Prior art keywords
power
load
electric power
power supply
cutting method
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510136905.6A
Other languages
Chinese (zh)
Other versions
CN104682398A (en
Inventor
张胜飞
王强
郭力
余熙
王劲
李嘉逸
夏雪
孙建伟
余舟子
肖汉
郑勇
付浩
陈卓
黄晓明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Original Assignee
Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group filed Critical Southwest Electric Power Design Institute Co Ltd of China Power Engineering Consulting Group
Priority to CN201510136905.6A priority Critical patent/CN104682398B/en
Publication of CN104682398A publication Critical patent/CN104682398A/en
Application granted granted Critical
Publication of CN104682398B publication Critical patent/CN104682398B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • Y02B70/3225Demand response systems, e.g. load shedding, peak shaving
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/222Demand response systems, e.g. load shedding, peak shaving

Abstract

The invention provides a kind of independent micro-grid electric power system power supply reliability load cutting method.Independent microgrid system is divided into different feeder zone;Master control power supply uses concentrates access way, is connected from different feeder zone through transformer;Independent microgrid system also include renewable energy power generation machine and or energy storage device, be arranged on high voltage side of transformer be connected bus on or be arranged on inside feeder zone;Determine the interruptible load in independent micro-grid electric power system, and from small to large and or cut down table according to significance level sequential build load from lightweight to heavyweight according to burden with power amount.In the case of regenerative resource has randomness, intermittent feature, in independent microgrid system planning and designing, regenerative resource can be made full use of, ensure that the power supply reliability of system simultaneously.

Description

A kind of independent micro-grid electric power system power supply reliability load cutting method
Technical field
The present invention relates to a kind of independent micro-grid electric power system power supply reliability load cutting method, particularly relate to A kind of independent microgrid system being applicable to based on trend balances can be powered by property load cutting method.
Background technology
Along with the continuous growth of energy demand, greenhouse effects are further obvious, and utilize wind energy, solar energy etc. can Renewable source of energy generation technology rapidly becomes the current reply energy and the important means of environmental crisis.Independent micro-grid system Polytype distributed generation unit can be combined by system, effectively realizes various energy resources complementary, improves The energy utilization rate of whole system and power supply reliability.In remote and Island, independent microgrid system is to solve Certainly one of effective means of its powerup issue.
Regenerative resource often has randomness, intermittent feature.In independent microgrid system planning and designing In, while making full use of regenerative resource, how to ensure that the power supply reliability of system is the pass needing to pay close attention to One of key problem.
But, the reliability of current independent microgrid system is basic only around the generating in autonomous system-negative in powering Lotus capacitance balance carries out the method for supplying power to after reliability assessment, it is impossible to meet the planning and designing need of independent micro-grid Ask.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of power supply reliability more preferable independent micro-grid electric power system Power supply reliability load cutting method.
Along with the increase of independent microgrid system scale, it should also be taken into account that the shadow of grid structure in reliability assessment Ring, in existing independent microgrid system Reliability Evaluation, do not consider the impact that equipment fault brings, Owing to grid structure is complicated, load bus is more, middle pressure independent microgrid system is structurally closer to containing distribution The distribution system of formula power supply.But except for the difference that, the distribution system containing distributed power source is incorporated into the power networks for a long time, and Independent microgrid system is in off-network state the most all the time, needs the power supply fully relying in microgrid to realize electric power and puts down Weighing apparatus.The voltage problem that this feature determines middle pressure independent microgrid system is more prominent than distribution system, due to In distribution line higher resistive, therefore voltage is simultaneously by active balance and the double influence of reactive balance.And In this, existing method the most only considers intrasystem active balance, have ignored in system reactive balance and Its voltage problem brought.
The technical solution used in the present invention is as follows: a kind of independent micro-grid electric power system power supply reliability load is cut Subtract method, it is characterised in that independent microgrid system is divided into different feeder zone;Master control power supply uses Concentrate access way, be connected from different feeder zone through transformer;Independent microgrid system also includes renewable Energy generator and or energy storage device, be arranged on high voltage side of transformer be connected bus on or be arranged on feeder line district Inside territory;Determine the interruptible load in independent micro-grid electric power system, and according to burden with power amount from small to large With or cut down table according to significance level sequential build load from lightweight to heavyweight.
As preferably, when energy storage device is as master control power supply, if there is power shortage, opening one and awaiting orders The non-renewable energy resources generator of state makes up this vacancy;When non-renewable energy resources generator is as master control electricity During source, if there is power shortage, preferentially call meritorious, the reactive energy of energy storage device to make up this vacancy, When energy storage device is sufficient to compensate for vacancy, reselection opens the non-renewable energy resources generating of an armed state Machine makes up this vacancy;If in system, all power supplys have been in full hair-like state the most, but still suffer from power shortage, Now need to call load cutting method.
As preferably, described load cutting method also includes, when carrying out load and cutting down, cuts with described load Subtracting table is foundation, and the most meritorious and load or burden without work of excision interruptible load point, excises each time Meritorious total load and idle total load to current system are updated afterwards, rejudge master control source nominal and hold Whether amount can meet the system total load after renewal, then can cut down termination, system resumes power, record by load The excision total amount of lower interruptible load, otherwise continue executing with load cut down strategy, until meet described judgement or Till all interruptible loads are the most cut.
As preferably, described load cutting method also includes, if still can not expire after excising all interruptible loads The described basis for estimation of foot, in system, all load point all have a power failure.
As preferably, also include automatic safety device, be arranged on high voltage side of transformer and feeder zone entrance, The connection of fault zone and other region of electric power system is automatically cut off when fault;When element any in region When breaking down, rapid action is made whole feeder zone isolate by corresponding automatic safety device.
As preferably, independent micro-grid electric power system is divided into different feeder zone, can be again in reading system Power-supply device operational factor and the events such as raw energy generator group, non-renewable energy resources generating set and energy storage device Barrier parameter, and the basic Power Flow Information of feeder zone and fault message;According to all power-supply devices and feeder line The fault parameter in region, carries out moment state sampling to described power-supply device and feeder zone, obtains described electricity The state change cyclic sequence of source device and feeder zone;By opening up of described state change cyclic sequence and system Flutter structure to combine, obtain system normal UNICOM region;Adjustable according in the normal connected region of described system Degree power type, selects coordinated operation strategy tentatively to judge the active balance of system, and records non-renewable energy The unlatching number of units of source generating set, the charge-discharge electric power of battery and the excess power of renewable energy power generation unit Active power dispatch information carry out active power dispatch.
As preferably, according to described active power dispatch information, the active power utilizing Load flow calculation to obtain system lacks Volume and reactive power vacancy;According to described system active power vacancy and reactive power vacancy, utilize and revise plan Slightly the dispatch command of non-renewable energy resources generating set and energy-storage battery is modified, and calls and can interrupt bearing The cutting method of lotus.
As preferably, also include Manual isolation switch, be arranged in the branch of electric power system grid structure, use In the excision operation to corresponding load point.
Compared with prior art, the invention has the beneficial effects as follows: in regenerative resource, there is randomness, intermittently In the case of the feature of property, in independent microgrid system planning and designing, regenerative resource can be made full use of, Ensure that the power supply reliability of system simultaneously.
Accompanying drawing explanation
Fig. 1 is the system architecture schematic diagram of a present invention wherein embodiment.
Fig. 2 is the hard charging strategy schematic flow sheet of a present invention wherein embodiment.
Fig. 3 is the correction strategy schematic flow sheet of a present invention wherein embodiment.
Detailed description of the invention
In order to make the purpose of the present invention, technical scheme and advantage clearer, below in conjunction with accompanying drawing and reality Execute example, the present invention is further elaborated.Only should be appreciated that specific embodiment described herein In order to explain the present invention, it is not intended to limit the present invention.
Any feature disclosed in this specification (including any accessory claim, summary and accompanying drawing), removes Non-specifically describes, all can be by other equivalences or have the alternative features of similar purpose and replaced.That is, remove Non-specifically describes, and each feature is an example in a series of equivalence or similar characteristics.
As it is shown in figure 1, a kind of independent micro-grid electric power system, independent micro-grid electric power system is divided into different Feeder zone;In this specific embodiment, renewable energy power generation machine is wind-driven generator, non-renewable energy resources Generator is diesel-driven generator;Diesel-driven generator as system master power supply uses concentration access way, warp Transformer is connected from different feeder zone;Wind-driven generator WT and energy storage device EA is (concrete real at this Execute in example as batteries to store energy device) it is arranged on the bus that high voltage side of transformer is connected or is arranged on feeder line district Territory is internal (being arranged on inside feeder zone in this specific embodiment).
In this specific embodiment, it is contemplated that the line fault in transformer fault and feeder zone, transformer High-pressure side and porch, feeder zone are respectively arranged with automatic safety device.When an error occurs, automatic safety device Intrasystem irregular operating state can be detected in time, by trip operation rapid disengagement failure region be Unite the connection in other region, thus realize the isolation of fault zone.
In this specific embodiment, it is inside each feeder zone at tree network, root node and area entry Automatic safety device is connected, and load point is dispersed in the Heavenly Stems and Earthly Branches and the branch of network.Some branch of tree network It is provided with Manual isolation switch, it would be preferable to support the excision operation of corresponding load point, but does not contains inside each feeder line district Automatic safety device.
In the system shown in figure 1, high voltage side of transformer and porch, each feeder zone are equipped with and automatically protect dress Put.Under this structure, all elements in feeder zone are all at the protection domain of its porch automatic safety device In, when any element failure in region, rapid action is made whole feeder line by corresponding automatic safety device Zone isolation, thus all loads in causing this region have a power failure.When certain region is isolated, in this region The power supply of all renewable energy power generation equipment and energy storage device is all by cut-out.In sum, in system arbitrarily The fault of circuit all can be equivalent to the fault in respective feed connection region.With the independent micro-grid electric power system shown in Fig. 1 As a example by, whole system can be divided into 4 regions according to the position of automatic safety device.Region 0 is diesel generation The master control power supply area that machine forms with transformer, region 1~3 is different load area.
Independent micro-grid electric power system is divided into different feeder zone, renewable energy power generation in reading system Power-supply device operational factor and the fault parameters such as unit, non-renewable energy resources generating set and energy storage device, with And the basic Power Flow Information of feeder zone and fault message;According to all power-supply devices and the fault of feeder zone Parameter, carries out moment state sampling to described power-supply device and feeder zone, obtains described power-supply device and feedback The state change cyclic sequence in line region;The topological structure of described state change cyclic sequence with system is tied mutually Close, obtain system normal UNICOM region;According to the schedulable power supply kind in the normal connected region of described system Class, selects coordinated operation strategy tentatively to judge the active balance of system, and records non-renewable energy resources generator The meritorious tune of the excess power of unlatching number of units, the charge-discharge electric power of battery and the renewable energy power generation unit of group Degree information carries out active power dispatch.
In this specific embodiment, based on sequential Monte Carlo simulation, element each in system is carried out state Sampling, produces the running status sequence of each element.
In sampling generation system after the running status sequence of each power supply and feeder zone, it becomes possible to according to system Topological structure obtains the system connected region in each moment and (is not i.e. automatically protected the district of device isolation Territory).As a example by Fig. 1 system, when in system, fault-free occurs, connected region is that whole middle pressure is independent micro- Net electric power system.When fault occurs in region 0 (transformer fault), all diesel-driven generators all move back Going out to run, connected region is region 1,2,3, and energy storage device is by the master control power supply temporarily as system.When When fault occurs in zone 1, separation generator and energy storage device are the most out of service, and connected region is region 0、2、3.When fault occurs in region 2 (or region 3), connected region be 0,1,3 (or 0,1, 2), diesel-driven generator will cooperate with wind-driven generator, energy storage device, to fault-free block supply.
The Real-time Power Flow poised state of system is judged based on system running policy.This specific embodiment is based on having On the coordinated operation policy grounds of merit balance, it is further proposed that correction strategy based on trend balance is in terms of simultaneously And active balance and the reactive balance impact on system reliability.
In the independent micro-grid electric power system being originally embodied as exist two kinds of schedulable power supplys: diesel-driven generator and Batteries to store energy device.According to the selection of schedulable power supply, the coordinated operation strategy of independent micro-grid electric power system Three classes can be divided into: energy storage scheduling strategy, diesel-driven generator scheduling strategy, the association of energy storage and diesel-driven generator Adjust scheduling strategy.In view of power failure and the impact of area fault, this specific embodiment is in coordinated operation plan Count above-mentioned three class situations in slightly simultaneously:
Floating charge strategy: if diesel-driven generator region is isolated by protection device action, system will be with battery Energy storage is as master control power supply, and coordinates wind-driven generator to exert oneself to meet workload demand.Floating charge strategy is used to make For the operation reserve under energy storage scheduling method, its dispatching principle is: if regenerative resource is exerted oneself and is higher than in system Workload demand, dump power is energy storage charging, when energy storage maximum charge power can not dissolve dump power, Surplus power is recorded as regenerative resource and abandons power EP (t);Otherwise, if regenerative resource is exerted oneself low in system In workload demand, insufficient section is supplemented by energy storage electric discharge.
Strategy without energy storage: if batteries to store energy region is isolated by protection device action, system runs on bavin Under fry dried food ingredients motor scheduling strategy.The diesel-driven generator scheduling strategy used is: preferentially utilize development of renewable energy Electricity is powered to load, and insufficient section is provided by diesel-driven generator.Under this strategy, clean according to this step-length of system Load condition selects diesel-driven generator to open number of units: if net load is less than 0, one diesel generation of enforced opening Machine ensures system stable operation, and records regenerative resource and abandon power EP (t);If net load is more than 0, root Suitable diesel-driven generator is selected to open number of units according to net load value size, if available diesel-driven generator all puts into Run and still can not meet net load demand, make diesel-driven generator open number of units and send out number of units equal to available bavin.
Hard charging strategy: when in independent micro-grid all the most normally devote oneself to work containing power supply area time, system is in fortune Need during row to coordinate the relation between diesel-driven generator, renewable energy power generation and energy storage.In order to as far as possible Reduce the fuel consumption of diesel-driven generator, more fully utilize intrasystem regenerative resource, select firmly to fill Electricity strategy is as the coordinated operation strategy under this pattern.Under this strategy, diesel-driven generator and batteries to store energy can Alternate play main power source meets net load demand (system total load and the difference of generated output of renewable energy source), its Flow process is as shown in Figure 2.
In Fig. 2, P1-P6 represents system net load respectively, counts the net load of system reserve capacity, electric power storage Pond maximum charge power, battery maximum discharge power, diesel generating set EIAJ, diesel-driven generator Group minimum load (more than 0).This strategy is according to this moment system net load and spare capacity, and upper a period of time In quarter, diesel-driven generator is opened number of units and energy storage charge-discharge electric power and is calculated and should open bavin in this step-length and send out number of units nt, and then according to system net carry calculation accumulator cell charging and discharging power PbatT (), system are abandoned ENERGY E P (t) etc. and are referred to Mark, the correction strategy link for subsequent time provides essential information.
According to described active power dispatch information, Load flow calculation is utilized to obtain the active power vacancy of system and idle merit Rate vacancy;According to described system active power vacancy and reactive power vacancy, utilize correction strategy to can not be again The dispatch command of raw energy generator group and energy-storage battery is modified, and calls the reduction plan of interruptible load Slightly.
On above-mentioned coordinated operation policy grounds based on active balance, present invention further proposes based on tide The correction strategy of mobile equilibrium.Correction strategy flow process is as shown in Figure 3:
For calculating system load flow, needing the given node of system, branch road and generator information, the present invention selects Above-mentioned information is stored, in order to trend input information is recombinated with feeder zone for base unit.Need It is emphasized that two way convertor in energy-storage system of accumulator can run at four quadrants, i.e. it can be In Converter Capacity limits, absorb according to system requirements or release active power and reactive power.Therefore for The independent micro-grid electric power system that reactive capability is limited, must count and the nothing of batteries to store energy in its operation reserve Function power.In addition, it is contemplated that the node voltage brought when renewable energy power generation power is higher than workload demand is lifted The problem of liter, abandons power in the reduction that meter of the present invention and regenerative resource are exerted oneself, i.e. coordinated operation Policy Result EP (t) counts in Load flow calculation not as the effective output of wind-driven generator.
In correction strategy, gain merit real-time with system of the instruction that each power supply is issued by independent micro-grid electric power system Vacancy Plack(t) and no-power vacancy QlackT () is relevant, its calculation is as follows:
Plack(t)=max (0, Ps.re(t)-Ps.max(t)) (1)
Qlack(t)=max (0, Qs.re(t)-Qs.max(t)) (2)
In formula, Ps.re(t)、Qs.reT () meritorious, idle is exerted oneself for balance in power flow solutions that node should provide; Ps.max(t)、Qs.maxT () is that the maximum that can be provided by of main power source is meritorious, reactive power, when diesel-driven generator or storage When energy system is as main power source, it calculates as follows:
P s . max ( t ) = P dg . max ( t ) = n t S dg Q s . max ( t ) = Q dg . max ( t ) = ( n t S dg ) 2 - ( n t P dg ( t ) ) 2 - - - ( 3 )
P s . max ( t ) = P bat . max ( t ) = P dis . max ( t ) Q s . max ( t ) = Q bat . max ( t ) = S con 2 - P bat 2 ( t ) - - - ( 4 )
In formula, Pdis.maxT () is the maximum discharge power of energy-storage system;SdgFor diesel oil Rated motor capacity;Scon For energy storage two way convertor rated capacity;Pbat(t) and PdgT () is respectively energy storage device, diesel-driven generator is gained merit Exerting oneself, their initial value is given by coordinated operation strategy, and constantly updates in correction strategy.
With meritorious vacancy Plack(t), no-power vacancy QlackT () is foundation, described correction strategy is: when energy storage system When system is as main power source, if there is power shortage, the diesel-driven generator opening an armed state makes up this Vacancy;When diesel-driven generator is as main power source, if there is power shortage, preferentially call having of energy-storage system Merit, reactive energy make up this vacancy, and when energy-storage system is sufficient to compensate for vacancy, reselection opens one The diesel-driven generator of armed state makes up this vacancy;If all power supplys have been in full hair-like state the most in system, But still suffer from power shortage, now need to call load and cut down strategy.
Described load cutting method is: determine the interruptible load in independent micro-grid electric power system, and according to having Workload amount from small to large and or is cut down according to significance level sequential build load from lightweight to heavyweight Table.
Described load cutting method also includes, when carrying out load and cutting down, with described load reduction table for depending on According to, the most meritorious and load or burden without work of excision interruptible load point, to currently after excision each time Whether meritorious total load and the idle total load of system are updated, rejudge master control source nominal capacity and can Meet the system total load after updating, then can cut down termination, system resumes power by load, record and can interrupt The excision total amount of load, otherwise continue executing with load cut down strategy, until meet described judgement or all can in Till disconnected load is the most cut.
Described load cutting method also includes, if still can not meet described judgement after excising all interruptible loads Foundation, in system, all load point all have a power failure.
In view of the impact of grid structure, all in each feeder zone it is connected with main line through Manual isolation switch Load point is regarded as interruptible load, can be cut when generation capacity deficiency in load cuts down strategy Remove.Under trend equilibrium condition, the meritorious of interruptible load point and reactive power should be paid close attention to simultaneously.This is concrete Embodiment only considers single load type, and such as all load is resident load, and therefore load is cut down suitable Sequence is only relevant with load.For improving analog rate, heuristic load is taked to cut down strategy herein: first false Fixed all load point are not cut down, and call coordinated operation strategy and correction strategy and carry out the operation shape of simulation system State.When there is the situation of system generation capacity deficiency, the interruptible load of load total amount minimum is preferentially cut Removing, repeating this process until meeting following formula:
P s . re 2 ( t ) + Q s . re 2 ( t ) ≤ S mp 2 ( t ) - - - ( 5 )
In formula, SmpT () is the rated capacity of current system main power source.If this formula meets, show that system can be passed through Load is cut down strategy and is restored electricity, and now system blackout time LT (t) is recorded as 0, power failure amount UL (t) record Total amount L is cut down for interruptible loadcut(t)。
It should be noted that due to interruptible load Limited Number in system, taking load to cut down strategy might not The system of being able to ensure that reaches power balance.If interruptible load is still unsatisfactory for wanting of formula (5) after all cutting down Asking, whole system will have a power failure less than workload demand completely because of generating capacity.Now system blackout time LT (t) Being recorded as 1 hour, power failure amount UL (t) is recorded as Real-time Load L (t) of whole system.

Claims (6)

1. an independent micro-grid electric power system power supply reliability load cutting method, it is characterised in that independent microgrid system is divided into different feeder zone;Master control power supply uses concentrates access way, is connected from different feeder zone through transformer;Independent microgrid system also include renewable energy power generation machine and or energy storage device, be arranged on high voltage side of transformer be connected bus on or be arranged on inside feeder zone;Determine the interruptible load in independent micro-grid electric power system, and from small to large and or cut down table according to significance level sequential build load from lightweight to heavyweight according to burden with power amount;
When energy storage device is as master control power supply, if there is power shortage, the non-renewable energy resources generator opening an armed state makes up this vacancy;When non-renewable energy resources generator is as master control power supply, if there is power shortage, preferentially calling meritorious, the reactive energy of energy storage device to make up this vacancy, when energy storage device is sufficient to compensate for vacancy, reselection is opened the non-renewable energy resources generator of an armed state and is made up this vacancy;If in system, all power supplys have been in full hair-like state the most, but still suffer from power shortage, now need to call load cutting method;
Described load cutting method also includes, when carrying out load and cutting down, table is cut down as foundation with described load, the most meritorious and the load or burden without work of excision interruptible load point, after excision each time, meritorious total load and the idle total load of current system is updated, rejudge the system total load after whether master control source nominal capacity can meet renewal, then can cut down termination by load, system resumes power, record the excision total amount of interruptible load, otherwise continue executing with load and cut down strategy, until meet described judgement or all interruptible loads the most cut till.
Independent micro-grid electric power system power supply reliability load cutting method the most according to claim 1, it is characterized in that, described load cutting method also includes, if still can not meet after excising all interruptible loads whether master control source nominal capacity can meet the basis for estimation of the system total load after renewal, in system, all load point all have a power failure.
Independent micro-grid electric power system power supply reliability load cutting method the most according to claim 1; it is characterized in that; also include automatic safety device, be arranged on high voltage side of transformer and feeder zone entrance, when fault, automatically cut off the connection of fault zone and other region of electric power system;When any element failure in region, rapid action is made whole feeder zone isolate by corresponding automatic safety device.
Independent micro-grid electric power system power supply reliability load cutting method the most according to claim 1, it is characterized in that, independent micro-grid electric power system is divided into different feeder zone, renewable energy power generation unit, non-renewable energy resources generating set and energy storage device power-supply device operational factor and fault parameter in reading system, and the basic Power Flow Information of feeder zone and fault message;According to all power-supply devices and the fault parameter of feeder zone, described power-supply device and feeder zone are carried out moment state sampling, obtain the state change cyclic sequence of described power-supply device and feeder zone;Described state change cyclic sequence is combined with the topological structure of system, obtains system normal UNICOM region;According to the schedulable power type in the normal connected region of described system, select coordinated operation strategy tentatively to judge the active balance of system, and the active power dispatch information recording the excess power of the unlatching number of units of non-renewable energy resources generating set, the charge-discharge electric power of battery and renewable energy power generation unit carries out active power dispatch.
Independent micro-grid electric power system power supply reliability load cutting method the most according to claim 4, it is characterised in that according to described active power dispatch information, utilizes Load flow calculation to obtain active power vacancy and the reactive power vacancy of system;According to described system active power vacancy and reactive power vacancy, utilize correction strategy that the dispatch command of non-renewable energy resources generating set and energy-storage battery is modified, and call the reduction strategy of interruptible load.
Independent micro-grid electric power system power supply reliability load cutting method the most according to claim 1, it is characterised in that also include Manual isolation switch, be arranged in the branch of electric power system grid structure, for operating the excision of corresponding load point.
CN201510136905.6A 2015-03-26 2015-03-26 A kind of independent micro-grid electric power system power supply reliability load cutting method Active CN104682398B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510136905.6A CN104682398B (en) 2015-03-26 2015-03-26 A kind of independent micro-grid electric power system power supply reliability load cutting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510136905.6A CN104682398B (en) 2015-03-26 2015-03-26 A kind of independent micro-grid electric power system power supply reliability load cutting method

