CN104631426A - Pretreatment method of coastal soft foundation water gate pile foundation - Google Patents

Pretreatment method of coastal soft foundation water gate pile foundation Download PDF

Info

Publication number
CN104631426A
CN104631426A CN201410827309.8A CN201410827309A CN104631426A CN 104631426 A CN104631426 A CN 104631426A CN 201410827309 A CN201410827309 A CN 201410827309A CN 104631426 A CN104631426 A CN 104631426A
Authority
CN
China
Prior art keywords
foundation
bonding pad
sluice
pile foundation
water gate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410827309.8A
Other languages
Chinese (zh)
Inventor
袁文喜
吴蕾
方咏来
陈喆谦
曾甄
赵勇
胡启帆
邵玮
张田韡
邢颜胤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Original Assignee
Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Design Institute of Water Conservancy and Hydroelectric Power filed Critical Zhejiang Design Institute of Water Conservancy and Hydroelectric Power
Priority to CN201410827309.8A priority Critical patent/CN104631426A/en
Publication of CN104631426A publication Critical patent/CN104631426A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/02Improving by compacting
    • E02D3/10Improving by compacting by watering, draining, de-aerating or blasting, e.g. by installing sand or wick drains
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2250/00Production methods
    • E02D2250/0053Production methods using suction or vacuum techniques

Abstract

The invention discloses a pretreatment method of a coastal soft foundation water gate pile foundation. Before the water gate pile foundation is constructed, a soft foundation shallow layer of a water gate is processed firstly, namely the whole water gate area is divided to an upstream connection area, a downstream connection area, a left bank connection area, a right bank connection area and a lock chamber foundation area, and vacuum preloading is conducted on all the areas, so that the consolidation degree and the horizontal resistance coefficient of a foundation soil layer are improved; then, according to the physical-mechanical indexes of the foundation soil layer which is improved after vacuum preloading, the design of the pile foundation is optimized, and the pile foundation is constructed. The pretreatment method solves the problem that a traditional soft foundation water gate pile foundation is too low in horizontal bearing capacity, the horizontal resistance coefficient of the soft foundation is effectively improved, the foundation bearing capacity is improved, and the differential settlement between connection sections between the water gate and the two banks is reduced.

Description

A kind of strand soft foundation sluice pile foundation pre-treating method
Technical field
The present invention relates to a kind of method for processing foundation, particularly relate to a kind of strand soft foundation sluice pile foundation pre-treating method.
Background technology
At present, the conventional method of littoral soft soil ground sluice pile foundation process is in lock chamber section and aileron region, adopts bored pile, then adopts cement mixing pile in bonding pad, upstream and downstream and left and right bank bonding pad.Direct pile on deep deficient consolidation soft foundation, because littoral soft soil ground water content is high, low bearing capacity, highly sensitive, compressibilty is large, the stream mud layer that top layer often also has one deck water content to be greater than 80%, pile foundation construction complicated condition.Foundation soil static horizontal loading test m value is evaluate the key parameter of stake horizontal bearing capacity, and the silt soil value that stream is moulded is 500 ~ 2000MPa, and mucky soil value is 2500 ~ 6000MPa, brings larger uncertainty to practical engineering calculation.In order to ensure engineering safety, design often adopts comparatively conservative value, increases the quantity of pile foundation, and this must cause increasing considerably of investment.Engineering time, the load of sluice and two sides building are all different, and deuterogenesis's settling amount is also different, and both settling amounts are wayward, very easily form relative settlement, cause the lateral displacement of sluice quaywall, severe patient can cause seepage, jeopardizes the stable of both sides quaywall even lock chamber.Therefore in the actual motion of coastal many engineerings, often adopt a large amount of cement mixing piles to process, but cement mixing pile there are certain degree of depth and the restriction of spacing, cause the relative settlement in later stage still larger.Therefore, for reaching good Foundation Treatment Effect, controlling relative settlement well, a kind of new sluice ground pretreatment technology need be sought.
Summary of the invention
The object of the invention is to overcome the deficiencies in the prior art, a kind of horizontal bearing capacity that both can improve pile foundation is provided, the strand soft foundation sluice pile foundation pre-treating method of relative settlement can be reduced again.
Technical scheme of the present invention is: a kind of strand soft foundation sluice pile foundation pre-treating method, before sluice pile foundation construction, first carry out the soft foundation shallow-layer process of sluice, namely whole sluice region is divided into bonding pad, upstream, bonding pad, downstream, bonding pad, left bank, right bank bonding pad and lock chamber basis district, each district all adopts the ground in each region of vacuum preloading process; Vacuum preloading horizontal drainage adopts to be had sand cushion or directly connects chimney filter draining without sand cushion; Vertical drainage adopts band drain draining, and draining plate plane is in square or triangular arrangement; Bonding pad, upstream, bonding pad, downstream, the draining plate degree of depth in each region, the basic district of bonding pad, left bank, right bank bonding pad and lock chamber is had nothing in common with each other, wherein: bonding pad, upstream, bonding pad, downstream, because upper building load is less, the draining plate degree of depth is 10 ~ 15m; Bonding pad, left bank, right bank bonding pad, need to be connected with two sides, and the later stage loads comparatively large, and for avoiding differential settlement, the draining plate degree of depth is 20 ~ 25m; Lock chamber basis district, need moisture content and the shear strength of improving underconsolidated soil, the draining plate degree of depth is 10m ~ 15m.After bonding pad, sluice left bank, right bank bonding pad adopt vacuum preloading, these two region quickly stuffings load, and foundation settlement is fully occurred, and reduce after backfilling and the relative settlement of sluice both sides quaywall.
About 90 days vacuum preloading time, the foundation settlement speed of observation in continuous 5 days is less than 2mm/d, and the ground degree of consolidation is greater than 80% simultaneously, gets final product termination of pumping.After Soft Ground Improved By Vacuum Preloading pre-treatment, carry out geological mapping, need the pore water pressure of detection pre-reinforcement foundation soil, moisture content, bearing capacity of foundation soil and shear strength, according to the foundation soil mechanics index of physics that pile foundation pre-treatment improves, to pile foundation optimal design, then carry out pile foundation construction.
The invention has the beneficial effects as follows:
(1) because taking sluice pile foundation pretreatment technology, the water content of whole sluice region foundation soil reduces, and pore water pressure reduces, and the degree of consolidation improves, and geological conditions obviously improves.
(2) pre-treatment of sluice pile foundation adopts large-area vacuum preloading, makes place, whole sluice region Equalsettlement, effectively controls relative settlement.
(3) pre-treatment of sluice pile foundation improves horizontal resistance coefficient of foundation, can reduce pile foundation quantity, thus decrease civilwork engineering quantity, save investment.
(4) vacuum preloading construction speed is fast, and ambient influnence is little, and bearing capacity of foundation soil effect improves obviously.
(5) because place is after the pre-treatment of sluice pile foundation, construction of can directly marching into the arena, convenient construction organization design, easily controls workmanship well.
Accompanying drawing explanation
Fig. 1 is flow chart of the present invention;
Fig. 2 is the layout plan adopting sluice of the present invention;
Fig. 3 is the longitudinal plan adopting sluice of the present invention;
Fig. 4 is the drawing in side sectional elevation adopting sluice of the present invention;
Fig. 5 is vacuum preloading structural representation of the present invention.
In figure, bonding pad, 1-upstream; 2-lock chamber basis district; Bonding pad, 3-downstream; Bonding pad, 4-left bank; 5-right bank bonding pad; 6-lock chamber basis district's draining plate; 7-upstream and downstream bonding pad draining plate; 8-left and right bank bonding pad draining plate; 9-lower floor geotextiles; 10-bed course; 11-middle level geotextiles; 12-drainage pipe; 13-upper strata geotextiles; 14-vacuum seal film; 15-vacuum pump.
Detailed description of the invention
Below by embodiment, the invention will be further described by reference to the accompanying drawings.
As shown in Figures 1 to 4, a kind of strand soft foundation sluice pile foundation pre-treating method, before sluice pile foundation construction, first carry out the Soft Ground of sluice, whole sluice region is divided into bonding pad, upstream 1, bonding pad, downstream 3, bonding pad, left bank 4, right bank bonding pad 5 and lock chamber basis 2, regional all adopts vacuum preloading; Vacuum preloading horizontal drainage adopts bed course 10 directly to connect drainage pipe 12 draining; Vertical drainage adopts draining plate, and draining plate plane is in square or triangular arrangement, and spacing 0.8m ~ 1.0m, exposes mud face and be about 50cm.The draining plate degree of depth in each region, the basic district 2 of bonding pad, upstream 1, bonding pad, downstream 3, bonding pad, left bank 4, right bank bonding pad 5 and lock chamber is had nothing in common with each other, wherein: bonding pad, upstream 1, bonding pad, downstream 3 due to upper building load less, draining plate 7 degree of depth is 10 ~ 15m; Bonding pad, left bank 4, right bank bonding pad 5 need to be connected with two sides, and the later stage loads comparatively large, and for avoiding differential settlement, draining plate 8 degree of depth is 20 ~ 25m; District 2, lock chamber basis needs moisture content and the shear strength of improving underconsolidated soil, and draining plate 6 degree of depth is 10m ~ 15m.As shown in Figure 5, vacuum preloading process need lay lower floor geotextiles 9 from bottom to top successively at original place base surface of base, bed course 10, middle level geotextiles 11, drainage pipe 12, upper strata geotextiles 13, vacuum seal film 14 are two-layer, finally install vacuum pump 15.Vacuum seal film 14 imbeds the impervious stratum degree of depth should not be less than 1m, and adjacent vacuum diaphragm seal 14 is reserved spacing and namely sealed ditch scope and be not less than 50cm.About 90 days vacuum preloading time, the rate of settling of observation in continuous 5 days is less than 2mm/d, and the ground degree of consolidation is greater than 80% simultaneously, can termination of pumping.After vacuum preloading is disposed, carry out geological mapping, need the pore water pressure of detection pre-reinforcement ground, moisture content, bearing capacity of foundation soil and shear strength, according to the foundation soil mechanics index of physics that pile foundation pre-treatment improves, to pile foundation optimal design, then carry out pile foundation construction.

Claims (5)

1. a strand soft foundation sluice pile foundation pre-treating method, it is characterized in that: before sluice pile foundation construction, first carry out the soft foundation shallow-layer process of sluice, namely whole sluice region is divided into bonding pad, upstream, bonding pad, downstream, bonding pad, left bank, right bank bonding pad and lock chamber basis district, each district all adopts vacuum preloading, to improve the degree of consolidation and the static horizontal loading test of foundation soil; Thereafter according to the foundation soil mechanics index of physics improved after vacuum preloading, to pile foundation optimal design, then pile foundation construction is carried out.
2. strand according to claim 1 soft foundation sluice pile foundation pre-treating method, it is characterized in that: described vacuum preloading vertical drainage adopts the draining of draining plate, described bonding pad, upstream, bonding pad, downstream, the plastic draining plate degree of depth in each region, the basic district of bonding pad, left bank, right bank bonding pad and lock chamber is had nothing in common with each other.
3. strand according to claim 2 soft foundation sluice pile foundation pre-treating method, it is characterized in that: described bonding pad, upstream, bonding pad, downstream, because upper building load is less, the draining plate degree of depth is 10 ~ 15m; Described bonding pad, left bank, right bank bonding pad need to be connected with two sides, and the later stage loads comparatively large, and for avoiding differential settlement, the draining plate degree of depth is 20 ~ 25m; Described lock chamber basis district, need moisture content and the shear strength of improving underconsolidated soil, the draining plate degree of depth is 10m ~ 15m.
4. strand according to claim 1 soft foundation sluice pile foundation pre-treating method, it is characterized in that: after described bonding pad, sluice left bank, right bank bonding pad adopt vacuum preloading, these two region quickly stuffings load, foundation settlement fully occurs, and reduces after backfilling and the relative settlement of sluice both sides quaywall.
5. strand according to claim 1 soft foundation sluice pile foundation pre-treating method, is characterized in that: the foundation settlement speed of described vacuum preloading observation in continuous 5 days is less than 2mm/d, and the ground degree of consolidation is greater than 80% simultaneously, gets final product termination of pumping.
CN201410827309.8A 2014-12-26 2014-12-26 Pretreatment method of coastal soft foundation water gate pile foundation Pending CN104631426A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410827309.8A CN104631426A (en) 2014-12-26 2014-12-26 Pretreatment method of coastal soft foundation water gate pile foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410827309.8A CN104631426A (en) 2014-12-26 2014-12-26 Pretreatment method of coastal soft foundation water gate pile foundation

Publications (1)

Publication Number Publication Date
CN104631426A true CN104631426A (en) 2015-05-20

Family

ID=53210627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410827309.8A Pending CN104631426A (en) 2014-12-26 2014-12-26 Pretreatment method of coastal soft foundation water gate pile foundation

Country Status (1)

Country Link
CN (1) CN104631426A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549750A (en) * 2020-05-20 2020-08-18 浙江水利水电学院 Pond and sluice connection section foundation structure for controlling uneven settlement and construction method thereof

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1082065A (en) * 1996-09-05 1998-03-31 Masaya Nagashima Differential settlement prevention method of house in soft soil by making use of soil pile consolidation method, unevenness adjusting method of differential settlement house, and device used therefor
CN101250868A (en) * 2008-03-12 2008-08-27 中交第四航务工程局有限公司 Precipitation prepressing association motivation induration deep densification method
CN101413261A (en) * 2008-11-28 2009-04-22 天津市水利科学研究所 Double-layer low-position vacuum preload consolidation device and soft soil foundation reinforcing method
CN101666083A (en) * 2009-08-13 2010-03-10 林佳栋 Soft soil foundation treatment reinforcement method and device thereof
CN104032761A (en) * 2014-04-23 2014-09-10 上海市基础工程集团有限公司 Combined dewatering and drainage method for high-moisture-content soft soil foundations close to rivers and seas
CN104120710A (en) * 2014-06-13 2014-10-29 宁波高新区围海工程技术开发有限公司 Soft foundation reinforcing processing method of vacuum preloading combined hydraulic reclamation mud

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1082065A (en) * 1996-09-05 1998-03-31 Masaya Nagashima Differential settlement prevention method of house in soft soil by making use of soil pile consolidation method, unevenness adjusting method of differential settlement house, and device used therefor
CN101250868A (en) * 2008-03-12 2008-08-27 中交第四航务工程局有限公司 Precipitation prepressing association motivation induration deep densification method
CN101413261A (en) * 2008-11-28 2009-04-22 天津市水利科学研究所 Double-layer low-position vacuum preload consolidation device and soft soil foundation reinforcing method
CN101666083A (en) * 2009-08-13 2010-03-10 林佳栋 Soft soil foundation treatment reinforcement method and device thereof
CN104032761A (en) * 2014-04-23 2014-09-10 上海市基础工程集团有限公司 Combined dewatering and drainage method for high-moisture-content soft soil foundations close to rivers and seas
CN104120710A (en) * 2014-06-13 2014-10-29 宁波高新区围海工程技术开发有限公司 Soft foundation reinforcing processing method of vacuum preloading combined hydraulic reclamation mud

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
楼永良: "《真空预压加固深厚软土地基现场试验与设计理论研究》", 1 January 2005, 浙江大学 *
祝卫东,张瑛颖,吴蕾: ""深厚淤泥层上大型综合型海堤地基处理分析"", 《南昌工程学院学报》 *
程晓航: ""沿海水闸软土地基基础的处理方法"", 《中国水运(下半月)》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111549750A (en) * 2020-05-20 2020-08-18 浙江水利水电学院 Pond and sluice connection section foundation structure for controlling uneven settlement and construction method thereof

Similar Documents

Publication Publication Date Title
CN103233454B (en) Processing method of soaking, vacuum preloading and slurry injecting for sand piles of collapsible loess foundation
CN103031836B (en) A kind of method of building road on new hydraulically filled sludge ground fast
CN104947650B (en) Grouting behind shaft or drift lining closed reinforcing method after sand drain piling prepressing
CN102926376B (en) One is reclaimed fields from the sea region soft-soil foundation treatment method
CN104088208B (en) A kind of wet and soft earth foundation processing method
CN102220757B (en) Immediate processing method for drainage solidifying of super soft soil shallow surface space
CN103953008B (en) A kind of modified mixed dam being applicable to Tailings Dam
CN101949153A (en) Foundation drainage control method
CN101225654B (en) Blow fill foundation treating method and gas injection draining device therefor
CN104947651A (en) Anti-liquefaction method applicable to sand foundation of subway station
CN205636721U (en) Strain equipment that well vacuum preloading consolidated deep soft soil foundation
CN215669631U (en) Deep overburden foundation structure
CN201785743U (en) Vacuum preloading consolidated soft soil foundation for combining sand wells and water discharging plates
CN104264559A (en) Vacuum preloading roadbed processing device and vacuum preloading roadbed construction method
CN104480949A (en) Strong draining and seepage-based upstream type tailings pond two-level dam structure and application thereof
CN105804045A (en) Equipment for strengthening deep soft soil foundation by vacuum preloading of filter well and method
CN106703053A (en) Construction method for reinforced soil drainage composite revetment structure
CN104631426A (en) Pretreatment method of coastal soft foundation water gate pile foundation
Zeng et al. A case study of vacuum tube-well dewatering technology for improving deep soft soil in Yangtze River floodplain
CN106761914A (en) A kind of routed water water damage prevention and controls of shallow buried coal seam mine raceway groove flood
CN105804046A (en) Processing method for soft clay foundation
CN203924082U (en) Anti-floating of underground building structure
CN102912787B (en) Vacuum preloading method for fine sand mats and filter tube sealing
CN106049508B (en) A kind of swag type depression earth rock placement structure and construction method
CN202925540U (en) Arrangement structure of device for processing soft soil foundation in coastal reclamation region

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150520

WD01 Invention patent application deemed withdrawn after publication