CN104635809B - Cluster well heating sucker rod frequency modulation circulating-heating remote control - Google Patents

Cluster well heating sucker rod frequency modulation circulating-heating remote control Download PDF

Info

Publication number
CN104635809B
CN104635809B CN201310571864.4A CN201310571864A CN104635809B CN 104635809 B CN104635809 B CN 104635809B CN 201310571864 A CN201310571864 A CN 201310571864A CN 104635809 B CN104635809 B CN 104635809B
Authority
CN
China
Prior art keywords
heating
sucker rod
control unit
frequency
circulating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201310571864.4A
Other languages
Chinese (zh)
Other versions
CN104635809A (en
Inventor
邹祥城
王增强
王雷
郭庆荣
韩民强
胡松阳
刘建鹏
王润玲
王绍军
朱宏伟
侯少峰
张士伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bohai Petroleum Equipment (tianjin) Zhong Cheng Machinery Manufacturing Co Ltd
China National Petroleum Corp
CNPC Bohai Equipment Manufacturing Co Ltd
Original Assignee
Bohai Petroleum Equipment (tianjin) Zhong Cheng Machinery Manufacturing Co Ltd
China National Petroleum Corp
CNPC Bohai Equipment Manufacturing Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bohai Petroleum Equipment (tianjin) Zhong Cheng Machinery Manufacturing Co Ltd, China National Petroleum Corp, CNPC Bohai Equipment Manufacturing Co Ltd filed Critical Bohai Petroleum Equipment (tianjin) Zhong Cheng Machinery Manufacturing Co Ltd
Priority to CN201310571864.4A priority Critical patent/CN104635809B/en
Publication of CN104635809A publication Critical patent/CN104635809A/en
Application granted granted Critical
Publication of CN104635809B publication Critical patent/CN104635809B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Control Of Resistance Heating (AREA)

Abstract

A kind of cluster well heating sucker rod frequency modulation circulating-heating remote control, it is adaptable to the exploitation of cluster well viscous crude, including master device and stand-by provision, master device includes frequency conversion control unit, boosting rectifier control unit and oil well action response contact unit;Wherein frequency conversion control unit carries out VFC to external power supply, while being also responsible for T1 heat time heating time, the setting of heat-up periods time T2;Boosting rectifier control unit to frequency conversion after electric current boosted and selected the gear of voltage output;Oil well action response contact unit selects connection to need the oil well heating sucker rod of heating.Stand-by provision identical with master device internal part and be in symmetric configuration.This control device is rational in infrastructure, simple, reliable, a set of intermediate frequency power supply the using and the reserved, and Automatic Cycle heats multiple wells, possesses fault diagnosis and warning function, and reduces cost reduces work on the spot intensity, improves crude output.

Description

Cluster well heating sucker rod frequency modulation circulating-heating remote control
Art
The present invention relates to the remote control field in oil field, especially drives many mouthfuls of oil wells to sucker rod with an intermediate frequency power supply Automatic/hand circulation electric-heating is carried out, and possesses the cluster well heating sucker rod frequency modulation circulating-heating remotely control of remote monitoring function Device, it is adaptable to cluster well thickened oil recovery.
Background technology
Many difficult problems during for " three high " oil extraction, such as:Crude oil lifting is difficult;Sucker rod load is overweight, under Row is difficult;Oil pumper load is increased, and crude oil enters pump difficulty etc., generally adopts individual well electric heating apparatus of hollow sucker rod, profit at present The heat energy produced with electrical heating, carries out whole heating to the crude oil in oil pipe, reduces viscosity of crude, prevents wax deposition in oil pipe, carry High crude oil fluidity, reaches oil recovery volume increase, the purpose of potentiation.
Existing exploit the electrical heating oil pumping pole technology adopted by a difficult problem for heavy oil wells, be to one by an electric heater unit The heating sucker rod of mouth well is heated, but for cluster well, on each platform, integrated distribution has some mouthfuls of rod-pumped wells, and every mouthful of well Electrical heating sucker rod heat penetration different when, required heating voltage and heated current different, using one-to-one heating gesture The increase of cost for oil production must be caused.
Content of the invention
In order to meet cluster well thickened oil recovery, reduce production cost, improve the needs of the automatization level of equipment, the present invention A kind of cluster well heating sucker rod frequency modulation circulating-heating remote control is provided.
The technical solution adopted in the present invention is:Cluster well heating sucker rod frequency modulation circulating-heating remote control, at least wraps A set of master device is included, master device includes that the frequency conversion control unit being sequentially connected, boosting rectifier control unit and oil well action response connect Tentaculum unit;Wherein frequency conversion control unit carries out VFC to external power supply, and the unit is also responsible for T1 heat time heating time simultaneously, adds The setting of hot T2 interval time.Boosting rectifier control unit to frequency conversion after electric current boosted and selected the gear of voltage output;Connect Oil well action response contact unit selects connection to need the oil well heating sucker rod of heating, so according to T1 heat time heating time, heating Interval time, the setting value of T2 was circulated heating to N mouth oil wells.
Wherein frequency conversion control unit includes air-break, the first electric parameters transducer and the VFC being sequentially connected Device.Air-break is main power switch;The three-phase voltage of the first electric parameters transducer collection power input, electric current;Frequency conversion control Device processed adjusts the frequency of power supply.
Wherein boosting rectifier control unit includes the second electricity that a transformator and are connected with transformator outfan Transmitter.Voltage, electric current after the collection frequency conversion of second electric parameters transducer, boosting, and signal is fed back to frequency-variable controller.
Wherein oil well action response contact unit includes N number of action response catalyst, numbers of the wherein N for oil well heating sucker rod Amount, the corresponding oil well heating sucker rod of each action response catalyst.
The remote control of the present invention also includes that one is enclosed within the stand-by provision that starts working when master device breaks down.
In preferred version one, boosting rectifier control unit also includes that more than be connected with transformer secondary lateral coil 2 are used In the voltage gear contactor for selecting output voltage, the corresponding voltage of each voltage gear contactor selects gear;Standby dress Put identical with master device internal part and in symmetric configuration.
In preferred version two, stand-by provision only includes identical with master device internal part and in symmetric configuration change Frequency control unit and boosting rectifier control unit, stand-by provision share an oil well action response contact unit with master device.Standby The boosting rectifier control unit of device and master device fixes one grade of voltage output respectively, and voltage output is 1000V.
In preferred version three, stand-by provision only includes identical with master device internal part and in symmetric configuration change Frequency control unit, stand-by provision share a boosting rectifier control unit and an oil well action response contact unit with master device.
The invention has the beneficial effects as follows:Control device is rational in infrastructure, simple, reliable, a set of electrical heating sucker rod medium frequency electric Source can Automatic Cycle heating multiple wells, intermediate frequency power supply the using and the reserved, possess on-site manual control and remote auto control function, with And fault diagnosis and warning function, oil well production cost is reduced, work on the spot intensity is reduced, crude output is improved.
Description of the drawings
Fig. 1 is the functional-block diagram of cluster well heating sucker rod frequency modulation circulating-heating remote control of the present invention;
Fig. 2 is the frequency modulation circulating-heating remote control circuit theory diagrams of one embodiment of the invention.
Fig. 3 is the frequency modulation circulating-heating remote control operational flowchart of one embodiment of the invention.
Fig. 4 is the frequency modulation circulating-heating remote control of another embodiment of the present invention.
Fig. 5 is the frequency modulation circulating-heating remote control of another embodiment of the invention.
In figure:11. air-breaks, 12. electric parameters transducers, 13. frequency-variable controllers, 24. transformators, 25. electricity pick-ups Device, 28. catalysts, 29. catalysts, 36. catalysts, 37. catalysts, 39. catalysts, 210. catalysts, 211. catalysts, 301. catalysts, 302. catalysts, 303. catalysts, 304. catalysts, 305. catalysts, 312. catalysts, 313. catalysts, 314. catalysts, B15. catalysts, B16. catalysts, B17. catalysts, B18. catalysts, B19. catalysts, B20. catalysts, B21. catalyst, B22. catalysts, B23. catalysts, B24. air-breaks, B25. electric parameters transducers, B26. VFC Device, B27. transformators, B28. electric parameters transducers, B29. catalysts, B211. catalysts.
Specific embodiment
The invention will be further described with reference to the accompanying drawings and examples, but, those skilled in the art should know , the invention is not restricted to listed specific embodiment, as long as meeting the spirit of the present invention, should all be included in the present invention Protection domain in.
Fig. 1 is the functional-block diagram of cluster well heating sucker rod frequency modulation circulating-heating remote control of the present invention.The present invention's Control device key component includes:Frequency conversion control unit 1, boosting rectifier control unit 2 and oil well action response catalyst list Unit 3.
External power supply input electric current VFC is carried out by frequency conversion control unit 1 first, the unit be also responsible for simultaneously plus Hot time T1, the setting of heat-up periods time T2.
Then electric current enters boosting rectifier control unit 2 and is boosted, and the power supply is responsible for the gear for selecting voltage output simultaneously.
Then the oil well for needing heating is selected by oil well action response contact unit 3, so according to T1 heat time heating time, is added The setting value of hot T2 interval time is circulated heating to N mouth oil wells.
It is the basic functional principle of this device above, describes in detail below in conjunction with specific embodiment.
Embodiment one
Cluster well heating sucker rod frequency modulation circulating-heating remote control in the present embodiment is used for 1~6 mouthful of oil of loop control The heating of well, certainly, controlled oil well quantity can also increase in other embodiments.As shown in Fig. 2 being the frequency modulation of the present embodiment Circulating-heating remote control circuit theory diagrams.
Frequency conversion control unit 1 includes air-break 11, electric parameters transducer 12, frequency-variable controller 13, in VFC list In unit 1, air-break 11 is main power switch, and electric parameters transducer 12 is used for gathering three-phase voltage, the electric current of power input, Frequency-variable controller 13 is used for frequency modulation.
Three action response units that boosting rectifier control unit 2 is included transformator 24 and is connected with its second siding ring Part voltage gear contactor 210, voltage gear contactor 211, voltage gear contactor 28;Boosting rectifier control unit 2 is also wrapped Include the electric parameters transducer 25 being connected with 24 outfan of transformator.Electric parameters transducer 25 has MODBUS communication functions, for adopting Voltage, electric current after collection frequency conversion, boosting, and signal is fed back to frequency-variable controller 13.Wherein transformator 24 is used for boosting, this reality Apply in example and sucker rod electrical heating voltage driving switch corresponding with each oil well is divided into 800V, 1000V, 1200V third gear, each gear Voltage can change according to the winding number of turns of transformer secondary lateral coil, and corresponding action response element is catalyst 210, catalyst 211st, catalyst 28.
Oil well action response contact unit 3 include 6 action response catalysts i.e. catalyst 37, catalyst 36, Catalyst 39, catalyst 312, catalyst 314, catalyst 313, are connected with the electrical heating start button of 1~No. 6 oil well respectively Connect, for heating to each oil well heating sucker rod.
Additionally, it is preferable that the frequency modulation circulating-heating remote control of the present embodiment further provided with stand-by provision, standby The internal components of device are identical with the internal components of master device, and its 26S Proteasome Structure and Function is also identical, both internal parts It is in symmetric configuration.As shown in Fig. 2 stand-by provision includes air-break B24, electric parameters transducer B25, frequency-variable controller B26, change Depressor B27, electric parameters transducer B28, catalyst B19, catalyst B18, catalyst B15, catalyst B16, catalyst B17, contact Device B20, catalyst B22, catalyst B23, catalyst B21, the function of spare controller part are identical with main control device, therefore not Repeat again.After main control device failure, system will automatically switch to spare controller part and be operated.
The present invention is described in further details with reference to Fig. 3, Fig. 3 adds for the frequency modulation circulation of one embodiment of the invention Hot remote control operational flowchart.In use, close air-break 11 and air-break B24 first, and Relevant parameter is set, is mainly included:Heat time heating time T1, heating voltage, T2 interval time, oil well quantity N, initial heating pound sign A Deng.
During manual operation is:
First, close air-break 11 and air-break B24, by " automatic/to stop/manual " in control operation panel Button pushes " manual " position.
Then, heating voltage gear is selected.According to the corresponding hole condition needs of live sucker rod electrical heating well, in control operation Stir in panel and select certain voltage driving switch, voltage gear contactor 210, voltage gear contactor 211 or voltage gear Some in catalyst 28 just with certain oil well(To be selected)The adhesive of action response catalyst connect, other voltage gears are corresponding Action response catalyst disconnect.
Secondly, certain mouthful of oil well is selected.According to the numbering corresponding to the oil well that the needs of scene 1~6 are electrically heated, in control The oil well being pressed in guidance panel processed and numbering corresponding start button, the action response catalyst of this number oil well is selected with aforementioned The adhesive of voltage gear contactor connect;Transformator 24 exports the gear voltage, and PLC frequency-variable controllers 13 are started working, and right The electric quantity signal that electric parameters transducer 12, electric parameters transducer 25 send is analyzed, and controls the output current size of frequency-variable controller, Now the sucker rod electricity of this number oil well begins to warm up.When needing to stop heating, the corresponding stop button of this number well, frequency conversion is pressed Controller 13 quits work, and voltage gear contactor corresponding with this number oil well and action response catalyst disconnect, this number oil well Stop carrying out sucker rod electrical heating.
When needing to select lower a bite well to carry out sucker rod electrical heating, then it is corresponding to press this number well in control operation panel Start button.During whole operation, state-detection control and fault diagnosis, warning are carried out by PLC frequency-variable controllers 13, if PLC frequency-variable controllers 13 in main control device break down, and system automatically switches to spare controller part PLC frequency-variable controllers B26 is operated, while switch board and host computer can show fault cues, informs that maintainer is overhauled to equipment.
The process of being automatically brought into operation is:
First, close air-break 11 and air-break B24, according to the corresponding hole condition of live sucker rod electrical heating well Need, the corresponding voltage gear switch of each oil well of selection 1~6 is stirred in control operation panel, by control operation panel " automatic/to stop/manual " button pushes " automatic " position.
Then, pound sign assignment A initially will be set, and such as A=1 is begun to warm up from No. 1 oil well, now, PLC VFC Device 13 is controlled the action response catalyst 37 corresponding to No. 1 well and is connect with the voltage gear contactor adhesive of certain selected gear aforementioned Logical, PLC frequency-variable controllers 13 are started working afterwards, and the electric quantity signal that electric parameters transducer 12, electric parameters transducer 25 send is entered Row analysis, the size of VFC output current, No. 1 oil well proceed by sucker rod electrical heating, when being heated in the program of PLC After set T1 heat time heating time, frequency-variable controller 13 quits work, and disconnects the voltage gear catalyst corresponding to No. 1 well and action The connection of response catalyst 37, No. 1 well sucker rod stop electrical heating.Postpone certain time after, T2 interval time has been arrived, No. 2 The voltage gear contactor adhesive of action response catalyst 36 and certain gear corresponding to well is connected, afterwards PLC VFC Device 13 is started working, and No. 2 oil wells proceed by sucker rod electrical heating, the like sequential loop sucker rod is carried out to 1~6 mouthful of well Electrical heating, when wherein certain number oil well is shut down, PLC frequency-variable controllers 13 are shut down or fault-signal by the oil well for detecting, PLC frequency-variable controllers 13 are skipped this mouthful of oil well automatically, execute the sucker rod electrical heating of lower a bite oil well.If in main control device Frequency-variable controller 13, transformator 24 or catalyst break down, system automatically switches to spare controller part and is operated, with When switch board and host computer can show fault cues, inform that maintainer is overhauled to equipment.
Embodiment two need not change voltage
As shown in figure 4, present invention also offers the frequency modulation circulating-heating remote control of another embodiment, works as oil recovery Up to 5 mouthfuls of oil well on job platform, and well depth gap little when, without the need for switch over to heating voltage, only using wherein During any one gear, by the A1 ends of transformator 24 and the connection of X1 ends or A2 ends and the connection of X2 ends or A3 ends and the connection of X3 ends, Then the output voltage at A, X end of transformator 24 is a fixed value, and two other voltage gear removed in embodiment one is corresponding Catalyst, only retains 1 catalyst 211, is to connect the A2 ends of transformator 24 and X2 ends in Fig. 4, and the output voltage at A, X end is 1000V, system is by PLC frequency-variable controllers 13 and working condition and control contactor 211 and the catalyst of standby variable frequency device B211 is switched on or switched off to select to access main control intermediate frequency power supply or standby intermediate frequency power supply.
For further simplifying equipment, the master device, stand-by provision in the present embodiment device only retains same action response Contact unit, removes the action response contact unit in the spare controller part in embodiment one, both VFC Unit 1,2 26S Proteasome Structure and Function of boosting rectifier control unit are also identical, and both internal parts are also in symmetric configuration, as shown in Figure 4.
In practical operation, the action response device corresponding to the electrical heating start button of 1~No. 5 oil well is catalyst 301st, catalyst 302, catalyst 303, catalyst 304, catalyst 305, break-make pair of this device by 5 response catalysts Each oil well electrical heating sucker rod carries out manual/auto heating;The function of miscellaneous part and identical in embodiment one, master device When life is broken down, system automatically switches to stand-by provision work.
Embodiment three need not change voltage, and share a transformator
Fig. 5 is the frequency modulation circulating-heating remote control of another embodiment of the present invention.The embodiment is without the need for changing Voltage, and share a transformator.
As shown in figure 5, on the basis of embodiment two, then remove one group of transformator and electric parameters transducer, system passes through PLC The working condition and control contactor 29 of frequency-variable controller 13 and frequency-variable controller B26 and being switched on or switched off for catalyst B29 To select to access main frequency-variable controller 13 or standby variable frequency controller B26, then boost through transformator 24, then by control 1 Action response device contacts device 301, catalyst 302, catalyst corresponding to the electrical heating start button of~No. 5 oil wells 303rd, catalyst 304, the break-make of catalyst 305 carry out manual/auto heating to each oil well electrical heating sucker rod.
The present embodiment still arranges standby frequency-variable controller B26 and control contactor B29, when electric parameters transducer 29, When frequency-variable controller 13 breaks down, system automatically switches to standby device work.
The device of the embodiment uses relatively easy:Please also refer to shown in Fig. 3, close air-break 11 first With air-break B24, and relevant parameter is set, mainly included:Heat time heating time T1, heating voltage, T2 interval time, oil well number Amount N, initial heating pound sign A etc..
Because without the need for switching over to heating voltage, so heating voltage gear need not be selected, directly selecting certain mouthful of needs The oil well of heating.Assume that the transformator 24 in the present embodiment is output as 800V shelves.
" automatic/to stop/manual " button is pushed " automatic " position in control operation panel, it is assumed that heating is from No. 1 well Start.Control system in the case where fault message is not detected by, connect, PLC frequency-variable controllers by catalyst 29,301 adhesive of catalyst 13 frequency conversions are exported, then are exported through transformator 24, start to carry out sucker rod electrical heating to No. 1 oil well, and PLC is according to electricity pick-up The analysis of the electric parameter of device 12 and the collection of electric parameters transducer 25, carries out closed loop feedback to the output current size of frequency-variable controller 13 Control, after T1 heat time heating time for setting is reached, PLC frequency-variable controllers 13 disconnect output, disconnect catalyst 29, catalyst afterwards 301, after time delay certain time interval T 2,13 control contactor 29 of PLC frequency-variable controllers is connected with 302 adhesive of catalyst, transformator 24 800V shelves are output as, and 13 frequency conversion of PLC frequency-variable controllers exports, starts sucker rod electrical heating to be carried out to No. 2 oil wells, sets when reaching Heat time heating time after T1, PLC frequency-variable controllers 13 disconnect output, disconnect catalyst 29, catalyst 302, one timing of time delay afterwards Between after T2, now PLC frequency-variable controllers 13 detect No. 3 oil wells and shut down ... ... by that analogy, moves in circles, is that 5 mouthfuls of oil wells add Heat.
Above three embodiment is merely illustrative, as long as this device includes a frequency conversion control unit 1, boosting rectifier control Unit 2 and oil well action response contact unit 3 can operate, that is to say, that even no matter how stand-by provision is arranged Be technical scheme without stand-by provision still fall within the scope of the present invention should be noted that above-described embodiment be example and The unrestricted present invention, those skilled in the art are possible to design scope of a lot of alternate embodiments without deviating from claims.

Claims (8)

1. a kind of cluster well heating sucker rod frequency modulation circulating-heating remote control, at least includes a set of master device, it is characterized by:
The master device includes frequency conversion control unit, boosting rectifier control unit and the oil well action response catalyst being sequentially connected Unit;
Wherein described frequency conversion control unit carries out VFC to external power supply, and the unit is also responsible for T1 heat time heating time simultaneously, adds The setting of hot T2 interval time;The boosting rectifier control unit to frequency conversion after electric current boosted and selected the shelves of voltage output Position;Then the oil well action response contact unit selects connection to need the oil well heating sucker rod of heating, so according to during heating Between T1, the setting value of heat-up periods time T2 heating is circulated to N mouth oil wells;
The frequency conversion control unit includes air-break, the first electric parameters transducer and the frequency-variable controller being sequentially connected, institute Air-break is stated for main power switch, the three-phase voltage of the first electric parameters transducer collection power input, electric current are described Frequency-variable controller adjusts the frequency of the power supply.
2. cluster well heating sucker rod frequency modulation circulating-heating remote control as claimed in claim 1, it is characterized by:The boosting Control unit includes a transformator and second electric parameters transducer being connected with the transformator outfan, described Voltage, electric current after the collection frequency conversion of second electric parameters transducer, boosting, and signal is fed back to the frequency-variable controller.
3. the cluster well heating sucker rod frequency modulation circulating-heating remote control described in claim 1, it is characterized by:The oil well is moved Making response contact unit includes N number of action response catalyst, and wherein N is the quantity of the electrical heating oil well, and each is described dynamic Make the corresponding oil well heating sucker rod of response catalyst.
4. the cluster well heating sucker rod frequency modulation circulating-heating remote control as described in claim 1,2 or 3, it is characterized by:Institute Stating remote control also includes that one is enclosed within the stand-by provision that starts working when the master device breaks down.
5. cluster well heating sucker rod frequency modulation circulating-heating remote control as claimed in claim 4, it is characterized by:The boosting Control unit also includes that more than be connected with transformer secondary lateral coil 2 are used for selecting the voltage gear of output voltage to contact Device, the corresponding voltage of each described voltage gear contactor select gear;Portion inside the stand-by provision and the master device Part identical and be in symmetric configuration.
6. cluster well heating sucker rod frequency modulation circulating-heating remote control as claimed in claim 4, it is characterized by:Described standby Device only includes and frequency conversion control unit in symmetric configuration and boosting rectifier control list identical with the master device internal part Unit, the stand-by provision share an oil well action response contact unit with the master device.
7. cluster well heating sucker rod frequency modulation circulating-heating remote control as claimed in claim 6, it is characterized by:Described standby The boosting rectifier control unit of device and the master device fixes one grade of voltage output respectively, and the voltage output is 1000V.
8. cluster well heating sucker rod frequency modulation circulating-heating remote control as claimed in claim 4, it is characterized by:Described standby Device only includes identical with the master device internal part and in symmetric configuration frequency conversion control unit, the stand-by provision A boosting rectifier control unit and an oil well action response contact unit are shared with the master device.
CN201310571864.4A 2013-11-13 2013-11-13 Cluster well heating sucker rod frequency modulation circulating-heating remote control Active CN104635809B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310571864.4A CN104635809B (en) 2013-11-13 2013-11-13 Cluster well heating sucker rod frequency modulation circulating-heating remote control

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310571864.4A CN104635809B (en) 2013-11-13 2013-11-13 Cluster well heating sucker rod frequency modulation circulating-heating remote control

Publications (2)

Publication Number Publication Date
CN104635809A CN104635809A (en) 2015-05-20
CN104635809B true CN104635809B (en) 2017-03-15

Family

ID=53214672

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310571864.4A Active CN104635809B (en) 2013-11-13 2013-11-13 Cluster well heating sucker rod frequency modulation circulating-heating remote control

Country Status (1)

Country Link
CN (1) CN104635809B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105715231B (en) * 2016-04-29 2018-04-24 沧州润涛石油设备有限公司 A kind of clump formula producing well heating unit in turn
CN114086917B (en) * 2020-08-25 2023-11-28 中国石油天然气股份有限公司 Method, device, equipment and storage medium for removing wax from oil well

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2602155Y (en) * 2002-11-22 2004-02-04 天津大港油田维罗电缆有限责任公司 Automatic temperature control electric heating rod frequency conversion heating arrangement
CN2898284Y (en) * 2005-11-29 2007-05-09 中国石油天然气股份有限公司 Electric heater of oil pipeline
CN101220740A (en) * 2008-01-25 2008-07-16 朱成林 Electric heating apparatus of hollow sucker rod
CN102587861A (en) * 2011-01-10 2012-07-18 中国石油天然气股份有限公司 System and method for automatic electric heating control for oil pumping well

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2602155Y (en) * 2002-11-22 2004-02-04 天津大港油田维罗电缆有限责任公司 Automatic temperature control electric heating rod frequency conversion heating arrangement
CN2898284Y (en) * 2005-11-29 2007-05-09 中国石油天然气股份有限公司 Electric heater of oil pipeline
CN101220740A (en) * 2008-01-25 2008-07-16 朱成林 Electric heating apparatus of hollow sucker rod
CN102587861A (en) * 2011-01-10 2012-07-18 中国石油天然气股份有限公司 System and method for automatic electric heating control for oil pumping well

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
《基于ARM的抽油机节能控制系统的设计》;童颖;《中国优秀硕士学位论文全文数据库 工程科技I辑》;20110615;第B019-188页 *
《基于DPC的油井电加热技术研究》;李文义;《中国优秀硕士学位论文全文数据库 工程科技I辑》;20130315;第B019-152页 *
《基于PLC抽油机变频节能控制系统的研究》;刘慧芳;《中国优秀硕士学位论文全文数据库 信息科技辑》;20120515;第I140-664页 *

Also Published As

Publication number Publication date
CN104635809A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN103596307A (en) Resonance control circuit and electromagnetic heating device
CN104635809B (en) Cluster well heating sucker rod frequency modulation circulating-heating remote control
CN204392216U (en) A kind of trigger unit for thyristor
CN201656570U (en) Electric carrier wave intelligent home control system
CN104049165A (en) Electrical performance testing device of electromagnet
CN103487768A (en) System and method for lamp batch aging and detection
CN204256582U (en) A kind of three-phase electric appliance five notch power control device
CN203661321U (en) Resonance control circuit and electromagnetic heating device
CN205247232U (en) Transformer temperature control system
CN203645586U (en) Integration system of oil well heating and intelligent control of clustered-well oil pumping units
CN104349517A (en) Heating control circuit
CN203311230U (en) Household intelligent control system
CN103267585B (en) Data acquisition system for electric appliance heating test testing angle
CN202978695U (en) Common-grounded series-parallel circuit of multipath output power supplies
CN202813498U (en) Automatic induction device for microwave ovens and microwave oven
CN105320204B (en) A kind of five notch power control device of three-phase electric appliance
CN207218378U (en) The online switch modulation digital communication control system of local power utilization network
CN202677155U (en) Installation control system of automatic production line intelligent distribution
CN206114801U (en) Laboratory automation testing arrangement
CN204440052U (en) A kind of control circuit board
CN104133508A (en) Lathe bed and disc chuck temporary heating control device for warp knitting machine
CN204793592U (en) Automatic quick coating removal frock of solenoid lead wire induction heating
CN202231254U (en) Timing socket
CN104090199B (en) Device for simulating poor power source contact phenomenon in use process of electric appliance
CN203982229U (en) The interim heating control apparatus of tricot machine lathe bed and floral disc

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant