CN104690467A - Application method of positioning fixture in steel-clad column construction process - Google Patents
Application method of positioning fixture in steel-clad column construction process Download PDFInfo
- Publication number
- CN104690467A CN104690467A CN201410745139.9A CN201410745139A CN104690467A CN 104690467 A CN104690467 A CN 104690467A CN 201410745139 A CN201410745139 A CN 201410745139A CN 104690467 A CN104690467 A CN 104690467A
- Authority
- CN
- China
- Prior art keywords
- batten plate
- fixture
- positioning
- positioning fixture
- steel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23K—SOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
- B23K37/00—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups
- B23K37/04—Auxiliary devices or processes, not specially adapted to a procedure covered by only one of the preceding main groups for holding or positioning work
- B23K37/0426—Fixtures for other work
- B23K37/0435—Clamps
Abstract
The invention discloses an application method of a positioning fixture in a steel-clad column construction process. A to-be-fixed batten plate is used; the fixture comprises stand columns, positioning and clamping grooves, horizontal tightening hoops and stiffening bolts, wherein the stand columns are mounted in the middles of the periphery of the batten plate; the positioning and clamping grooves are formed in the matching positions of the front sides of the stand columns and the batten plate; the horizontal tightening hoops are mounted on the outer sides of the stand columns; four ends of each horizontal tightening hoop are fixed by the tightening bolts; the batten plate is welded after fixed by the fixture. According to the application method of the positioning fixture in the steel-clad column construction process, the batten plate is positioned through the clamping grooves, and the horizontal tightening hoops are used for tightening; accurate positioning is realized, and the operation space is enlarged; welding is facilitated, and the welding quality is guaranteed; the positioning fixture can be repeatedly used, and the welding construction speed is increased.
Description
Technical field
The present invention relates to the temporary fixed technology of batten plate in a kind of coupled columns Baogang construction steel frame welding process, be specifically related to the application process of a kind of positioning fixture in post Baogang work progress.
Background technology
In post Baogang construction steel frame welding process, to batten plate location, the main method adopting an artificial manual positioning at present.The method construction workload is large, and limits by on-the-spot site condition, time-consumingly takes a lot of work, and not easily ensures due to the limited welding quality in operating space.
Summary of the invention
(1) technical problem that will solve
For solving the problem, the present invention proposes the application process of a kind of positioning fixture in post Baogang work progress, positioning rear welding by fixture, can increase work efficiency and welding quality.
(2) technical scheme
The application process of positioning fixture of the present invention in post Baogang work progress, comprises batten plate to be fixed; Fixture is made up of column, locating groove, horizontal lock ring and bolt of putting more energy into; Described column is installed in the middle part of batten plate surrounding; Described locating groove be installed on front side of column with batten plate cooperation place; Described horizontal lock ring is installed on outside column; Described horizontal lock ring four end is fixed by bolt of putting more energy into; Described batten plate welds after fixture is fixing.
(3) beneficial effect
Compared with prior art, it has following beneficial effect in the present invention: the application process of positioning fixture of the present invention in post Baogang work progress, is positioned batten plate by draw-in groove; Horizontal lock ring steps up; Solve accurate positioning, and improve operating space; Be beneficial to welding, ensure welding quality; Reusable, accelerate welding procedure speed.
Accompanying drawing explanation
Fig. 1 is structural representation of the present invention.
Detailed description of the invention
Embodiment 1:
As shown in Figure 1, the application process of positioning fixture of the present invention in post Baogang work progress, comprises batten plate to be fixed; It is characterized in that: fixture is made up of column 2, locating groove 1, horizontal lock ring 3 and bolt 4 of putting more energy into; Described column 2 is installed in the middle part of batten plate surrounding; Described locating groove 1 be installed on front side of column 2 with batten plate cooperation place; Described horizontal lock ring 3 is installed on outside column 2; Described horizontal lock ring 3 four end is fixed by bolt 4 of putting more energy into; Described batten plate welds after fixture is fixing.
Embodiment recited above is only be described the preferred embodiment of the present invention, not limits the spirit and scope of the present invention.Under the prerequisite not departing from design concept of the present invention; the various modification that this area ordinary person makes technical scheme of the present invention and improvement; all should drop into protection scope of the present invention, the technology contents of request protection of the present invention, all records in detail in the claims.
Claims (2)
1. the application process of positioning fixture in post Baogang work progress, comprises batten plate to be fixed; It is characterized in that: fixture is made up of column, locating groove, horizontal lock ring and bolt of putting more energy into; Described column is installed in the middle part of batten plate surrounding; Described locating groove be installed on front side of column with batten plate cooperation place; Described horizontal lock ring is installed on outside column; Described horizontal lock ring four end is fixed by bolt of putting more energy into.
2. the application process of positioning fixture according to claim 1 in post Baogang work progress, is characterized in that: described batten plate welds after fixture is fixing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410745139.9A CN104690467A (en) | 2014-12-05 | 2014-12-05 | Application method of positioning fixture in steel-clad column construction process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410745139.9A CN104690467A (en) | 2014-12-05 | 2014-12-05 | Application method of positioning fixture in steel-clad column construction process |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104690467A true CN104690467A (en) | 2015-06-10 |
Family
ID=53338220
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410745139.9A Pending CN104690467A (en) | 2014-12-05 | 2014-12-05 | Application method of positioning fixture in steel-clad column construction process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104690467A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2701977Y (en) * | 2004-07-15 | 2005-05-25 | 北京建工一建工程建设有限公司 | Size adjustable column hoop |
JP2008019576A (en) * | 2006-07-11 | 2008-01-31 | Fujita Corp | Reinforcing method for steel structure |
CN202767549U (en) * | 2012-09-18 | 2013-03-06 | 中铁十局集团建筑工程有限公司 | Angle steel encased reinforced perfusion glue device |
CN103061502A (en) * | 2012-12-30 | 2013-04-24 | 河北建设集团有限公司 | Tool type square steel tube fastener and construction method |
CN202969976U (en) * | 2012-10-12 | 2013-06-05 | 南京固强建筑技术有限公司 | Reinforcing structure for frame columns at deformation joint |
CN203347257U (en) * | 2013-05-13 | 2013-12-18 | 宁波大学 | Anti-seismic reinforcement device for steel reinforced concrete column after fire |
CN103696582A (en) * | 2012-09-27 | 2014-04-02 | 贵阳铝镁设计研究院有限公司 | Method and structure for improving rigidity of reinforced concrete beam |
-
2014
- 2014-12-05 CN CN201410745139.9A patent/CN104690467A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN2701977Y (en) * | 2004-07-15 | 2005-05-25 | 北京建工一建工程建设有限公司 | Size adjustable column hoop |
JP2008019576A (en) * | 2006-07-11 | 2008-01-31 | Fujita Corp | Reinforcing method for steel structure |
CN202767549U (en) * | 2012-09-18 | 2013-03-06 | 中铁十局集团建筑工程有限公司 | Angle steel encased reinforced perfusion glue device |
CN103696582A (en) * | 2012-09-27 | 2014-04-02 | 贵阳铝镁设计研究院有限公司 | Method and structure for improving rigidity of reinforced concrete beam |
CN202969976U (en) * | 2012-10-12 | 2013-06-05 | 南京固强建筑技术有限公司 | Reinforcing structure for frame columns at deformation joint |
CN103061502A (en) * | 2012-12-30 | 2013-04-24 | 河北建设集团有限公司 | Tool type square steel tube fastener and construction method |
CN203347257U (en) * | 2013-05-13 | 2013-12-18 | 宁波大学 | Anti-seismic reinforcement device for steel reinforced concrete column after fire |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103015537B (en) | Beam-column joint connecting device of assembled steel structure system | |
CN104690467A (en) | Application method of positioning fixture in steel-clad column construction process | |
CN104607683A (en) | Cylindrical gear turning fixture | |
CN106078063B (en) | For electrolytic cell cathode steel bar and the welding tool setup of explosion block | |
CN204471583U (en) | The stretch-draw tool of a kind of prestressed concrete pipe pile single pile one end end-plate-free | |
CN203887445U (en) | Giant-tower segmented assembling jig frame | |
CN203156280U (en) | Welding device for front top support of dumper | |
CN203767024U (en) | Simple manhole guardrail | |
CN103967042A (en) | Mounting correction tool for protection corner angle of frame column and manufacturing method thereof | |
CN202831658U (en) | Butt joint positioning device of aerial hoisting steel beams | |
CN102704696B (en) | Space locator for high, big and heavy steel upright column | |
CN203684703U (en) | Assembly jig frame for main truss spare parts of large-span steel structure roof cover | |
CN205742554U (en) | A kind of steel column and the Mixed Architecture of beams of concrete | |
CN104014960A (en) | Engine platform support welding locating device | |
CN203701702U (en) | Splicing type dustproof shed | |
CN203738284U (en) | Welding clamp | |
CN203343669U (en) | Motor base protective cover positioning welded block general welding tyre | |
CN203175387U (en) | Quick installation vertical ladder for steel plate silo wall | |
CN203684672U (en) | Column template clamp | |
CN206066280U (en) | A kind of deep well pump dismounts fixture | |
CN203918994U (en) | People's air defense doorframe producing device | |
CN104368930A (en) | Welding clamping base | |
CN104368958A (en) | Photovoltaic module dismantling clamp | |
CN202180317U (en) | Welding fixture for front part of motorcycle frame | |
CN204001195U (en) | Steel work module |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C02 | Deemed withdrawal of patent application after publication (patent law 2001) | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150610 |