CN104635275B - 共中心点探地雷达数据自动快速测量系统 - Google Patents
共中心点探地雷达数据自动快速测量系统 Download PDFInfo
- Publication number
- CN104635275B CN104635275B CN201510111128.XA CN201510111128A CN104635275B CN 104635275 B CN104635275 B CN 104635275B CN 201510111128 A CN201510111128 A CN 201510111128A CN 104635275 B CN104635275 B CN 104635275B
- Authority
- CN
- China
- Prior art keywords
- gpr
- antenna
- reception antenna
- stepper motor
- cmp
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Geophysics And Detection Of Objects (AREA)
- Radar Systems Or Details Thereof (AREA)
Abstract
共中心点探地雷达数据自动快速测量系统,涉及探地雷达。设有共中心点探地雷达数据自动测量装置、计算机、雷达主机;测量装置设有传动螺母、左右螺旋杆、管箍、探地雷达发射天线、探地雷达接收天线和步进马达;步进马达设于左螺旋杆的一端,左右螺旋杆通过管箍连接;发射天线与接收天线通过传动螺母固定在左右螺旋杆上;计算机通过数据线与步进马达和雷达主机连接,步进马达和雷达主机用于分别同步控制发射天线和接收天线的位置移动以及雷达数据采集,步进马达通过传动左右螺旋杆控制发射天线和接收天线的位置并使发射天线和接收天线向相反方向等距移动;雷达主机控制发射天线向地下介质辐射高频电磁波,并由接收天线记录来自地下目标的反射回波。
Description
技术领域
本发明涉及探地雷达,具体是涉及一种共中心点探地雷达数据自动快速测量系统。
背景技术
探地雷达(ground penetrating radar,简称GPR)是一种公认的近地表地球物理方法,在过去的二十年来,探地雷达在硬件开发、数据处理和成像方法等方面取得了一系列的研究成果,并已经在地下探测、工程结构质量检测、环境监测和考古勘探等领域得到了成功应用。由于探地雷达数据解释需要一定的专业知识,非专业技术人员使用比较困难,制约了其在一些工程领域进一步推广应用。开发一些鲁棒的探地雷达定量表征和反演分析技术将是探地雷达方法实现第二次飞跃的关键所在。
探地雷达一般采用共偏移距(common-offset,简称CO)的工作模式。发射天线和接收天线之间的距离是固定的,两者一起在地表移动并探测来自地下目标的反射信号。为了定量地反演地下介质的电磁参数,探地雷达通常需要采集多天线偏移距数据,即在同一个位置逐步改变发射天线和接收天线之间的偏移距并采集来自地下目标的多次覆盖数据。
共中心点数据是多天线偏移距数据的最重要的数据采集方式之一。图1为共中心点(common mid-point,简称CMP)探地雷达探测方法的示意图。图中x为收发天线之间的距离,ε为所探测介质的介电常数,w为所探测介质的含水率,d为层状介质的厚度。发射天线TX1、TX2、TX3、TX4、TX5和接收天线RX1、RX2、RX3、RX4、RX5均置于地表,并向相反方向移动,逐步增大天线偏移距,采集来自地下目标的多次覆盖数据。采用速度谱等鲁棒方法对共中心点探地雷达数据进行分析可高精度地定量反演地下层状介质的介电参数,该方法已经在不同工程应用中得到了验证。另一方面,共中心点多通道探地雷达数据比单通道的共偏移距数据所容纳信息量大,通过叠加后可大大提高信号的信杂比和信噪比。
然而,目前共中心点探地雷达数据通常采用两个人手动移动天线的方式来采集。数据采集时间长,劳动强度大。另外,手动控制天线位置的工作方式会不可避免地给收/发天线偏移距引入误差,这已经被证明是后续的介电参数反演结果误差的主要来源。因此,开发一种共中心点探地雷达数据的自动快速采集系统,不仅具有重大的研究意义,而且具有广阔的工程 应用推广前景。
发明内容
本发明的目的在于提供一种共中心点探地雷达数据自动快速测量系统。
本发明设有共中心点探地雷达数据自动测量装置、计算机、雷达主机;所述共中心点探地雷达数据自动测量装置设有传动螺母、左螺旋杆、右螺旋杆、管箍、探地雷达发射天线、探地雷达接收天线和步进马达;步进马达设于左螺旋杆的一端,左螺旋杆的另一端通过管箍与右螺旋杆连接;探地雷达发射天线通过传动螺母固定在左螺旋杆上,并位于步进马达与管箍之间;探地雷达接收天线通过传动螺母固定在右螺旋杆上;计算机通过数据线与步进马达和雷达主机连接,步进马达和雷达主机用于分别同步控制探地雷达发射天线和探地雷达接收天线的位置移动以及雷达数据采集,步进马达通过传动左螺旋杆和右螺旋杆控制探地雷达发射天线和探地雷达接收天线的位置并使探地雷达发射天线和探地雷达接收天线向相反方向等距移动;雷达主机控制探地雷达发射天线向地下介质辐射高频电磁波,并由探地雷达接收天线记录来自地下目标的反射回波;步进马达对探地雷达发射天线和探地雷达接收天线的控制和雷达主机对雷达数据的采集分别由计算机上的自动控制和数据采集软件来同步实现,从而有效地实现共中心点雷达数据的快速采集。
其中两个传动螺母主要用于分别传动探地雷达发射天线和探地雷达接收天线在左螺旋杆和右螺旋杆的等距相向移动;左螺旋杆和右螺旋杆用于承载探地雷达接收天线和探地雷达发射天线的等距反向移动;管箍用于连接左螺旋杆和右螺旋杆并使其同步转动;探地雷达发射天线用于向地下介质辐射高频电磁波脉冲信号;探地雷达接收天线用于接收和采集来自地下目标的回波信号。
本发明可用于地下层状介质介电常数及厚度的定量表征和反演分析。本发明由计算机分别通过一个步进马达和一个雷达主机同步控制收/发天线的位置移动和雷达数据采集,步进马达通过转动一根左螺旋杆和一根右螺旋杆可高精度控制收/发天线的位置并使其反向等距移动。
与传统共中心点探地雷达数据手动采集方法相比,本发明具有以下突出优点:自动化程度高,可节约劳力成本;使用方便,数据采集时间大幅度减少;天线位置及偏移距的控制精度高;在环境监测及土木工程结构质量检测等领域具有广阔的应用前景。
附图说明
图1为现有的共中心点探地雷达探测方法示意图。
图2为本发明实施例的结构示意图。
图3为本发明实施例的共中心点探地雷达数据自动测量装置结构示意图。
具体实施方式
以下实施例将结合附图对本发明做进一步说明。
参见图2和图3,本发明实施例设有共中心点探地雷达数据自动测量装置1、计算机2、雷达主机3;所述共中心点探地雷达数据自动测量装置1设有传动螺母4、左螺旋杆5、右螺旋杆6、管箍7、探地雷达发射天线11、探地雷达接收天线12和步进马达13;步进马达13设于左螺旋杆5的一端,左螺旋杆5的另一端通过管箍7与右螺旋杆6连接;探地雷达发射天线11通过传动螺母4固定在左螺旋杆5上,并位于步进马达13与管箍7之间;探地雷达接收天线12通过传动螺母4固定在右螺旋杆6上;计算机2通过数据线与步进马达13和雷达主机3连接,步进马达13和雷达主机3用于分别同步控制探地雷达发射天线11和探地雷达接收天线12的位置移动以及雷达数据采集,步进马达13通过传动左螺旋杆5和右螺旋杆6控制探地雷达发射天线11和探地雷达接收天线12的位置并使探地雷达发射天线11和探地雷达接收天线12向相反方向等距移动;雷达主机3控制探地雷达发射天线11向地下介质辐射高频电磁波,并由探地雷达接收天线12记录来自地下目标的反射回波;步进马达13对探地雷达发射天线11和探地雷达接收天线12的控制和雷达主机3对雷达数据的采集分别由计算机2上的自动控制和数据采集软件来同步实现,从而有效地实现共中心点雷达数据的快速采集。
其中两个传动螺母4主要用于分别传动探地雷达发射天线11和探地雷达接收天线12在左螺旋杆5和右螺旋杆6的等距相向移动;左螺旋杆5和右螺旋杆6用于承载探地雷达发射天线11和探地雷达接收天线12的等距反向移动;管箍7用于连接左螺旋杆5和右螺旋杆6并使其同步转动;探地雷达发射天线11用于向地下介质辐射高频电磁波脉冲信号;探地雷达接收天线12用于接收和采集来自地下目标的回波信号。
探地雷达发射天线11和探地雷达接收天线12的高精度等距反向移动是由如图3所示的共中心点探地雷达数据自动测量装置实现,其中两个传动螺母4主要用于分别传动探地雷达发射天线11和探地雷达接收天线12在左螺旋杆5和右螺旋杆6的等距相向移动;左螺旋杆5和右螺旋杆6用于承载探地雷达发射天线11和探地雷达接收天线12的等距反向移动;管箍7用于连接左螺旋杆5和右螺旋杆6并使其同步转动;探地雷达发射天线11用于向地下介质辐射高频电磁波脉冲信号;探地雷达接收天线12用于接收和采集来自地下目标的回波信 号。
探地雷达发射天线11和探地雷达接收天线12,通过传动螺母4分别布置于左螺旋杆5和右螺旋杆6上,且以装置中心为基点对称分布;左螺旋杆5和右螺旋杆6的螺纹旋转方向相反,两者通过管箍7连为一体;通过步进马达13控制左螺旋杆5和右螺旋杆6的转动,从而使传动螺母4水平移动,进而使得探地雷达发射天线11和探地雷达接收天线12向相反方向等距移动并进行数据测量。
在图3中,标记A表示探地雷达发射天线11的移动方向,标记B表示探地雷达接收天线12的移动方向。
传统共中心点探地雷达数据的采集方法需要手动控制收/发天线的位置并改变其间距,费时费力且不能保证收/发天线位置和偏移距的精度。与之相比,本发明所公开的共中心点数据采集系统自动化程度高,可节约劳力成本;使用方便,数据采集时间大幅度减少;天线位置及偏移距的控制精度高;在环境监测及土木工程结构质量检测等领域具有广阔的应用前景。
Claims (1)
1.共中心点探地雷达数据自动快速测量系统,其特征在于设有共中心点探地雷达数据自动测量装置、计算机、雷达主机;所述共中心点探地雷达数据自动测量装置设有传动螺母、左螺旋杆、右螺旋杆、管箍、探地雷达发射天线、探地雷达接收天线和步进马达;步进马达设于左螺旋杆的一端,左螺旋杆的另一端通过管箍与右螺旋杆连接,左螺旋杆和右螺旋杆的螺纹旋转方向相反;探地雷达发射天线通过传动螺母固定在左螺旋杆上,并位于步进马达与管箍之间;探地雷达接收天线通过传动螺母固定在右螺旋杆上;计算机通过数据线与步进马达和雷达主机连接,步进马达和雷达主机用于分别同步控制探地雷达发射天线和探地雷达接收天线的位置移动以及雷达数据采集,步进马达通过传动左螺旋杆和右螺旋杆控制探地雷达发射天线和探地雷达接收天线的位置并使探地雷达发射天线和探地雷达接收天线向相反方向等距移动;雷达主机控制探地雷达发射天线向地下介质辐射高频电磁波,并由探地雷达接收天线记录来自地下目标的反射回波;步进马达对探地雷达发射天线和探地雷达接收天线的控制和雷达主机对雷达数据的采集分别由计算机上的自动控制和数据采集软件来同步实现,从而有效地实现共中心点雷达数据的快速采集。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510111128.XA CN104635275B (zh) | 2015-03-13 | 2015-03-13 | 共中心点探地雷达数据自动快速测量系统 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510111128.XA CN104635275B (zh) | 2015-03-13 | 2015-03-13 | 共中心点探地雷达数据自动快速测量系统 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104635275A CN104635275A (zh) | 2015-05-20 |
CN104635275B true CN104635275B (zh) | 2016-12-21 |
Family
ID=53214228
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510111128.XA Active CN104635275B (zh) | 2015-03-13 | 2015-03-13 | 共中心点探地雷达数据自动快速测量系统 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104635275B (zh) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107436435A (zh) * | 2017-08-07 | 2017-12-05 | 广州地铁设计研究院有限公司 | 一种单孔探测孤石的探地雷达装置及其探测方法 |
CN107390182B (zh) * | 2017-09-12 | 2024-05-24 | 广州辰创科技发展有限公司 | 一种移动式fod雷达 |
CN109212616A (zh) * | 2018-11-30 | 2019-01-15 | 中国矿业大学(北京) | 一种探地雷达ct透射探测实验装置 |
CN110940680A (zh) * | 2019-12-25 | 2020-03-31 | 上海熹翼科技有限公司 | 一种基于雷达技术的土壤含水量测量装置 |
CN111929646A (zh) * | 2020-08-14 | 2020-11-13 | 中国地质大学(北京) | 波束扫描探地雷达系统及智能波束扫描探测方法 |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1227343A2 (en) * | 1996-01-11 | 2002-07-31 | Vermeer Manufacturing Company | Trenchless underground boring system with boring tool location |
CN203149134U (zh) * | 2013-04-12 | 2013-08-21 | 黑龙江科技学院 | 一种地质勘测探地雷达 |
CN104267440A (zh) * | 2014-09-29 | 2015-01-07 | 中国神华能源股份有限公司 | 一种用于探地雷达的共中心点cmp探测方法 |
CN204101725U (zh) * | 2014-10-30 | 2015-01-14 | 厦门大学 | 一种混合极化双通道探地雷达系统 |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US6744253B2 (en) * | 2002-01-15 | 2004-06-01 | Larry G. Stolarczyk | Synchronous radio-imaging of underground structures |
-
2015
- 2015-03-13 CN CN201510111128.XA patent/CN104635275B/zh active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1227343A2 (en) * | 1996-01-11 | 2002-07-31 | Vermeer Manufacturing Company | Trenchless underground boring system with boring tool location |
CN203149134U (zh) * | 2013-04-12 | 2013-08-21 | 黑龙江科技学院 | 一种地质勘测探地雷达 |
CN104267440A (zh) * | 2014-09-29 | 2015-01-07 | 中国神华能源股份有限公司 | 一种用于探地雷达的共中心点cmp探测方法 |
CN204101725U (zh) * | 2014-10-30 | 2015-01-14 | 厦门大学 | 一种混合极化双通道探地雷达系统 |
Also Published As
Publication number | Publication date |
---|---|
CN104635275A (zh) | 2015-05-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104635275B (zh) | 共中心点探地雷达数据自动快速测量系统 | |
CN103777247B (zh) | 一种瞬变电磁雷达探测系统及探测方法 | |
AU2011382521B2 (en) | Acoustic transducer apparatus, systems, and methods | |
CN104656154B (zh) | 共发射源探地雷达多偏移距数据自动快速测量系统 | |
JP6567162B2 (ja) | 地下物性探査システムおよびそれを用いた地下物性分析方法 | |
CN104820021A (zh) | 一种采用相控阵超声成像检测煤岩界面的方法 | |
EP3605152B1 (en) | Ground penetrating radar and electromagnetic soil analysis method | |
US7345617B2 (en) | Apparatus for collecting ground radar data with polarization information | |
CA2561636A1 (en) | Method and apparatus for azimuthal logging of shear waves in boreholes using optionally rotatable transmitter and receiver assemblies | |
CN104459650A (zh) | 一种毫米波测云雷达实时标校系统及方法 | |
CN204439848U (zh) | 一种共发射源探地雷达多偏移距数据自动快速测量系统 | |
Wu et al. | Experimental study on the radiation characteristics of downhole acoustic phased combined arc array transmitter | |
CN204439847U (zh) | 一种共中心点探地雷达数据自动快速测量系统 | |
Lu et al. | Azimuthally acoustic logging tool to evaluate cementing quality | |
CN111897020A (zh) | 地下目标探测系统及方法 | |
CN109212616A (zh) | 一种探地雷达ct透射探测实验装置 | |
CN114527512A (zh) | 一种频率域无人机多频电磁探测水平梯度采集系统 | |
CA2895025A1 (en) | Sourceless density determination apparatus, methods, and systems | |
CN102946001B (zh) | 一种与随钻电阻率测井仪相耦合的天线耦合器 | |
Che et al. | Experimental study on the performance of an azimuthal acoustic receiver sonde for a downhole tool | |
Lu et al. | An acousto-electric effect logging detector in boreholes | |
CN205691773U (zh) | 一种可旋转的冻深自动测量装置 | |
Hansen | The far field of a borehole radar and its reflection at a planar interface | |
CN204374150U (zh) | 一种用于检测金属棒的超声无损检测装置 | |
CN204256188U (zh) | 多井间地质信息的探测处理系统 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant |