CN104601771B - A kind of cell phone mainboard method of testing and its system - Google Patents

A kind of cell phone mainboard method of testing and its system Download PDF

Info

Publication number
CN104601771B
CN104601771B CN201410834051.4A CN201410834051A CN104601771B CN 104601771 B CN104601771 B CN 104601771B CN 201410834051 A CN201410834051 A CN 201410834051A CN 104601771 B CN104601771 B CN 104601771B
Authority
CN
China
Prior art keywords
test
mainboard
control box
command
test command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410834051.4A
Other languages
Chinese (zh)
Other versions
CN104601771A (en
Inventor
顾辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenyang Chenxun Simcom Technology Co Ltd
Original Assignee
Shenyang Chenxun Simcom Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenyang Chenxun Simcom Technology Co Ltd filed Critical Shenyang Chenxun Simcom Technology Co Ltd
Priority to CN201410834051.4A priority Critical patent/CN104601771B/en
Publication of CN104601771A publication Critical patent/CN104601771A/en
Application granted granted Critical
Publication of CN104601771B publication Critical patent/CN104601771B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Telephone Function (AREA)

Abstract

The present invention relates to mainboard testing field, discloses a kind of cell phone mainboard method of testing and its system.In the present invention, cell phone mainboard method of testing specifically includes:A. mainboard receives the test command from PC;B. control box receives the test command from PC;C. control box is according to the requirement of test command, hardware simulation test scene corresponding to control;D. mainboard performs test operation according to test command;E.PC obtains test result and carries out mainboard confirming performance;Wherein, PC to the test command that mainboard is sent be the interactive process ADB orders of client-server end.Utilize control box simulation test scene, substitute the artificial process in existing test, reduce artificial disturbance, accelerate test speed, cell phone mainboard test in embodiment of the present invention fundamentally reduces the artificial process in mainboard test process, so that test more automates, while human cost is reduced, the speed and accuracy of test are improved.

