Summary of the invention
In order to overcome above-mentioned defect, the technical problem that the present invention solves provides the preparation method of the anti-rutting asphalt ground surface material of a kind of waterproof, obtained ground surface material in the presence of moisture, can satisfactory stability be had, prevent distortion simultaneously, avoid producing rut.
In order to solve the problems of the technologies described above, the technical solution used in the present invention is: the preparation method of the anti-rutting asphalt ground surface material of a kind of waterproof, comprises the following steps:
(1) by weight, 64-82 part pitch is placed in reactor heating and makes it melt, then add 25-33 part ABS epoxy resin, be heated to 200-230 DEG C, stir 30-50min, stirring velocity is that 3000-4500 turns/min, and stirring after terminating is A material;
(2) 4-13 part paraffin, 21-29 part diatomite, 5-11 part aluminium hydroxide, 5-18 part butyl methacrylate, 2-12 part metatitanic acid vinegar and 7-19 part polyvinyl alcohol are put into another reactor, churning time is 90-120min, stirring velocity is that 5000-7000 turns/min, control temperature is 150-180 DEG C, and stirring after terminating is B material;
(3) B material is dropped in A material, with 6000-7500 turn/speed of min continues to be stirred to evenly, control temperature is 170-200 DEG C;
(4), after step (3) stirs and terminates, be incubated under 170-200 DEG C of condition, obtain the anti-rutting asphalt ground surface material of described waterproof.
Above-mentioned steps (1) medium pitch is the one in petroleum pitch, oxidized bitumen, coal-tar pitch.
Above-mentioned steps (1) medium pitch Heating temperature is 180-195 DEG C.
In above-mentioned steps (3), churning time is 60-90min.
In above-mentioned steps (4), soaking time is 2-4h.
beneficial effect
The asphalt pavement material that the present invention obtains in the presence of moisture, satisfactory stability can be had, prevent distortion simultaneously, avoid producing rut, due to the synergy between component, Marshall stability and rut dynamic stability are all improved largely, and wherein Marshall stability is between 9.5-10.8 kN, and rut dynamic stability is between 12986-14529 time/mm.
Embodiment
Embodiment 1
A preparation method for the anti-rutting asphalt ground surface material of waterproof, comprises the following steps:
(1) by weight, the reactor heating 64 parts of petroleum pitch being placed in 180 DEG C makes it melt, then adds 25 parts of ABS epoxy resin, and be heated to 200 DEG C, stir 30min, stirring velocity is 3000 turns/min, and stirring after terminating is A material;
(2) 4 parts of paraffin, 21 parts of diatomite, 5 parts of aluminium hydroxides, 5 parts of butyl methacrylate, 2 portions of metatitanic acid vinegar and 7 parts of polyvinyl alcohol are put into another reactor, churning time is 90min, stirring velocity is 5000 turns/min, and control temperature is 150 DEG C, and stirring after terminating is B material;
(3) by B material input A material, continue to stir 60min to even with the speed of 6000 turns/min, control temperature is 170 DEG C;
(4), after step (3) stirs and terminates, be incubated 2h under 170 DEG C of conditions, obtain the anti-rutting asphalt ground surface material of described waterproof.
Embodiment 2
A preparation method for the anti-rutting asphalt ground surface material of waterproof, comprises the following steps:
(1) by weight, the reactor heating 82 parts of oxidized bitumens being placed in 195 DEG C makes it melt, then adds 33 parts of ABS epoxy resin, and be heated to 230 DEG C, stir 50min, stirring velocity is 4500 turns/min, and stirring after terminating is A material;
(2) 13 parts of paraffin, 29 parts of diatomite, 11 parts of aluminium hydroxides, 18 parts of butyl methacrylate, 12 portions of metatitanic acid vinegar and 19 parts of polyvinyl alcohol are put into another reactor, churning time is 120min, stirring velocity is 7000 turns/min, and control temperature is 180 DEG C, and stirring after terminating is B material;
(3) by B material input A material, continue to stir 90min to even with the speed of 7500 turns/min, control temperature is 200 DEG C;
(4), after step (3) stirs and terminates, be incubated 4h under 200 DEG C of conditions, obtain the anti-rutting asphalt ground surface material of described waterproof.
Embodiment 3
A preparation method for the anti-rutting asphalt ground surface material of waterproof, comprises the following steps:
(1) by weight, the reactor heating 66 parts of coal-tar pitch being placed in 185 DEG C makes it melt, then adds 27 parts of ABS epoxy resin, and be heated to 205 DEG C, stir 35min, stirring velocity is 3300 turns/min, and stirring after terminating is A material;
(2) 7 parts of paraffin, 24 parts of diatomite, 6 parts of aluminium hydroxides, 8 parts of butyl methacrylate, 4 portions of metatitanic acid vinegar and 7-19 part polyvinyl alcohol are put into another reactor, churning time is 100min, stirring velocity is 5500 turns/min, and control temperature is 155 DEG C, and stirring after terminating is B material;
(3) by B material input A material, continue to stir 65min to even with the speed of 6500 turns/min, control temperature is 180 DEG C;
(4), after step (3) stirs and terminates, be incubated 3h under 180 DEG C of conditions, obtain the anti-rutting asphalt ground surface material of described waterproof.
Embodiment 4
A preparation method for the anti-rutting asphalt ground surface material of waterproof, comprises the following steps:
(1) by weight, the reactor heating 78 parts of petroleum pitch being placed in 190 DEG C makes it melt, then adds 30 parts of ABS epoxy resin, and be heated to 225 DEG C, stir 45min, stirring velocity is 4000 turns/min, and stirring after terminating is A material;
(2) 11 parts of paraffin, 26 parts of diatomite, 9 parts of aluminium hydroxides, 15 parts of butyl methacrylate, 11 portions of metatitanic acid vinegar and 17 parts of polyvinyl alcohol are put into another reactor, churning time is 115min, stirring velocity is 6500 turns/min, and control temperature is 170 DEG C, and stirring after terminating is B material;
(3) by B material input A material, continue to stir 85min to even with the speed of 7000 turns/min, control temperature is 190 DEG C;
(4), after step (3) stirs and terminates, be incubated 3h under 190 DEG C of conditions, obtain the anti-rutting asphalt ground surface material of described waterproof.
Embodiment 5
A preparation method for the anti-rutting asphalt ground surface material of waterproof, comprises the following steps:
(1) by weight, the reactor heating 73 parts of petroleum pitch being placed in 190 DEG C makes it melt, then adds 29 parts of ABS epoxy resin, and be heated to 220 DEG C, stir 40min, stirring velocity is 3500 turns/min, and stirring after terminating is A material;
(2) 8 parts of paraffin, 25 parts of diatomite, 9 parts of aluminium hydroxides, 15 parts of butyl methacrylate, 6 portions of metatitanic acid vinegar and 12 parts of polyvinyl alcohol are put into another reactor, churning time is 100min, stirring velocity is 6000 turns/min, and control temperature is 165 DEG C, and stirring after terminating is B material;
(3) by B material input A material, continue to stir 70min to even with the speed of 7000 turns/min, control temperature is 185 DEG C;
(4), after step (3) stirs and terminates, be incubated 3h under 185 DEG C of conditions, obtain the anti-rutting asphalt ground surface material of described waterproof.
Comparative example 1
Butyl methacrylate is not added with the difference step (2) of embodiment 5.
A preparation method for asphalt pavement material, comprises the following steps:
(1) by weight, the reactor heating 73 parts of petroleum pitch being placed in 190 DEG C makes it melt, then adds 29 parts of ABS epoxy resin, and be heated to 220 DEG C, stir 40min, stirring velocity is 3500 turns/min, and stirring after terminating is A material;
(2) 8 parts of paraffin, 25 parts of diatomite, 9 parts of aluminium hydroxides, 6 portions of metatitanic acid vinegar and 12 parts of polyvinyl alcohol are put into another reactor, churning time is 100min, and stirring velocity is 6000 turns/min, and control temperature is 165 DEG C, and stirring after terminating is B material;
(3) by B material input A material, continue to stir 70min to even with the speed of 7000 turns/min, control temperature is 185 DEG C;
(4), after step (3) stirs and terminates, be incubated 3h under 185 DEG C of conditions, obtain described asphalt pavement material.
Comparative example 2
Do not add polyvinyl alcohol in step (2) with the difference of embodiment 5.
A preparation method for asphalt pavement material, comprises the following steps:
(1) by weight, the reactor heating 73 parts of petroleum pitch being placed in 190 DEG C makes it melt, then adds 29 parts of ABS epoxy resin, and be heated to 220 DEG C, stir 40min, stirring velocity is 3500 turns/min, and stirring after terminating is A material;
(2) 8 parts of paraffin, 25 portions of diatomite, 9 portions of aluminium hydroxides, 15 parts of butyl methacrylate and 6 portions of metatitanic acid vinegar are put into another reactor, churning time is 100min, and stirring velocity is 6000 turns/min, and control temperature is 165 DEG C, and stirring after terminating is B material;
(3) by B material input A material, continue to stir 70min to even with the speed of 7000 turns/min, control temperature is 185 DEG C;
(4), after step (3) stirs and terminates, be incubated 3h under 185 DEG C of conditions, obtain described asphalt pavement material.
Performance test:
By as follows to its performance test results for the asphalt pavement material of embodiment 1-5 and comparative example 1-2 gained:
Wherein Marshall stability test is according to " highway engineering pitch and Asphalt Mixture Experiment code " (JTG E20-2011) Asphalt Mixture Marshall stability test (T0709), test it in the Marshall stability of maintenance after 7 days, test loading rate is 50mm/min;
Rut dynamic stability test, according to the asphalt mixture in track test (T0719) in " highway engineering pitch and Asphalt Mixture Experiment code " (JTG E20-2011), tests it at the rut dynamic stability of maintenance after 7 days.
|
Embodiment 1 |
Embodiment 2 |
Embodiment 3 |
Embodiment 4 |
Embodiment 5 |
Comparative example 1 |
Comparative example 2 |
Marshall stability (kN) |
9.5 |
10.2 |
9.8 |
10.4 |
10.8 |
5.3 |
6.2 |
Rut dynamic stability (secondary/mm) |
12986 |
13842 |
13524 |
14027 |
14529 |
10941 |
6430 |
As can be seen from the above table: the asphalt pavement material that the present invention obtains in the presence of moisture, satisfactory stability can be had, prevent distortion simultaneously, avoid producing rut, due to the synergy between component, Marshall stability and rut dynamic stability are all improved largely, and wherein Marshall stability is between 9.5-10.8 kN, and rut dynamic stability is between 12986-14529 time/mm; And in comparative example 1, do not add butyl methacrylate, cause Marshall stability to be significantly reduced to 5.3 kN, rut dynamic stability is reduced to 10941 times/mm; Do not add polyvinyl alcohol in comparative example 2, Marshall stability and rut dynamic stability all decline, and are respectively 6.2 kN and 6430/mm.