CN104632171B - Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well - Google Patents

Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well Download PDF

Info

Publication number
CN104632171B
CN104632171B CN201510060994.0A CN201510060994A CN104632171B CN 104632171 B CN104632171 B CN 104632171B CN 201510060994 A CN201510060994 A CN 201510060994A CN 104632171 B CN104632171 B CN 104632171B
Authority
CN
China
Prior art keywords
well
tool
branch
sealing base
whipstock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510060994.0A
Other languages
Chinese (zh)
Other versions
CN104632171A (en
Inventor
任荣权
张燕萍
李显义
吴千里
王军
仇珍珠
吕明杰
于永亮
杨毅
王雪
贾涛
张士彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China National Petroleum Corp
CNPC Engineering Technology R&D Co Ltd
Original Assignee
China National Petroleum Corp
CNPC Drilling Research Institute Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China National Petroleum Corp, CNPC Drilling Research Institute Co Ltd filed Critical China National Petroleum Corp
Priority to CN201510060994.0A priority Critical patent/CN104632171B/en
Publication of CN104632171A publication Critical patent/CN104632171A/en
Application granted granted Critical
Publication of CN104632171B publication Critical patent/CN104632171B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B23/00Apparatus for displacing, setting, locking, releasing or removing tools, packers or the like in boreholes or wells

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides complete set of equipments and method under a kind of Multilateral Wells staged fracturing completion interval of well, the equipment includes positioning tool string or branch well fracturing tool string;Positioning tool string includes the drilling rod, orientation pipe nipple and positioner connected with can be removably mounted from top to bottom;Positioner includes the lowering system and sealing base connected with can be removably mounted from top to bottom;Lowering system includes connecting rod and the tapered expansion plug set from top to bottom;The bottom of sealing base is fixedly connected with plug, and sealing base includes the sealing and holding part set from top to bottom, and tapered expansion is plugged in the inner chamber of holding part;Holding part, plug and tapered expansion plug surround push chamber, and push chamber promotes tapered expansion plug to move crush seal portion upwards and radially expanded;Branch well fracturing tool string includes drilling rod, releasing tool and the branch borehole pressure break completion tubular column connected with can be removably mounted successively from top to bottom.The device and method of the present invention can improve the security of pressure break by fracturing string string feeding in place.

Description

Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well
Technical field
Well technical field is drilled the present invention relates to oil and gas industry, more particularly to a kind of Multilateral Wells that are used for are segmented pressure Complete set of equipments and method under the completion interval of well split.
Background technology
Multilateral well is to get out several pit shafts on the different depth in a main hole to be used to exploit different depth oil reservoir Well.The technology, which can increase, rushes down pasta product, improves oil well output, oil reservoir development cost is reduced comprehensively.In low hole, hypotonic, low In pressure and Heterogeneous Oil And Gas Reservoirs, staged fracturing is carried out in branch well hole, well yield can be effectively improved.
It is general in routine techniques to use pressure break tubing string to carry out pressure break again after fracturing string string is sent directly into place, due to The lighter in weight of tubing string, rigidity is small, often situation not in place is sent in extended horizontal well, such as in actual job It is still not in place by sending into repeatedly, direct pressure break at position just often is being sent into, fracturing effect is being influenceed, it is impossible to significantly improve individual well Yield.
The content of the invention
To solve above-mentioned technical problem, the present invention proposes complete set of equipments and side under a kind of Multilateral Wells staged fracturing completion interval of well Complete set of equipments is reliably positioned in the wellbore using positioner under method, Multilateral Wells staged fracturing completion interval of well, so as to fracturing string String can send into the security for improving pressure break in place.
Complete set of equipments under a kind of Multilateral Wells staged fracturing completion interval of well of the present invention, including positioning tool string or branch well pressure break Tool string;
The positioning tool string includes the drilling rod, orientation pipe nipple and positioner connected with can be removably mounted successively from top to bottom; The positioner includes the lowering system being sequentially connected from top to bottom and for the sealing base with the cooperation of the inwall of sleeve pipe, institute Lowering system is stated to be connected with can be removably mounted with the sealing base;
The lowering system includes connecting rod and the tapered expansion plug set gradually from top to bottom;The sealing base is hollow Cylinder, the bottom of the sealing base be fixedly connected one be used for insulate plug;The sealing base includes setting successively from top to bottom The sealing and holding part that can radially expand put, the internal diameter of the holding part are more than the internal diameter of the sealing, the cone Shape is swollen to be plugged in the inner chamber of the holding part and positioned at the top of the plug;The inwall of the holding part, the plug and The lower surface of the tapered expansion plug surrounds push chamber, and the upward motion of the tapered expansion plug is promoted by the pressure of the push chamber The sealing is extruded to radially expand;
The branch well fracturing tool string include connect with can be removably mounted successively from top to bottom the drilling rod, releasing tool and Branch borehole pressure break completion tubular column.
Further, the upper releasing tool that the releasing tool includes connecting with can be removably mounted successively from top to bottom is given up with Instrument;
The upper releasing tool includes the upper releasing running tool connected with can be removably mounted successively from top to bottom and above given up back Patch cylinder, it is described on the give up upper end of tieback insertion tube there is upwardly opening inserting groove, the upper releasing running tool can be plugged Ground is placed in the inserting groove.
Further, the branch well fracturing tool string also includes the pressure break tubing string being sequentially connected from top to bottom and returned Jacket pipes, the tieback intubation can be inserted in the inserting groove.
As a kind of enforceable mode, the lower releasing tool with it is described on give up tieback insertion tube by hydraulic releasing or Pitching is given up separation, the upper releasing running tool with it is described on tieback insertion tube of giving up given up and separate by back-off.
Further, the upper surface of the sealing base is to set keyway on guiding surface, the side wall of the sealing base, The side wall of the keyway has otch, and the side wall of the keyway intersects in the incision with the guiding surface;
Under the Multilateral Wells staged fracturing completion interval of well complete set of equipments also include reclaim whipstock, the recovery whipstock it is upper End sets windowing inclined-plane, and the lower end of the recovery whipstock is stretched into the hollow and connected with can be removably mounted with the sealing base Connect;The positioning key that can be engaged with the keyway is set on the side wall for reclaiming whipstock, the positioning key is cut by described Mouth is slipped into the keyway.
The stop pin that can radially stretch is set as a kind of enforceable mode, on the side wall of the recovery whipstock, Pin-and-hole is set on the side wall of the hollow, and the stop pin is extended radially and is engaged with the pin-and-hole.
Further, the otch of the keyway is located at the lower end of the guiding surface.
Further, the lowering system also includes locating part, and the locating part is sleeved on the outside of the connecting rod, The lower surface of the locating part is the spacing inclined-plane being engaged with the guiding surface.
As a kind of enforceable mode, the plug is sealed on the lower surface of the hollow.
Further, the area of section of the tapered expansion plug is gradually reduced from top to bottom.
The present invention also proposes a kind of Multilateral Wells staged fracturing completion method, using above-mentioned Multilateral Wells staged fracturing completion interval of well Lower complete set of equipments, the Multilateral Wells staged fracturing completion method comprises the following steps:
After S10, casing cementing, main borehole is bored, main borehole staged fracturing is completed;
S20, positioning tool string transfers to predetermined well depth, and being suppressed in well head makes the sealing base and described sleeve pipe of positioner Inwall be brought into close contact, plug insulates the main borehole;Above carry the drilling rod, the lowering system of the positioner with it is described close Seal base-separation;
S30, transfers gyroscope, measures the true bearing angle of the guiding surface of the sealing base, calculates the reality side Phase difference between parallactic angle and predetermined design orientation, reclaims the gyroscope;
S40, whipstock is reclaimed in well head adjustment, and the recovery whipstock is transferred to the sealing base by the drilling rod, The recovery whipstock is locked with the sealing base;The drilling rod is above carried, the recovery whipstock is given up with the drilling rod;
S50, opens a window at the windowing inclined-plane of the recovery whipstock, sidetracking branch well;Transfer branch well fracturing tool string Into the branch well, branch borehole fracturing work is completed, acts the releasing tool in described sleeve pipe;
S60, the drilling rod transfers casing section mill, and the casing section mill reclaims the recovery whipstock;The drilling rod transfers junk mill Plug described in milling, connects the main borehole and the branch well.
Further, in the S50, step S510, institute are included in decentralization branch well fracturing tool string to the branch well State upper releasing tool, lower releasing tool and branch borehole pressure break completion that drilling rod decentralization is connected in which can be removably mounted successively from top to bottom Tubing string, the upper releasing running tool and tieback of above giving up that the upper releasing tool includes connecting with can be removably mounted successively from top to bottom is inserted Cylinder;After the drilling rod decentralization in place, the lower releasing tool is located in the branch well;
Above carry the drilling rod, the upper releasing running tool with it is described on tieback insertion tube of giving up give up;Pressure break tubing string Lower end connects back to jacket pipes, and the tieback intubation inserts tieback insertion tube of being given up on described, realizes the tieback of the pressure break tubing string; The pressure break tubing string is docked with the branch borehole pressure break completion tubular column, forms airtight passage, carries out branch borehole pressure Split operation;
Acting releasing tool in described sleeve pipe includes step S520, is suppressed in well head, the lower releasing tool with Tieback insertion tube of being given up on described is given up, and is acted the pressure break tubing string, the tieback and is intubated and is given up on described tieback insertion tube.
The present invention is compared to the beneficial effect of prior art:Under Multilateral Wells staged fracturing completion interval of well complete set of equipments and In method, positioner provides to reclaim the lowered position of whipstock, the directional drilling of the windowing position and branch well of branch well Reliable positioning datum.Complete set of equipments can ensure to transfer to positioner using drilling rod under Multilateral Wells staged fracturing completion interval of well Predetermined well depth, advantageously ensures that the position of sidetracking branch well is accurate.Using drilling rod tripping in branch borehole pressure break completion tubular column, phase Than in the tripping in mode of routine techniques, the present invention can guarantee that tubing string decentralization in place, improve the security of fracturing work, improve single Well production.
Brief description of the drawings
Fig. 1 is the structural representation of the main borehole got out after casing cementing;
Fig. 2 is the structural representation that main borehole staged fracturing completion tubular column is transferred in main borehole;
Fig. 3 positions the structural representation of tool string to be transferred in sleeve pipe using drilling rod;
Fig. 4 makes lowering system be given up with sealing base the structural representation separated above to carry drilling rod;
Fig. 5 is the structural representation on drilling rod decentralization gyroscope to sealing base;
Fig. 6 is recovery whipstock and the exploded perspective view of sealing base;
Fig. 7 is that drilling rod transfers the structural representation reclaimed on whipstock to sealing base;
Fig. 8 is the structural representation that drilling rod is separated with reclaiming whipstock to give up;
Fig. 9 is the structural representation of the branch well that sidetracking goes out at the windowing inclined-plane for reclaiming whipstock;
Figure 10 is that drilling rod transfers branch well fracturing tool string to the structural representation in branch well;
Figure 11 is that upper releasing running tool is given up the structural representation separated with tieback insertion tube of above giving up;
The structural representation that Figure 12 is connected for the tieback intubation of pressure break tubing string lower end with tieback insertion tube of above giving up;
Figure 13 gives up the structural representation separated for tieback insertion tube of above giving up with lower releasing tool;
Figure 14 is that drilling rod transfers structural representation of the casing section mill into sleeve pipe;
The structural representation of Multilateral Wells after Figure 15 is reclaimed for recovery whipstock by casing section mill;
Figure 16 is that drilling rod transfers structural representation of the junk mill into sleeve pipe;
The structural representation that Figure 17 connects for main borehole after plug milling with branch well.
Reference:
1- sleeve pipes;2- main boreholes;3- main borehole staged fracturing completion tubular columns;
4- sealing bases;41- sealings;42- holding parts;43- guiding surfaces;44- keyways;45- pin-and-holes;
5- lowering systems;51- connecting rods;52- tapered expansion plugs;The spacing inclined-planes of 53-;
6- drilling rods;7- orients pipe nipple;8- plugs;9- gyroscopes;
10- reclaims whipstock;101- windowings inclined-plane;102- positioning keys;
11- branch wells;12- branch borehole pressure break completion tubular columns;Releasing tool under 13-;
The upper releasing tools of 14-;The upper releasing running tools of 141-;Given up on 142- tieback insertion tube;
15- tiebacks are intubated;16- pressure break tubing strings;17- casing section mills;18- junk mills.
Embodiment
Below in conjunction with accompanying drawing, the technical characteristic above-mentioned and other to the present invention and advantage are clearly and completely described, Obviously, described embodiment is only the section Example of the present invention, rather than whole embodiments.
Refer to shown in Fig. 1 and Fig. 2, after sleeve pipe 1 is cemented the well, bore main borehole 2, transfer main borehole staged fracturing completion tubular column 3, Main borehole staged fracturing operation is carried out using common process, after the completion of main borehole staged fracturing operation, main borehole staged fracturing is complete Well casing post 3 stays in shaft bottom.
Complete set of equipments includes positioning tool string or branch well pressure break under a kind of Multilateral Wells staged fracturing completion interval of well of the present invention Tool string.As shown in figure 3, positioning tool string is including the drilling rod 6 connected with can be removably mounted successively from top to bottom, orientation pipe nipple 7 and determines Position device.It can ensure positioner transferring to predetermined well depth using drilling rod 6, advantageously ensure that the position of sidetracking branch well is accurate Really.Positioner includes the lowering system 5 and sealing base 4 being sequentially connected from top to bottom, lowering system 5 and the energy of sealing base 4 Removably connect.Sealing base 4 is hollow, and sealing base 4 is used to coordinate with the inwall of sleeve pipe 1, and the bottom of sealing base 4 is consolidated Surely connection one is used for the plug 8 insulated.
Refer to shown in Fig. 4, lowering system 5 includes connecting rod 51 and the tapered expansion plug 52 set gradually from top to bottom.It is close Envelope pedestal 4 includes the sealing 41 that can be radially expanded and holding part 42 set gradually from top to bottom, the internal diameter of holding part 42 More than the internal diameter of sealing 41.Tapered expansion plug 52 is placed in the inner chamber of holding part 42 and positioned at the top of plug 8, holding part 42 The lower surface of inwall, plug 8 and tapered expansion plug 52 surrounds push chamber, makes the pressure rise of push chamber, promote tapered expansion plug 52 to Upper motion, the crush seal portion 41 of tapered expansion plug 52 is radially expanded, and is coordinated so that sealing base 4 is sealed with sleeve pipe 1.
Further, as shown in figure 4, lowering system 5 also includes locating part, locating part is sleeved on the outer of connecting rod 51 Portion, the lower surface of locating part is the spacing inclined-plane 53 being engaged with guiding surface 43.The insertion sealing of connecting rod 51 of lowering system 5 In the holding part 42 of pedestal 4, spacing inclined-plane 53 cooperates with guiding surface 43, makes whole positioner in the cylinder of rule Shape, so that impact resistance is stronger.
As a kind of enforceable mode, plug 8 is sealed on the lower surface of hollow;During plug 8 can also be arranged on The inside of empty cylinder.
Further, the area of section of tapered expansion plug 52 is gradually reduced from top to bottom.
Further, refer to shown in Fig. 6 and Fig. 7, the upper surface of sealing base 4 (i.e. hollow) is guiding surface 43, Keyway 44 is set on the side wall of sealing base 4, and the side wall of keyway 44 has otch, and the side wall of keyway 44 is oblique with being oriented in incision Intersect in face 43.Complete set of equipments also includes reclaiming whipstock 10 under Multilateral Wells staged fracturing completion interval of well, reclaims the upper end of whipstock 10 Windowing inclined-plane 101 is set, and the lower end for reclaiming whipstock 10 is stretched into hollow and is connected with can be removably mounted with sealing base 4;Reclaim The positioning key 102 that can be engaged with keyway 44 is set on the side wall of whipstock 10, and positioning key 102 slips into keyway 44 by otch It is interior.
As a kind of enforceable mode, the stop pin that sets and can radially stretch on the side wall of whipstock 10 is reclaimed, in Pin-and-hole 45 is set on the side wall of empty cylinder, and stop pin is extended radially and is engaged with pin-and-hole 45, makes recovery whipstock 10 and sealing Pedestal 4 can effectively locking, it is to avoid depart from.Further, the otch of keyway 44 is located at the lower end of guiding surface 43.
Refer to shown in Figure 10, under Multilateral Wells staged fracturing completion interval of well the branch well fracturing tool string of complete set of equipments include from Drilling rod 6, releasing tool and branch borehole pressure break completion tubular column 12 that top to bottm is connected in which can be removably mounted successively.Further, lose Hand-held tool includes the upper releasing tool 14 and lower releasing tool 13 connected with can be removably mounted successively from top to bottom.Refer to Figure 11 institutes Show, the upper releasing running tool 141 and tieback of above giving up that upper releasing tool 14 includes connecting with can be removably mounted successively from top to bottom are inserted Cylinder 142, the upper end for tieback insertion tube 142 of above giving up has upwardly opening inserting groove, and upper releasing running tool 141 is put in which can plug In inserting groove.
Further, refer to shown in Figure 12, branch well fracturing tool string also includes the pressure break being sequentially connected from top to bottom Tubing string 16 and tieback intubation 15, tieback intubation 15 can be inserted in inserting groove.Upper releasing running tool 141 is extracted after inserting groove, Tieback intubation 15 inserts inserting groove, carries out branch borehole fracturing work.
As a kind of enforceable mode, lower releasing tool 13 and tieback insertion tube 142 of above giving up pass through hydraulic releasing or throwing Ball is given up separation, and upper releasing running tool 141 is given up by back-off with tieback insertion tube 142 of above giving up and separated.At the place of sleeve pipe 1 Use back-off to give up in main hole safer, different modes of giving up is used on whole tubing string string, the peace of operation can be also improved Quan Xing.
The present invention a kind of Multilateral Wells staged fracturing completion method, using under above-mentioned Multilateral Wells staged fracturing completion interval of well into Complete equipment, comprises the following steps:
S10, as depicted in figs. 1 and 2, after sleeve pipe 1 is cemented the well, bores main borehole 2, main after the completion of main borehole staged fracturing operation Borehole pressure break completion tubular column 3 stays in shaft bottom;
S20, as shown in Figure 3 and Figure 4, transfers to predetermined well depth, being suppressed in well head makes positioner by positioning tool string The inwall of sealing base 4 and sleeve pipe 1 is brought into close contact, the packing main borehole 2 of plug 8;Above carry drilling rod 6, the lowering system 5 of positioner Separated with sealing base 4;Sealing base 4 is lowered position, the windowing position of branch well 11 and the branch well for reclaiming whipstock 10 11 directional drilling provides positioning datum;
S30, is referred to shown in Fig. 5, is transferred in gyroscope 9, the present embodiment in the decentralization of gyroscope 9 to orientation pipe nipple 7, measurement The true bearing angle of the guiding surface 43 of sealing base 4, calculates the phase difference between true bearing angle and predetermined design orientation, Reclaim gyroscope 9;
S40, is referred to shown in Fig. 7 and Fig. 8, is reclaimed whipstock 10 according to the adjusting offset measured in well head, is adjusted back The method for receiving whipstock 10 is the ordinary skill in the art, be will not be repeated here;Drilling rod 6 transfers to sealing by whipstock 10 is reclaimed Pedestal 4, reclaims whipstock 10 and is locked with sealing base 4;Drilling rod 6 is above carried, whipstock 10 is reclaimed and is given up with drilling rod 6;
S50, is referred to shown in Fig. 9, is opened a window at the windowing inclined-plane 101 for reclaiming whipstock 10, sidetracking branch well 11;As schemed Shown in 10, in decentralization branch well fracturing tool string to branch well 11, branch borehole fracturing work is completed, Figure 13 institutes are referred to Show, act the releasing tool in sleeve pipe 1;
S60, is referred to shown in Figure 14 and Figure 15, the decentralization of drilling rod 6 casing section mill 17 supporting with reclaiming whipstock 10, casing section mill 17 reclaim whipstock 10;Refer to shown in Figure 16, the decentralization milling plug 8 of junk mill 18 of drilling rod 6 is referred to shown in Figure 17, ground After the completion of milling, main borehole 2 connects to form overall structure with branch well 11.
Further, in S50, step S510 is included in decentralization branch well fracturing tool string to branch well 11, drilling rod 6 is transferred Upper releasing tool 14, lower releasing tool 13 and the branch borehole pressure break completion tubular column connected with can be removably mounted successively from top to bottom 12.Refer to shown in Figure 11, upper releasing tool 14 includes the upper releasing running tool 141 connected with can be removably mounted successively from top to bottom Above give up tieback insertion tube 142;After drilling rod 6 is transferred in place, lower releasing tool 13 is located in branch well 11;Drilling rod 6 is above carried, is above lost Hand running tool 141 is given up with tieback insertion tube 142 of above giving up.In the present embodiment, upper releasing running tool 141 and tieback of above giving up Insertion tube 142 is given up separation by back-off, and reversion drilling rod 6 can be achieved to give up.Using the tripping in branch borehole pressure break completion of drilling rod 6 Tubing string 12, compared to pressure break oil pipe tripping in mode is used, the present invention can guarantee that tubing string decentralization in place, improve the peace of fracturing work Quan Xing.
Refer to shown in Figure 12, the lower end of pressure break tubing string 16 is connected back to gives up in jacket pipes 15, the insertion of tieback intubation 15 Tieback insertion tube 142, realizes the tieback of pressure break tubing string 16;12 pairs of pressure break tubing string 16 and branch borehole pressure break completion tubular column Connect, form airtight passage, carry out branch borehole fracturing work.Acting the releasing tool in sleeve pipe 1 includes step S520, Refer to shown in Figure 13, suppressed in well head, lower releasing tool 13 is given up with tieback insertion tube 142 of above giving up, act pressure break tubing string 16th, tieback intubation 15 and on give up tieback insertion tube 142.
It is different from conventional pressure break, in the Multilateral Wells staged fracturing completion method of the present invention, before tripping in pressure break tubing string 16, Need that branch borehole pressure break completion tubular column 12 is lowered into branch well 11 by side windowing, pressure break is suppressed in tripping in afterwards in place Complete, in addition it is also necessary to branch borehole pressure break completion tubular column 12 is separated with pressure break tubing string 16 by releasing tool, makes branch well Staged fracturing completion tubular column 12 is remained entirely in branch well hole 11, and pressure break tubing string 16 goes out.The recovery that will be left in sleeve pipe 1 is oblique Reclaimed to device 10, without fracturing string string or pressure break oil pipe string in sleeve pipe 1, the need for linking up main branch well so as to next step, so that Complete Multilateral Wells staged fracturing technique.Accordingly, it would be desirable to ensure that fracturing string string must be lowered into branch well 11 completely, if branch 12 tripping in of completion tubular column of borehole pressure break are not in place, and main borehole 2 and branch well 11 can be caused to link up process and be obstructed, cause branch Well construction fails.
In the present invention, successfully branch borehole pressure break completion tubular column 12 is sent to using the larger drilling rod 6 of weight Position, improves the security of pressure break, it is ensured that fracturing effect, improves well yield.Simultaneously as when drilling rod 6 can not bear pressure break High pressure, is given up in drilling rod 6 after tripping in by upper releasing running tool 141 with tieback insertion tube 142 of above giving up, tripping in pressure break oil pipe string Docked with the branch borehole pressure break completion tubular column 12 of bottom, form airtight passage, complete fracturing work.
Particular embodiments described above, has been carried out further to the purpose of the present invention, technical scheme and beneficial effect Describe in detail, it will be appreciated that the foregoing is only the specific embodiment of the present invention, the protection being not intended to limit the present invention Scope.Particularly point out, to those skilled in the art, within the spirit and principles of the invention, that is done any repaiies Change, equivalent substitution, improvement etc., should be included in the scope of the protection.

Claims (6)

1. a kind of complete set of equipments under Multilateral Wells staged fracturing completion interval of well, it is characterised in that the Multilateral Wells staged fracturing completion interval of well Lower complete set of equipments includes positioning tool string or branch well fracturing tool string;
The positioning tool string includes the drilling rod, orientation pipe nipple and positioner connected with can be removably mounted successively from top to bottom;It is described Positioner includes the lowering system that is sequentially connected from top to bottom and for the sealing base with the cooperation of the inwall of sleeve pipe, it is described under Place system is connected in which can be removably mounted with the sealing base;
The lowering system includes connecting rod and the tapered expansion plug set gradually from top to bottom;The sealing base is hollow, The bottom of the sealing base be fixedly connected one be used for insulate plug;The sealing base includes what is set gradually from top to bottom The sealing and holding part that can be radially expanded, the internal diameter of the holding part are more than the internal diameter of the sealing, the tapered expansion Plug in the inner chamber of the holding part and positioned at the top of the plug;The inwall of the holding part, the plug and described The lower surface of tapered expansion plug surrounds push chamber, and the upward motion for promoting the tapered expansion plug by the pressure of the push chamber is extruded The sealing is radially expanded;Wherein, the upper surface of the sealing base is on guiding surface, the side wall of the sealing base Keyway is set, and the side wall of the keyway has otch, and the side wall of the keyway intersects in the incision with the guiding surface;
Complete set of equipments also includes reclaiming whipstock under the Multilateral Wells staged fracturing completion interval of well, and the upper end of the recovery whipstock is set Windowing inclined-plane is put, the lower end of the recovery whipstock is stretched into the hollow and is connected with can be removably mounted with the sealing base; The positioning key that can be engaged with the keyway is set on the side wall for reclaiming whipstock, the positioning key is slided by the otch Enter in the keyway;The stop pin that can radially stretch, the side wall of the hollow are set on the side wall for reclaiming whipstock Upper setting pin-and-hole, the stop pin is extended radially and is engaged with the pin-and-hole;
The branch well fracturing tool string includes the drilling rod, releasing tool and the Zhi Jing connected with can be removably mounted successively from top to bottom Eye staged fracturing completion tubular column;
The releasing tool includes the upper releasing tool and lower releasing tool connected with can be removably mounted successively from top to bottom;Lost on described Hand-held tool includes the upper releasing running tool that connects with can be removably mounted successively from top to bottom and tieback insertion tube of above giving up, it is described on give up The upper end of tieback insertion tube has upwardly opening inserting groove, and the upper releasing running tool is placed in the inserting groove with plugging In;The branch well fracturing tool string also includes the pressure break tubing string being sequentially connected from top to bottom and tieback intubation, the tieback Intubation can be inserted in the inserting groove;The lower releasing tool with it is described on tieback insertion tube of giving up lost by hydraulic releasing or pitching Hand is separated, the upper releasing running tool with it is described on tieback insertion tube of giving up given up and separate by back-off;
Wherein, the sealing base is to reclaim the lowered position of whipstock, the windowing position of branch well and the Directional Drilling of branch well Enter to provide positioning datum.
2. complete set of equipments under Multilateral Wells staged fracturing completion interval of well according to claim 1, it is characterised in that the keyway Otch is located at the lower end of the guiding surface.
3. complete set of equipments under Multilateral Wells staged fracturing completion interval of well according to claim 1, it is characterised in that the decentralization system System also includes locating part, and the locating part is sleeved on the outside of the connecting rod, and the lower surface of the locating part is to be led with described The spacing inclined-plane being engaged to inclined-plane.
4. complete set of equipments under Multilateral Wells staged fracturing completion interval of well according to claim 1, it is characterised in that the plug envelope Cover on the lower surface in the hollow.
5. complete set of equipments under Multilateral Wells staged fracturing completion interval of well according to claim 1, it is characterised in that the tapered expansion The area of section of plug is gradually reduced from top to bottom.
6. a kind of Multilateral Wells staged fracturing completion method, it is characterised in that using point as described in any one of claim 1 to 5 Complete set of equipments under branch well staged fracturing completion interval of well, the Multilateral Wells staged fracturing completion method comprises the following steps:
After S10, casing cementing, main borehole is bored, main borehole staged fracturing is completed;
S20, positioning tool string transfers to predetermined well depth, and being suppressed in well head makes in the sealing base and described sleeve pipe of positioner Wall is brought into close contact, and plug insulates the main borehole;Above carry the drilling rod, the lowering system of the positioner and the sealing base Seat separation;
S30, transfers gyroscope, measures the true bearing angle of the guiding surface of the sealing base, calculates the true bearing angle With the phase difference between predetermined design orientation, the gyroscope is reclaimed;
S40, reclaims whipstock, the recovery whipstock is transferred to the sealing base by the drilling rod, described in well head adjustment Whipstock is reclaimed to lock with the sealing base;The drilling rod is above carried, the recovery whipstock is given up with the drilling rod;
S50, opens a window at the windowing inclined-plane of the recovery whipstock, sidetracking branch well;Branch well fracturing tool string is transferred to institute State in branch well, complete branch borehole fracturing work, act the releasing tool in described sleeve pipe;
S60, the drilling rod transfers casing section mill, and the casing section mill reclaims the recovery whipstock;The drilling rod transfers junk mill milling The plug, connects the main borehole and the branch well;
Include step S510 in the S50, in decentralization branch well fracturing tool string to the branch well, the drilling rod is transferred from upper Upper releasing tool, lower releasing tool and the branch borehole pressure break completion tubular column connected with can be removably mounted successively under, it is described on lose Hand-held tool includes the upper releasing running tool connected with can be removably mounted successively from top to bottom and tieback insertion tube of above giving up;Under the drilling rod It is put into behind position, the lower releasing tool is located in the branch well;
Above carry the drilling rod, the upper releasing running tool with it is described on tieback insertion tube of giving up give up;The lower end of pressure break tubing string Jacket pipes are connected back to, the tieback intubation inserts tieback insertion tube of being given up on described, realizes the tieback of the pressure break tubing string;It is described Pressure break tubing string is docked with the branch borehole pressure break completion tubular column, forms airtight passage, is carried out branch borehole pressure break and is made Industry;
Acting releasing tool in described sleeve pipe includes step S520, is suppressed in well head, the lower releasing tool with it is described On tieback insertion tube of giving up give up, rise the pressure break tubing string, tieback intubation and it is described on give up tieback insertion tube.
CN201510060994.0A 2015-02-05 2015-02-05 Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well Active CN104632171B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510060994.0A CN104632171B (en) 2015-02-05 2015-02-05 Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510060994.0A CN104632171B (en) 2015-02-05 2015-02-05 Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well

Publications (2)

Publication Number Publication Date
CN104632171A CN104632171A (en) 2015-05-20
CN104632171B true CN104632171B (en) 2017-10-17

Family

ID=53211350

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510060994.0A Active CN104632171B (en) 2015-02-05 2015-02-05 Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well

Country Status (1)

Country Link
CN (1) CN104632171B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104895516B (en) * 2015-05-22 2017-12-15 姚娜 Slim-hole sidewall coring tool
CN105507839A (en) 2015-12-01 2016-04-20 中国石油天然气集团公司 Window milling method for casings of continuous oil pipes
CN109899047B (en) * 2017-12-07 2021-02-26 中国石油化工股份有限公司 Tieback fracturing method and anchoring retrievable tieback fracturing shaft
CN109931042B (en) * 2017-12-18 2022-03-01 中国石油天然气股份有限公司 Directional hydraulic sand-blasting perforation fracturing device and method
CN109403943A (en) * 2018-09-26 2019-03-01 中国石油天然气股份有限公司 Staged fracturing method for 3-inch half sidetracking horizontal well
CN115637925A (en) * 2021-07-19 2023-01-24 蓝土地能源技术有限公司 Rigid-transmission branch drilling and completion tool and drilling method thereof
CN113586025B (en) * 2021-09-03 2023-03-14 陕西延长石油(集团)有限责任公司 Compact reservoir horizontal well intermittent volume fracturing device and method
CN114439454A (en) * 2021-12-09 2022-05-06 潍坊市宇宏石油机械有限公司 Multilateral well drilling and completion device and using method
CN114607318A (en) * 2022-03-24 2022-06-10 中煤科工集团西安研究院有限公司 Fracturing cooperative construction method for combined production and drilling of multi-layer horizontal well for deep coal bed methane

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2310148Y (en) * 1997-11-25 1999-03-10 胜利石油管理局采油工艺研究院 Multifunctional well completion pipe string for horizontal well
CN2864079Y (en) * 2005-11-29 2007-01-31 新疆石油管理局钻井工艺研究院 Locating device for naked eye sub-well oblique machine
CN1948702A (en) * 2005-10-10 2007-04-18 中国石油天然气集团公司 Well drilling method of multibranch well
CN201991444U (en) * 2011-03-23 2011-09-28 中国石油化工股份有限公司 Windowing and sidetrack drilling device
CN202659183U (en) * 2012-06-11 2013-01-09 潍坊市宇宏石油机械有限公司 Multifunctional downhole positioning device for oil drilling and production
CN103132967A (en) * 2011-12-01 2013-06-05 阜新驰宇石油机械有限公司 Multilateral well fracturing hanging well completion process device
CN204532317U (en) * 2015-02-05 2015-08-05 中国石油天然气集团公司 A complete set of equipment under Multilateral Wells staged fracturing completion interval of well

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6056059A (en) * 1996-03-11 2000-05-02 Schlumberger Technology Corporation Apparatus and method for establishing branch wells from a parent well

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2310148Y (en) * 1997-11-25 1999-03-10 胜利石油管理局采油工艺研究院 Multifunctional well completion pipe string for horizontal well
CN1948702A (en) * 2005-10-10 2007-04-18 中国石油天然气集团公司 Well drilling method of multibranch well
CN2864079Y (en) * 2005-11-29 2007-01-31 新疆石油管理局钻井工艺研究院 Locating device for naked eye sub-well oblique machine
CN201991444U (en) * 2011-03-23 2011-09-28 中国石油化工股份有限公司 Windowing and sidetrack drilling device
CN103132967A (en) * 2011-12-01 2013-06-05 阜新驰宇石油机械有限公司 Multilateral well fracturing hanging well completion process device
CN202659183U (en) * 2012-06-11 2013-01-09 潍坊市宇宏石油机械有限公司 Multifunctional downhole positioning device for oil drilling and production
CN204532317U (en) * 2015-02-05 2015-08-05 中国石油天然气集团公司 A complete set of equipment under Multilateral Wells staged fracturing completion interval of well

Also Published As

Publication number Publication date
CN104632171A (en) 2015-05-20

Similar Documents

Publication Publication Date Title
CN104632171B (en) Complete set of equipments and method under Multilateral Wells staged fracturing completion interval of well
CN105064919A (en) Ultra-short-radius radial lateral drilling method for horizontal wells
DK3080387T3 (en) SYSTEM AND PROCEDURE FOR Borehole Completion
CN101915059B (en) Process method for well completion at equal borehole diameter
NO342388B1 (en) Well completion method and well completion apparatus
NO329159B1 (en) System for flowing cement through an intersection formed between first and second wellbores
EP0857247A1 (en) Assembly and process for drilling and completing multiple wells
CN104314482A (en) Closed type helical hole-protecting drill and using method thereof for drilling of soft coal bed
CN104169514A (en) Drill bit for use in boring wellbore and subterranean fracturing
US20200325746A1 (en) A downhole apparatus and a method at a downhole location
CN105156089A (en) U-shaped well system and well drilling method thereof
CN105134162A (en) U-shaped well system and drilling method thereof
CN104612691B (en) Single borehole multilateral directional butted well salt mining method
CN1644869A (en) Completion device and method for branch well with pre-windows
CN204266948U (en) Closed spiral guard aperture drilling tool is crept into for weak seam
DK200970205A (en) Jacking units and bellows for down hole intervention tools
CA2483957A1 (en) Method of drilling and completing multiple wellbores inside a single caisson
CN104912480B (en) Coal bed gas near-end docks the brill completion method of horizontal well
CN100575659C (en) A kind of insufficient balance well completion method
CN109854203B (en) Windowing sidetracking plugging device and method for branch well
CN204532317U (en) A complete set of equipment under Multilateral Wells staged fracturing completion interval of well
CN108547575A (en) The method that the high-pressure water jet drilling huge heavy parting of explosion collapses
CN107542420A (en) Salvaging type expandable casing patching exempts to bore plug device
CN205876250U (en) Stopper device is exempted from to bore in subsidy of salvage formula expansion pipe
CN203948055U (en) A kind of casing centralization locator

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Ren Rongquan

Inventor after: Wang Xue

Inventor after: Jia Tao

Inventor after: Zhang Shibin

Inventor after: Zhang Yanping

Inventor after: Li Xianyi

Inventor after: Wu Qianli

Inventor after: Wang Jun

Inventor after: Chou Zhenzhu

Inventor after: Lv Mingjie

Inventor after: Yu Yongliang

Inventor after: Yang Yi

Inventor before: Ren Rongquan

Inventor before: Jia Tao

Inventor before: Zhang Shibin

Inventor before: Zhang Yanping

Inventor before: Wu Qianli

Inventor before: Wang Jun

Inventor before: Chou Zhenzhu

Inventor before: Lv Mingjie

Inventor before: Yu Yongliang

Inventor before: Yang Yi

Inventor before: Wang Xue

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant