protrude two side elevations, and extend transversely through muscle through groove; Upper and lower ends face is protruded longitudinally through muscle two ends, and slot is passed through longitudinally through muscle.Precast shear wall, the level side of shear wall Multiple wallboards are respectively provided with to vertical direction.The construction method of precast shear wall, comprises the following steps:Live unwrapping wire, installation is faced When fixed mount;Lifting wallboard in place, is connected with temporary fixing rack;Prefabricated upper strata floor is in place;Lay dark beam steel And each additional muscle, lay pipeline;Pour high-flowing concrete;Into next layer of installation.Most current reinforced concrete Native shear wall needs colligation at the scene, live formwork, and then disturbing concrete conserves shaping, the more difficult control of construction quality, due to Assembling reinforcement and the quality of disturbing concrete and the qualification of construction worker and the degree of understanding to drawing are closely related, if The mobility of workman is too big, and training degree not enough, drives plan, and construction material is unqualified, and the factor such as construction bad weather can all be led The anti-seismic performance of the shearing wall member that cause finally gives is had a greatly reduced quality.If but all again with prefabricated mode itself and basic foundation Combination force intensity it is unreliable, and high cost.
Furthermore, although normal concrete has compression strength higher but its tensile strength is smaller, in horizontal force action Easy tensile failure, general reinforced concrete shear wall bearing horizontal loading, such as earthquake load and during high wind load, its side The easy tensile failure of edge concrete, after producing direct tension cracking, its edge member angle effect region when pressure is born just more It is easy to be pressurized and peels off.So, suffering certain horizontal force --- when earthquake or high wind are acted on, conventional steel bar concrete shear wall Easily in edge corner failure damage.Although the destruction may not cause integrally-built failure, its edge concrete Peel off, Bar Buckling can cause the difficulty for being difficult to repair, and what is brought therewith is probably integrally-built cannot reparation so that abandoning Even need labor intensive material resources to remove to rebuild.
Although also having some preferable concrete of tension effect now, the cost of these concrete is often higher, if It is in the building course of building, all using the concrete that these tension effects are good, often to cause that construction cost is too high.
The content of the invention
The purpose of the present invention is exactly to provide a kind of prefabricated super based on half for the defect for overcoming above-mentioned prior art to exist The overlapped shear wall of toughness armored concrete.
The purpose of the present invention can be achieved through the following technical solutions:
A kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete, including:
Core wall, is formed by normal concrete is cast-in-place;
Also include:
Shear wall edge member, is formed by ultra-tough is concrete prefabricated, located at core wall both sides, for improving overlapping shearing The tensile property of wall edge.
The side of core wall two is equipped with buckling parts, and an at least side of the shear wall edge member is provided with fastening and matches somebody with somebody Conjunction portion, buckling parts and fasten and coordinate portion snapping.
The fasten and coordinate portion is by the fasten and coordinate portion of wharf's pavement quality.
The shear wall edge member includes ultra-tough concrete wall and is embedded in ultra-tough concrete wall for branch Support the second steel bar framework of ultra-tough concrete wall, second steel bar framework include many vertical muscle of second for be arrangeding in parallel and Stirrup for tying up the second vertical muscle.
One end of the shear wall edge member is provided with the connector for connecting another shear wall edge member, up and down Two shear wall edge members are connected by connector.
The connector is the steel bushing being connected with one end of the second vertical muscle, and the other end of the second vertical muscle protrudes from shear wall The ultra-tough concrete wall end face of edge member, and connect the steel bushing on adjacent shear wall edge member.
The steel bushing is provided with grout hole, and steel bushing two ends connect the second of upper and lower two shear wall edge members respectively After vertical muscle, from grout hole to the slurries poured into steel bushing for bonding steel bushing and the second vertical muscle.
The connector is located at the bottom of shear wall edge member.
The core wall includes normal concrete wall and is embedded in normal concrete wall for supporting common coagulation wall First steel bar framework of body, first steel bar framework includes many vertical muscle of first for be arrangeding in parallel and for tying up the first vertical muscle Stirrup.
One end of described first vertical muscle protrudes from the end face of the normal concrete wall of core wall, and with adjacent core wall in The first vertical muscle colligation connection.
Compared with prior art, the present invention has advantages below:
1) it is of the invention in the case where the core wall of main body is formed using normal concrete cast in situs, on core wall both sides Formed using by ultra-tough is concrete prefabricated, toughness and tensile property of the shear wall in edge can be greatly improved, wind, Under the effect of the horizontal externals such as earthquake, the possibility for producing slight crack is substantially reduced using shear wall of the invention, and can be significantly Reduce its edge damage degree, increase building is not repaiied under high wind, severe earthquake action or light maintenance can recover the possibility that uses; Simultaneously compared to whole shear wall all by the way of ultra-tough concrete is made, cost, furthermore because processing can be greatly reduced Difficulty is larger, and the shear wall edge member for playing a crucial role is by the way of prefabrication, can cause shear wall edge structure Part quality can effectively be guaranteed, and prevent to lack muscle or wrong cloth muscle and the uncompacted phenomenon of concrete, and site operation is made Industry amount is small, and construction speed is fast, can improve integrated engineering scheduling.
2) buckling parts and fasten and coordinate portion can make the engagement of core wall and shear wall edge member become easy, and simplification is applied Work.
3) buckling parts and fasten and coordinate portion can improve the bonding force of core wall and shear wall all by wharf's pavement quality.
4) the second steel bar framework can play a supporting role to ultra-tough concrete wall, further improve shear wall edge The intensity of component.
5) one end of shear wall edge member is provided with the connector for connecting another shear wall edge member, upper and lower two Individual shear wall edge member can make prefabricated shear wall edge member construct at the scene assembling by way of connector is connected Shi Gengjia is convenient.
6) connector is steel bushing, and upper and lower two shear wall edges structure is connected using the mode for connecting the upper and lower second vertical muscle Part can be with streamline operation, while simplifying structure.
7) after steel bushing two ends connect the second vertical muscle of upper and lower two shear wall edge members respectively, from grout hole to steel bushing The slurries for bonding steel bushing and the second vertical muscle are poured into cylinder, the link that can improve upper and lower two shear wall edge members is strong Degree.
8) connector so in construction, can easily carry out whole building located at the bottom of shear wall edge member Construction from the bottom up.
9) end face of the normal concrete wall that one end of the first vertical muscle protrudes from core wall can easily carry out colligation Processed with bar splicing.
Brief description of the drawings
Fig. 1 is the structural representation of the embodiment of the present invention one;
Fig. 2 is the positive structure schematic of the embodiment of the present invention two;
Fig. 3 is the side structure schematic diagram of the embodiment of the present invention two;
Fig. 4 is the decomposition texture schematic diagram of the embodiment of the present invention two;
Fig. 5 is the attachment structure schematic diagram of steel bushing and the second vertical muscle;
Wherein:1st, core wall, the 2, shear wall edge member, 11, first vertical muscle, 12, normal concrete wall, 13, stirrup, 14th, the first vertical muscle strap-on structure, the 21, second vertical muscle, 22, steel bushing, 23, stirrup, 24, ultra-tough concrete wall, 221, fill Slurry hole.
Specific embodiment
The present invention is described in detail with specific embodiment below in conjunction with the accompanying drawings.The present embodiment is with technical solution of the present invention Premised on implemented, give detailed implementation method and specific operating process, but protection scope of the present invention is not limited to Following embodiments.
Embodiment one:
A kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete, as shown in figure 1, including by normal concrete Cast-in-place core wall 1 and by the concrete prefabricated shear wall edge member 2 of ultra-tough, shear wall edge member 2 Located at the both sides of core wall 1, the tensile property for improving overlapped shear wall edge.
Above-mentioned normal concrete can be common concrete C30~C60, but not limited to this, and general composition is:Water Mud, aggregate, water, additive.
1 liang of side of core wall is equipped with buckling parts, and an at least side of shear wall edge member 2 is provided with fasten and coordinate portion, Buckling parts and fasten and coordinate portion snapping.
Shear wall can simultaneously undertake effect that is curved, cutting, turn round, be a kind of good structure lateral resistant member.Profit of the invention Tensile strength with ultra-tough concrete is high, the characteristics of add prefabricated components controllable quality, with reference to core cast-in-place shear wall, can hold Load horizontal side force higher and more preferable deformation performance, as the structural elements that anti-seismic performance is excellent, can be widely applied to resist Shake and multilayer, the high-level structure construction of non-Anti-Seismic Region.
Concrete is a kind of with advantages of higher compressive strength, but the relatively low construction material of tensile strength.Reinforced concrete member If bearing certain moment of flexure to be easy for producing direct tension cracking, once crack occurs, if being subject to load action again, will be existing Bigger destruction is produced at crack.Ultra-tough concrete is a kind of concrete material that fiber and additive are added in concrete Material, contains composition:Cement, aggregate, water, fiber, additive, fiber therein can be steel fibre or carbon fiber or polyvinyl alcohol Deng while having resistance to compression and tensile strength higher, deformability is stronger than normal concrete.Using ultra-tough concrete for making Reinforced concrete member has ductility and deformability higher, can effectively reduce the possibility of component damage.
Shear wall edge member 2 is quality controllable due to being prefabricated in the factory, can effectively reduce site operation man-hour and noise, Dust etc. pollutes, with good replicability.The concrete prefabricated shear wall edge member 2 of ultra-tough of the invention, the shearing Wall edge member 2 and the junction wharf's pavement quality of cast-in-situ steel reinforced concrete core wall 1, it is and rear using fasten and coordinate portion wedge-shaped impression Boss shape buckling parts form fit in phase cast-in-place concrete, can strengthen Mechanics Performance of Adherence of New, and ensure good flatness.
On certain buckling parts and fasten and coordinate portion concrete implementation mode can also buckling parts be wedge-shaped impression, fasten and coordinate Portion is the boss with wedge-shaped impression form fit, and by wharf's pavement quality, when core wall 1 is poured, buckling parts is molded in fasten and coordinate portion During can be fitted at automatic and fasten and coordinate portion plucking, enhancing strength of connection.
Embodiment two:
Do not described with the something in common in embodiment one in the present embodiment, only describing difference.
Significant difference of the present embodiment compared with embodiment one is as shown in Figures 2 to 4, to be cut in the present embodiment Power wall edge member 2 includes ultra-tough concrete wall 24 and is embedded in ultra-tough concrete wall 24 for supporting ultra-tough to mix Second steel bar framework of solidifying cob wall body 24, second steel bar framework includes many vertical muscle 21 of second for be arrangeding in parallel and for tying Prick the stirrup 23 of the second vertical muscle 21.
One end of shear wall edge member 2 is provided with the connector for connecting another shear wall edge member 2, upper and lower two Individual shear wall edge member 2 is connected by connector.
Connector is the steel bushing 22 being connected with one end of the second vertical muscle 21, and the other end of the second vertical muscle 21 protrudes from shearing The end face of ultra-tough concrete wall 24 of wall edge member 2, and connect the steel bushing 22 on adjacent shear wall edge member 2.
When assembling at the scene, the vertical muscle 21 of shear wall edge member 2 second is protruded from into the end face of ultra-tough concrete wall 24 Length is blocked as required for part, be inserted in the steel bushing 22 of shear wall edge member 2 above, positioning is installed.
As shown in figure 5, steel bushing 22 is provided with grout hole 221, the two ends of steel bushing 22 connect upper and lower two shear walls respectively After second vertical muscle 21 of edge member 2, from grout hole 221 to being poured into steel bushing 22 for bonding the vertical muscle of steel bushing 22 and second 21 slurries.
Meanwhile, for easy construction, connector is located at the bottom of shear wall edge member 2.
Core wall 1 includes normal concrete wall 12 and is embedded in normal concrete wall 12 for supporting common coagulation wall First steel bar framework of body, first steel bar framework includes many vertical muscle 11 of first for be arrangeding in parallel and is indulged for tying up first The stirrup 13 of muscle 11.
One end of first vertical muscle 11 protrudes from the end face of the normal concrete wall 12 of core wall 1, and with adjacent core wall 1 In the first vertical colligation of muscle 11 connection.
The shear wall both sides shear wall edge member 2 is concrete prefabricated using superhigh tenacity, and assembling in place, dress at the scene With completing to be molded form removal in the cage both sides formwork casting concrete of the second vertical muscle 21, as half precast shear wall.Its core wall 1 is still adopted Muscle 11 is indulged with conventional method colligation first, formwork maintenance, the first vertical top of muscle 11 protrudes from the normal concrete wall of core wall 1 12 end face, overlaps with upper strata shear force wall reinforcing steel bar according to code requirement.Core wall 1 can reduce construction cost using cast-in-place, together When due to the bearing load of core wall 1 it is relatively small, general ordinary reinforced concrete can ensure build require.
Embodiment three:
Connected mode can also connect prefabricated components node to this patent using other effective means herein.
No longer described with the something in common in embodiment two in the present embodiment, only describe difference.
Connector is not steel bushing 22 during significant difference of the present embodiment compared with embodiment two is the present embodiment, And use other effective means to connect prefabricated two shear wall edge members 2 up and down, for example with preformed hole slurry anchor connection side Formula, in the upper end preformed hole of shear wall edge member 2, upper end reserved steel bar realizes that upper and lower two are cut by injecting slurry anchor mortar The connection of power wall edge member.

Claims (8)

1. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete, including:
Core wall (1), is formed by normal concrete is cast-in-place;
Characterized in that, also including:
Shear wall edge member (2), is formed by ultra-tough is concrete prefabricated, located at core wall (1) both sides, is cut for improving overlapping The tensile property of power wall edge;
The side of the core wall (1) two is equipped with buckling parts, and an at least side of the shear wall edge member (2) is provided with fastening Auxiliary section, buckling parts and fasten and coordinate portion snapping;
The shear wall edge member (2) is including ultra-tough concrete wall (24) and is embedded in ultra-tough concrete wall (24) The second steel bar framework for supporting ultra-tough concrete wall (24), second steel bar framework includes many for be arrangeding in parallel Two vertical muscle (21) and the stirrup (23) for tying up the second vertical muscle (21).
2. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete according to claim 1, its feature exists In the fasten and coordinate portion is by the fasten and coordinate portion of wharf's pavement quality.
3. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete according to claim 1, its feature exists In, one end of the shear wall edge member (2) is provided with the connector for connecting another shear wall edge member (2), on Lower two shear wall edge members (2) are connected by connector.
4. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete according to claim 3, its feature exists In the connector is the steel bushing (22) being connected with one end of the second vertical muscle (21), and the other end of the second vertical muscle (21) is protruded In ultra-tough concrete wall (24) end face of shear wall edge member (2), and connect on adjacent shear wall edge member (2) Steel bushing (22).
5. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete according to claim 4, its feature exists In the steel bushing (22) is provided with grout hole (221), and steel bushing (22) two ends connect upper and lower two shear wall edges structure respectively After the vertical muscle (21) of the second of part (2), poured into for bonding steel bushing (22) and second to steel bushing (22) is interior from grout hole (221) The slurries of vertical muscle (21).
6. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete according to claim 3, its feature exists In the connector is located at the bottom of shear wall edge member (2).
7. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete according to claim 1, its feature exists It is common for supporting including normal concrete wall (12) and in being embedded in normal concrete wall (12) in, the core wall (1) First steel bar framework of coagulation wall, first steel bar framework includes many vertical muscle (11) of first for be arrangeding in parallel and for tying Prick the stirrup (13) of the first vertical muscle (11).
8. a kind of overlapped shear wall for being based on half prefabricated ultra-tough armored concrete according to claim 7, its feature exists Protrude from the end face of the normal concrete wall (12) of core wall (1) in, one end of the described first vertical muscle (11), and with adjacent core First vertical muscle (11) colligation connection in core-wall (1).
CN201510090061.6A 2015-02-27 2015-02-27 Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete Active CN104695594B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510090061.6A CN104695594B (en) 2015-02-27 2015-02-27 Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510090061.6A CN104695594B (en) 2015-02-27 2015-02-27 Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete

Publications (2)

Publication Number Publication Date
CN104695594A CN104695594A (en) 2015-06-10
CN104695594B true CN104695594B (en) 2017-05-24

Family

ID=53343105

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510090061.6A Active CN104695594B (en) 2015-02-27 2015-02-27 Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete

Country Status (1)

Country Link
CN (1) CN104695594B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107035005A (en) * 2017-04-19 2017-08-11 中建四局第三建筑工程有限公司 A kind of superimposed sheet plate stitch construction treating methods and its structure

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2006063733A (en) * 2004-08-30 2006-03-09 Mitsui Home Co Ltd Bearing wall of high magnification
CN1246547C (en) * 2004-11-19 2006-03-22 清华大学 Buckling and energy consumption preventing steel plate shear wall
CN201212191Y (en) * 2008-05-19 2009-03-25 润弘精密工程事业股份有限公司 Connecting structure of precast shear wall
CN102747796A (en) * 2012-07-12 2012-10-24 南京工业大学 Precast wall casing structure of reinforced concrete superposed shear wall and splicing method thereof
CN202787577U (en) * 2012-07-12 2013-03-13 南京工业大学 Prefabricating wall outer shell structure of reinforced concrete superimposition shear wall
CN204590336U (en) * 2015-02-27 2015-08-26 同济大学 A kind of overlapped shear wall based on half prefabricated ultra-tough steel concrete

Also Published As

Publication number Publication date
CN104695594A (en) 2015-06-10

Similar Documents

Publication Publication Date Title
CN104878948B (en) A kind of reinforcement means of rc-frame-beam hogging moment area
CN101408039A (en) Bamboo-wood mixed structure of house architecture
CN208441231U (en) A kind of beam column built from concrete dry method connecting node
CN101608480A (en) Precast concrete short-limb shear wall provided and the preparation method of band door and window
CN112575886A (en) Low-level and multi-level fully-prefabricated assembled concrete structure and design, production and installation method
CN109914589B (en) Vertical connecting structure of prestressed reinforced concrete precast column and construction method thereof
CN201202181Y (en) Connection structure for precast concrete board and beam and construction including the same
CN110644662A (en) Prefabricated flat slab composite slab based on stress and splitting method thereof
CN117587923A (en) Dry connection frame node structure and construction method thereof
CN104695594B (en) Superimposed shear wall based on semi-prefabricated super-tough reinforced concrete
CN204590336U (en) A kind of overlapped shear wall based on half prefabricated ultra-tough steel concrete
CN209874048U (en) Vertical connection structure of prestressed reinforced concrete prefabricated column
CN107035027A (en) A kind of assembled steel reinforced concrete structure light wt compound external wall panel
CN108360690B (en) Column cap connection reinforced beam slab structure
CN101581113B (en) Connecting structure for precast concrete board and beam, construction method and building
CN108560585B (en) Basement outer wall full assembly structure and construction method thereof
KR100860592B1 (en) Temporary system for vertical structure using precast concreat block
CN114635503A (en) Fair-faced concrete wall flexibly connected with concrete frame column and construction method
CN113374171A (en) Recycled block concrete prefabricated assembled ring beam structure and construction method thereof
CN101059009B (en) Reinforced concrete precast plate
CN205857403U (en) Building wall board connects and piece structure
CN215166455U (en) Low, multi-layer fully prefabricated assembled concrete structure
CN217871125U (en) Be used for cast-in-place post connected node structure of prefabricated side fascia and corner
CN212506886U (en) I-shaped precast concrete wall connection structure
CN215053984U (en) Connecting assembly of prefabricated parts and connecting node of prefabricated parts

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant