CN104656571B CN201310578182.6A CN201310578182A CN104656571B CN 104656571 B CN104656571 B CN 104656571B CN 201310578182 A CN201310578182 A CN 201310578182A CN 104656571 B CN104656571 B CN 104656571B
Authority
CN
China
Prior art keywords
processing module
batch processing
module
target location
batch
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310578182.6A
Other languages
Chinese (zh)
Other versions
CN104656571A (en
Inventor
崔琳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing North Microelectronics Co Ltd
Original Assignee
Beijing North Microelectronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing North Microelectronics Co Ltd filed Critical Beijing North Microelectronics Co Ltd
Priority to CN201310578182.6A priority Critical patent/CN104656571B/en
Publication of CN104656571A publication Critical patent/CN104656571A/en
Application granted granted Critical
Publication of CN104656571B publication Critical patent/CN104656571B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P80/00Climate change mitigation technologies for sector-wide applications
    • Y02P80/40Minimising material used in manufacturing processes
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]

Landscapes

  • Engineering & Computer Science (AREA)
  • Container, Conveyance, Adherence, Positioning, Of Wafer (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Quality & Reliability (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Automation & Control Theory (AREA)

Abstract

The embodiment of the invention provides a kind of support while processing the route control method of many sheet materials, the route control method is comprised the following steps:To support that the processing chamber for processing many sheet materials simultaneously is labeled as batch processing module;It is marked for material to be processed according to preset rules;When the source position of current material is batch processing module, judge whether there is the minimum material of priority in the batch processing module;If it is not, then allowing the material to be left from the source position;When the target location of current material is batch processing module, judge whether there is material in the batch processing module;If so, then allowing the material transferring to the batch processing module when the group mark of the material is identical with the group mark of material in the batch processing module;Otherwise, it is allowed to the material transferring to the batch processing module.The invention enables the biography piece of apparatus for production line high-efficiency automatic, the yield of apparatus for production line is improve.

Description

It is a kind of to support while processing the route control method and device of many sheet materials
Technical field
It is more particularly to a kind of to support while processing the route control of many sheet materials the present invention relates to apparatus and process control field Method processed and a kind of processing chamber is supported while processing the route control device of many sheet materials.
Background technology
Arrange the transmission order of material, and each process station proceeds by time of technique and is collectively referred to as in processing chamber The route test of material.
Material Route control is a search tree based on equipment state, and each node of search tree is represented in equipment All materials position and the set of state of the art.Material is often mobile once, and the state of equipment just occurs once to change, shape Each branch into a new node, therefore search tree represents the movement of material one at a time.Material is moved once, forms one Individual new node;It is mobile again on new node once to form a new node again, until all materials all complete setting Task.That is the leaf node of this search tree is that all materials all complete technique processing, returns to corresponding position.Time This search tree is gone through, that minimum paths, are optimal the time required to finding out this search tree from root node to leaf node Material transmission order and processing sequence.
Behind the position for carrying out technique processing the need for material is placed into accordingly, processing is immediately begun to.And each branch Can only be once moving for material, can be exported from journal file:
1. material 1 moves to B location from location A, and starts technique;
2. material 2 moves to D positions from location of C, and starts technique;
3. material 1 moves to location A from B location;
4. material 2 moves to location of C from D positions;
5. position C carries out technique processing once without material.
But the above-mentioned position that can carry out technique processing can only all place a sheet material, i.e., a thing can only be directed to every time Material carries out PROCESS FOR TREATMENT.Processing multiple materials simultaneously clearly for needs carries out the apparatus for production line of PROCESS FOR TREATMENT, for example APCVD(Atmospheric Pressure Chemical Vapor Deposition, normal pressure chemical vapor phase deposition)Equipment, on The method of stating can not be applicable.
The content of the invention
Embodiment of the present invention technical problem to be solved is to provide a kind of support while processing the route control of many sheet materials Method processed, to solve the problems, such as that processing chamber is not supported while processing many sheet materials.
Support while process the route control device of many sheet materials, to be used to ensure the above method present invention also offers a kind of Realization and application.
In order to solve the above problems, supported while processing the route test of many sheet materials the embodiment of the invention discloses a kind of Method, the route control method, comprises the following steps:
To support that the processing chamber for processing many sheet materials simultaneously is labeled as batch processing module;
It is marked for material to be processed according to preset rules;Wherein, the preset rules include that group number demarcates rule Then rule is demarcated with priority;The batch processing module has capacity, and it is according to the batch processing mould that the group number demarcates rule Material to be processed is divided into one or more packets by the capacity of block, and there is the material of same packet identical group to identify;Institute State priority and demarcate rule for the material in same packet is ranked up according to priority;The material has source position and target Position;
When the source position of current material is batch processing module, judge whether there is priority most in the batch processing module Low material;If it is not, then allowing the material to be left from the source position;
When the target location of current material is batch processing module, judge whether there is material in the batch processing module; If so, then allowing the material transferring when the group mark of the material is identical with the group mark of material in the batch processing module To the batch processing module;Otherwise, it is allowed to the material transferring to the batch processing module.
Preferably, the route control method, further comprising the steps of:
When the target location of current material is non-batch processing module, judge whether the target location has material;If It is no, then the material transferring to the target location is allowed when with corresponding idle mechanical arm.
Preferably, the route control method, further comprising the steps of:
When the source position of current material is non-batch processing module, the target location of current material is inquired about;
When the target location of current material is batch processing module, judge whether there is material in the batch processing module; If so, then allowing the material transferring when the group mark of the material is identical with the group mark of material in the batch processing module To the batch processing module;Otherwise, it is allowed to the material transferring to the batch processing module;
When the target location of current material is non-batch processing module, judge whether the target location has material;If It is no, then the material transferring to the target location is allowed when with corresponding idle mechanical arm.
Preferably, the preset rules also include that technique demarcates rule, and the technique demarcation rule is excellent for same packet There are first level highest material preliminary processes to identify, and there is the minimum material of priority process to identify and rearmounted technique mark Know;
Wherein, when there are material preliminary processes to identify, carried out before material transferring to the batch processing module preposition Technique;
When there is material process to identify, process is carried out after material transferring to the batch processing module;
When material has rearmounted craft label, rearmounted technique is carried out from after the batch processing module in material.
Preferably, the batch processing module is the processing chamber of Films Prepared by APCVD APCVD equipment, the batch processing Module includes heat deposition processing chamber and plasma assisted deposition processing chamber.
Supported while process the route control device of many sheet materials the embodiment of the invention also discloses a kind of, the route control Device processed, including with lower module:
Processing chamber demarcating module, the processing chamber for will support to process many sheet materials simultaneously is labeled as batch processing mould Block;
Material mark module, for being marked for material to be processed according to preset rules;Wherein, the default rule Then include that group number demarcates rule and priority demarcates rule;The batch processing module has capacity, and the group number is demarcated rule and is Material to be processed is divided into one or more packets according to the capacity of the batch processing module, the material of same packet has Identical group is identified;The priority demarcates rule for the material in same packet is ranked up according to priority;The material With source position and target location;
First source position judge module, for when the source position of current material is batch processing module, judging at described batch Whether there is the minimum material of priority in reason module;If it is not, then calling the first permission module;
First allows module, for allowing the material to be left from the source position;
First object position judging module, for when the target location of current material is batch processing module, judging described Whether there is material in batch processing module;If so, then calling the second permission module;Otherwise, the 3rd permission module is called;
Second allows module, identical with the group mark of material in the batch processing module for the group mark in the material When allow the material transferring to the batch processing module;
3rd allows module, for allowing the material transferring to the batch processing module.
Preferably, the route control device, also including with lower module:
Second target location judge module, for when the target location of current material is non-batch processing module, judging institute State whether target location has material;If it is not, then calling the 4th permission module;
4th allows module, for allowing the material transferring to the target position when with corresponding idle mechanical arm Put.
Preferably, the route control device, also including with lower module:
Second source position enquiry module, for when the source position of current material is non-batch processing module, inquiring about current thing The target location of material;
When the target location of current material is batch processing module, first object position judging module is called;
When the target location of current material is non-batch processing module, the second target location judge module is called.
Preferably, the preset rules also include that technique demarcates rule, and the technique demarcation rule is excellent for same packet There are first level highest material preliminary processes to identify, and there is the minimum material of priority process to identify and rearmounted technique mark Know;
Wherein, when there are material preliminary processes to identify, carried out before material transferring to the batch processing module preposition Technique;
When there is material process to identify, process is carried out after material transferring to the batch processing module;
When material has rearmounted craft label, rearmounted technique is carried out from after the batch processing module in material.
Preferably, the batch processing module is the processing chamber of Films Prepared by APCVD APCVD equipment, the batch processing Module includes heat deposition processing chamber and plasma assisted deposition processing chamber.
Compared with background technology, the present invention includes advantages below:
The mark of the processing chamber by supporting to process many sheet materials simultaneously of the invention, and group number demarcates regular, preferential Level demarcates rule, and also technique demarcates the utilization of rule, realizes support processing chamber while processing the route control of many sheet materials System so that the biography piece of apparatus for production line high-efficiency automatic, improves the yield of apparatus for production line.
Brief description of the drawings
Fig. 1 is of the invention a kind of supports while the step of processing the route test embodiment of many sheet materials flow chart;
Fig. 2 is a kind of structural representation of APCVD equipment of the invention;
Fig. 3 is a kind of materiel machining path flow diagram in the APCVD equipment shown in Fig. 2;
Fig. 4 is of the invention a kind of supports while processing the structured flowchart of the route control device embodiment of many sheet materials.
Specific embodiment
To enable above-mentioned purpose, the feature and advantage of the embodiment of the present invention more obvious understandable, below in conjunction with the accompanying drawings and Specific embodiment is described in further detail to the embodiment of the present invention.
Reference picture 1, shows that a kind of of the embodiment of the present invention is supported while processing the route control method reality of many sheet materials The step of applying flow chart, as shown in figure 1, a kind of route control method, comprises the following steps:
Step 101, will support that the processing chamber for processing many sheet materials simultaneously is labeled as batch processing module;
In implementing, can be marked in CONFIG.SYS can carry out the processing chamber of multi-disc processing, with area The processing chamber of monolithic processing is not carried out, is called Batch Module.Certainly, in addition to Batch Module, the present invention is real Applying example can also be to supporting the processing chamber of multi-disc processing for other are identified, as long as the technique that can carry out multi-disc processing can be distinguished Chamber and the processing chamber of monolithic processing, the embodiment of the present invention are not any limitation as to this.
To make those skilled in the art more fully understand the present invention, APCVD equipment presented below illustrates this as an example The application implementation process of inventive embodiments.
Reference picture 2, shows a kind of structural representation of APCVD equipment of the invention.As shown in Fig. 2 the APCVD bags Include:
Two LoadPort:The container of loaded material, comprising multiple grooves, each groove can accommodate a sheet material, inside have 25 Slot(A position for placement material in the container of material can be placed), wherein the material deposited includes 5 cun, 6 cun and 8 Very little three kinds of forms;
One LoadLock:One container that can be sealed, transmission material plays buffering between air and vacuum parts Effect, can place 1 sheet material;
One ExternalValve:A valve between LoadPort and LoadLock, only when this valve is opened Qi Shi, material could be transmitted between LoadPort and LoadLock;
One TC(Transfor Cambe):Form vacuum environment, the chamber where vacuum end single arm robot, its periphery Equipped with multiple processing chambers;
One InternalValve:A valve between LoadLock and TC, only when this valve opening, Material could be transmitted between LoadLock and TC chambers;
One PM:Processing chamber, for carrying out corresponding technological operation, for various sizes of material, deposits in pallet Material number it is also inconsistent.8 cun can at most put 5, and 6 cun can at most put 8, and 5 cun can at most put 10, in pallet Position referred to as " Pocket " for depositing material;
One GateValve:Valve between TC and processing chamber, only when this valve opening, material ability Transmitted between TC and PM;
One atmosphere end single arm robot, for the biography piece between LoadPort and LoadLock
One vacuum end single arm robot, for the material transferring between LoadLock and TC, and TC and PM.
Reference picture 3, shows a kind of materiel machining path flow diagram in the APCVD equipment shown in Fig. 2.As shown in figure 3, The machining path of material can be:
1st, atmosphere end single arm robot(Robot)Material in LoadPort is placed into calibrator(Aligner)Colonel It is accurate;
2nd, ExternalValve is opened;
3rd, atmosphere end single arm robot by material from LoadLock is moved on calibrator;
4th, LoadLock completes air pressure conversion;
5th, InternalValve is opened;
6th, vacuum end single arm robot takes piece from LoadLock;
7th, GateValve is opened;
8th, be placed into material in PM by vacuum end single arm robot;
9th, material is processed in PM;
10th, after completion of processing, GateValve is opened;
11st, vacuum end single arm robot takes out material from PM;
12nd, InternalValve is opened;
13rd, be placed into material in LoadLock by vacuum end single arm robot;
14th, LoadLock completes air pressure conversion;
15th, ExternalValve is opened;
16th, during material to move to from LoadLock atmosphere end single arm robot LoadPort.
Since then, material completes time processing.
In one preferred embodiment of the invention, the Batch Module are set for Films Prepared by APCVD APCVD Standby processing chamber, the Batch Module include heat deposition processing chamber and plasma assisted deposition processing chamber.
Wherein, the heat deposition processing chamber, for carrying out heat deposition;
The plasma assisted deposition processing chamber, for carrying out plasma assisted deposition.
Step 102, is marked according to preset rules for material to be processed;
Specifically, the preset rules can include that group number demarcates rule and priority demarcates rule;
Wherein, the batch processing module has capacity;, it is the appearance according to the batch processing module that the group number demarcates rule Material to be processed is divided into one or more packets by amount, and there is the material of same packet identical group to identify;
It should be noted that after device hardware determination, the capacity of BatchModule is the same.But user can be with It is set in BatchModule to set and carries out technique processing using how many positions(Can if certain position is not provided with Processed with the technique for carrying out material, then this position cannot place material).
According to the capacity of Batch Module, material to be processed is grouped, the quantity of material is not in same packet Can exceed that the capacity of Batch Module.For example, the capacity of Batch Module is C1, the 1st of material to be processed to the C1 pieces are divided into one group, and group number is 1;C1+1 to 2C1 points is one group, and group number is 2;2C1+1 to 3C1 points is one group, and group number is 3, the rest may be inferred, is completed until material to be processed is grouped.
The priority demarcates rule for the material in same packet is ranked up according to priority;
In actual applications, sequence number can be set to material to be processed, divides preferential by sequence number size in same packet Level;Wherein, the highest priority of the minimum material of sequence number, the priority of the maximum material of sequence number is minimum.
When the material of same packet is taken away from Batch Module, priority material high can first from Batch Taken away in Module.
The material can have source position and target location;
In actual applications, can judge whether certain branch is feasible on search tree, the source position and target location are The movement of the branch.
Whether step 103, when the source position of current material is batch processing module, judges have in the batch processing module The minimum material of priority;If it is not, then performing step 104;
Step 104, it is allowed to which the material leaves from the source position;
When the source position of material is Batch Module, it is necessary to whole group material is taken away.In implementing, work as Batch Last sheet material in Module not comprising current group(That is the minimum material of priority), then for the loading for transporting The all materials of the involved packets of Batch Module are contained in device, then this time movement is feasible;If Batch Comprising last sheet material of involved group in Module, then in the loader that transports not comprising Batch Module The all materials of involved packet, then this time movement is infeasible.
Whether step 105, when the target location of current material is batch processing module, judges have in the batch processing module There is material;If so, then performing step 106, otherwise, step 107 is performed.
Step 106, institute is allowed when the group mark of the material is identical with the group mark of material in the batch processing module State material transferring to the batch processing module;
Step 107, it is allowed to the material transferring to the batch processing module.
It should be noted that the source position of material can be Batch Module, or non-Batch Module.
If Batch Module(Target location)In there is no material, this time movement it is feasible;If in Batch Module There is material, and the group mark of this material is identical with the material group mark in Batch Module, then and this time movement is feasible;Such as There is material in fruit Batch Module, and the group mark of this material is differed with the group mark of material in Batch Module, So this time movement is infeasible.
In one preferred embodiment of the invention, the route control method, can also comprise the following steps:
Step 108, when the target location of current material is non-batch processing module, judges whether the target location has Material;If it is not, then performing step 109;
Step 109, allows the material transferring to the target location when with corresponding idle mechanical arm.
It should be noted that the source position of material can be Batch Module, or non-Batch Module.
There is no material and with corresponding idle mechanical arm when target location(It is responsible between the source position and target location The idle mechanical arm of material transferring)When, it is allowed to the material transferring to the target location.
In one preferred embodiment of the invention, the route control method, can also comprise the following steps:
Step 110, when the source position of current material is non-batch processing module, inquires about the target location of current material;
When the target location of current material is batch processing module, step 105 is performed;
When the target location of current material is non-batch processing module, step 108 is performed.
When the source position of current material is non-Batch Module, then the target location that can be moved according to this is carried out Judge, the embodiment of the present invention is no longer described in detail one by one herein.
In one preferred embodiment of the invention, the preset rules can also include that technique demarcates rule, the work Skill demarcates rule for there are the material of the highest priority of same packet preliminary processes to identify, and the minimum material of priority had Journey craft label and rearmounted craft label;
Wherein, when there are material preliminary processes to identify, carried out before material transferring to the batch processing module preposition Technique;
When there is material process to identify, process is carried out after material transferring to the batch processing module;
When material has rearmounted craft label, rearmounted technique is carried out from after the batch processing module in material.
It is appreciated that in same packet, except there is preliminary processes PreRecipe marks, preferential in the material of highest priority There is the minimum material of level process ProcessRecipe to identify and rearmounted technique PostRecipe marks are outer, other piece things Material is in the absence of craft label.
It should be noted that when the material of same packet carries out technique processing in Batch Module, processing can be Carry out simultaneously.When there is material preliminary processes PreRecipe to identify, can be before material transferring to Batch Module The preliminary processes Recipe for carrying out.It should be noted that the preliminary processes Batch corresponding to different Batch Module Module can be specifically configured by user, can be sky in some cases.
When material have process ProcessRecipe identify when, can material transferring to Batch Module it The process Recipe for carrying out afterwards.It should be noted that the process Batch corresponding to different Batch Module Module can be specifically configured by user, can be in some cases sky.
It should be noted that when there is material rearmounted technique PostRecipe to identify, can be in material from Batch Take the rearmounted technique Recipe for carrying out afterwards in Module away.It should be noted that corresponding to different Batch Module Rearmounted technique Batch Module can be specifically configured by user, can be in some cases sky.
So for the material in same packet, if this group of material will be put into Batch Module, except the 1st (That is highest priority)There is material preliminary processes PreRecipe to identify, and other materials are in the absence of preliminary processes PreRecipe Mark.Because if also be present preliminary processes PreRecipe marks in other materials, such as X sheet materials, then just occur Material 1 to X-1 pieces is placed in Batch Module, the preliminary processes Recipe of X pieces can act on Batch Module In 1 to X-1 pieces, this is not allowed.
For similarly for the material in same packet, if this group of material will be put into Batch Module, except last It is a piece of(I.e. priority is minimum)There is material process ProcessRecipe to identify and rearmounted technique PostRecipe marks, Other materials are identified and/or rearmounted technique PostRecipe marks in the absence of process ProcessRecipe.If because Also there is process ProcessRecipe marks in other materials, such as X sheet materials, X+1 pieces there is also process ProcessRecipe is identified, then X sector-meetings carry out process ProcessRecipe processing twice, and this is incorrect;If There is rearmounted technique PostRecipe marks in other sheet materials, such as X sheet materials, X+1 pieces there is also rearmounted craft label, After so taking this group of material away in Batch Module, it may appear that repeatedly rearmounted technique processing, this is also not allow.
For embodiment of the method, in order to be briefly described, therefore it is all expressed as a series of combination of actions, but this area Technical staff should know that the embodiment of the present invention is not limited by described sequence of movement, because implementing according to the present invention Example, some steps can sequentially or simultaneously be carried out using other.Secondly, those skilled in the art should also know, specification Described in embodiment belong to preferred embodiment, necessary to the involved action not necessarily embodiment of the present invention.
Reference picture 4, shows that a kind of of the embodiment of the present invention is supported while processing the route control device reality of many sheet materials The structured flowchart of example is applied, as illustrated, the system, can include with lower module:
Processing chamber demarcating module 401, the processing chamber for will support to process many sheet materials simultaneously is labeled as batch processing Module;
Material mark module 402, for being marked for material to be processed according to preset rules;Wherein, it is described pre- If rule includes that group number demarcates rule and priority demarcates rule;The batch processing module has capacity, and the group number demarcates rule It is then that material to be processed is divided into one or more packets, the material of same packet according to the capacity of the batch processing module With identical group mark;The priority demarcates rule for the material in same packet is ranked up according to priority;It is described Material has source position and target location;
First source position judge module 403, for when the source position of current material is batch processing module, judging described batch Whether there is the minimum material of priority in processing module;If it is not, then calling the first permission module 404;
First allows module 404, for allowing the material to be left from the source position;
First object position judging module 405, for when the target location of current material is batch processing module, judging institute Whether state in batch processing module has material;If so, then calling the second permission module 406;Otherwise, the 3rd permission module is called 407;
Second allows module 406, is identified for the group mark in the material and the group of material in the batch processing module The material transferring to the batch processing module is allowed when identical;
3rd allows module 407, for allowing the material transferring to the batch processing module.
In one preferred embodiment of the invention, the route control device, can also include with lower module:
Second target location judge module, for when the target location of current material is non-batch processing module, judging institute State whether target location has material;If it is not, then calling the 4th permission module;
4th allows module, for allowing the material transferring to the target position when with corresponding idle mechanical arm Put.
In one preferred embodiment of the invention, the route control device, can also include with lower module:
Second source position enquiry module, for when the source position of current material is non-batch processing module, inquiring about current thing The target location of material;
When the target location of current material is batch processing module, first object position judging module is called;
When the target location of current material is non-batch processing module, the second target location judge module is called.
In one preferred embodiment of the invention, the preset rules can also include that technique demarcates rule, the work Skill demarcates rule for there are the material of the highest priority of same packet preliminary processes to identify, and the minimum material of priority had Journey craft label and rearmounted craft label;
Wherein, when there are material preliminary processes to identify, carried out before material transferring to the batch processing module preposition Technique;
When there is material process to identify, process is carried out after material transferring to the batch processing module;
When material has rearmounted craft label, rearmounted technique is carried out from after the batch processing module in material.
In one preferred embodiment of the invention, the batch processing module is Films Prepared by APCVD APCVD equipment Processing chamber, the batch processing module include heat deposition processing chamber and plasma assisted deposition processing chamber.
For device embodiment, because it is substantially similar to embodiment of the method, so description is fairly simple, it is related Part is illustrated referring to the part of embodiment of the method.
Each embodiment in this specification is described by the way of progressive, what each embodiment was stressed be with The difference of other embodiment, between each embodiment identical similar part mutually referring to.
Although having been described for the preferred embodiment of the embodiment of the present invention, those skilled in the art once know base This creative concept, then can make other change and modification to these embodiments.So, appended claims are intended to be construed to Including preferred embodiment and fall into having altered and changing for range of embodiment of the invention.
Finally, in addition it is also necessary to explanation, herein, such as first and second or the like relational terms be used merely to by One entity or operation make a distinction with another entity or operation, and not necessarily require or imply these entities or operation Between there is any this actual relation or order.And, term " including ", "comprising" or its any other variant meaning Covering including for nonexcludability, so that process, method, article or mobile device including a series of key elements are not only wrapped Those key elements, but also other key elements including being not expressly set out are included, or also includes being this process, method, article Or the intrinsic key element of mobile device.In the absence of more restrictions, by wanting that sentence "including a ..." is limited Element, it is not excluded that also there is other identical element in the process including the key element, method, article or mobile device.
The embodiment of the present invention is provided above it is a kind of support and meanwhile process many sheet materials route control method and It is a kind of to support while process the route control device of many sheet materials, to be described in detail, specific case pair used herein The principle and implementation method of the embodiment of the present invention are set forth, and the explanation of above example is only intended to help and understands the present invention The method and its core concept of embodiment;Simultaneously for those of ordinary skill in the art, according to the think of of the embodiment of the present invention Think, will change in specific embodiments and applications, in sum, it is right that this specification content should not be construed as The limitation of the embodiment of the present invention.

Claims (10)

1. it is a kind of to support while processing the route control method of many sheet materials, it is characterised in that the route control method, including Following steps:
To support that the processing chamber for processing many sheet materials simultaneously is labeled as batch processing module;
It is marked for material to be processed according to preset rules;Wherein, the preset rules include group number demarcate rule and Priority demarcates rule;The batch processing module has capacity, and it is according to the batch processing module that the group number demarcates rule Material to be processed is divided into one or more packets by capacity, and there is the material of same packet identical group to identify;It is described excellent First level demarcates rule for the material in same packet is ranked up according to priority;The material has source position and target position Put;
When the source position of current material is batch processing module, judge whether have priority minimum in the batch processing module Material;If it is not, then allowing the material to be left from the source position;
When the target location of current material is batch processing module, judge whether there is material in the batch processing module;If so, Then the material transferring to institute is allowed when the group mark of the material is identical with the group mark of material in the batch processing module State batch processing module;Otherwise, it is allowed to the material transferring to the batch processing module.
2. it is according to claim 1 to support while processing the route control method of many sheet materials, it is characterised in that the road It is further comprising the steps of by control method:
When the target location of current material is non-batch processing module, judge whether the target location has material;If it is not, then The material transferring to the target location is allowed when with corresponding idle mechanical arm.
3. it is according to claim 1 to support while processing the route control method of many sheet materials, it is characterised in that the road It is further comprising the steps of by control method:
When the source position of current material is non-batch processing module, the target location of current material is inquired about;
When the target location of current material is batch processing module, judge whether there is material in the batch processing module;If so, Then the material transferring to institute is allowed when the group mark of the material is identical with the group mark of material in the batch processing module State batch processing module;Otherwise, it is allowed to the material transferring to the batch processing module;
When the target location of current material is non-batch processing module, judge whether the target location has material;If it is not, then The material transferring to the target location is allowed when with corresponding idle mechanical arm.
4. it is according to claim 1 to support while processing the route control method of many sheet materials, it is characterised in that described pre- If rule also includes that technique demarcates rule, it is preposition for the material of the highest priority of same packet has that the technique demarcates rule There is craft label, the minimum material of priority process to identify and rearmounted craft label;
Wherein, when there are material preliminary processes to identify, preliminary processes were carried out before material transferring to the batch processing module;
When there is material process to identify, process is carried out after material transferring to the batch processing module;
When material has rearmounted craft label, rearmounted technique is carried out from after the batch processing module in material.
5. it is according to claim 1 to support while processing the route control method of many sheet materials, it is characterised in that described batch Processing module is the processing chamber of Films Prepared by APCVD APCVD equipment, and the batch processing module includes heat deposition process cavity Room and plasma assisted deposition processing chamber.
6. it is a kind of to support while processing the route control device of many sheet materials, it is characterised in that the route control device, including With lower module:
Processing chamber demarcating module, the processing chamber for will support to process many sheet materials simultaneously is labeled as batch processing module;
Material mark module, for being marked for material to be processed according to preset rules;Wherein, the preset rules bag Include group number and demarcate rule and priority demarcation rule;The batch processing module has capacity, and it is foundation that the group number demarcates rule Material to be processed is divided into one or more packets by the capacity of the batch processing module, and the material of same packet has identical Group mark;The priority demarcates rule for the material in same packet is ranked up according to priority;The material has Source position and target location;
First source position judge module, for when the source position of current material is batch processing module, judging the batch processing mould Whether there is the minimum material of priority in block;If it is not, then calling the first permission module;
First allows module, for allowing the material to be left from the source position;
First object position judging module, for when the target location of current material is batch processing module, judging at described batch Whether there is material in reason module;If so, then calling the second permission module;Otherwise, the 3rd permission module is called;
Second allows module, for permitting when the group mark of the material is identical with the group mark of material in the batch processing module Perhaps described material transferring is to the batch processing module;
3rd allows module, for allowing the material transferring to the batch processing module.
7. it is according to claim 6 to support while processing the route control device of many sheet materials, it is characterised in that the road By control device, also including with lower module:
Second target location judge module, for when the target location of current material is non-batch processing module, judging the mesh Whether cursor position has material;If it is not, then calling the 4th permission module;
4th allows module, for allowing the material transferring to the target location when with corresponding idle mechanical arm.
8. it is according to claim 7 to support while processing the route control device of many sheet materials, it is characterised in that the road By control device, also including with lower module:
Second source position enquiry module, for when the source position of current material is non-batch processing module, inquiring about current material Target location;
When the target location of current material is batch processing module, first object position judging module is called;
When the target location of current material is non-batch processing module, the second target location judge module is called.
9. it is according to claim 6 to support while processing the route control device of many sheet materials, it is characterised in that described pre- If rule also includes that technique demarcates rule, it is preposition for the material of the highest priority of same packet has that the technique demarcates rule There is craft label, the minimum material of priority process to identify and rearmounted craft label;
Wherein, when there are material preliminary processes to identify, preliminary processes were carried out before material transferring to the batch processing module;
When there is material process to identify, process is carried out after material transferring to the batch processing module;
When material has rearmounted craft label, rearmounted technique is carried out from after the batch processing module in material.
10. it is according to claim 6 to support while processing the route control device of many sheet materials, it is characterised in that described Batch processing module is the processing chamber of Films Prepared by APCVD APCVD equipment, and the batch processing module includes heat deposition technique Chamber and plasma assisted deposition processing chamber.
CN201310578182.6A 2013-11-18 2013-11-18 It is a kind of to support while processing the route control method and device of many sheet materials Active CN104656571B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310578182.6A CN104656571B (en) 2013-11-18 2013-11-18 It is a kind of to support while processing the route control method and device of many sheet materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310578182.6A CN104656571B (en) 2013-11-18 2013-11-18 It is a kind of to support while processing the route control method and device of many sheet materials

Publications (2)

Publication Number Publication Date
CN104656571A CN104656571A (en) 2015-05-27
CN104656571B true CN104656571B (en) 2017-07-04

Family

ID=53247835

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310578182.6A Active CN104656571B (en) 2013-11-18 2013-11-18 It is a kind of to support while processing the route control method and device of many sheet materials

Country Status (1)

Country Link
CN (1) CN104656571B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111882168B (en) * 2020-07-02 2024-04-02 北京北方华创微电子装备有限公司 Material scheduling method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7672748B2 (en) * 2006-04-17 2010-03-02 Chartered Semiconductor Manufacturing, Ltd. Automated manufacturing systems and methods
JP2010052938A (en) * 2008-08-29 2010-03-11 Ihi Corp Conveyance control device and conveyance control method
CN101751025B (en) * 2008-12-12 2012-06-06 北京北方微电子基地设备工艺研究中心有限责任公司 Silicon slice optimal scheduling method and device
JP5282021B2 (en) * 2009-12-14 2013-09-04 株式会社日立ハイテクノロジーズ Semiconductor processing system and semiconductor processing method
JP5738796B2 (en) * 2012-04-11 2015-06-24 株式会社日立ハイテクノロジーズ Processing room assignment setting device and processing room assignment setting program
CN103034215B (en) * 2012-12-21 2015-08-19 上海交通大学 Based on reentried multimachine batch processing dispatching device and the method for closed-loop
CN103136631B (en) * 2013-01-22 2015-11-11 安徽工程大学 Batch dispatching method of minimum total complete time is realized based on product family's sequence

Also Published As

Publication number Publication date
CN104656571A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
WO2018058842A1 (en) Scheduling method and device for production line apparatus
CN101192055B (en) Control device and control method for substrate processing device
US8467895B2 (en) Processing system and method for operating the same
WO2017101165A1 (en) Device real-time status-based material scheduling method and system
TWI509722B (en) Semiconductor processing station and method for processing semiconductor wafer
CN109034596A (en) A kind of method and apparatus of material Optimized Operation
CN104404468A (en) Preparation device and preparation method of high-flux combined material
KR20160115794A (en) Substrate transfer method and substrate processing apparatus
CN104658943B (en) Material processing method and device when a kind of semiconductor equipment is abnormal
KR20050086451A (en) Apparatus for vacuum treating two dimensionally extended substrates and method for manufacturing such substrates
CN104656571B (en) It is a kind of to support while processing the route control method and device of many sheet materials
JP2013098412A (en) Vacuum processing apparatus and method for conveying object to be processed
CN101751025B (en) Silicon slice optimal scheduling method and device
CN103979245A (en) Configuration method of storage cabinet shelf of crystal boxes
CN101763098B (en) Method and device for silicon wafer optimized scheduling
WO2023125220A1 (en) Semiconductor process apparatus scheduling control method and semiconductor process apparatus
JP2016004923A (en) Manufacturing line of semiconductor device and manufacturing method of semiconductor device
CN104651808B (en) A kind of loader lacks the treating method and apparatus of piece
JP2016096211A (en) Vacuum processing apparatus
US10236199B2 (en) Substrate processing method and substrate processing apparatus
CN107434146B (en) Method and device for conveying materials on equipment and material conveying equipment
CN104752150A (en) Method for establishing technological process
TW202205038A (en) Scheduling substrate routing and processing
CN110895733A (en) Production scheduling method and device, semiconductor processing equipment and storage medium
JP2011228510A (en) Substrate processing apparatus and substrate transferring method

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 100176 Beijing economic and Technological Development Zone, Wenchang Road, No. 8, No.

Patentee after: Beijing North China microelectronics equipment Co Ltd

Address before: 100176 Beijing economic and Technological Development Zone, Beijing, Wenchang Road, No. 8, No.

Patentee before: Beifang Microelectronic Base Equipment Proces Research Center Co., Ltd., Beijing