CN104682306A - 一种电线支撑装置 - Google Patents
一种电线支撑装置 Download PDFInfo
- Publication number
- CN104682306A CN104682306A CN201510069841.2A CN201510069841A CN104682306A CN 104682306 A CN104682306 A CN 104682306A CN 201510069841 A CN201510069841 A CN 201510069841A CN 104682306 A CN104682306 A CN 104682306A
- Authority
- CN
- China
- Prior art keywords
- segmental arc
- insulating bar
- adjusting rod
- electric wire
- support device
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/05—Suspension arrangements or devices for electric cables or lines
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Abstract
本发明涉及一种电线支撑装置,属于电线锁紧装置领域,在方便电线拆装的同时,也降低了电线的安装费用。一种电线支撑装置,包括绝缘杆、支撑杆和锁紧单元,所述绝缘杆与所述支撑杆铰接,其铰接处形成第一轴心,所述锁紧单元包括调节杆和套在所述绝缘杆上的锁紧环,所述锁紧环沿所述绝缘杆轴向移动抵触所述支撑杆后,所述调节杆固定在所述锁紧环上,以实现所述锁紧环固定在所述绝缘杆上。
Description
技术领域
本发明涉及一种电线支撑装置,属于电线锁紧装置领域。
背景技术
现有的电线可通过螺钉或者绑扎件(绑扎件包括绑扎绳、绑扎带和绑扎钢筋)固定在绝缘件上,电线通过螺钉固定在绝缘件上,电工拆装电线耗时长、工作效率低;电线通过绑扎件固定在绝缘件上,电线的安装费用高(绑扎钢筋具有不可重复利用的缺点,绑扎绳和绑扎带具有使用寿命短、捆绑强度低等缺点)。
发明内容
本发明所要解决的问题就是提供一种电线支撑装置,在方便电线拆装的同时,也降低了电线的安装费用。
为解决上述问题,本发明提供如下技术方案:一种电线支撑装置,包括绝缘杆、支撑杆和锁紧单元,所述绝缘杆与所述支撑杆铰接,其铰接处形成第一轴心,所述锁紧单元包括调节杆和套在所述绝缘杆上的锁紧环,所述锁紧环沿所述绝缘杆轴向移动抵触所述支撑杆后,所述调节杆固定在所述锁紧环上,以实现所述锁紧环固定在所述绝缘杆上。
进一步的,所述锁紧环包括第一弧形段和第二弧形段,所述第一弧形段与所述第二弧形段铰接,其铰接处形成第二轴心,所述第二弧形段绕所述第二轴心旋转后,所述第一弧形段与所述第二弧形段抵触,以实现所述锁紧环套在所述绝缘杆上。
进一步的,所述调节杆与所述第二弧形段铰接,其铰接处形成第三轴心,所述调节杆绕所述第二弧形段旋转后,所述调节杆与所述第一弧形段连接,以实现所述锁紧环固定在所述绝缘杆上。
进一步的,所述第一弧形段上设有卡槽,所述调节杆远离所述第三轴心的一端设有手柄,所述手柄的直径大于所述调节杆的直径,所述调节杆绕第三轴心旋转后,所述调节杆可插入所述卡槽,并且所述手柄抵触所述第一弧形段。
进一步的,所述支撑杆包括与所述绝缘杆铰接的第一支撑段、第二支撑段和第三支撑段,所述第一支撑段、所述第二支撑段和所述第三支撑段依次连接围成凹槽,所述凹槽槽口的宽度大于所述凹槽槽底的宽度。
进一步的,所述绝缘杆与所述锁紧环之间设有调节环。
进一步的,所述绝缘杆上套有柔性环,所述支撑杆绕所述第一轴心旋转后抵触所述柔性环。
进一步的,所述绝缘杆包括绝缘杆主杆和套在绝缘杆主杆上的调节管,所述调节管与所述支撑杆铰接。
本发明的有益效果:
本发明电线支撑装置包括支撑杆,支撑杆用于固定电线(即支撑杆包括第一支撑段、第二支撑段和第三支撑段,第一支撑段、第二支撑段和第三支撑段依次连接围成凹槽,电线从凹槽的槽口处卡入凹槽,以实现固定电线),在电线卡入支撑杆后,锁紧环抵触支撑杆,以避免支撑杆绕第一轴心旋转,锁紧环通过调节杆固定在绝缘杆上,以避免锁紧杆沿绝缘杆轴向移动。这就意味着,在拆除电线时,移动调节杆(即调节杆绕第二弧形段旋转),电线在自身重力的作用下,可推动支撑杆绕第一轴心旋转,以实现电工快速拆除电线;在安装电线时,电动只需通过锁紧环固定支撑杆(支撑杆上已卡接有电线),就能够实现固定电线,以实现电工快速安装电线。
附图说明
图1是本发明中一种电线支撑装置的结构示意图;
图2是本发明中支撑杆的结构示意图;
图3是本发明中锁紧单元的结构示意图;
图4是图3中A-A处的剖视图(放大后)。
具体实施方式
参照图1,一种电线支撑装置,包括绝缘杆1、用于固定电线的支撑杆2和锁紧单元,绝缘杆1与支撑杆2通过第一连杆6连接(即第一连杆6一端穿过绝缘杆1,第一连杆6另一端穿过支撑杆2,以实现绝缘杆1与支撑杆2铰接),第一连杆6的轴心为第一轴心,支撑杆2绕第一轴心旋转,以实现支撑杆抵触绝缘杆1。
参照图1和图4,锁紧单元包括调节杆4和套在绝缘杆1上的锁紧环3,在支撑杆2绕第一轴心旋转抵触绝缘杆1后,锁紧环3沿绝缘杆1轴向移动以紧压支撑杆2,并且,锁紧环3通过调节杆4固定在绝缘杆1上,以实现安装电线9。
参照图1和图3,具体的,本实施例中锁紧环3包括第一弧形段31和第二弧形段32,第一弧形段31与第二弧形段32通过第二连杆7连接(即第二连杆7一端穿过第一弧形段31,第二连杆7另一端穿过第二弧形段32,以实现第一弧形段31与第二弧形段32铰接),第二连杆7的轴心为第二轴心,第二弧形段32绕第二轴心旋转,以实现锁紧环3套在绝缘杆1上。调节杆4与第二弧形段32通过第三连杆8连接(即第三连杆8一端穿过第二弧形段32,第三连杆8另一端穿过调节杆4,以实现第二弧形段32与调节杆3铰接),第三连杆8的轴心为第三轴心,调节杆4绕第三轴心旋转,以实现调节杆4与第一弧形段31连接。第一弧形段31上设置有第一卡槽311,第二弧形段32上设置有与第一卡槽311对应的第二卡槽321,第三连杆8贯穿第二卡槽321固定在第二弧形段32,调节杆4通过第三连杆8固定在第二卡槽321内,调节杆4远离第三轴心的一端设置有手柄41,在调节杆4绕第三轴心旋转后,调节杆4卡入第一卡槽311,并且,手柄抵触第一弧形段31,以实现锁紧环3固定在绝缘杆1上。
参照图1和图3,电线9的安装过程包括:首先,电线9插入支撑杆2后,旋转支撑杆2,使得支撑杆2抵触绝缘杆1;接着,锁紧环3轴向移动抵触支撑杆2后,调节杆4旋转卡入第一卡槽311内使得锁紧环3固定在绝缘杆1上,以防止支撑杆2旋转(这就意味着,电线9通过支撑杆2固定在绝缘杆1上)。
参照图1和图3,电线9的拆除过程包括:首先,将调节杆4从第一卡槽311内旋出,使得锁紧环3与支撑杆2分离;接着,旋转支撑杆2,以实现电线9从支撑杆2内取出。
参照参照图1和图2,支撑杆2包括第一支撑段21、第二支撑段22和第三支撑段23,其中,第一支撑段21与绝缘杆1通过第一连杆6连接,第一支撑段21、第二支撑段22和第三支撑段23依次连接围成一个收容电线9的凹槽24。
参照图2,为了更好的卡住电线9,第三支撑段23朝向第一支撑段21的侧面为231斜面,此结构实现了凹槽24槽口的宽度大于凹槽24槽底的宽度。
参照图1,本实施例中,绝缘杆1包括绝缘杆主杆11和套在绝缘杆1上的调节管12,调节管12与支撑杆2铰接。绝缘杆主杆11上还套有柔性环5,支撑杆2与绝缘杆主杆11通过柔性环5柔性顶触。
以上所述,仅为本发明的具体实施方式,但本发明的保护范围并不局限于此,熟悉本领域的技术人员应该明白本发明包括但不限于附图和上面具体实施方式中描述的内容。任何不偏离本发明的功能和结构原理的修改都将包括在权利要求书的范围中。
Claims (8)
1.一种电线支撑装置,其特征在于:包括绝缘杆、支撑杆和锁紧单元,所述绝缘杆与所述支撑杆铰接,其铰接处形成第一轴心,所述锁紧单元包括调节杆和套在所述绝缘杆上的锁紧环,所述锁紧环沿所述绝缘杆轴向移动抵触所述支撑杆后,所述调节杆固定在所述锁紧环上,以实现所述锁紧环固定在所述绝缘杆上。
2.如权利要求1所述的一种电线支撑装置,其特征在于:所述锁紧环包括第一弧形段和第二弧形段,所述第一弧形段与所述第二弧形段铰接,其铰接处形成第二轴心,所述第二弧形段绕所述第二轴心旋转后,所述第一弧形段与所述第二弧形段抵触,以实现所述锁紧环套在所述绝缘杆上。
3.如权利要求2所述的一种电线支撑装置,其特征在于:所述调节杆与所述第二弧形段铰接,其铰接处形成第三轴心,所述调节杆绕所述第二弧形段旋转后,所述调节杆与所述第一弧形段连接,以实现所述锁紧环固定在所述绝缘杆上。
4.如权利要求3所述的一种电线支撑装置,其特征在于:所述第一弧形段上设有卡槽,所述调节杆远离所述第三轴心的一端设有手柄,所述手柄的直径大于所述调节杆的直径,所述调节杆绕第三轴心旋转后,所述调节杆可插入所述卡槽,并且所述手柄抵触所述第一弧形段。
5.如权利要求1至4之一所述的一种电线支撑装置,其特征在于:所述支撑杆包括与所述绝缘杆铰接的第一支撑段、第二支撑段和第三支撑段,所述第一支撑段、所述第二支撑段和所述第三支撑段依次连接围成凹槽,所述凹槽槽口的宽度大于所述凹槽槽底的宽度。
6.如权利要求1至4之一所述的一种电线支撑装置,其特征在于:所述绝缘杆与所述锁紧环之间设有调节环。
7.如权利要求1至4之一所述的一种电线支撑装置,其特征在于:所述绝缘杆上套有柔性环,所述支撑杆绕所述第一轴心旋转后抵触所述柔性环。
8.如权利要求1至4之一所述的一种电线支撑装置,其特征在于:所述绝缘杆包括绝缘杆主杆和套在绝缘杆主杆上的调节管,所述调节管与所述支撑杆铰接。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510069841.2A CN104682306B (zh) | 2015-02-10 | 2015-02-10 | 一种电线支撑装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510069841.2A CN104682306B (zh) | 2015-02-10 | 2015-02-10 | 一种电线支撑装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104682306A true CN104682306A (zh) | 2015-06-03 |
CN104682306B CN104682306B (zh) | 2017-04-12 |
Family
ID=53317046
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510069841.2A Active CN104682306B (zh) | 2015-02-10 | 2015-02-10 | 一种电线支撑装置 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104682306B (zh) |
Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2218462A (en) * | 1988-04-01 | 1989-11-15 | Magneti Marelli Spa | Cable retaining device |
US5059748A (en) * | 1990-04-26 | 1991-10-22 | Raychem Corporation | Cable splice enclosure |
CN2650367Y (zh) * | 2003-09-11 | 2004-10-20 | 杭州高盛电力设备有限公司 | 四芯集束电缆悬吊线夹 |
CN201269361Y (zh) * | 2008-07-24 | 2009-07-08 | 江苏捷诚车载电子信息工程有限公司 | 一种固定器 |
CN201672151U (zh) * | 2010-03-26 | 2010-12-15 | 陈忠全 | 旋转式电缆挂钩 |
CN201925606U (zh) * | 2011-01-26 | 2011-08-10 | 张家港迪克通信设备有限公司 | 一种抱箍 |
CN202004169U (zh) * | 2011-02-28 | 2011-10-05 | 西安澳立华勘探技术开发有限公司 | 一种电法勘探中电缆和电极的电连接装置 |
CN202379647U (zh) * | 2011-12-22 | 2012-08-15 | 山东电力集团公司潍坊供电公司 | 一种线杆金具安装吊具 |
CN202501112U (zh) * | 2012-04-17 | 2012-10-24 | 岳文智 | 一种可手拆式输送管夹持套 |
CN103867805A (zh) * | 2014-03-31 | 2014-06-18 | 刘明 | 铐式组合挂环 |
CN204118648U (zh) * | 2014-10-11 | 2015-01-21 | 国家电网公司 | 电线支撑装置 |
CN204349392U (zh) * | 2015-02-10 | 2015-05-20 | 国家电网公司 | 一种电线支撑装置 |
-
2015
- 2015-02-10 CN CN201510069841.2A patent/CN104682306B/zh active Active
Patent Citations (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2218462A (en) * | 1988-04-01 | 1989-11-15 | Magneti Marelli Spa | Cable retaining device |
US5059748A (en) * | 1990-04-26 | 1991-10-22 | Raychem Corporation | Cable splice enclosure |
CN2650367Y (zh) * | 2003-09-11 | 2004-10-20 | 杭州高盛电力设备有限公司 | 四芯集束电缆悬吊线夹 |
CN201269361Y (zh) * | 2008-07-24 | 2009-07-08 | 江苏捷诚车载电子信息工程有限公司 | 一种固定器 |
CN201672151U (zh) * | 2010-03-26 | 2010-12-15 | 陈忠全 | 旋转式电缆挂钩 |
CN201925606U (zh) * | 2011-01-26 | 2011-08-10 | 张家港迪克通信设备有限公司 | 一种抱箍 |
CN202004169U (zh) * | 2011-02-28 | 2011-10-05 | 西安澳立华勘探技术开发有限公司 | 一种电法勘探中电缆和电极的电连接装置 |
CN202379647U (zh) * | 2011-12-22 | 2012-08-15 | 山东电力集团公司潍坊供电公司 | 一种线杆金具安装吊具 |
CN202501112U (zh) * | 2012-04-17 | 2012-10-24 | 岳文智 | 一种可手拆式输送管夹持套 |
CN103867805A (zh) * | 2014-03-31 | 2014-06-18 | 刘明 | 铐式组合挂环 |
CN204118648U (zh) * | 2014-10-11 | 2015-01-21 | 国家电网公司 | 电线支撑装置 |
CN204349392U (zh) * | 2015-02-10 | 2015-05-20 | 国家电网公司 | 一种电线支撑装置 |
Also Published As
Publication number | Publication date |
---|---|
CN104682306B (zh) | 2017-04-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203255809U (zh) | 一种钢丝绳收集装置 | |
CN203614919U (zh) | 一种电缆固定夹 | |
CN204349392U (zh) | 一种电线支撑装置 | |
CN104682306A (zh) | 一种电线支撑装置 | |
CN204290226U (zh) | 节能型防振锤 | |
CN103208757A (zh) | 绝缘导线架线器 | |
CN104343776B (zh) | 室外ap的固定装置 | |
KR100407376B1 (ko) | 전주내 전선이선기구를 이용한 무정전 배전공법 | |
CN204905499U (zh) | 具有连体插套的插座 | |
CN202534446U (zh) | 一种架空导线防雷装置悬式瓷瓶安装抱箍 | |
JP2006271134A (ja) | バイパス接続装置 | |
CN202633543U (zh) | 导体接地辅助组件 | |
CN202940543U (zh) | 一种高压电缆固定装置 | |
CN204349308U (zh) | 一种操作杆头 | |
CN102145411B (zh) | 一种电链锯的链板安装改进结构 | |
CN104466786A (zh) | 绝缘子螺丝紧固装置 | |
CN204089093U (zh) | 一种一体分支式分支箱 | |
CN203849483U (zh) | 防脱落型杆用引下线夹 | |
CN207790571U (zh) | 一种具有耐磨护套的电线 | |
CN210014144U (zh) | 电力设备移动装置 | |
CN202059094U (zh) | 252kV封闭式组合电器的屏蔽罩 | |
CN204997593U (zh) | 安装轴承的气压工装 | |
CN106025597A (zh) | 一种接地棒 | |
CN211018198U (zh) | 一种高压线缆分离支撑装置 | |
CN202405684U (zh) | 电缆仓装置 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |