CN104655047B CN201510085599.8A CN201510085599A CN104655047B CN 104655047 B CN104655047 B CN 104655047B CN 201510085599 A CN201510085599 A CN 201510085599A CN 104655047 B CN104655047 B CN 104655047B
Authority
CN
China
Prior art keywords
tunnel
array camera
thermal infrared
led
infrared imager
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510085599.8A
Other languages
Chinese (zh)
Other versions
CN104655047A (en
Inventor
李清泉
曹民
章丽萍
孙小进
谢俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Optical Valley excellence Technology Co.,Ltd.
Original Assignee
WUHAN WUDA ZOYON SCIENCE AND TECHNOLOGY Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by WUHAN WUDA ZOYON SCIENCE AND TECHNOLOGY Co Ltd filed Critical WUHAN WUDA ZOYON SCIENCE AND TECHNOLOGY Co Ltd
Priority to CN201510085599.8A priority Critical patent/CN104655047B/en
Publication of CN104655047A publication Critical patent/CN104655047A/en
Application granted granted Critical
Publication of CN104655047B publication Critical patent/CN104655047B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Investigating Materials By The Use Of Optical Means Adapted For Particular Applications (AREA)
  • Length Measuring Devices By Optical Means (AREA)

Abstract

The invention discloses a kind of rapid integrated measuring system in tunnel, including chassis vehicle, sensor stand, sensor, sensor synchronization and signal processing apparatus, data acquisition and procession device and electric supply installation, sensor stand is installed on a chassis by feathering axis, if installing dried noodle array camera, LED illumination lamp, thermal infrared imager on sensor stand respectively;View data on the array camera collection tunnel cross-section of face;Thermal infrared imager gathers the temperature information of tunnel inner wall;It is synchronous to be set to thermal infrared imager, face array camera offer synchronizing signal with signal processing device;Data acquisition and procession device gathers and handled the thermal infrared imager, the signal of face array camera.The present invention can simultaneously, Quick Acquisition Lining Crack, lining cutting percolating water section deformation and comes to nothing a variety of tunnel defect data such as disease, substantially increases detection efficiency and accuracy of detection.Detection process does not need manual intervention, good for detection tunnel-liner percolating water and disease aspect of coming to nothing, security.

Description

The rapid integrated measuring system in tunnel
Technical field
The invention belongs to the field of existing vcehicular tunnel technology, is related specifically to Tunnel Lining Cracks, lining cutting percolating water, tunnel The rapid integrated measuring system in tunnel of the Indexs measures such as road section geometric deformation.
Background technology
The routine testing work of operation tunnel at present, be unable to do without manual work mostly.For example, the inspection of Tunnel Lining Cracks Survey, be to be identified using artificial naked eyes, then photograph to record crack speciality form, manual record crack position with tape measure, camera Confidence ceases.Detected for the Lining Crack more than haunch with vault, then need to use scaffold or high altitude lifting platform car, examined Survey personnel could close contact to tunnel inner wall, using flashlight lighting, visually check the disease of haunch and vault.This method The Lining Crack accuracy rate detected is low, and easy missing inspection, in detection process, personnel safety is poor, and detection efficiency is low, 1 kilometer Tunnel, 10 individual demands 1 hour complete.
For example, Tunnel Water Leakage and vacant analysis, are that manually naked eyes identify, vacant analysis.Man-hour manually hand-held iron hammer beats Lining cutting inwall, if running into has disease of coming to nothing, the lining cutting cement block to drop easily injures vehicle and the testing staff of traveling by a crashing object, In detection process, because tunnel vault is very high, it for the detection come to nothing, can not be completely covered, can only locally detect, this method Detection efficiency is low, and precision is low, and security is poor.
For example, tunnel cross section shape changing detection, uses total powerstation static state fixed test mostly.Because shape changing detection is desirable The historical data of same position contrasts through row.Same tunnel, the profile data of collection is more, and detection is more accurate.But In Practical Project detection process, due to fixed point Static Detection, it is necessary to which completely enclosed tunnel, serious have impact on traffic patency.
And it is above-mentioned operation tunnel conventional detection, indices can only be detected individually, efficiency is low." Tunnel testing car " (patent No. 200620052491.5) provides a kind of Tunnel testing equipment simple to operate, cheap.In conventional carrier vehicle On platform, fixed rotatable telescopic arm, radar detedtor is installed in telescopic arm front end, for gathering tunnel-liner inner surface Data.There is a range tracking element in radar erector, compensation is made in caused skew movable to vehicle, to ensure thunder It can accurately be close to inner surface of tunnel up to detector, collect accurately data.The base of fixed telescopic arm can turn Dynamic 180 °, the flexible of amplitude oil cylinder can make 100 ° of telescopic arm luffing, so as to may be implemented in comprehensive detection in tunnel.But this sets It is standby can practicality it is not high, detection speed is low, therefore there is no and applied by market.
The content of the invention
The technical problems to be solved by the invention are to provide a kind of rapid integrated measuring system in tunnel, have automaticity The characteristics of high, safe efficient, multi-parameter comprehensive measures.
In order to solve the above technical problems, the invention provides a kind of rapid integrated measuring system in tunnel, it is characterised in that bag Include chassis vehicle, sensor stand, sensor, sensor synchronization and signal processing apparatus, data acquisition and procession device and power supply Device, if the sensor includes dried noodle array camera and thermal infrared imager;
The chassis vehicle, the carrier platform for traverse measurement;
The sensor stand, the sensor stand are arranged on the chassis vehicle by feathering axis, Ruo Gansuo State face array camera, thermal infrared imager is separately mounted on sensor stand, some LED are installed on the sensor stand and shone Bright lamp;
The LED illumination lamp is used to irradiate tunnel inner wall, and shooting tunnel cross-section image for the face array camera provides light Source;The face array camera is used to gather the view data on tunnel cross-section;The thermal infrared imager is used to gather tunnel inner wall Temperature information;
The synchronization and signal processing apparatus, connect the thermal infrared imager, face array camera and data acquisition and procession Device, for providing synchronizing signal for the thermal infrared imager, face array camera;
The data acquisition and procession device, for gathering and handling the signal of the thermal infrared imager, face array camera;
The electric supply installation, for for the thermal infrared imager, face array camera, synchronous with signal processing apparatus, data Collection provides working power with processing unit.
More excellent, laser scanner is housed, the laser scanner connects the synchronization and signal on the horizontal base Processing unit and data acquisition and procession device, in vehicular motion, completing the outline data of full section of tunnel Collection.
Further optimize, if dried noodle array camera arrangement is arranged on fan-shaped curved line, the face array camera Shooting direction gradually changed by putting in order for face array camera;
Some LED illumination lamp arrangements are arranged on arrangement and are arranged on fan-shaped curved line, the irradiation of the LED illumination lamp Direction is gradually changed by putting in order for LED illumination lamp.
The accumulation emergent light angle of whole LED illumination lamps on the vertical plane covers 90 degree, whole face array cameras Accumulation shooting angle on the vertical plane covers 90 degree.
Each LED illumination lamp is arranged on the sensor stand by LED seat respectively, each LED The seat reduction of fractions to a common denominator does not overregulate nut adjustable angle on the sensor stand.
Each face array camera is arranged on the sensor stand by camera holder, and the camera holder passes through regulation Nut adjustable angle is arranged on the sensor stand.
The LED seat is that section is step-like elongate structure, and a LED is mounted with respectively in the going up or down stairway face Illuminating lamp, the illumination angle of the LED illumination lamp on upper and lower cascaded surface, which exists, to intersect, and makes to form unshadowed light on tunnel inner wall Shadow surface, and further strengthen illuminance.
Each LED illumination lamp includes some aligned LED, and the light of a row LED illumination lamp forms a light Band.
Preferably, the quantity of the LED seat is 17, and the quantity of the face array camera seat is 16, each described The installation alternate with the LED seat respectively of face array camera seat.
The thermal infrared imager uses the thermal infrared imager that 2 imaging angles are 45 ° for 90 ° or 3 imaging angles.
The principle of tunnel Fast measurement system is:In chassis vehicle traveling in tunnel, tunnel is gathered by face array camera The image data of inwall, laser scanner gather the outline data of tunnel cross section, and thermal infrared imager gathers the temperature of tunnel inner wall Spend information.The sensor stand uses 180 ° of rotational structures, is respectively completed the data acquisition in left and right half range tunnel;To collecting All the sensors data, carry out the fusion treatment of data post, by image data and infrared data, fit to tunnel 3D models On, reduce the true health status in tunnel.With reference to the encoder data in system, the geographical location information of disease is also recorded Come.The characteristics of for all diseases and physical location have accurate record, and the report data can of later stage production supplies Conserve departments' reference.
The beneficial effects of the present invention are:
The present invention is not under conditions of traffic control is made, and chassis vehicle under normally travel speed 60km/h -80km/h to pass through Tunnel, so that it may which simultaneously, a variety of tunnel defect data of Quick Acquisition, including Lining Crack, lining cutting percolating water and comes to nothing at section deformation Disease, substantially increase detection efficiency.
The present invention establishes 3D tunnel models, by tunnel defect number by the way that the data gathered are passed through into later stage fusion treatment According to being fused on 3D models, true reappearance tunnel outdoor scene, the geographical position of disease in tunnel is accurately positioned, so as to substantially increase Accuracy of detection.
Detection process of the present invention does not need manual intervention, using non-contact measurement, is oozed particularly with detection tunnel-liner In terms of leak and disease of coming to nothing, security is good.
Brief description of the drawings
Technical scheme is further described in detail with reference to the accompanying drawings and detailed description.
Fig. 1 is the overall structure front view of the specific embodiment of the invention.
Fig. 2 is the structural front view of car parts of the present invention.
Fig. 3 is the sensor stand three-dimensional structure diagram in car parts of the present invention.
Fig. 4 is sensor support structure left view.
Fig. 5 is sensor support structure partial enlarged drawing.
Fig. 6 is single led polishing characteristic schematic diagram.
Fig. 7 is the lighting strip schematic diagram that continuous multiple LED are formed.
Fig. 8 is that LED main light sources cover schematic diagram in the visual field of tunnel inner wall on sensor stand.
Fig. 9 is that LED pairs light source covers schematic diagram in the visual field of tunnel inner wall on sensor stand.
Figure 10 is the mounting coordinate schematic diagram of major and minor LED light source on sensor stand.
Figure 11 is the setting angle schematic diagram of main LED light source on sensor stand.
Figure 12 is the perspective plane schematic diagram of camera on sensor stand.
Figure 13 is camera mounting coordinate schematic diagram on sensor stand.
Figure 14 is camera setting angle schematic diagram on sensor stand.
Embodiment
As shown in figure 1, the system is a vehicle-mounted detection integrated system, including chassis vehicle 1, stroboscopic indicator lamp 2, subframe 3, Power supply wall box, slide shelter 5, preceding fixed barricade 6, workspace cludy 7, the big cabin 8 in workspace, accessory case 9, range finder 10, oil machine Door 11, slided as shown in Fig. 2 sensor stand is arranged in shelter 5.Chassis vehicle is the traverse measurement platform of the system, is tunnel Each equipment of road measuring system provides carrier loader platform.Chassis vehicle 1 uses light truck, and tractive force is big, handling good, and full car uses Air spring shock mitigation system, it is ensured that the security and stability of equipment.Synchronously be arranged on signal processing apparatus in workspace cludy 7, Data acquisition and procession device, electric supply installation are arranged in the big cabin 8 in workspace.
As shown in Figure 3, Figure 4, sensor stand is system sensor equipment carrying device, is arranged on by feathering axis , being capable of 90 ° of rotations in horizontal extent on chassis vehicle.Tunnel car passes through left rotation and right rotation sensor when traveling process measures The rotation of support, realize the collection of left and right half range tunneling data, it is not necessary to close a road to traffic, it is not required that reverse stroke, in actual workmanship When journey, it is not necessary to walk repetition section, the detection efficiency greatly improved.
Sensor stand includes horizontal base and fan-shaped stand, and a laser scanner 24 is housed on horizontal base, fan-shaped Thermal infrared imager is installed, thermal infrared imager is used to gather tunnel inner wall temperature data on the side of stand;Thermal infrared imager is adopted With the thermal infrared imager that 2 imaging angles are 90 ° or 3 imaging angles are 45 °.Thermal infrared imager is used to gather tunnel inner wall Temperature data, handled by later data, generate thermal map.Laser scanner, laser scanner connection are housed on horizontal base Synchronous and signal processing apparatus and data acquisition and procession device, in vehicular motion, completing full section of tunnel Outline data collection.
17 groups of Combined LED illumination lamps, and 16 face array phases are sequentially installed on the arcwall face at the top of fan-shaped stand Machine.The exit direction of different LED illumination lamps is gradually changed by putting in order for lighting unit, and whole LED illumination lamps are in vertical plane On accumulation emergent light angle cover 90 degree, and adjacent light belt is incident upon the just unshadowed linking on tunnel inner wall.All The shooting angle of face array camera is gradually changed by putting in order for face array camera, the accumulation of face array camera on the vertical plane Shooting angle covers 90 degree.
Laser scanner completes the collection of the outline data of full section of tunnel in vehicular motion;LED illumination lamp is used In irradiation tunnel arc top surface, shoot tunnel arc top image for face array camera and light source is provided;It is synchronous to be set to signal processing device Laser scanner, face array camera provide synchronization and signal transacting;Data acquisition and procession device gathers and processing laser scanning The signal of instrument, face array camera;Electric supply installation is laser scanner, face array camera, synchronously adopted with signal processing apparatus, data Collection provides working power with processing unit.
As shown in figure 5, every group of LED illumination lamp includes lamp socket 31, each LED seat is that section is step-like elongated knot Structure, the elongated combination LED installed on the high position of lamp socket 31 is main light source, the elongated group installed on lower position Conjunction LED is secondary light source.The component by adjusting nut A, can make ± 5 ° of regulation in the Y direction.Camera can pass through adjusting nut B, make ± 5 ° of regulation in the Y direction.The installation site and regulation angle of LED and camera, set according to two track tunnel models Meter and calculating, its main purpose is to realize the splicing of cross section image data.
Single led mounting means uses laterally, as shown in Figure 7.Using this mounting means, mainly in view of single The characteristics of LED light projector area and luminous intensity, as shown in fig. 6, the single led polishing on tunnel inner wall is shaped as an ellipse Region, and brightness is not uniform, but gradually weaken from center to surrounding.In view of single led photocurrent versus light intensity, in order to A light belt of showing up can be formed in the X-direction of tunnel inner wall cross section, so the mounting means of LED needs to combine adjustment, It is more than with reaching Uniform Illumination region in camera shooting area, so could auxiliary camera illumination.Fig. 7 is the multiple lists deployed LED illumination produces the schematic diagram of light belt, and adjacent single led illumination region has certain overlapping in figure, its act on be exactly in order to Brightness of illumination is improved by being superimposed, finally gives the strip-like rectangular illumination region of a brightness uniformity.
The perspective plane signal of main light source LED is as shown in Figure 8.41st, 42 respectively represent the 16th, the 15th LED key light The light path that source emits, and light projector region of the light path on tunnel inner wall.14th, the 15th the two adjacent main light sources are in tunnel There is space 43 in the projection on road inwall, there is also sky between other projections of two adjacent main light sources on tunnel inner wall Gap.The IMAQ being so unfavorable at the shadow that face array CCD camera irradiates to tunnel wall light source.In order to meet LED Light source covers whole half range tunnel inner wall, so add secondary light source, secondary light sources project face signal as shown in figure 9, wherein, 51, 52 represent the light path that the secondary light source of the 16th, the 15th LED emits, and light projector area of the light path on tunnel inner wall respectively Domain.Space 53 be present in the 14th, the 15th the two projections of adjacent secondary light source on tunnel inner wall.Other two adjacent secondary light There is also space between projection of the source on tunnel inner wall.But the projection space of secondary light source is located at effective projection of main light source Area, and projection space of the main light source on tunnel inner wall is located at effective projected area of secondary light source.So, secondary light source and main light source phase Mutually supplement, be used cooperatively, make light source projects space is not present on tunnel inner wall, while also enhance the illuminance to tunnel wall. The installation site coordinate that present embodiment gives light source is as shown in Figure 10, setting angle coordinate such as Figure 11 institutes of light source Show.
One face array CCD camera is arranged between two adjacent LED seats, and 16 are shared between 17 LED seats Individual face array CCD camera.The perspective plane signal of face array CCD camera is as shown in figure 12.Wherein, the meaning of label 61 is No. 16 phase The scanning area of machine, the signified scanning area for No. 15 camera of label 63, signified label 62 is No. 16 and No. 15 camera Scanning overlapping region.Because the focal length and object distance of each camera are different, so the projected area of each camera is also different, In order to which 1/2 tunnel inner wall is completely covered, so the installation site of each camera needs accurate calculating, present embodiment Give that the coordinate position of face array CCD camera is as shown in figure 13, and camera setting angle position is as shown in figure 14.Because the later stage is The demarcation of system, the position of camera need to finely tune, so the setting angle of single camera, can be adjusted at ± 5 °.
The principle of tunnel Fast measurement system of the present invention is:
The image data of tunnel inner wall is gathered by camera, scanner gathers the outline data of tunnel cross section, infrared heat As the temperature information of instrument collection tunnel inner wall.To all the sensors data collected, the fusion treatment of data post is carried out, will Image data and infrared data, fit on tunnel 3D models, reduce the true health status in tunnel.With reference to the coding in system Device data, the geographical location information of disease is also recorded.The characteristics of for all diseases and physical location have essence True record, the report data can of later stage production support shield departments' reference.
The tunnel slot detection method used at present, efficiency is low, it is necessary to which traffic is closed a road to traffic, and personnel hazard's property is big, general It is poor for applicability, do not possess generalization, the present invention gathers tunnel inner wall by the way of multi sensor combination by machine vision Image data, thermal infrared imager gather tunnel inner wall temperature information, and scanner gathers tunnel cross section profile information, encodes Device and GPS give mark of the data through row time and physical location collected, an engineering detecting, it is possible to collect tunnel Multiple diseases data, efficiency high, security is good, suitable for all tunnels;
The present invention is combined in actual application, the sShape features in tunnel itself, the exclusive sensor branch of autonomous Design Body panel, tunnel car, by the rotation of runing rest, are realized the collection of left and right half range tunneling data, are not required to during traveling Close a road to traffic, it is not required that reverse stroke, when engineering is actually done, it is not necessary to walk repetition section, the detection effect greatly improved Rate;
It should be noted last that above embodiment is merely illustrative of the technical solution of the present invention and unrestricted, Although the present invention is described in detail with reference to preferred embodiment, it will be understood by those within the art that, can be right Technical scheme is modified or equivalent substitution, and without departing from the spirit and scope of technical solution of the present invention, its is equal It should cover among scope of the presently claimed invention.

Claims (7)

1. a kind of rapid integrated measuring system in tunnel, it is characterised in that including chassis vehicle, sensor stand, sensor, sensor Synchronous and signal processing apparatus, data acquisition and procession device and electric supply installation, if the sensor includes dried noodle array camera And thermal infrared imager;
The chassis vehicle, the carrier platform for traverse measurement;
The sensor stand, the sensor stand are arranged on the chassis vehicle by feathering axis, some faces Array camera, thermal infrared imager are separately mounted on sensor stand, and some LED illuminations are provided with the sensor stand Lamp;Sensor stand includes horizontal base and fan-shaped stand;
The LED illumination lamp is used to irradiate tunnel inner wall, and shooting tunnel cross-section image for the face array camera provides light source;Institute Face array camera is stated to be used to gather the view data on tunnel cross-section;The thermal infrared imager is used for the temperature for gathering tunnel inner wall Information;
The synchronization and signal processing apparatus, the thermal infrared imager, face array camera and data acquisition and processing unit are connected, For providing synchronizing signal for the thermal infrared imager, face array camera;
The data acquisition and procession device, for gathering and handling the signal of the thermal infrared imager, face array camera;
The electric supply installation, for for the thermal infrared imager, face array camera, synchronous with signal processing apparatus, data acquisition Working power is provided with processing unit;
Laser scanner is housed on the horizontal base, the laser scanner connect the synchronization and signal processing apparatus and Data acquisition and procession device, the collection of the outline data in vehicular motion, completing full section of tunnel;
If the dried noodle array camera arrangement is arranged on the arcwall face at the top of the fan-shaped stand, the bat of the face array camera Direction is taken the photograph to gradually change by putting in order for face array camera;
Some LED illumination lamp arrangements are arranged on the arcwall face that arrangement is arranged at the top of fan-shaped stand, the LED illumination lamp Direction of illumination gradually changed by putting in order for LED illumination lamp;
Each face array camera seat installation alternate with the LED seat respectively;
The image data of tunnel inner wall is gathered by camera, scanner gathers the outline data of tunnel cross section, thermal infrared imager Gather the temperature information of tunnel inner wall;To all the sensors data collected, the fusion treatment of data post is carried out, by image Data and infrared data, fit on tunnel 3D models, reduce the true health status in tunnel.
2. the rapid integrated measuring system in tunnel according to claim 1, it is characterised in that whole LED illumination lamps Accumulation emergent light angle on the vertical plane covers 90 degree, the accumulation shooting angle covering of whole face array cameras on the vertical plane 90 degree.
3. the rapid integrated measuring system in tunnel according to claim 2, it is characterised in that every group of LED illumination lamp includes lamp Seat, each LED seat is that section is step-like elongate structure, the elongated combination LED installed on the high position of lamp socket For main light source, an elongated combination LED being installed on lower position is secondary light source, the light of the LED illumination lamp on upper and lower cascaded surface Exist according to angle and intersect.
4. the rapid integrated measuring system in tunnel according to claim 3, it is characterised in that each face array camera leads to Camera holder is crossed on the sensor stand, the camera holder is arranged on the sensor by adjusting nut adjustable angle On support.
5. the rapid integrated measuring system in tunnel according to claim 3, it is characterised in that each LED illumination lamp bag Some aligned LED are included, for single led mounting means using laterally, the light of a row LED illumination lamp forms a light Band.
6. the rapid integrated measuring system in tunnel according to claim 3, it is characterised in that the quantity of the LED seat is 17, the quantity of the face array camera seat is 16.
7. the rapid integrated measuring system in tunnel according to claim 3, it is characterised in that the thermal infrared imager uses 2 The thermal infrared imager that platform imaging angle is 90 ° or 3 imaging angles are 45 °.
CN201510085599.8A 2015-02-16 2015-02-16 The rapid integrated measuring system in tunnel Active CN104655047B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510085599.8A CN104655047B (en) 2015-02-16 2015-02-16 The rapid integrated measuring system in tunnel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510085599.8A CN104655047B (en) 2015-02-16 2015-02-16 The rapid integrated measuring system in tunnel

Publications (2)

Publication Number Publication Date
CN104655047A CN104655047A (en) 2015-05-27
CN104655047B true CN104655047B (en) 2018-02-02

Family

ID=53246458

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510085599.8A Active CN104655047B (en) 2015-02-16 2015-02-16 The rapid integrated measuring system in tunnel

Country Status (1)

Country Link
CN (1) CN104655047B (en)

Families Citing this family (22)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105004732A (en) * 2015-07-16 2015-10-28 武汉长盛工程检测技术开发有限公司 Tunnel crack rapid detection device and method
CN105352550B (en) * 2015-12-01 2018-06-05 武汉武大卓越科技有限责任公司 A kind of Tunnel testing multiple-sensor integration platform
CN105737849A (en) * 2015-12-24 2016-07-06 武汉武大卓越科技有限责任公司 Calibration method of relative position between laser scanner and camera on tunnel car
CN106324102B (en) * 2016-11-01 2018-11-27 金陵科技学院 A kind of tunnel sound emission inspection car
CN106627317B (en) * 2017-01-03 2020-10-13 同济大学 Apparent disease collection vehicle for highway tunnel
CN108318488A (en) * 2017-01-17 2018-07-24 南京火眼猴信息科技有限公司 A kind of subway tunnel Defect inspection device and detection method
CN108332084B (en) * 2017-01-17 2023-10-13 南京熊猫信息产业有限公司 Light source device of tunnel detection platform and light source distribution method thereof
CN107014352A (en) * 2017-05-02 2017-08-04 中铁第四勘察设计院集团有限公司 A kind of railcar and detection method for railway tunnel tunneling boring comprehensive detection
CN107178054B (en) * 2017-06-30 2018-09-14 长乐巧通工业设计有限公司 A kind of control method of Multipurpose Tunnel Cleanning Vehicle
CN107808371B (en) * 2017-09-15 2020-07-03 长安大学 Vehicle-mounted tunnel lining surface crack image acquisition method
CN107655898B (en) * 2017-10-10 2023-11-03 山西省智慧交通研究院有限公司 Stereoscopic scanning robot for road tunnel detection and implementation method thereof
CN108020197B (en) * 2017-12-05 2020-03-10 湖南湘建检测有限公司 Wall deformation detection method
CN108593654B (en) * 2018-03-28 2020-08-25 北京交通大学 Tunnel image acquisition system and method
CN108680582A (en) * 2018-06-15 2018-10-19 中路高科交通检测检验认证有限公司 A kind of apparent Defect inspection device in portable tunnel based on digital picture
CN109295913B (en) * 2018-08-24 2020-09-11 浙江大学 Bottom surface fixed type flexible water bag breakwater section deformation monitoring experiment device
CN110082354B (en) * 2019-03-29 2021-03-26 同济大学 Tunnel lining shallow layer potential peeling and stripping infrared detection device
CN110161043B (en) * 2019-05-10 2021-03-26 同济大学 Subway tunnel structure comprehensive detection vehicle
CN110163166B (en) * 2019-05-27 2021-06-25 北京工业大学 Robust detection method for LED lighting lamp of highway tunnel
CN111398309A (en) * 2020-04-03 2020-07-10 中铁隧道局集团有限公司 Apparent detection system of tunnel lining disease comprehensive detection vehicle
CN113916133A (en) * 2021-10-19 2022-01-11 中铁隧道局集团路桥工程有限公司 CCD-based linear array camera and infrared ray composite tunnel crack detection system
CN115128084B (en) * 2022-06-27 2024-06-25 长安大学 Image acquisition device and method for rotary tunnel lining
CN115127516B (en) * 2022-06-27 2024-02-02 长安大学 Multifunctional tunnel detection vehicle based on chassis of passenger car

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102768027A (en) * 2012-07-20 2012-11-07 山东理工大学 Method for monitoring whole-process safe displacement of underground surrounding rock
CN102880179A (en) * 2012-09-19 2013-01-16 山东康威通信技术股份有限公司 Multifunctional intelligent routing inspection robot used in power tunnel
CN104019742A (en) * 2014-06-05 2014-09-03 武汉武大卓越科技有限责任公司 Method for rapidly detecting cracks of tunnel lining
CN204007533U (en) * 2014-06-19 2014-12-10 樊晓东 The comprehensive checkout equipment of tunnel defect
CN104236827A (en) * 2013-06-09 2014-12-24 同济大学 Tunnel water leakage detection method and device based on temperature gradient

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102768027A (en) * 2012-07-20 2012-11-07 山东理工大学 Method for monitoring whole-process safe displacement of underground surrounding rock
CN102880179A (en) * 2012-09-19 2013-01-16 山东康威通信技术股份有限公司 Multifunctional intelligent routing inspection robot used in power tunnel
CN104236827A (en) * 2013-06-09 2014-12-24 同济大学 Tunnel water leakage detection method and device based on temperature gradient
CN104019742A (en) * 2014-06-05 2014-09-03 武汉武大卓越科技有限责任公司 Method for rapidly detecting cracks of tunnel lining
CN204007533U (en) * 2014-06-19 2014-12-10 樊晓东 The comprehensive checkout equipment of tunnel defect

Also Published As

Publication number Publication date
CN104655047A (en) 2015-05-27

Similar Documents

Publication Publication Date Title
CN104655047B (en) The rapid integrated measuring system in tunnel
CN110161043A (en) A kind of subway tunnel structure synthetic detection vehicle
CN110529186A (en) Tunnel structure percolating water based on infrared thermal imaging accurately identifies device and method
CN103194956B (en) Road detection vehicle and utilize it to carry out the method for Road Detection
CN104406521A (en) Vision measurement technology-based catenary geometric parameter measurement instrument and detection method
CN107102004A (en) A kind of tunnel detector
CN101487224B (en) High-speed road conditions detection vehicle
US20180164157A1 (en) Street light detection
CN103630088B (en) High accuracy tunnel cross-section detection method based on bidifly light belt and device
CN111413353A (en) Tunnel lining disease comprehensive detection vehicle
CN107504899A (en) The system and method for continuous tracking measurement contact net geometric parameter
CN103411530B (en) Large free forging part size on-line measurement device and method
CN104567684A (en) Contact network geometrical parameter detection method and device
CN105628194B (en) A kind of road lighting quality on-site measurement method
CN101487223A (en) Laser road synthetic detection vehicle
CN107356609A (en) A kind of vcehicular tunnel surface and internal detection vehicle
CN112329531B (en) Linear array binocular imaging system for pipe gallery apparent disease detection and working method
WO2018146358A1 (en) System and metod for the volumetric and isotopic identification of radiation distribution in radioactive surroundings
CN107284330A (en) A kind of existing vcehicular tunnel car
CN111398309A (en) Apparent detection system of tunnel lining disease comprehensive detection vehicle
CN112924344A (en) Monitoring system and method for acquiring underground coal mine dust concentration based on image
CN207225178U (en) A kind of existing vcehicular tunnel vehicle
CN201354024Y (en) High-speed road condition inspection vehicle
ES2394902B2 (en) SYSTEM AND PROCEDURE FOR MEASURING THE THICKNESS OF PANTOGRAPH FROTERS.
CN106223175A (en) A kind of road detection vehicle and Approach for road detection

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 430223 Hubei science and Technology Park, East Lake Development Zone, Wuhan, China

Patentee after: Wuhan Optical Valley excellence Technology Co.,Ltd.

Address before: 430223 No.6, 4th Road, Wuda Science Park, Donghu New Technology Development Zone, Wuhan City, Hubei Province

Patentee before: WUHAN WUDA ZOYON SCIENCE AND TECHNOLOGY Co.,Ltd.