A kind of three-dimensional storage rack of releasing pulley
Technical field
The invention belongs to the auxiliary facility of transmission line construction instrument releasing pulley, specifically
A kind of three-dimensional storage rack of releasing pulley.
Background technology
Releasing pulley is one of main Work tool of work transmission line Poling Construction indispensability.According to
The difference of wheel sheet quantity can be divided into single-wheel, three-wheel, five take turns, seven the releasing pulley such as takes turns.Unwrapping wire is sliding
Car needs reasonable, safe putting after using.At present, sliding due to three-wheel and the above unwrapping wire of three-wheel
Car heavier mass, volume are relatively big, its storage mode mainly has solid in loading framework to stack layer by layer,
Directly lie in ground, directly stack layer by layer, decompose after deposit etc. by parts several.Load frame
Frame can be deposited by layered stereoscopic, and floor space is little, and safety is good, does not damage coaster, but needs processing
Framework, access is hard, needs link plate to be inverted, manually lifts, hole, bolt are fastened operations such as unscrewing,
Personnel are many, and labor intensity is big, and efficiency is low;Directly plane is deposited, and security and stability is good, picks and places
Convenient, but floor space is excessive;Directly piling up layering to deposit, low cost, the useful space stores
Amount is many, but access need to exist easily damage coaster, potential safety hazard of collapsing by pressure by crane;After decomposition
Depositing floor space by parts less, but need dismounting, the most difficultly, labor intensity is big, efficiency
Low.At present releasing pulley is deposited and there is no good solution.
Summary of the invention
In order to solve the weak point of the above-mentioned various storage modes of existing releasing pulley, the present invention's
Purpose is to provide a kind of three-dimensional storage rack of releasing pulley.This storage rack is applicable to three-wheel and three
Take turns the storage of above releasing pulley, both saved space, accessed convenient, efficiency height, labor intensity
Little, it is hardly damaged again cunning simultaneously, safety is high.
It is an object of the invention to be achieved through the following technical solutions:
The storage rack of the present invention includes the multilayer bracket put the most successively, and every layer of support is equal
Including being positioned at the bracket upright post of both sides, wherein the bottom of the bracket upright post of bottom support both sides connects
Having the bracket base depositing in ground, top is provided with on support support;Other layer of support both sides
The top and the bottom of bracket upright post are connected to the upper and lower support of support, and adjacent layer support passes through respectively
The upper and lower support of described support of each layer bracket upright post top and the bottom is put the most successively;Described
It is connected by crossbeam between the bracket upright post of the every side of other layer of support in addition to bottom support, institute
State on crossbeam and have support beam hole in the bracket upright post of the described every side of layer support, described
It is provided with carrying releasing pulley between the bracket upright post of other layer of support both sides in addition to bottom support
Coaster carrier bar, the two ends of described coaster carrier bar are passed by described support beam hole and are consolidated respectively
Fixed, carried from the connection in different support beam holes by described coaster carrier bar and each take turns several unwrapping wire
Coaster.
Wherein: the coaster carrier bar in described other layer of support in addition to bottom support is mutually
Parallel two, in other layer of support in addition to bottom support on each side stand column and crossbeam
Support beam hole be six altogether, described two coaster carrier bars and be positioned at centre two support beams
Hole is connected, in order to carry three wheel line tackles, be connected with two support beam holes in the middle of being positioned at time,
In order to carry five wheel line tackles, it is connected, in order to hold with being positioned at outermost two support beam holes
Carry seven-wheel line tackle;Described coaster carrier bar is placed in the pulley groove of each releasing pulley;
On described support support and support under support shape identical, be angle steel, adjacent layer support
The upper and lower support of support of both sides bracket upright post is respectively cooperating with grafting;The two of described coaster carrier bar
End is passed by support beam hole respectively, and is fixed by clamp;Coaster carrying in second layer support
It is respectively equipped with between beam and ground and between the coaster carrier bar of adjacent layer and guarantees that coaster carries
The most reclinate bracing frame of beam stress;Support frame as described above be positioned at described coaster carrier bar near in
Between position;Pacify respectively in the both sides bracket upright post of described other layer of support in addition to bottom support
Equipped with U-shaped ring, between the U-shaped ring in both sides of other layer of support in addition to bottom support, connection has anti-
The steel wire rope that only during flood access releasing pulley, this layer of support ftractures to both sides;Described bottom support
It is provided with support gripper shoe between bracket base and the bracket upright post of both sides.
Advantages of the present invention with good effect is:
1. the present invention is applicable to the universal releasing pulley of more than three-wheel and three-wheel, same width
Releasing pulley, such as three-wheel, five takes turns or seven-wheel line tackle can utilize same storage rack to deposit,
Save releasing pulley placing space, strengthen releasing pulley put safety, improve put work
While making efficiency and reducing labor intensity, largely save releasing pulley storage rack
Cost of manufacture.
2. form cooperation by angle steel between the present invention each layer support to put, put steadily,
Convenient to operate.
3. the present invention inserts the support beam hole of diverse location by coaster carrier bar, can put
The releasing pulleys of different wheel numbers, coaster carrier bar is also provided with bracing frame, it is to avoid coaster holds
It is bent downwardly after carrier beam stress.
4. it is provided with steel wire rope between the both sides of the present invention other layer of support in addition to bottom support,
When preventing flood from storing releasing pulley, support ftractures to both sides.
Accompanying drawing explanation
Fig. 1 is the overall structure schematic diagram of the present invention;
Fig. 2 is the side view of Fig. 1;
Wherein: 1 is bottom bracket base, 2 is bottom support gripper shoe, and 3 is bottom support
Column, 4 is to support on bottom support, and 5 is to support under middle layer bracket, and 6 stand for middle layer bracket
Post, 7 is support beam hole, and 8 is coaster carrier bar, and 9 is U-shaped ring, and 10 is in middle layer bracket
Supporting, 11 is to support under upper layer bracket, and 12 is upper layer bracket column, and 13 is bracing frame, 14
For clamp, 15 is steel wire rope, and 16 is to support in upper layer bracket, and 17 is crossbeam.
Detailed description of the invention
The invention will be further described below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, the storage rack of the present invention includes putting the most successively many
Layer support, every layer of support all includes the bracket upright post being positioned at both sides, wherein bottom support both sides
The bottom of bracket upright post connects the bracket base depositing in ground, and top is provided with on support props up
Support;The structure of other layer of support is identical, the top and the bottom of other layer of mount both sides bracket upright post
Being connected to the upper and lower support of support, adjacent layer support is upper and lower by each layer bracket upright post respectively
The upper and lower support of described support in portion is put the most successively;Other layers in addition to bottom support
It is connected by crossbeam 17 between the bracket upright post of the every side of support, on crossbeam 17 and described layer props up
Support beam hole 7 is had, other layers in addition to bottom support in the bracket upright post of the every side of frame
Being provided with the coaster carrier bar 8 of carrying releasing pulley between the bracket upright post of support both sides, coaster holds
The two ends of carrier beam 8 are passed by support beam hole 7 and are fixed respectively, by coaster carrier bar 8 with not
Carry with the connection in support beam hole 7 and each take turns several releasing pulleys.
The storage rack of the present invention is preferably three~four layers, diameter 660mm and the design of following coaster
Four-layer structure, major diameter 822mm and above coaster is become to be designed to three-decker, the most properly,
Ensure that access is convenient in the altitude range set.The storage rack of the present embodiment is three framves, respectively
For bottom support, middle layer bracket and upper layer bracket.The both sides of bottom support are respectively provided with two foundation layers
Bracket upright post 3, the lower weld of every foundation layer bracket upright post 3 has bottom bracket base 1, should
Bottom bracket base 1 deposits in ground, in order to ensure the stationarity of storage rack;Every foundation layer props up
The upper weld erecting post 3 has as the angle steel supporting 4 on bottom support, and at every foundation layer
Bottom support gripper shoe 2 it is welded with, to increase between bracket upright post 3 and bottom bracket base 1
The support strength of bottom support.
The both sides of middle layer bracket are respectively provided with two middle layer bracket columns 6, every middle layer bracket column
The lower weld of 6 has support 5 under middle layer bracket, and upper weld has support 10 in middle layer bracket,
The upper and lower support of middle layer bracket 10,5 is angle steel, support 5 and bottom support under middle layer bracket
Upper support 4 is mutually inserted, forms cooperation, it is achieved middle layer bracket is placed on bottom support.
It is welded with crossbeam 17 between the bottom of two middle layer bracket columns 6 of the every side of middle layer bracket,
The bottom of every middle layer bracket column 6 has a support beam hole 7, each crossbeam 17
On all have four support beam holes 7, two middle layer bracket columns of the every side of such middle layer bracket
6 and crossbeam 17 on offer six support beam holes 7 altogether.The middle layer bracket of middle layer bracket both sides is stood
Two coaster carrier bars 8 being parallel to each other, the two of every coaster carrier bar 8 it are provided with between post 6
End is passed by the support beam hole 7 of both sides respectively, and blocks firmly with clamp 14.Two coasters hold
Carrier beam 8 be positioned at centre two support beam holes 7 be connected, in order to carry three wheel line tackles,
It is connected, in order to carry five wheel line tackles, with position with two the support beam holes 7 being positioned in the middle of secondary
It is connected, in order to carry seven-wheel line tackle in outermost two support beam holes 7;Coaster carries
Beam 8 is placed in the pulley groove of each releasing pulley being stored in this layer.In middle layer bracket two
Being respectively equipped with bracing frame 13 between coaster carrier bar 8 and ground, this bracing frame 13 is placed on cunning
Car carrier bar 8 is near middle position, it is ensured that be not bent downwardly after coaster carrier bar 8 stress.
Being connected with a U-shaped ring 9 on every middle layer bracket column 6, the relative middle layer bracket in both sides is stood
Connect between U-shaped ring 9 on post 6 and have steel wire rope 15, in preventing when accessing releasing pulley
Layer support ftractures to both sides.
The structural principle of upper layer bracket is identical with middle layer bracket, and the both sides of upper layer bracket respectively set
There are two upper layer bracket columns 12, one end (lower end) welding of every upper layer bracket column 12
Having under upper layer bracket and support 11, the other end (upper end) is welded with in upper layer bracket support 16,
The upper and lower support of upper layer bracket 16,11 is angle steel, supports 11 and prop up with middle level under upper layer bracket
Support on frame and 10 be mutually inserted, form cooperation, it is achieved upper layer bracket be placed in middle layer bracket it
On.It is welded with crossbeam between the bottom of two upper layer bracket columns 12 of the every side of upper layer bracket
17, the bottom of every upper layer bracket column 12 has a support beam hole 7, each horizontal stroke
All having four support beam holes 7 on beam 17, two upper stratas of the every side of such upper layer bracket are propped up
Erect and offer six support beam holes 7 altogether on post 12 and crossbeam 17.Upper layer bracket both sides upper
Being provided with two coaster carrier bars 8 being parallel to each other between layer bracket upright post 12, every coaster holds
The two ends of carrier beam 8 are passed by the support beam hole 7 of both sides respectively, and block firmly with clamp 14.
Two coaster carrier bars 8 are connected, in order to carry three-wheel with two the support beam holes 7 being positioned at centre
Releasing pulley, is connected with two support beam holes 7 in the middle of being positioned at time, takes turns unwrapping wire in order to carrying five
Coaster, is connected, in order to carry seven-wheel line tackle with being positioned at outermost two support beam holes 7;
Coaster carrier bar 8 is placed in the pulley groove of each releasing pulley being stored in this layer.Upper layer bracket
In two coaster carrier bars 8 and two coaster carrier bars 8 in middle layer bracket between set respectively
Having bracing frame 13, this bracing frame 13 is placed on the coaster carrier bar 8 position near centre, really
It is not bent downwardly after protecting coaster carrier bar 8 stress.It is connected with on every upper layer bracket column 12
One U-shaped ring 9, connects between the U-shaped ring 9 on upper layer bracket column 12 that both sides are relative
There is steel wire rope 15, prevent the upper layer bracket when accessing releasing pulley from ftractureing to both sides.
The operation principle of the present invention is:
Putting of bottom releasing pulley.Releasing pulley is pushed in the middle of the bottom bracket upright post 3 of both sides
Vacant lot on put neat, the distance between both sides bottom bracket upright post 3 is than coaster carrier bar 8
Short about the 200mm of length.
The ornaments of middle level releasing pulley.First a middle layer bracket is positioned on ground, uses two
Root coaster carrier bar 8, the support beam hole 7 of insertion side, one end, extension elongation about 50mm, stretches
The end clamp 14 gone out blocks firmly.Then pushing away releasing pulley makes pulley groove hold along two coasters
Carrier beam 8 is pushed on coaster carrier bar 8, after coaster carrier bar 8 occupies releasing pulley,
The other end of coaster carrier bar 8 penetrates in opposite side middle layer bracket corresponding support beam hole 7, stretches
Going out length about 50mm, the end clamp 14 stretched out blocks firmly.
Depositing of middle level releasing pulley.It is hung in two ends middle layer bracket with two steel wire ropes 15
On the U-shaped ring 9 of column 6 both sides, tense wire rope 15.Then fork truck is used, fork truck
Fork be put into width position, being well placed releasing pulley and middle level below coaster carrier bar 8
Support integral end rises, and relies on movement and the movement of bottom support of fork truck, is placed on bottom support
On, it is ensured that support under the middle layer bracket of middle layer bracket column 6 lower end, middle layer bracket two ends held
5 align to be formed with support 4 on bottom support respectively coordinates.Two bracing frames 13 are put respectively
Put at two coaster carrier bars 8 near middle position, it is ensured that after coaster carrier bar stress not to
Lower bending.Move away fork truck and just complete putting of middle layer bracket.
According to putting of above-mentioned middle level releasing pulley, other layers the most just can be well placed
Releasing pulley.
The taking-up of releasing pulley.Fork truck fork is utilized to be placed on the coaster carrying of the superiors' releasing pulley
The centre position of beam 8, integral end rises and is put into ground, pulls down the clamp of coaster carrier bar 8 one end
14, take out a side stand, releasing pulley is just rolled into ground along with coaster carrier bar 8 to thrust;
After releasing pulley takes, pulling down the clamp 14 of other end coaster carrier bar 8, overall shelf is just
Dismantle complete.Entirety takes off each layer the most from top to bottom, so that it may take out whole releasing pulley.
The present invention is applicable to the universal releasing pulley of more than three-wheel and three-wheel, according to coaster carrier bar
The difference of position can be used separately as three-wheel, five take turns the storage rack with seven-wheel line tackle, is saving
Releasing pulley placing space, strengthen releasing pulley and put safety, improve and put work efficiency
While reducing labor intensity, largely save being fabricated to of releasing pulley storage rack
This.