CN104656133A - 一种油藏模型限定下的四维地震反演解释方法 - Google Patents
一种油藏模型限定下的四维地震反演解释方法 Download PDFInfo
- Publication number
- CN104656133A CN104656133A CN201510103899.4A CN201510103899A CN104656133A CN 104656133 A CN104656133 A CN 104656133A CN 201510103899 A CN201510103899 A CN 201510103899A CN 104656133 A CN104656133 A CN 104656133A
- Authority
- CN
- China
- Prior art keywords
- dimensional
- reservoir
- inversion
- result
- engineering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Geophysics And Detection Of Objects (AREA)
Abstract
本发明公开了一种油藏模型限定下的四维地震反演解释方法,具体步骤包括:对油藏模型进行三维和四维波阻抗的扰动模拟,分别得到油藏工程三维预测结果和油藏工程四维预测结果;对井数据进行静态数据统计分析得到先验统计信息,再进行三维反演得到三维油藏物性反演结果;将油藏工程四维预测结果进行统计分析得到油藏工程限定条件;将三维油藏物性反演结果与四维地震数据进行对比,在油藏工程限定下,通过马氏链统计的贝叶斯推导得到四维油藏反演结果。本发明得到的四维油藏反演结果整体更稳定、更清晰,对油藏模拟的预测更有参考性,四维地震与三维地震观测结果的连续性强,具有更高的统计精度和时延域上的连贯性。
Description
技术领域
本发明涉及油藏地球物理技术领域,具体是一种油藏模型限定下的四维地震反演解释方法。
背景技术
国外现有地震反演技术直接对单次地震观测数据进行反演,或对多次观测的数据差进行确定性或统计性反演。然而该方法存在以下缺点:首先进行地震反演时受输入数据质量影响严重,且难以保证和三维地震观测结果的连续性;其次反演结果不受油藏工程信息限定,因此计算结果可能在油藏管理背景下无意义;最后无法将结果定量地应用于油藏模型的校正和优化中。
发明内容
本发明的目的在于提供一种统计精度高、时延域连续性强的油藏模型限定下的四维地震反演解释方法,以解决上述背景技术中提出的问题。
为实现上述目的,本发明提供如下技术方案:
一种油藏模型限定下的四维地震反演解释方法,具体步骤如下:
(1)对油藏模型中压力和流体饱和度分别在三维和四维观测时间点上进行储层的岩石物理计算,并进行三维和四维波阻抗的扰动模拟,分别得到油藏工程三维预测结果和油藏工程四维预测结果;
(2)对井数据进行静态数据统计分析得到先验统计信息,再根据油藏工程三维预测结果、三维地震数据和先验统计信息进行三维反演,得到三维油藏物性反演结果;
(3)将油藏工程四维预测结果进行统计分析得到油藏工程限定条件;
(4)将三维油藏物性反演结果作为四维地震反演的初始参考模型,将三维油藏物性反演结果与四维地震数据进行对比,在油藏工程限定下,通过马氏链统计的贝叶斯推导得到四维油藏反演结果。
与现有技术相比,本发明的有益效果是:
本发明得到的四维油藏反演结果整体更稳定、更清晰,对油藏模拟的预测更有参考性,四维地震与三维地震观测结果的连续性强,具有更高的统计精度和时延域上的连贯性。
附图说明
图1为本发明的方法流程图。
具体实施方式
下面结合具体实施方式对本专利的技术方案作进一步详细地说明。
请参阅图1,一种油藏模型限定下的四维地震反演解释方法,具体步骤如下:
(1)对油藏模型中压力和流体饱和度分别在三维和四维观测时间点上进行储层的岩石物理计算,并进行三维和四维波阻抗的扰动模拟,分别得到油藏工程三维预测结果和油藏工程四维预测结果;
(2)对井数据进行静态数据统计分析得到先验统计信息,再根据油藏工程三维预测结果、三维地震数据和先验统计信息进行三维反演,得到三维油藏物性反演结果;
(3)将油藏工程四维预测结果进行统计分析得到油藏工程限定条件;
(4)将三维油藏物性反演结果作为四维地震反演的初始参考模型,将三维油藏物性反演结果与四维地震数据进行对比,在油藏工程限定下,通过马氏链统计的贝叶斯推导得到四维油藏反演结果,将三维油藏物性反演结果与四维地震数据反演进行耦合,解决了四维地震和三维地震观测结果的连续性问题。
所述油藏模型限定下的四维地震反演解释方法中通过引入三维地震数据噪音和四维地震数据噪音作为数据不确定性,统计性地估计实际现场数据监测到的真实油藏变化,相比传统的确定性非耦合反演结果,同时对结果的不确定性进行估计,有更高的统计精度和时延域上的连贯性。
通过将反演技术与模型优化流程进行整合,可将本发明的工作方法流程直接在油藏模型上进行计算,在取得定量反演结果以后,可以直接估计油藏的三维属性和四维属性,如孔隙度和净毛比及连通性等,并将参数直接应用于油藏模型的模拟和预测中,因此所述油藏模型限定下的四维地震反演解释方法得到的四维油藏反演结果在满足实际的地球物理数据同时也兼顾了油藏工程原理和模拟结果,为后续的解释工作带来极大便利。
本发明得到的四维油藏反演结果整体更稳定、更清晰,对油藏模拟的预测更有参考性,四维地震与三维地震观测结果的连续性强,具有更高的统计精度和时延域上的连贯性。
上面对本专利的较佳实施方式作了详细说明,但是本专利并不限于上述实施方式,在本领域的普通技术人员所具备的知识范围内,还可以在不脱离本专利宗旨的前提下作出各种变化。
Claims (1)
1.种油藏模型限定下的四维地震反演解释方法,其特征在于,具体步骤如下:
(1)对油藏模型中压力和流体饱和度分别在三维和四维观测时间点上进行储层的岩石物理计算,并进行三维和四维波阻抗的扰动模拟,分别得到油藏工程三维预测结果和油藏工程四维预测结果;
(2)对井数据进行静态数据统计分析得到先验统计信息,再根据油藏工程三维预测结果、三维地震数据和先验统计信息进行三维反演,得到三维油藏物性反演结果;
(3)将油藏工程四维预测结果进行统计分析得到油藏工程限定条件;
(4)将三维油藏物性反演结果作为四维地震反演的初始参考模型,将三维油藏物性反演结果与四维地震数据进行对比,在油藏工程限定下,通过马氏链统计的贝叶斯推导得到四维油藏反演结果。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510103899.4A CN104656133A (zh) | 2015-03-10 | 2015-03-10 | 一种油藏模型限定下的四维地震反演解释方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510103899.4A CN104656133A (zh) | 2015-03-10 | 2015-03-10 | 一种油藏模型限定下的四维地震反演解释方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104656133A true CN104656133A (zh) | 2015-05-27 |
Family
ID=53247480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510103899.4A Pending CN104656133A (zh) | 2015-03-10 | 2015-03-10 | 一种油藏模型限定下的四维地震反演解释方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104656133A (zh) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427435A (zh) * | 2020-09-22 | 2022-05-03 | 中国石油化工股份有限公司 | 一种三维油藏模型更新方法、装置、电子设备及存储介质 |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102508294A (zh) * | 2011-10-20 | 2012-06-20 | 西北大学 | 一种利用时移地震勘探资料进行差异avo分析的方法 |
CN102695970A (zh) * | 2009-06-04 | 2012-09-26 | 道达尔公司 | 用于表征石油或者天然气储集层随时间演变的改进方法 |
-
2015
- 2015-03-10 CN CN201510103899.4A patent/CN104656133A/zh active Pending
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102695970A (zh) * | 2009-06-04 | 2012-09-26 | 道达尔公司 | 用于表征石油或者天然气储集层随时间演变的改进方法 |
CN102508294A (zh) * | 2011-10-20 | 2012-06-20 | 西北大学 | 一种利用时移地震勘探资料进行差异avo分析的方法 |
Non-Patent Citations (4)
Title |
---|
S. TIAN ET AL.: "An Engineering-consistent Inversion of Timelapse Seismic Data", 《74TH EAGE CONFERENCE & EXHIBITION INCORPORATING SPE EUROPEC 2012》 * |
S. TIAN ET AL.: "Updating the Reservoir Model Using Engineering-consistent 4D Seismic Inversion", 《76TH EAGE CONFERENCE & EXHIBITION 2014》 * |
SEAN TIAN ET AL.: "Closing the loops using engineering-consistent 4D seismic inversion", 《THE LEADING EDGE》 * |
王守东等: "时移地震资料贝叶斯AVO波形反演", 《地球物理学报》 * |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114427435A (zh) * | 2020-09-22 | 2022-05-03 | 中国石油化工股份有限公司 | 一种三维油藏模型更新方法、装置、电子设备及存储介质 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
AU2014101610A4 (en) | System and method for characterizing uncertainty in subterranean reservoir fracture networks | |
CN110031896B (zh) | 基于多点地质统计学先验信息的地震随机反演方法及装置 | |
CN109655903B (zh) | 页岩层横波速度预测方法及系统 | |
AU2012369161B2 (en) | Systems and methods for estimating fluid breakthrough times at producing well locations | |
Ray et al. | Building more robust low-frequency models for seismic impedance inversion | |
Sharifi et al. | Novel permeability upscaling method using fast marching method | |
WO2015050530A1 (en) | In-situ wellbore, core and cuttings information system | |
Lu et al. | Assisted history matching for fractured reservoirs by use of hough-transform-based parameterization | |
EP2973429A1 (en) | Basin-to-reservoir modeling | |
AU2015416311A1 (en) | Automated upscaling of relative permeability using fractional flow in systems comprising disparate rock types | |
CN111025384A (zh) | 基于波形分类交汇融合的储层预测方法和装置 | |
CN108873065A (zh) | 砂岩优质储层预测方法及装置 | |
Jin et al. | 4D seismic history matching using information from the flooded zone | |
CN105723051A (zh) | 根据使用粘度比不变量阶跃函数相对渗透率近似的历史生产数据的相对渗透率反演 | |
CN110927789A (zh) | 一种基于欠失数据预测页岩平面分布的方法及装置 | |
Ray* et al. | More robust methods of low-frequency model building for seismic impedance inversion | |
CN104656133A (zh) | 一种油藏模型限定下的四维地震反演解释方法 | |
Nejadi et al. | Ensemble Kalman filter predictor bias correction method for non-Gaussian geological facies detection | |
CN112415616B (zh) | 深埋储层孔隙度反演方法及装置 | |
CN107871028B (zh) | 一种层序地层的级别划分方法及装置 | |
Bouatay et al. | An approach for imperfection propagation: Application to land cover change prediction | |
Mai et al. | Application of geostatistical tools to assess geological uncertainty for Sinquyen Copper mine, Vietnam | |
CN113050162B (zh) | 基于Zoeppritz方程的粘弹介质地震反演方法 | |
Khatoon et al. | Polynomial chaos based solution to inverse problems in petroleum reservoir engineering | |
Aljuboori et al. | The impact of contact area and fracture surface roughness on fluid flow in fractured reservoirs |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C41 | Transfer of patent application or patent right or utility model | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20160504 Address after: 100000 Beijing City West Road No. 12 Chaoyang District Building No. 2 (national advertising Industrial Park incubator No. 23891) Applicant after: Beijing deep blue pioneer Gas Technology Service Co., Ltd. Address before: 230000 Anhui city of Hefei province Luyang Industrial Zone Science and Technology Industrial Park Xinglu rain Road No. 8 Building Applicant before: Anhui Sai Si Mick Enertech Co., Ltd. |
|
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150527 |
|
WD01 | Invention patent application deemed withdrawn after publication |