CN104654795A - Modularly mounted heating furnace - Google Patents
Modularly mounted heating furnace Download PDFInfo
- Publication number
- CN104654795A CN104654795A CN201310596344.9A CN201310596344A CN104654795A CN 104654795 A CN104654795 A CN 104654795A CN 201310596344 A CN201310596344 A CN 201310596344A CN 104654795 A CN104654795 A CN 104654795A
- Authority
- CN
- China
- Prior art keywords
- heater
- furnace bottom
- furnace
- splicing
- module
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Tunnel Furnaces (AREA)
Abstract
The invention relates to a modularly mounted heating furnace. The heating furnace comprises a furnace seat and a furnace body, wherein the furnace seat is formed by splicing two to three furnace bottom modules; the furnace body is formed by splicing 3-5 furnace body modules; the furnace bottom modules comprise furnace bottom fragments and supporting legs at bottoms of furnace bottom fragments; the furnace bottom modules are spliced into an entire circle through splice beams of the furnace bottom fragments; the furnace body module is cambered; splice stand columns are arranged on the two sides of the furnace body modules; the furnace body modules are spliced into the circular furnace body through the splice stand columns. The heating furnace has the beneficial effects that the furnace can be transported by using a normal vehicle, the flexibility of the transportation is increased, and the loading capacity of the transport vehicle can be utilized to the greatest extent through rational stacking arrangement.
Description
Technical field
The present invention relates to the heating furnace that a kind of modularization is installed.
Background technology
Industrial heating furnace is all directly manufacture shaping in production plant usually, then transported in applying unit by the vehicles, but the usual volume of industrial heating furnace is very large, the common vehicles cannot transport, need the special vehicle of specialty, and cannot limit for height section be passed through, add cost of transportation.
Summary of the invention
Technical problem to be solved by this invention is: provide the heating furnace that a kind of modularization is installed, convenient transport.
The technical solution adopted for the present invention to solve the technical problems is: the heating furnace that a kind of modularization is installed, comprise furnace base and body of heater, furnace base is spliced by 2 ~ 3 furnace bottom modules, body of heater top cover covers on body of heater, body of heater comprises feet bottom furnace bottom burst and furnace bottom burst by 3 ~ 5 body of heater modules furnace bottom module that is spliced, furnace bottom burst comprises the burst bottom girder of the support body of heater bottom furnace bottom sheet and furnace bottom sheet, the stitching portion of burst bottom girder has joggle beam, full circle is spliced into by the joggle beam of furnace bottom burst between furnace bottom module, joggle beam has bolt hole, during splicing, adjacent joggle beam is bolted, body of heater module is circular arc, has splicing column in the both sides of body of heater module, and splicing column has bolt hole, circular body of heater is spliced into by splicing column between body of heater module, splicing column has bolt hole, and during splicing, adjacent splicing column is bolted, splicing column is channel-section steel, and bolt hole is arranged in the groove bottom of channel-section steel, and the splicing seams of the splicing column be stitched together by bolt carries out seal weld.
For ease of splicing, limit further, joggle beam is channel-section steel, and bolt hole is arranged in the groove bottom of channel-section steel, and the splicing seams of the joggle beam be stitched together by bolt is welded.
Furnace base is spliced by 2, left and right furnace bottom module, furnace bottom burst is semicircle, the outer ring of furnace bottom burst have collar tie beam and furnace bottom cycle beam in furnace bottom, in furnace bottom, collar tie beam and furnace bottom cycle beam are channel-section steel, and collar tie beam and furnace bottom cycle beam opening are relatively arranged in furnace bottom, in furnace bottom, the top of collar tie beam and furnace bottom cycle beam has furnace bottom girth sheets, in the furnace bottom that the furnace bottom girth sheets of one of them furnace bottom module is overlapped on another furnace bottom module when splicing on collar tie beam and furnace bottom cycle beam.
Body of heater is spliced by 4 body of heater modules, the top of body of heater module has collar tie beam and body of heater cycle beam in body of heater, in body of heater, collar tie beam and body of heater cycle beam are channel-section steel, and in body of heater, collar tie beam and body of heater cycle beam opening are relatively arranged, and in body of heater, the bottom of collar tie beam and body of heater cycle beam has body of heater girth sheets.
The invention has the beneficial effects as follows: common vehicle can be used to transport, add the flexibility of transport, by reasonably stacking layout, farthest can utilize the delivered payload capability of haulage vehicle.
Accompanying drawing explanation
Below in conjunction with drawings and Examples, the present invention is further described;
Fig. 1 is structural representation of the present invention;
Fig. 2 is I place of the present invention enlarged drawing;
Fig. 3 is the structural representation that splicing column of the present invention splices mutually;
Fig. 4 is the structural representation of collar tie beam in body of heater of the present invention, body of heater cycle beam and body of heater girth sheets;
Fig. 5 is the distribution schematic diagram of the bolt hole of splicing column of the present invention;
Fig. 6 is the structural representation that joggle beam of the present invention splices mutually;
Fig. 7 is the distribution schematic diagram of the bolt hole of joggle beam of the present invention;
Wherein, 1. furnace bottom module, 1-1. furnace bottom sheet, 1-2. joggle beam, collar tie beam in 1-3. furnace bottom, 1-4. furnace bottom cycle beam, 1-5. furnace bottom girth sheets, 2. body of heater module, 2-1. splices column, collar tie beam in 2-2. body of heater, 2-3. body of heater cycle beam, 2-4. body of heater girth sheets, 3. bolt hole, 4. bolt, 5. body of heater top cover.
Detailed description of the invention
As shown in Figure 1, the heating furnace that a kind of modularization is installed, comprise furnace base, body of heater and body of heater top cover 5, described furnace base is spliced by 2 furnace bottom modules 1, and body of heater is spliced by 4 body of heater modules 2, and body of heater top cover 5 covers on body of heater.
As Fig. 1,2,3, shown in 4 and 5, body of heater module 2 is circular arc, there is in the both sides of body of heater module 2 splicing column 2-1, splicing column 2-1 has bolt hole 3, circular body of heater is spliced into by splicing column 2-1 between body of heater module 2, splicing column 2-1 has bolt hole 3, during splicing, adjacent splicing column 2-1 is connected by bolt 4, splicing column 2-1 have two row's bolts hole 3, two row's bolts hole of end position are symmetrical, and two row's bolts hole in centre position are interspersed, as shown in Figure 5.
Splicing column 2-1 is channel-section steel, and bolt hole 3 is arranged in the groove bottom of channel-section steel, when installing at the scene, first body of heater module 2 is stitched together by bolt 4, then carries out seal weld at the splicing seams place of splicing column 2-1.Such design improves body of heater module 2 and splices precision, reduces site operation amount.
The top of body of heater module 2 has collar tie beam 2-2 and body of heater cycle beam 2-3 in body of heater, in body of heater, collar tie beam 2-2 and body of heater cycle beam 2-3 is channel-section steel, and collar tie beam 2-2 and body of heater cycle beam 2-3 opening are relatively arranged in body of heater, in body of heater, the bottom of collar tie beam 2-2 and body of heater cycle beam 2-3 has body of heater girth sheets 2-4, carry out plug welding between collar tie beam 2-2, body of heater cycle beam 2-3 in body of heater girth sheets 2-4 and body of heater, body of heater top cover 5 covers collar tie beam 2-2, body of heater cycle beam 2-3 top in body of heater.
As Fig. 1, 6 and 7 furnace bottom modules 1 comprise the feet bottom semicircular furnace bottom burst and furnace bottom burst, furnace bottom burst comprises the burst bottom girder of the support body of heater bottom semicircular furnace bottom sheet 1-1 and furnace bottom sheet 1-1, the stitching portion of burst bottom girder has joggle beam 1-2, joggle beam 1-2 extends in diametric(al), joggle beam 1-2 by furnace bottom burst between furnace bottom module 1 is spliced into full circle, joggle beam 1-2 has bolt hole 3, during splicing, adjacent joggle beam 1-2 is connected by bolt 4, joggle beam have two row's bolts hole 3, two row's bolts hole of end position are symmetrical, two row's bolts hole in centre position are interspersed, as shown in Figure 7.
The outer ring of furnace bottom burst has collar tie beam 1-3 and furnace bottom cycle beam 1-4 in furnace bottom, in furnace bottom, collar tie beam 1-3 and furnace bottom cycle beam 1-4 is channel-section steel, and collar tie beam 1-3 and furnace bottom cycle beam 1-4 opening are relatively arranged in furnace bottom, in furnace bottom, the top of collar tie beam 1-3 and furnace bottom cycle beam 1-4 has furnace bottom girth sheets 1-5, in the furnace bottom that the furnace bottom girth sheets 1-5 of one of them furnace bottom module 1 is overlapped on another furnace bottom module 1 when splicing on collar tie beam 1-3 and furnace bottom cycle beam 1-4, when installing at the scene, lap-joint welds, and ensures that overall structure is stablized.
Joggle beam 1-2 is channel-section steel, bolt hole 3 is arranged in the groove bottom of channel-section steel, the splicing seams of the joggle beam 1-2 be stitched together by bolt 4 is welded, when installing at the scene, first furnace bottom module 1 be stitched together by bolt 4, then inside and outside joggle beam 1-2, splicing seams place bevel carries out intensity weldering.Such design improves furnace bottom module 1 and splices precision, reduces site operation amount.
Claims (4)
1. the heating furnace of a modularization installation, it is characterized in that: comprise furnace base, body of heater and body of heater top cover (5), described furnace base is spliced by 2 ~ 3 furnace bottom modules (1), and described body of heater is spliced by 3 ~ 5 body of heater modules (2), body of heater top cover (5) covers on body of heater
Furnace bottom module (1) comprises the feet bottom furnace bottom burst and furnace bottom burst, furnace bottom burst comprises the burst bottom girder of the support body of heater of furnace bottom sheet (1-1) and furnace bottom sheet (1-1) bottom, the stitching portion of burst bottom girder has joggle beam (1-2), joggle beam (1-2) by furnace bottom burst between furnace bottom module (1) is spliced into full circle, joggle beam (1-2) has bolt hole (3), during splicing, adjacent joggle beam (1-2) is connected by bolt (4);
Body of heater module (2) is circular arc, in the both sides of body of heater module (2), there is splicing column (2-1), splicing column (2-1) has bolt hole (3), circular body of heater is spliced into by splicing column (2-1) between body of heater module (2), splicing column (2-1) has bolt hole (3), during splicing, adjacent splicing column (2-1) is connected by bolt (4);
Splicing column (2-1) is channel-section steel, and bolt hole (3) is arranged in the groove bottom of channel-section steel, and the splicing seams of the splicing column (2-1) be stitched together by bolt (4) carries out seal weld.
2. the heating furnace of modularization installation according to claim 1, it is characterized in that: described joggle beam (1-2) is channel-section steel, bolt hole (3) is arranged in the groove bottom of channel-section steel, and the splicing seams of the joggle beam (1-2) be stitched together by bolt (4) is welded.
3. the heating furnace of modularization installation according to claim 1, it is characterized in that: described furnace base is spliced by 2, left and right furnace bottom module (1), furnace bottom burst is semicircle, the outer ring of furnace bottom burst have collar tie beam in furnace bottom (1-3) and furnace bottom cycle beam (1-4), in furnace bottom, collar tie beam (1-3) and furnace bottom cycle beam (1-4) are channel-section steel, and collar tie beam (1-3) and furnace bottom cycle beam (1-4) opening are relatively arranged in furnace bottom, in furnace bottom, the top of collar tie beam (1-3) and furnace bottom cycle beam (1-4) has furnace bottom girth sheets (1-5), in the furnace bottom that the furnace bottom girth sheets (1-5) of one of them furnace bottom module (1) is overlapped on another furnace bottom module (1) when splicing on collar tie beam (1-3) and furnace bottom cycle beam (1-4).
4. the heating furnace of modularization installation according to claim 1, it is characterized in that: described body of heater is spliced by 4 body of heater modules (2), the top of body of heater module (2) has collar tie beam in body of heater (2-2) and body of heater cycle beam (2-3), in body of heater, collar tie beam (2-2) and body of heater cycle beam (2-3) are channel-section steel, and in body of heater, collar tie beam (2-2) and body of heater cycle beam (2-3) opening are relatively arranged, and in body of heater, the bottom of collar tie beam (2-2) and body of heater cycle beam (2-3) has body of heater girth sheets (2-4).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310596344.9A CN104654795A (en) | 2013-11-22 | 2013-11-22 | Modularly mounted heating furnace |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201310596344.9A CN104654795A (en) | 2013-11-22 | 2013-11-22 | Modularly mounted heating furnace |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104654795A true CN104654795A (en) | 2015-05-27 |
Family
ID=53246209
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201310596344.9A Pending CN104654795A (en) | 2013-11-22 | 2013-11-22 | Modularly mounted heating furnace |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104654795A (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106288365A (en) * | 2015-06-11 | 2017-01-04 | 全爱军 | A kind of Large Copacity heating stove |
CN108895836A (en) * | 2018-08-23 | 2018-11-27 | 洛阳宏达炉业有限公司 | A kind of furnace chamber is the lift electric kiln of cylindrical structure |
CN109764688A (en) * | 2019-01-18 | 2019-05-17 | 彭志坚 | A kind of cylinder-shaped vertical cooling equipment of outer furnace of modularization furnace |
CN110132014A (en) * | 2019-06-03 | 2019-08-16 | 吴书平 | A kind of unit module layered stacks furnace body |
CN110307726A (en) * | 2019-08-05 | 2019-10-08 | 洛阳市谱瑞慷达耐热测试设备有限公司 | A kind of Modular electrical heating furnace |
CN115306163A (en) * | 2022-09-14 | 2022-11-08 | 中化二建集团有限公司 | Modularized construction method for tubular heating furnace in petrochemical engineering |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4702694A (en) * | 1984-08-31 | 1987-10-27 | Union Oil Company Of California | Furnace with modular construction |
US5575970A (en) * | 1995-04-14 | 1996-11-19 | Coble; Gary L. | Cast refractory base segments and modular fiber seal system for plural-stack annealing furnace |
CN202002490U (en) * | 2010-12-30 | 2011-10-05 | 碧海舟(北京)石油化工设备有限公司 | Novel modular cylindrical heating furnace shell |
CN202915713U (en) * | 2012-11-23 | 2013-05-01 | 北京京鲁兴华工业炉有限公司 | Modular furnace lining |
CN203642695U (en) * | 2013-11-22 | 2014-06-11 | 江苏东方成套设备制造有限公司 | Modular assembled heating furnace |
-
2013
- 2013-11-22 CN CN201310596344.9A patent/CN104654795A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4702694A (en) * | 1984-08-31 | 1987-10-27 | Union Oil Company Of California | Furnace with modular construction |
US5575970A (en) * | 1995-04-14 | 1996-11-19 | Coble; Gary L. | Cast refractory base segments and modular fiber seal system for plural-stack annealing furnace |
CN202002490U (en) * | 2010-12-30 | 2011-10-05 | 碧海舟(北京)石油化工设备有限公司 | Novel modular cylindrical heating furnace shell |
CN202915713U (en) * | 2012-11-23 | 2013-05-01 | 北京京鲁兴华工业炉有限公司 | Modular furnace lining |
CN203642695U (en) * | 2013-11-22 | 2014-06-11 | 江苏东方成套设备制造有限公司 | Modular assembled heating furnace |
Non-Patent Citations (1)
Title |
---|
余海军: "石油化工圆筒炉模块化设计", 《工业炉》 * |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106288365A (en) * | 2015-06-11 | 2017-01-04 | 全爱军 | A kind of Large Copacity heating stove |
CN108895836A (en) * | 2018-08-23 | 2018-11-27 | 洛阳宏达炉业有限公司 | A kind of furnace chamber is the lift electric kiln of cylindrical structure |
CN109764688A (en) * | 2019-01-18 | 2019-05-17 | 彭志坚 | A kind of cylinder-shaped vertical cooling equipment of outer furnace of modularization furnace |
CN109764688B (en) * | 2019-01-18 | 2020-08-25 | 彭志坚 | Cylindrical vertical cooling equipment for outer furnace of modular furnace |
CN110132014A (en) * | 2019-06-03 | 2019-08-16 | 吴书平 | A kind of unit module layered stacks furnace body |
CN110307726A (en) * | 2019-08-05 | 2019-10-08 | 洛阳市谱瑞慷达耐热测试设备有限公司 | A kind of Modular electrical heating furnace |
CN115306163A (en) * | 2022-09-14 | 2022-11-08 | 中化二建集团有限公司 | Modularized construction method for tubular heating furnace in petrochemical engineering |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104654795A (en) | Modularly mounted heating furnace | |
CN203201562U (en) | Shield tunneling machine initial counter-force frame convenient to detach, install and transport | |
CN103465852B (en) | The bumper body of self-propelled vehicle and manufacture method thereof | |
CN103231169B (en) | Laser welding method for reactor core wrapping tube | |
CN203284056U (en) | Transportation lifting device | |
CN203642695U (en) | Modular assembled heating furnace | |
CN102145438B (en) | Assembling method of doorframe of wind power tower | |
CN103661066B (en) | Container and quarry tipper | |
CN207155150U (en) | Burst tower welding system | |
CN202579061U (en) | Tower drum assembling structure | |
CN105485705A (en) | Integrated structure of reactor frame and economizer protection plate | |
CN205896568U (en) | Strenghthened type turn -ups joggle base | |
CN204750292U (en) | Butterfly subframe structure | |
CN204713695U (en) | A kind of two up and down gas cylinder storage bottle frameworks of easy accessibility | |
CN203437794U (en) | Thin-wall barrel manufacturing, assembling and transferring tool | |
CN103909979A (en) | Lap joint structure of ceiling cover and side body of high-ceiling microbus | |
CN103447587B (en) | A kind of frock and method electrokinetic cell bag screw shell being positioned to welding | |
CN209566782U (en) | The battery pack mounting bracket of vehicle | |
CN203702190U (en) | Supporting assembly for overlapped tunnel or short-range construction tunnel | |
CN209319079U (en) | A kind of Vehicular liquefied natural gas cylinder shell rear head component positioning tool | |
CN102730309A (en) | Strapping and fixing device for pipe barrel parts | |
CN203316887U (en) | Double-wheel follow-up automatic welding seam tracking mechanism | |
CN202352509U (en) | Novel assembling structure | |
CN202726365U (en) | Connecting lug installing and welding device for rack section of derrick | |
CN202736637U (en) | Air guide device used for ascending seat of transformer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150527 |