Publications (2)

Publication Number Publication Date
CN104682398A CN104682398A (en) 2015-06-03
CN104682398B true CN104682398B (en) 2016-09-07

Family

ID=53317136

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510136905.6A Active CN104682398B (en) 2015-03-26 2015-03-26 A kind of independent micro-grid electric power system power supply reliability load cutting method

Country Status (1)

Country Link
CN (1) CN104682398B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106329515B (en) * 2015-06-29 2019-02-22 中国电力科学研究院 A kind of horizontal determination method of electric network reliability based on static reliability probability level
CN106856330A (en) * 2017-01-20 2017-06-16 许继集团有限公司 The unbalanced adjusting method of active power in flexible load control system
CN110247403A (en) * 2019-07-18 2019-09-17 广东电网有限责任公司 A kind of judgment method that the isolated island internal loading containing distributed generation resource is cut down

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074952A (en) * 2010-12-03 2011-05-25 中国科学院广州能源研究所 Independent micro-grid system

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP2434605A1 (en) * 2010-09-28 2012-03-28 Landis + Gyr (Europe) AG Load management system and load management method for electricity users

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102074952A (en) * 2010-12-03 2011-05-25 中国科学院广州能源研究所 Independent micro-grid system

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
《基于孤岛运行特性的微电网可靠性分析》;王杨等;《电网技术》;20140930;第38卷(第9期);第2379-2385页 *

Also Published As

Publication number Publication date
CN104682398A (en) 2015-06-03

Similar Documents

Publication Publication Date Title
Li et al. Energy management and operational control methods for grid battery energy storage systems
Beaudin et al. Energy storage for mitigating the variability of renewable electricity sources: An updated review
CN102289566B (en) Multiple-time-scale optimized energy dispatching method for micro power grid under independent operation mode
CN102842904B (en) Micro-grid collaborative frequency control method based on power shortage prediction and distribution
CN102904288B (en) Steady-state operation strategy for wind and light contained diesel storage isolated microgrid
CN108988322A (en) The microgrid optimization of operation strategy method of consideration system time variation
CN102496948B (en) Central-control-system-based energy storage type wind power plant
CN104682408B (en) A kind of energy management method of the off-network type wind-light storage micro-capacitance sensor containing multiclass energy storage
CN105375501B (en) Multiple Time Scales micro-capacitance sensor is layered stable control method
CN104701842B (en) A kind of independent micro-grid electric power system and Reliability Estimation Method thereof
CN202363902U (en) System for managing micro-grid energy
CN106992544A (en) Microgrid energy real-time management control method
CN104682398B (en) A kind of independent micro-grid electric power system power supply reliability load cutting method
CN108054775A (en) A kind of microgrid control method
CN106849166B (en) Energy storage type wind power plant is as power grid"black-start" power-supply battery energy-storage system configuration method
CN105429180A (en) Frequency layered control method for diesel-wind-solar-battery micro-grid under off-grid and grid-connected modes
CN107508304A (en) A kind of partition control method of battery energy storage system
CN102510123B (en) Automatic energy storage control method for large-scale wind power cutter
CN107528344A (en) A kind of light storage integrated generating device is incorporated into the power networks control method and system
CN104268668A (en) Low-carbon optimized dispatching method for closed loop
CN104281984B (en) A kind of method of supplying power to for micro-capacitance sensor economical operation
Bayani et al. Coordinated scheduling of electric vehicles within zero carbon emission hybrid ac/dc microgrids
CN103138294A (en) Operation and control method of large-scale wind turbine generator in micro grid system
Huang et al. Optimal design of an island microgrid with considering scheduling optimization
CN107241052A (en) It is a kind of can independent operating Mobile energy storage power station

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant