CN104617664A - Method for switching double intelligent terminal device remote communication quantity in intelligent substation - Google Patents
Method for switching double intelligent terminal device remote communication quantity in intelligent substation Download PDFInfo
- Publication number
- CN104617664A CN104617664A CN201410842697.7A CN201410842697A CN104617664A CN 104617664 A CN104617664 A CN 104617664A CN 201410842697 A CN201410842697 A CN 201410842697A CN 104617664 A CN104617664 A CN 104617664A
- Authority
- CN
- China
- Prior art keywords
- intelligent terminal
- power monitoring
- remote signalling
- open
- state
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/16—Electric power substations
Landscapes
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention relates to a method for switching double intelligent terminal device remote communication quantity in an intelligent substation, and belongs to the technical field of automation of electric power system substations. The method includes the steps: firstly, setting an optional hard opening-inserting in intelligent terminal device opening-inserting plug-ins into an opening-inserting power monitoring opening-inserting; enabling shaking elimination time of the opening-inserting power monitoring opening-inserting to be shorter than that of the rest hard opening-inserting within a standard range; switching double intelligent terminal devices according to received opening-inserting power monitoring states, keeping all states of GOOSE (generic object oriented substation event) remote communication quantity of last change before the opening-inserting power monitoring states are zero when the received state of opening-inserting power monitoring remote communication quantity of any intelligent terminal device is zero, automatically switching to one intelligent terminal device, and switching the double intelligent terminal devices. The remote communication quantity of the intelligent terminal device in the opening-inserting power monitoring state is 1. The double intelligent terminal device remote communication quantity is intelligently switched when network communication reliability and intelligent terminal running stability are ensured.
Description
Technical field
The present invention relates to the changing method of two cover intelligent terminal remote signalling amount in a kind of intelligent substation, belong to power system transformer substation technical field of automation.
Background technology
Along with being in full swing of intelligent substation construction and developing rapidly of intelligent substation technology, accelerate the paces that secondary device optimizes and combines, based on the basic demand optimized and combined secondary device and intelligent substation Protection Technology code requirement, the two cover intelligent terminal of single cover measure and control device access should be adopted for 220kV and above, the GOOSE network of intelligent terminal duplicate system retrofit all follows separate principle, when a Network Abnormal or the operation not affecting another network when exiting, first set intelligent terminal access A net, second cover intelligent terminal access B net.
Single cover measure and control device accesses separate A net and B net, corresponding reception duplicate system retrofit two overlaps the GOOSE remote signalling amount of intelligent terminal, owing to there is duplexed system, owing to there is no unified standard, therefore according to which kind of principle, how to determine that unique and effective remote signalling amount data source signal truly reflects the state of switchgear, avoid the state of two cover intelligent terminals to repeat to send or entanglement, become insoluble problem.
Summary of the invention
To the object of this invention is to provide in a kind of intelligent substation the changing method of two cover intelligent terminal remote signalling amount, to avoid the state of two cover intelligent terminals to repeat sending or the stability of a system that entanglement causes and the problem that reliability reduces.
The present invention to provide in a kind of intelligent substation the changing method of two cover intelligent terminal remote signalling amount for solving the problems of the technologies described above, and this changing method comprises the following steps:
1) intelligent terminal is left any distance in plug-in unit firmly open into be set to open into power monitoring open into;
2) make to open time of trembling that disappears that power monitoring opens be less than in critical field all the other firmly open into disappear the time of trembling;
3) according to receiving the state opened into power monitoring, two cover intelligent terminal is switched, when receiving any a set of intelligent terminal to open into power monitoring remote signalling amount state being 0, be switched to open into power monitoring state remote signalling amount be 1 that a set of intelligent terminal.
Describedly stop refreshing remote signalling quantity of state when receiving any a set of intelligent terminal to open into power monitoring remote signalling amount state being 0, retain that to open into power monitoring state be all GOOSE remote signalling amount states of last change before 0.
Described when be switched to, another set of to open into power monitoring remote signalling amount be the intelligent terminal of 1, as remote signalling amount data source and automatically Flushing status amount.
Described opening into power supply is that intelligent terminal leaves firmly into power supply, by GOOSE remote signalling amount gives measure and control device.
The described time of trembling that disappears is adjusted by configuration tool, and measure and control device receives to hold and firmly can hold into remote signalling amount state prior to all the other into power monitoring remote signalling amount state, makes measure and control device have sufficient time to judge to open the state into power monitoring.
The invention has the beneficial effects as follows: the present invention first intelligent terminal is left any distance in plug-in unit firmly open into be set to open into power monitoring open into, then by open time of trembling that disappears that power monitoring opens be less than in critical field all the other firmly open into disappear the time of trembling, measure and control device carries out the switching of two cover intelligent terminal according to receiving the state opened into power monitoring, when receiving any a set of intelligent terminal to open into power monitoring remote signalling amount state being 0, and stop refreshing remote signalling quantity of state, measure and control device can retain that to hold power monitoring state be before 0, all GOOSE remote signalling amount states of last change, can automatically switch to simultaneously hold into power monitoring state remote signalling amount be 1 that a set of intelligent terminal, thus realize the switching of two cover intelligent terminals.The present invention, when ensureing network communication reliability and intelligent terminal is stable, reaches two cover intelligent terminal remote signalling amount intelligence and switches.
Accompanying drawing explanation
Fig. 1 be the present invention for the network diagram of the two cover intelligent terminal of list cover measure and control device access;
Fig. 2 opens into power monitoring schematic diagram in intelligent terminal;
Fig. 3 is the waveform schematic diagram of the time of trembling of disappearing in the present invention.
Embodiment
Below in conjunction with accompanying drawing, the specific embodiment of the present invention is further described.
The present invention for intelligent substation in the two cover intelligent terminal network of single cover measure and control device access, as shown in Figure 1, measure and control device provides 2 independently 100,000,000 fiber optic Ethernet mouths, for the access of the two net general object of process layer intelligent terminal, process layer 2 overlaps intelligent terminal and accesses A cover network and B cover network respectively, completely independent on 2 cover network physicals, the GOOSE network of any a set of network is independent.Intelligent terminal and primary equipment adopt cable to be connected, and realize the state acquisition to primary equipment, often overlap intelligent terminal and all comprise complete switchgear state information.In this intelligent substation, the detailed process of the changing method of two cover intelligent terminal remote signalling amount is as follows:
1. intelligent terminal all run in plug-in unit design any distance firmly open into for open into power monitoring open into, as shown in Figure 2.
2. arrange open time of trembling that disappears that power monitoring opens firmly be less than within the scope of standard configuration all the other should open into disappear the time of trembling, and to be adjusted by intelligent terminal.Open firmly to open into supervision due to power supply and be less than all the other into the time of trembling that disappears and firmly open into disappearing the time of trembling, as shown in Figure 3, measure and control device can be preferentially received power supply and hold into monitored state.
3. measure and control device opens according to what receive the remote signalling amount switching automatically carrying out two cover intelligent terminal into power monitoring state, when receiving any a set of intelligent terminal to open into power monitoring remote signalling amount state being 0, stop refreshing remote signalling quantity of state, measure and control device retains that to open power monitoring state be before 0, all GOOSE remote signalling amount states of last change, automatically switch to simultaneously open into power monitoring state remote signalling amount be 1 that cover intelligent terminal, remote signalling amount state is overlapped for data source state with this, and start to refresh the remote signalling quantity of state of access corresponding to intelligent terminal in real time.
The present invention can make two cover intelligent terminals automatically switch each other, when there is mistake in any a set of intelligent terminal remote signalling quantity of state, switch to another set of, the state avoiding two cover intelligent terminals repeats to send or entanglement, thus determines that unique and effective signal truly reflects the state of switchgear.Add the reliability and stability of system, it will obtain applying more and more widely in high pressure level intelligent substation.
Claims (5)
1. the changing method of two cover intelligent terminal remote signalling amount in intelligent substation, it is characterized in that, this changing method comprises the following steps:
1) intelligent terminal is left any distance in plug-in unit firmly open into be set to open into power monitoring open into;
2) make to open time of trembling that disappears that power monitoring opens be less than in critical field all the other firmly open into disappear the time of trembling;
3) according to receiving the state opened into power monitoring, two cover intelligent terminal is switched, when receiving any a set of intelligent terminal to open into power monitoring remote signalling amount state being 0, be switched to open into power monitoring state remote signalling amount be 1 that a set of intelligent terminal.
2. the changing method of two cover intelligent terminal remote signalling amount in a kind of intelligent substation according to claim 1, it is characterized in that, when receiving any a set of intelligent terminal to open into power monitoring remote signalling amount state being 0, stopping refreshes remote signalling quantity of state, and it is the 0 front last all GOOSE remote signalling amount states changed that reservation is opened into power monitoring state.
3. the changing method of two cover intelligent terminal remote signalling amount in a kind of intelligent substation according to claim 2, it is characterized in that, described when be switched to, another set of to open into power monitoring remote signalling amount be the intelligent terminal of 1, as remote signalling amount data source and automatically Flushing status amount.
4. the changing method of two cover intelligent terminal remote signalling amount in a kind of intelligent substation according to claim 1, is characterized in that, described in open into power supply be that intelligent terminal leaves firmly into power supply, by GOOSE remote signalling amount gives measure and control device.
5. the changing method of two cover intelligent terminal remote signalling amount in a kind of intelligent substation according to claim 4, it is characterized in that, the described time of trembling that disappears is adjusted by configuration tool, measure and control device receives to hold and firmly can hold into remote signalling amount state prior to all the other into power monitoring remote signalling amount state, makes measure and control device have sufficient time to judge to open the state into power monitoring.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410842697.7A CN104617664B (en) | 2014-06-24 | 2014-12-30 | Method for switching double intelligent terminal device remote communication quantity in intelligent substation |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN2014102890718 | 2014-06-24 | ||
CN201410289071 | 2014-06-24 | ||
CN201410842697.7A CN104617664B (en) | 2014-06-24 | 2014-12-30 | Method for switching double intelligent terminal device remote communication quantity in intelligent substation |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104617664A true CN104617664A (en) | 2015-05-13 |
CN104617664B CN104617664B (en) | 2017-01-11 |
Family
ID=53152001
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410842697.7A Expired - Fee Related CN104617664B (en) | 2014-06-24 | 2014-12-30 | Method for switching double intelligent terminal device remote communication quantity in intelligent substation |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104617664B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111224371A (en) * | 2019-12-31 | 2020-06-02 | 南京因泰莱电器股份有限公司 | Relay protection method for power system |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101621187A (en) * | 2009-06-11 | 2010-01-06 | 北京四方继保自动化股份有限公司 | Implement method of electric substation automation system for supporting double measurement and control |
CN102570607A (en) * | 2011-12-30 | 2012-07-11 | 长园深瑞继保自动化有限公司 | Redundant data processing system of intelligent substation |
CN102833119A (en) * | 2012-09-29 | 2012-12-19 | 南京国电南自轨道交通工程有限公司 | Method for synchronously receiving and processing real-time data under dual-network redundancy mechanism |
-
2014
- 2014-12-30 CN CN201410842697.7A patent/CN104617664B/en not_active Expired - Fee Related
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101621187A (en) * | 2009-06-11 | 2010-01-06 | 北京四方继保自动化股份有限公司 | Implement method of electric substation automation system for supporting double measurement and control |
CN102570607A (en) * | 2011-12-30 | 2012-07-11 | 长园深瑞继保自动化有限公司 | Redundant data processing system of intelligent substation |
CN102833119A (en) * | 2012-09-29 | 2012-12-19 | 南京国电南自轨道交通工程有限公司 | Method for synchronously receiving and processing real-time data under dual-network redundancy mechanism |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111224371A (en) * | 2019-12-31 | 2020-06-02 | 南京因泰莱电器股份有限公司 | Relay protection method for power system |
Also Published As
Publication number | Publication date |
---|---|
CN104617664B (en) | 2017-01-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203377679U (en) | Intelligent distribution network system based on BeiDou-GPS dual-mode communication | |
CN203261128U (en) | Load-balancing control system for measuring power demand | |
CN102931731A (en) | Integrated intelligent monitoring system applicable to substation direct-current power supply | |
CN204103598U (en) | A kind of redundancy protection systems of transformer station | |
CN104967216B (en) | A kind of substation and its monitoring system and its monitoring method | |
CN202856468U (en) | Integrated intelligent monitoring system suitable for substation direct current power supply | |
CN205178647U (en) | Relay protection of transformer substation intelligence clamp plate system | |
CN106992599A (en) | Automatic switchover loading switch cabinet and automatic switchover loading switch cabinet system | |
CN207408826U (en) | Mining electric power monitoring system | |
CN105071337A (en) | Self-feedback intelligent earth leakage protection controlling device and method | |
CN102868218A (en) | Transition method for improving monitoring system in intelligent improvement of ordinary transformer substation | |
CN203014357U (en) | GOOSE message/switch value conversion device for relay protection digitized transformation | |
CN104617664A (en) | Method for switching double intelligent terminal device remote communication quantity in intelligent substation | |
CN103683510A (en) | Intelligent switch control device with phase selection control and wave self-recording functions and method | |
CN203232270U (en) | Automatic restart system of electrical energy collection terminal of transformer station | |
CN105226819A (en) | A kind of distributed power source monitoring management system based on IEC61850 | |
CN105223469A (en) | A kind of line-selected earthing device being applicable to intelligent substation | |
CN104009547A (en) | Motoring device for breaker remote operation function and transformer substation remote operation system | |
CN203871927U (en) | Breaker remote operation function monitoring device | |
CN104868593B (en) | Power utilization information acquisition terminal communication message local real-time monitoring method | |
CN203719730U (en) | Underground high-voltage power tunnel water level online monitoring device | |
CN204118858U (en) | A kind of transformer station dispatching automation uniting and adjustment system | |
CN203660667U (en) | Detection device for energy and electric power monitoring system | |
CN204905833U (en) | Earth -leakage protector and residual current circuit breaker centralized control device | |
CN103701216B (en) | A kind of energy and electric power monitoring system checkout equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170111 Termination date: 20201230 |