CN104638565A CN201510048764.2A CN201510048764A CN104638565A CN 104638565 A CN104638565 A CN 104638565A CN 201510048764 A CN201510048764 A CN 201510048764A CN 104638565 A CN104638565 A CN 104638565A
Authority
CN
China
Prior art keywords
electrician
wire
live
ground
electric field
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510048764.2A
Other languages
English (en)
Inventor
雷冬云
任承贤
邹德华
梅文建
甄朝晖
曾文远
汪志刚
周再游
石凯
袁黎
李辉
童诚
欧乃成
夏增明
刘治国
唐力
郑克全
何龙飞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Original Assignee
State Grid Corp of China SGCC
State Grid Hunan Electric Power Co Ltd
Live Working Center of State Grid Hunan Electric Power Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hunan Electric Power Co Ltd, Live Working Center of State Grid Hunan Electric Power Co filed Critical State Grid Corp of China SGCC
Priority to CN201510048764.2A priority Critical patent/CN104638565A/zh
Publication of CN104638565A publication Critical patent/CN104638565A/zh
Pending legal-status Critical Current

Links

Landscapes

  • Electric Cable Installation (AREA)

Abstract

本发明涉及一种±800千伏直线塔输电线路进入电场等电位带电作业方法,地电位电工将绝缘软梯悬挂于杆塔地线上,等电位电工从带电导线横担侧登上软梯,地面配合人员拖曳软梯末端绳头,带动绝缘软梯沿地线滑动,将等电位电工停靠在正对导线带电作业区域的位置,等电位作业人员沿软梯攀爬至带电导线与肩平行位置,接到进入电场命令后,地面配合人员通过垂直于地线方向拖曳软梯绳头,使软梯朝位于地线内侧的带电导线晃动;等电位电工采用电位转移棒快速靠近带电导线并向内荡入强电场。该方法能够在输电线路的任意位置进行带电作业,全过程体力消耗小,方法实施简单。

Description

±800千伏直线塔输电线路进入电场等电位带电作业方法
技术领域
本发明属于超高压输变电领域,具体涉及一种±800千伏直线塔输电线路进入电场等电位带电作业方法。
背景技术
超高压输电线路发生故障时,由于线路输送功率大,常常需要采用带电消缺的方式。传统进入电场的方式主要是“跨二短三”法和吊篮法两种,但超高压输电线路具有绝缘子串长度大的特点,采用“跨二短三“的方式进入电场面临体力消耗大和零值绝缘子无法检测的问题,故通常使用吊篮法进入电场。
吊篮法进入电场能够有效保证等电位作业人员安全、可靠地进入电场进行等电位作业。但有如下的几点不足:
1)等电位作业人员采用吊篮法进入电场的过程中,仅仅只能沿着轨迹绳规定轨道进入电场的某一位置;
2)采用吊篮法进入电场之前,需对轨迹绳的固定位置、长度等进行确定,特别是轨迹绳的长度需多次调整,若长度过短,作业人员无法到达作业位置;若长度过长,则加大作业人员进入电场的难度;
3)吊篮法进入电场需考虑是否满足组合间隙,若不无法满足带电作业组合间隙,则无法开展带电作业任务;
4)吊篮法中,吊篮本身规格尺寸固定。故常常需根据实际带电作业人员身形采用不同规格尺寸的吊篮。
发明内容
本发明的目的是提供一种±800千伏直线塔输电线路进入电场等电位带电作业方法,能够在输电线路的任意位置进行带电作业,全过程体力消耗小,方法实施简单。
    本发明的技术方案为:一种±800千伏直线塔输电线路进入电场等电位带电作业方法,包括以下步骤:
1)等电位电工登塔至带电导线横担处,地电位电工登塔至地线横担处;
2)地面配合人员传递绝缘软梯和绝缘软梯滑轮至地电位电工位置;
3)地电位电工将绝缘软梯悬挂于杆塔地线上,通过绝缘软梯滑轮绝缘软梯能够在地线上滑动;
4)等电位电工检查屏蔽服各部件连接正确无误后,系好绝缘保护绳,从带电导线横担侧登上软梯并将安全带系于绝缘软梯上;
5)地面配合人员拖曳软梯末端绳头,带动绝缘软梯沿地线滑动,使等电位电工向带电作业区域靠近,将等电位电工停靠在正对导线带电作业区域的位置;
6)等电位作业人员到达作业区域后,沿软梯攀爬至带电导线与肩平行位置,等待地面负责人下达进入电场命令;
7)接到进入电场命令后,地面配合人员通过垂直于地线方向拖曳软梯绳头,使软梯朝位于地线内侧的带电导线晃动;
8)等电位电工依靠绝缘软梯晃动,采用电位转移棒快速靠近带电导线并向内荡入强电场。
等电位电工和地电位电工按照着装规范穿戴完毕后,等电位电工登塔至相应位置;地电位电工携带绝缘传递绳登塔至地线横担处并系好安全带,将绝缘传递绳和绝缘滑车组安装在地线横担侧合适作业位置;地面配合人员通过绝缘传递绳将绝缘软梯及绝缘软梯滑轮传递给地电位电工。
步骤5)在等电位电工向带电作业区域靠近的过程中,当等电位电工与带电区域导线在沿带电导线方向的距离L1约1米处时,地面配合人员反方向拉紧软梯绳头,将等电位电工停靠在正对导线带电作业区域的位置。
等电位电工进入电场后,将绝缘保护绳安装在可靠位置再进行等电位作业。
由于±800千伏直线塔输电线路有其特殊性,本发明是专门针对±800千伏直线塔输电线路而提出的进入电场等电位带电作业方法,本发明方法具有如下优点:
1)作业人员采用软梯荡入法进入电场后,可以随时根据作业情况,在地面人员的配合下,仅需拖曳软梯末端绳头就可以调整等电位电工的操作位置,在输电线路的任意位置进行带电作业。
2)相比软梯攀爬进入电场的方法,采用软梯荡入法进入电场,作业人员无需消耗过多体力攀爬软梯进入电场,在整个进入电场的过程中,等电位作业人员都是通过地面配合人员拖曳软梯绳头进行移动从而到达作业位置。进而,本发明等电位电工从带电导线横担侧进入软梯,而不用再爬上很高的地线横担,使其能够在合适位置进入强电场,省去了在高空调整自身位置所造成的不便及体力消耗。
3)软梯荡入法采用将软梯悬挂于地线侧的方案,由于地线与带电导线的垂直投影距离远远大于带电作业最小安全组合间隙,解决了现有方法无法满足所有线路的最小安全组合间隙,从而无法开展带电作业任务的问题。采用从输电线路导线外侧荡入的方法,也保证了等电位电工有足够摆角能够可靠、有效、安全地进入电场。
4)本发明方法仅仅只需要绝缘软梯便可以完成进入特高压强电场任务,具有工器具少,便于操作的优点。
附图说明
附图1为本发明方法实施示意图。
附图2为在地面上的正投影图。
其中,地线横担1,带电导线横担2,地线3,带电导线4,绝缘软梯5,绝缘软梯滑轮6,软梯末端绳头7,地线投影A,带电导线投影B,等电位电工投影C,带电区域投影D。
具体实施方式
如图1所示,本发明的±800千伏直线塔输电线路进入电场等电位带电作业方法,包括以下步骤:
1)等电位电工和地电位电工按照着装规范穿戴完毕后,等电位电工登塔至带电导线横担处;地电位电工携带绝缘传递绳登塔至地线横担处并系好安全带,将绝缘传递绳和绝缘滑车组安装在地线横担侧合适作业位置;
2)地面配合人员通过绝缘传递绳将绝缘软梯及绝缘软梯滑轮传递给地电位电工位置;
3)地电位电工将绝缘软梯悬挂于杆塔地线上,通过绝缘软梯滑轮绝缘软梯能够在地线上滑动;
4)等电位电工检查屏蔽服各部件连接正确无误后,系好绝缘保护绳,从带电导线横担侧登上软梯并将安全带系于绝缘软梯上;
5)地面配合人员拖曳软梯末端绳头,带动绝缘软梯沿地线滑动,使等电位电工向带电作业区域靠近,当等电位电工与带电区域导线在沿带电导线方向的距离L1约1米处时,地面配合人员反方向拉紧软梯绳头,将等电位电工停靠在正对导线带电作业区域的位置;
6)等电位作业人员到达作业区域后,沿软梯攀爬至带电导线与肩平行位置,等待地面负责人下达进入电场命令;
7)接到进入电场命令后,地面配合人员通过垂直于地线方向拖曳软梯绳头,使软梯朝位于地线内侧的带电导线晃动;
8)等电位电工依靠绝缘软梯晃动,采用电位转移棒快速靠近带电导线并向内荡入强电场;等电位电工进入电场后,将绝缘保护绳安装在可靠位置再进行等电位作业。
如图1所示,±800千伏直线塔地线位于带电导线外侧。假设等电位电工重100公斤,地线与导线在地面投影的垂直距离L2约为4米,等电位电工进入电场前距离输电导线约3.5米,在地面人员的配合下等电位电工迅速荡入强电场。通过对整个过程计算分析,发现相比自由式沿绝缘子串进入等电位的方法而言,等电位电工使用软梯荡入进入强电场的方法可以有效解决体力消耗大的难题,并且配合等电位电工进入强电场的两名地面人员每人仅需使用500N的力拖拽软梯3~4米即可将等电位电工带入强电场进行带电作业,具有极大的可行性。
考虑到在对±800千伏直流特高压输电线路进行带电作业任务时需满足至少6.6米组合间隙,将软梯悬挂在距离导线垂直距离15米的地线上以保证足够的组合间隙。在本方法中,在等电位电工进入强电场前(当等电位电工位于带电导线横担处时,这时组合间隙是耐张绝缘子串长度,一定是满足要求的),距离带电体至少12.5米以上,远大于安规规定的±800千伏直流特高压带电作业6.8米的安全距离。
因此,采用本发明方法可以在体力消耗较小的情况下、安全地进入电场。通过适当变形,本发明方法可以适用于±800千伏及以下输电线路进入电场等电位作业。

Claims (4)

1.一种±800千伏直线塔输电线路进入电场等电位带电作业方法,包括以下步骤:
1)等电位电工登塔至带电导线横担处,地电位电工登塔至地线横担处;
2)地面配合人员传递绝缘软梯和绝缘软梯滑轮至地电位电工位置;
3)地电位电工将绝缘软梯悬挂于杆塔地线上,通过绝缘软梯滑轮绝缘软梯能够在地线上滑动;
4)等电位电工检查屏蔽服各部件连接正确无误后,系好绝缘保护绳,从带电导线横担侧登上软梯并将安全带系于绝缘软梯上;
5)地面配合人员拖曳软梯末端绳头,带动绝缘软梯沿地线滑动,使等电位电工向带电作业区域靠近,将等电位电工停靠在正对导线带电作业区域的位置;
6)等电位作业人员到达作业区域后,沿软梯攀爬至带电导线与肩平行位置,等待地面负责人下达进入电场命令;
7)接到进入电场命令后,地面配合人员通过垂直于地线方向拖曳软梯绳头,使软梯朝位于地线内侧的带电导线晃动;
8)等电位电工依靠绝缘软梯晃动,采用电位转移棒快速靠近带电导线并向内荡入强电场。
2.根据权利要求1所述的±800千伏直线塔输电线路进入电场等电位带电作业方法,其特征在于:等电位电工和地电位电工按照着装规范穿戴完毕后,等电位电工登塔至相应位置;地电位电工携带绝缘传递绳登塔至地线横担处并系好安全带,将绝缘传递绳和绝缘滑车组安装在地线横担侧合适作业位置;地面配合人员通过绝缘传递绳将绝缘软梯及绝缘软梯滑轮传递给地电位电工。
3.根据权利要求1所述的±800千伏直线塔输电线路进入电场等电位带电作业方法,其特征在于:步骤5)在等电位电工向带电作业区域靠近的过程中,当等电位电工与带电区域导线在沿带电导线方向的距离L1约1米处时,地面配合人员反方向拉紧软梯绳头,将等电位电工停靠在正对导线带电作业区域的位置。
4.根据权利要求1所述的±800千伏直线塔输电线路进入电场等电位带电作业方法,其特征在于:等电位电工进入电场后,将绝缘保护绳安装在可靠位置再进行等电位作业。
CN201510048764.2A 2015-01-30 2015-01-30 ±800千伏直线塔输电线路进入电场等电位带电作业方法 Pending CN104638565A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510048764.2A CN104638565A (zh) 2015-01-30 2015-01-30 ±800千伏直线塔输电线路进入电场等电位带电作业方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510048764.2A CN104638565A (zh) 2015-01-30 2015-01-30 ±800千伏直线塔输电线路进入电场等电位带电作业方法

Publications (1)

Publication Number Publication Date
CN104638565A true CN104638565A (zh) 2015-05-20

Family

ID=53217019

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510048764.2A Pending CN104638565A (zh) 2015-01-30 2015-01-30 ±800千伏直线塔输电线路进入电场等电位带电作业方法

Country Status (1)

Country Link
CN (1) CN104638565A (zh)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104979776A (zh) * 2015-07-10 2015-10-14 中国电力科学研究院 一种进入特高压线路耐张塔等电位的方法
CN105591314A (zh) * 2015-09-09 2016-05-18 国家电网公司 特高压直流输电线路耐张塔带电处理金具脱落现场操作工艺
CN108074280A (zh) * 2017-12-18 2018-05-25 国网江苏省电力有限公司检修分公司 高压输电线路等电位带电作业模拟吊篮移动轨迹的方法
CN108133510A (zh) * 2017-12-18 2018-06-08 国网江苏省电力有限公司检修分公司 高压输电线路等电位带电作业吊篮法进入模拟系统及方法
CN109462184A (zh) * 2018-12-27 2019-03-12 广东电网有限责任公司 一种输电线路带电作业装置及其使用方法
CN109787142A (zh) * 2019-01-18 2019-05-21 三峡大学 一种考虑环境因素的特高压交流线路软梯法等电位作业路径规划方法
CN110499951A (zh) * 2019-09-17 2019-11-26 国网辽宁省电力有限公司辽阳供电公司 一种铁塔横担软梯悬挂点延长装置及应用
CN111934236A (zh) * 2020-07-03 2020-11-13 中国电力科学研究院有限公司 一种超特高压输电线路带电作业进出等电位的方法
CN112834537A (zh) * 2021-01-29 2021-05-25 四川赛康智能科技股份有限公司 一种基于地电位输电线路x射线带电检测方法

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080044012A (ko) * 2006-11-15 2008-05-20 한국전기공사협회 헬리콥터를 이용한 765킬로볼트 2회선 송전선로의 직접활선공법
CN101252264A (zh) * 2008-04-02 2008-08-27 云南电网公司大理供电局 一种等电位电工强电场带电作业方法
CN101728787A (zh) * 2008-10-29 2010-06-09 国网电力科学研究院 500kV同塔四回输电线路直线塔带电作业进入等电位方法
CN103618249A (zh) * 2013-11-27 2014-03-05 国家电网公司 ±500kV同塔双回直流输电线路带电检修工艺

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080044012A (ko) * 2006-11-15 2008-05-20 한국전기공사협회 헬리콥터를 이용한 765킬로볼트 2회선 송전선로의 직접활선공법
CN101252264A (zh) * 2008-04-02 2008-08-27 云南电网公司大理供电局 一种等电位电工强电场带电作业方法
CN101728787A (zh) * 2008-10-29 2010-06-09 国网电力科学研究院 500kV同塔四回输电线路直线塔带电作业进入等电位方法
CN103618249A (zh) * 2013-11-27 2014-03-05 国家电网公司 ±500kV同塔双回直流输电线路带电检修工艺

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104979776A (zh) * 2015-07-10 2015-10-14 中国电力科学研究院 一种进入特高压线路耐张塔等电位的方法
CN105591314A (zh) * 2015-09-09 2016-05-18 国家电网公司 特高压直流输电线路耐张塔带电处理金具脱落现场操作工艺
CN108074280A (zh) * 2017-12-18 2018-05-25 国网江苏省电力有限公司检修分公司 高压输电线路等电位带电作业模拟吊篮移动轨迹的方法
CN108133510A (zh) * 2017-12-18 2018-06-08 国网江苏省电力有限公司检修分公司 高压输电线路等电位带电作业吊篮法进入模拟系统及方法
CN109462184A (zh) * 2018-12-27 2019-03-12 广东电网有限责任公司 一种输电线路带电作业装置及其使用方法
CN109787142A (zh) * 2019-01-18 2019-05-21 三峡大学 一种考虑环境因素的特高压交流线路软梯法等电位作业路径规划方法
CN110499951A (zh) * 2019-09-17 2019-11-26 国网辽宁省电力有限公司辽阳供电公司 一种铁塔横担软梯悬挂点延长装置及应用
CN110499951B (zh) * 2019-09-17 2024-04-19 国网辽宁省电力有限公司辽阳供电公司 一种铁塔横担软梯悬挂点延长装置及应用
CN111934236A (zh) * 2020-07-03 2020-11-13 中国电力科学研究院有限公司 一种超特高压输电线路带电作业进出等电位的方法
CN111934236B (zh) * 2020-07-03 2022-10-28 中国电力科学研究院有限公司 一种超高压/特高压输电线路带电作业进出等电位的方法
CN112834537A (zh) * 2021-01-29 2021-05-25 四川赛康智能科技股份有限公司 一种基于地电位输电线路x射线带电检测方法
CN112834537B (zh) * 2021-01-29 2024-03-22 四川赛康智能科技股份有限公司 一种基于地电位输电线路x射线带电检测方法

Similar Documents

Publication Publication Date Title
CN104638565A (zh) ±800千伏直线塔输电线路进入电场等电位带电作业方法
CN105977863B (zh) 输电线路无人机抛绳停电及带电检修作业方法
CN105390988A (zh) 一种超高压输电线路等电位带电作业装置及其使用方法
CN106099760A (zh) 用于输电绳路带电作业抛挂绝缘工作绳的无人机投掷系统
CN102623926B (zh) 远方等电位滑车及其实现带电进出等电位的方法
CN102545100A (zh) 双分裂导线间隔棒带电安装工具
CN205178393U (zh) 一种超高压输电线路等电位带电作业装置
CN104979776A (zh) 一种进入特高压线路耐张塔等电位的方法
CN106771874B (zh) 输电线路雷电故障定位监控系统及监控方法
CN104917098A (zh) 自动闭锁的跟头滑车
CN103683105A (zh) 一种66kV输电线路下相导线绝缘斗臂车带电作业方法
CN104505763B (zh) 特高压直流线路带电更换双联v串合成绝缘子作业方法
CN108808544A (zh) 进出强电场装置
CN205786901U (zh) 绝缘子检测机器人
CN104868397A (zh) 一种用于跨越水平排列双分裂导线间隔棒的跟斗滑车
CN109462184A (zh) 一种输电线路带电作业装置及其使用方法
CN106356763A (zh) 一种进入紧凑型输电线路等电位的方法及所用折叠梯
CN104659710A (zh) 一种500kV输电线路边相导线绝缘斗臂车带电作业方法
CN106786146B (zh) 500kV三相同塔窗单回输电线路紧凑型直线塔进入等电位的作业方法
CN204823586U (zh) 一种矿井提升钢丝绳在线安全检测装置
CN107605394B (zh) 一种带电作业单摆调节式软梯头装置及其使用方法
CN205882560U (zh) 配电带电作业地电位专用循环绳架装置
CN204265376U (zh) 一种电线杆物料提升装置
CN106229881A (zh) 进入500/220千伏同塔多回输电线路电场的方法及所用软梯头
CN104410009A (zh) 攀爬式钢丝绳梯

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C12 Rejection of a patent application after its publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150520