Description

A kind of cell phone mainboard method of testing and its system
Technical field
The present invention relates to the measuring technology of mainboard testing field, more particularly to cell phone mainboard.
Background technology
Mobile phone, or be radio telephone, commonly referred to as mobile phone, it is a kind of communication tool originally, early stage has big again Brother is big to be commonly called as, and is the portable telephone terminal that can be used in the broader context, is to arrange high Maimonides by Soviet Union engineer earliest Ku Puliyang Milunovich is invented in nineteen fifty-seven.The 4G epoch have been developed to so far.Work as what mobile phone technique continued to develop Under, it has turned into daily necessities essential in people's life, and its output is also in the rising in geometry times.In the life of mobile phone During production, the test of mainboard is checked on step, and indispensable handset capability detecting step for its quality before dispatching from the factory.
Conventional mobile phone circuit board for testing function of main is all taking human as master, in view of the continuous lifting of human cost, with the survey of automation Test-run a machine is come to substitute people be trend of the times.Current phone production plant uses the test mode of following two automations mostly:1) touch The mode of control screen TP drivings, this mode cause control many technical matters in TP manufacturers, test link to be required for TP Manufacturer solves to coordinate, and has limitation;2) machine substitutes key mode, that is, substitutes human hand button, this side with mechanical arm Formula uses the difficulty of test in the mainboard stage higher, and reason is that fixture with test machine is difficult to be combined together, and needs Different operated keys is pressed according to specific mainboard and test event, versatility is not high, and cost is high.
The content of the invention
It is an object of the invention to provide a kind of cell phone mainboard method of testing and its system so that and test more automates, While human cost is reduced, the speed and accuracy of test are improved.
In order to solve the above technical problems, embodiments of the present invention provide a kind of cell phone mainboard method of testing, comprising with Lower step:
A. mainboard receives the test command from PC;
B. control box receives the test command from PC;
C. the control box is according to the requirement of the test command, hardware simulation test scene corresponding to control;
D. the mainboard performs test operation according to the test command;
E. the PC obtains test result and carries out mainboard confirming performance;
Wherein, the PC to the test command that mainboard is sent be client-server end interactive process ADB (Android Debug Bridge Androids debug bridge) order.
Embodiments of the present invention additionally provide a kind of cell phone mainboard test system, include mainboard to be measured, PC and control box; The PC is connected with mainboard to be measured;The PC is connected with the control box;
The PC includes first communication module and confirms module;
The first communication module, for sending test command to mainboard to be measured and control box respectively;
The confirmation module, for obtaining test result and carrying out mainboard confirming performance to be measured;
The control box includes second communication module and control module;
The second communication module, for receiving the test command from PC;
The control module, for the requirement according to the test command, hardware simulation test scene corresponding to control;
Wherein, the PC to the test command that mainboard to be measured is sent be the interactive process ADB orders of client-server end.
In terms of existing technologies, the main distinction and effect are embodiment of the present invention:Simulated and surveyed using control box Examination hall scape, the artificial process in existing test is substituted, reduce artificial disturbance, accelerate test speed;PC and mainboard are utilized simultaneously ADB orders are transmitted, and directly can accordingly be tested with the form control mainboard for sending order, are driven without TP Or carry out button operation by mechanical arm;In addition, PC can also directly obtain test result and carry out mainboard confirming performance, in result It it also avoid artificially judging during confirmation.Cell phone mainboard test in embodiment of the present invention fundamentally reduces to be tested in mainboard During artificial process so that test more automate, while human cost is reduced, improve test speed and accurately Property.
As a further improvement, following sub-step is also included in the step C:The control box is ordered according to the test The requirement of order, turn on hardware to be measured.Only when needing test, hardware to be measured is just turned on so that be not required to the hardware to be measured of test all It is closed, will not interacts.
As a further improvement, the test command is range sensor test, light sensor test or magnetic force test, In the step E, the test result that the PC is obtained is the test result from the mainboard received.
Using the application scenarios of control box simulation mainboard, PC can receive what mainboard was beamed back according to the needs of test event Test result, simplicity is realized, accurately, further improve the automaticity of mainboard test.
As a further improvement, after the step B, also comprise the steps of:The control box detects the test The content of order, and the test command be flash of light lamp test, tri coloured lantern test or during the bright dark test of backlight, perform the step Rapid D, and after performing step D and before execution step E, perform following steps:
The control box is according to the requirement of the test command, hardware collecting test result corresponding to control;To the PC Send collected test result;
In the step E, the test result that the PC is obtained is the test result from the control box received.
The test result of mainboard according to the needs of test event, can be gathered by control box, extends the applied field of the present invention Scape.
As a further improvement, before the step A, also comprise the steps of:Whether the installation of control box detection mainboard In place;After detecting that mainboard is installed in place, testing result is sent to PC;Receive the ON command from PC;Described in connection The key of mainboard, disconnected after the preset time that is delayed.
Before test, PC also triggers the start of mainboard using control box, further realizes the full mistake in mainboard test Process automation.
As a further improvement, after the step E, also comprise the steps of:The mainboard and/or the control box Receive the stopping test command from PC and perform.After the completion of test, stopped by order control mainboard and/or the control box Only run, fully achieve the automation of mainboard test overall process.
Brief description of the drawings
Fig. 1 is according to cell phone mainboard method of testing flow chart in first embodiment;
Fig. 2 is the connection diagram according to fixture, control box and PC in cell phone mainboard method of testing in first embodiment;
Fig. 3 is according to cell phone mainboard method of testing flow chart in the 3rd embodiment;
Fig. 4 is according to cell phone mainboard method of testing flow chart in the 4th embodiment;
Fig. 5 is according to cell phone mainboard method of testing flow chart in the 5th embodiment;
Fig. 6 is the structural representation according to cell phone mainboard test system in the 6th embodiment;
Fig. 7 is the functional module connection diagram according to cell phone mainboard test system in the 6th embodiment;
Fig. 8 is the structural representation according to control box in cell phone mainboard test system in the 6th embodiment;
Fig. 9 is the structural representation according to fixture in cell phone mainboard test system in the 6th embodiment;
Figure 10 is the functional module connection diagram according to cell phone mainboard test system in the 7th embodiment.
Embodiment
To make the object, technical solutions and advantages of the present invention clearer, each reality below in conjunction with accompanying drawing to the present invention The mode of applying is explained in detail.However, it will be understood by those skilled in the art that in each embodiment of the present invention, In order that reader more fully understands the application and proposes many ins and outs.But even if without these ins and outs and base Many variations and modification in following embodiment, each claim of the application technical side claimed can also be realized Case.
The first embodiment of the present invention is related to a kind of cell phone mainboard method of testing, and present embodiment is with the loudspeaker of mainboard Exemplified by test, its idiographic flow is as shown in figure 1, comprise the steps of:
Step 101, in place whether control box detection mainboard installed.
Specifically, mainboard to be measured is mounted on a fixture in present embodiment, limit switches on fixture, control box By detecting whether limit switch is triggered to detect whether mainboard is installed in place.
Step 102, after detecting that mainboard is installed in place, testing result is sent to PC.
It is noted that annexation in present embodiment between PC, control box and mainboard can with as shown in Fig. 2 its In, mainboard is mounted on fixture, and PC can carry out data exchange with fixture by USB line (national standard);PC can with control box To carry out data exchange by serial ports (RS232);Control box can carry out data with fixture by socket (24PIN and 40PIN) Exchange.
Specifically, when mainboard is installed in place, when fixture is depressed, while limit switch is triggered, and result is passed Result is sent to give control box (transmitting result by 40PIN sockets interface in present embodiment), control box transmits result by serial ports Give PC programs.
Step 103, the ON command from PC is received.
Specifically, after PC receives the information that mainboard is installed in place, begin to processing transmission power-on command and (namely turn on Order) give control box.
Step 104, the key of mainboard is connected, is disconnected after the preset time that is delayed.
Specifically, after control box receives order, by start relay conducting, triggering battery valve directly withstands mainboard Key is booted up, and is disconnected after preset time is kept, and start is completed.In actual applications, can also after withstanding key It is that the disconnection power-on command for receiving PC transmissions disconnects start relay again.
It is noted that above-mentioned steps 101 to 104 are the start step in main board test, examined in every piece of mainboard Start step can be performed before survey.If triggering the start of mainboard using control box, can further realize in mainboard test Full process automatization.
Step 105, mainboard receives the test command from PC.
Specifically, PC to the test command that mainboard is sent be the interactive process ADB orders of client-server end.And PC ADB orders are sent to PCBA by USB line.
In particular, the test command in present embodiment is tested for loudspeaker.
Step 106, control box receives the test command from PC.
Specifically, it is connected between control box and PC using Serial Port Line.
Step 107, control box is according to the requirement of test command, hardware simulation test scene corresponding to control.
Specifically, in present embodiment, control box simulation test scene is exactly to play one section of sound.
It should be noted that in this step, control box can also turn on hardware to be measured according to the requirement of test command, this Hardware to be measured in embodiment is exactly loudspeaker, in actual applications the conducting of hardware whether can by Control, After so control box is connected to test command, loudspeaker relay will be opened to turn on loudspeaker.It is being not required to test other simultaneously During project, other hardware are in closed mode, only when needing test, just turn on hardware to be measured so that be not required to treating for test Survey hardware and do not interfere with the hardware currently tested.
Step 108, mainboard performs test operation according to test command.
Specifically, after mainboard is connected to test command, the functional test of loudspeaker will be carried out.
Step 109, PC obtains test result, and carries out mainboard confirming performance.
Specifically, in present embodiment, the loudspeaker connection PC of mainboard sound card, it can be pair that PC, which obtains test result, Sound card has detected whether data generation.
Afterwards, in the present embodiment, PC carries out the technical indicator of sound to obtaining data and calculated, and technical indicator can be with It is:Peak-to-peak value (positive peak in waveform subtracts negative peak), the distortion factor, intensity, signal to noise ratio, phase difference, frequency or with Total harmonic distortion rate, judge whether to calculating each technical indicator value completed in indication range, you can confirm mainboard to be measured Performance.
It should be noted that process of the above-mentioned steps 105 to step 109 for one test event of execution, test command Can be the permutation and combination of various test events, when test event has it is multiple when, can be not required to repeat step 101 to 104, Direct circulation performs step 105 to 109.
Step 110, mainboard and control box receive the stopping test command from PC and performed.
Specifically, in present embodiment, mainboard and control box can also carry out closing test according to PC order, also It is to say, mainboard and control box close sound card according to test command is stopped.
In addition, in actual applications, loudspeaker can also be arranged to continue to be automatically stopped after opening preset time, also This step is not needed.
In terms of existing technologies, the main distinction and effect are present embodiment:Utilize control box simulation test field Scape, the artificial process in existing test is substituted, reduce artificial disturbance, accelerate test speed;The ADB of PC and mainboard lives are utilized simultaneously Order transmission, it directly can accordingly be tested with the form control mainboard for sending order, be driven or borrow without TP Mechanical arm is helped to carry out button operation;In addition, PC can also directly obtain test result and carry out mainboard confirming performance, in results verification When it also avoid artificially judging.Cell phone mainboard method of testing in present embodiment fundamentally reduces in mainboard test process In artificial process so that test more automate, while human cost is reduced, improve the speed and accuracy of test. Simultaneously as there is provided the Auto Power On program of mainboard so that realizes the automation of mainboard test overall process comprehensively.In addition, Fixture is designed with general connection jaws when making, when in use, according to the definition of the present invention come wiring, you can be applied to Different mainboards, solve the problems, such as fixture in the prior art and test machine with reference to difficult.
It is noted that the test command in present embodiment can also be except loudspeaker test mentioned above Microphone loop-around test, earphone test, radio test, microphone MIC tests or loudspeaker SPK tests, because step is similar, herein It will not enumerate.
Second embodiment of the present invention is related to a kind of cell phone mainboard method of testing.Second embodiment and the first embodiment party Formula is roughly the same, is in place of the main distinction:In the first embodiment, master of the test result that PC is obtained from PC to mainboard Dynamic monitoring;And in second embodiment of the invention, the test result that PC is obtained is the test result from mainboard received, So that the present invention has flexible and changeable application scenarios.
So that test command is range sensor test as an example, work illustrates present embodiment as follows:
Control box utilizes solenoid relay valve simulation application scene, and test magnetic valve is opened, and simulated range becomes near, disconnects and surveying Magnetic valve is tried, simulation becomes remote;Now the range sensor of mainboard is becoming far with after change closely, being transmitted test result by USB line To PC, test is completed.
In above process, PC does not need the test mode of actively monitoring mainboard, but is sent test result by mainboard To PC, a variety of test events are adapted to, the application scenarios of mainboard are simulated using control box, PC can be according to test event Need, directly obtain the test result of mainboard, further improve the automaticity of mainboard test, also the present invention is had more It is widely applied scene.
It is noted that the test command in present embodiment may be used also except range sensor test mentioned above To be light sensor test or magnetic force test, because step is similar, will not enumerate herein.
Third embodiment of the present invention is related to a kind of cell phone mainboard method of testing.Its flow chart is as shown in figure 3, this implementation Mode is described as follows so that test command is flash of light lamp test as an example:
Step 301 is similar to step 106 with the step 101 in first embodiment to step 306, no longer superfluous herein State.
Step 307, judge whether test command is flash of light lamp test, tri coloured lantern test or the bright dark test of backlight;If so, then Perform step 310;If it is not, then perform step 308.
Specifically, this step is by the content of mainboard detection test command.
Step 310 and the step 108 in first embodiment are similar, will not be repeated here.
Step 311, hardware collecting test result corresponding to control box control.
, it is necessary to whether correctly be glistened from external monitoring flash lamp, in this reality when in actual applications, due to flash of light lamp test Apply in mode, be to utilize photo resistance collection information, that is to say, that in actual test, control box is according to flash of light lamp test Requirement, control photo resistance open and collecting test result.Hereafter, the test result that PC is obtained is sent out to receive from control box The test result sent, it is exactly that the test result that control box collects photo resistance is returned by Serial Port Line in the present embodiment Back to PC.Present embodiment according to the needs of test event, can be gathered the test result of mainboard, the extension present invention by control box Application scenarios.
Step 312 is similar to step 110 with the step 109 in first embodiment to step 313, no longer superfluous herein State.
It is noted that the test command in present embodiment can also be except flash of light lamp test mentioned above Tri coloured lantern is tested or the bright dark test of backlight, because step is similar, will not enumerate herein.
The 4th embodiment of the present invention is related to a kind of cell phone mainboard method of testing.Its flow is as shown in figure 4, this embodiment party Formula is specific as follows so that test command is version test as an example:
Step 401 is similar to step 105 with the step 101 in first embodiment to step 405, no longer superfluous herein State.
Step 406, mainboard performs test operation according to test command.
Specifically, in present embodiment, mainboard performs version test, that is, reads version information, can include soft Part version and hardware version, and various information is sent to PC.
Step 407, PC obtains test result and carries out mainboard confirming performance.
Specifically, the test result that PC is obtained is that information of the reception from mainboard transmission (is version in present embodiment Information), after PC receives version information, you can judge whether version information is correct by the contrast with presupposed information.
It should be noted that except the version test mentioned in present embodiment, test command can also be that flag bit is remembered Number test, SIM card test or the test of T cards.
The 5th embodiment of the present invention is related to a kind of cell phone mainboard method of testing.Cell phone mainboard in present embodiment is surveyed Method for testing flow chart as shown in figure 5, by test command be major and minor Camera Test exemplified by, it is specific as follows:
Step 501 is similar to step 104 with the step 101 in first embodiment to step 504, no longer superfluous herein State.
Step 505, mainboard receives the test command from PC.
Specifically, in present embodiment, what mainboard received is the major and minor Camera Test from PC.
Step 506, mainboard performs test operation according to test command.
Specifically, in present embodiment, mainboard is according to the major and minor Camera Test received, by current test event Major and minor Camera Test is adjusted to, sequentially opens major and minor camera, intercepts the image of major and minor camera.
Step 507, PC obtains test result and carries out mainboard confirming performance.
Specifically, the test result that PC is obtained is to receive the test result sent from mainboard (to be in present embodiment Major and minor camera truncated picture), after PC receives image, you can contrasted with original image, pass through truncated picture and original Whether beginning image unanimously judges whether mainboard test result is correct.
It should be noted that except the Camera Test mentioned in present embodiment, test command can also be that charging is surveyed Examination, vibration test or gravity sensor test.
The step of various methods divide above, be intended merely to describe it is clear, can be merged into when realizing a step or Some steps are split, are decomposed into multiple steps, as long as including identical logical relation, all protection domain in this patent It is interior;To either adding inessential modification in algorithm in flow or introducing inessential design, but its algorithm is not changed Core design with flow is all in the protection domain of the patent.
Sixth embodiment of the invention is related to a kind of cell phone mainboard test system, as shown in fig. 6, comprising:Mainboard to be measured, PC, control box and fixture;Mainboard to be measured is mounted on fixture, and PC can carry out data with fixture by USB line (national standard) Exchange;PC can carry out data exchange with control box by serial ports (RS232);Control box can pass through socket (24PIN with fixture With 40PIN) carry out data exchange.
As shown in fig. 7, PC functional module includes first communication module and confirms module.
Wherein, first communication module, for sending test command to mainboard to be measured and control box respectively.Specifically, PC The test command sent to mainboard to be measured is the interactive process ADB orders of client-server end.It should be noted that the first communication Module, it is additionally operable to when test command is that range sensor test, light sensor test or magnetic force are tested, reception comes from master to be measured The test result that plate is sent.
Module is confirmed, for obtaining test result and carrying out mainboard confirming performance to be measured.
The functional module of control box includes second communication module and control module.
Wherein, second communication module, for receiving the test command from PC.
Control module, for the requirement according to test command, hardware simulation test scene corresponding to control.Wherein, control Comprising conducting submodule in module, for the requirement according to test command, hardware to be measured is turned on.
In addition, control box also includes:Second detection module and starting module.Specifically, the second detection module, for examining Whether in place to survey mainboard installation to be measured;Second communication module in control box, it is additionally operable to detect in the second detection module to be measured After mainboard is installed in place, testing result is sent to PC;It is additionally operable to after the ON command from PC is received, triggering start mould Block;Starting module, for connecting the key of mainboard to be measured, disconnected after the preset time that is delayed.
It is worth mentioning, mainboard to be measured and/or control box, is additionally operable to receive the stopping test command from PC and holds OK.
Furthermore, it is necessary to explanation, in actual applications, the hardware connection diagram of control box can be with as shown in figure 8, tool Body says control box is used to whether in place to detect mainboard installation to be measured, and after detecting that mainboard to be measured is installed in place, detection is tied Fruit is sent to PC;It is additionally operable to receive the ON command from PC, connects the key of mainboard to be measured, breaks after the preset time that is delayed Open.
It is noted that in actual applications, the hardware connection diagram of fixture can be as shown in Figure 9.
In addition it is also necessary to illustrate, the hardware configuration designed in present embodiment is universal architecture, that is to say, that It can be used when being applied to different mainboards to be measured and test disparity items, it is of course also possible to according to actual test Need, remove some devices for being not required to test, it is very flexible and changeable.
It is noted that each module involved in present embodiment is logic module, and in actual applications, one Individual logic unit can be a part for a physical location or a physical location, can also be with multiple physics lists The combination of member is realized.In addition, in order to protrude the innovative part of the present invention, will not be with solving institute of the present invention in present embodiment The unit that the technical problem relation of proposition is less close introduces, but this is not intended that in present embodiment and other lists are not present Member.
The 7th embodiment of the present invention is related to a kind of cell phone mainboard test system.Its structure is as shown in Figure 10, specifically such as Under:
In the present embodiment, mainboard to be measured is used for the content for detecting test command, and is detecting test command for sudden strain of a muscle When light lamp test, tri coloured lantern test or the bright dark test of backlight, test operation is performed according to test command.
Control box also includes first detection module, for detecting the content of test command.
Control module in control box, it is additionally operable to detect test command for flash of light lamp test, three in first detection module Colored lights is tested or during the bright dark test of backlight, according to the requirement of test command, hardware collecting test result corresponding to control.
Second communication module in control box, it is additionally operable to send collected test result to PC.
First communication module in PC, it is additionally operable to receive the test result sent from control box.
It will be understood by those skilled in the art that the respective embodiments described above are to realize the specific embodiment of the present invention, And in actual applications, can to it, various changes can be made in the form and details, without departing from the spirit and scope of the present invention.

Claims (10)

1. a kind of cell phone mainboard method of testing, it is characterised in that comprise the steps of:
A. mainboard receives the test command from PC;
B. control box receives the test command from PC;
C. the control box is according to the requirement of the test command, hardware simulation test scene corresponding to control;
D. the mainboard performs test operation according to the test command;
E. the PC obtains test result and carries out mainboard confirming performance;
Wherein, the PC to the test command that mainboard is sent be the interactive process ADB orders of client-server end;
Before the step A, also comprise the steps of:
In place whether control box detection mainboard installed, wherein, the mainboard is arranged on fixture, and limited location is opened on the fixture Close, whether the control box is triggered to detect whether the mainboard is installed in place according to limit switch;
After detecting that mainboard is installed in place, testing result is sent to PC;
Receive the ON command from PC;
The key of the mainboard is connected, is disconnected after the preset time that is delayed.
2. cell phone mainboard method of testing according to claim 1, it is characterised in that also comprising following in the step C Sub-step:
The control box turns on hardware to be measured according to the requirement of the test command.
3. cell phone mainboard method of testing according to claim 1, it is characterised in that the test command is range sensor Test, light sensor test or magnetic force test, in the step E, test result that the PC is obtained is coming from of receiving The test result of the mainboard.
4. cell phone mainboard method of testing according to claim 1, it is characterised in that after the step B, also include with Lower step:
The mainboard detects the content of the test command, and the test command be flash of light lamp test, tri coloured lantern test or During the bright dark test of backlight, the step D is performed, and after performing step D and before performing step E, execution following steps:
The control box is according to the requirement of the test command, hardware collecting test result corresponding to control;
Collected test result is sent to the PC;
In the step E, the test result that the PC is obtained is the test result from the control box received.
5. cell phone mainboard method of testing as claimed in any of claims 1 to 4, it is characterised in that in the step E Afterwards, also comprise the steps of:
The mainboard and/or the control box receive the stopping test command from PC and performed.
6. a kind of cell phone mainboard test system, it is characterised in that include mainboard to be measured, PC and control box;The PC treats with described Mainboard is surveyed to be connected;The PC is connected with the control box;
The PC includes first communication module and confirms module;
The first communication module, for sending test command to mainboard to be measured and control box respectively;
The confirmation module, for obtaining test result and carrying out mainboard confirming performance to be measured;
The control box includes second communication module and control module;
The second communication module, for receiving the test command from PC;
The control module, for the requirement according to the test command, hardware simulation test scene corresponding to control;
Wherein, the PC to the test command that mainboard to be measured is sent be the interactive process ADB orders of client-server end;
The control box also includes:Second detection module and starting module;
Second detection module, for whether in place to detect mainboard installation to be measured, wherein, the mainboard is arranged on fixture, Whether limit switches on the fixture, second detection module are triggered to whether detect the mainboard according to limit switch It is installed in place;
Second communication module in the control box, it is additionally operable to detect that mainboard to be measured is installed in place in second detection module Afterwards, testing result is sent to PC;It is additionally operable to after the ON command from PC is received, triggers the starting module;
The starting module, for connecting the key of the mainboard to be measured, disconnected after the preset time that is delayed.
7. cell phone mainboard test system according to claim 6, it is characterised in that conducting is included in the control module Module, for the requirement according to the test command, turn on hardware to be measured.
8. cell phone mainboard test system according to claim 6, it is characterised in that the first communication module, be additionally operable to When test command is that range sensor test, light sensor test or magnetic force are tested, receives and sent from the mainboard to be measured Test result.
9. cell phone mainboard test system according to claim 6, it is characterised in that the mainboard to be measured is described for detecting The content of test command, and detect the test command for flash of light lamp test, tri coloured lantern test or backlight bright dark test when, Test operation is performed according to the test command;
The control box also includes first detection module, for detecting the content of the test command;
Control module in the control box, it is additionally operable to detect that the test command is flash lamp in the first detection module When test, tri coloured lantern test or the bright dark test of backlight, according to the requirement of the test command, hardware collecting test corresponding to control As a result;
Second communication module in the control box, it is additionally operable to send collected test result to the PC;
First communication module in the PC, it is additionally operable to receive the test result sent from the control box.
10. the cell phone mainboard test system according to any one in claim 6 to 9, it is characterised in that the master to be measured Plate and/or the control box, it is additionally operable to receive the stopping test command from PC and performs.
CN201410834051.4A 2014-12-26 2014-12-26 A kind of cell phone mainboard method of testing and its system Active CN104601771B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410834051.4A CN104601771B (en) 2014-12-26 2014-12-26 A kind of cell phone mainboard method of testing and its system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410834051.4A CN104601771B (en) 2014-12-26 2014-12-26 A kind of cell phone mainboard method of testing and its system

Publications (2)

Publication Number Publication Date
CN104601771A CN104601771A (en) 2015-05-06
CN104601771B true CN104601771B (en) 2018-03-30

Family

ID=53127259

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410834051.4A Active CN104601771B (en) 2014-12-26 2014-12-26 A kind of cell phone mainboard method of testing and its system

Country Status (1)

Country Link
CN (1) CN104601771B (en)

Families Citing this family (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106707771A (en) * 2015-11-12 2017-05-24 丰唐物联技术(深圳)有限公司 Test method and system for intelligent appliance
CN105700289A (en) * 2015-12-24 2016-06-22 深圳市凯木金科技有限公司 Method for on-site rapid analysis and processing of bad images of image pickup module
CN106649008A (en) * 2016-11-21 2017-05-10 惠州Tcl移动通信有限公司 Method and system for automatically executing mobile terminal physical startup and shutdown pressure test
CN106932004B (en) * 2017-03-27 2019-09-13 上海与德科技有限公司 A kind of detection method and device of sensor
CN107168846A (en) * 2017-03-31 2017-09-15 北京奇艺世纪科技有限公司 The monitoring method and device of electronic equipment
CN107677313A (en) * 2017-09-26 2018-02-09 努比亚技术有限公司 Auto-Test System and method
WO2019061343A1 (en) * 2017-09-29 2019-04-04 深圳传音通讯有限公司 Method and apparatus for detecting device of smart terminal
CN107727133B (en) * 2017-10-31 2020-12-25 东莞华贝电子科技有限公司 Method and system for testing internal sensor of intelligent terminal
CN109969538A (en) * 2017-12-28 2019-07-05 重庆智享物流设备有限公司 A kind of post pallet
CN116414640A (en) * 2018-12-27 2023-07-11 睿云联(厦门)网络通讯技术有限公司 Communication terminal hardware testing method and complete machine testing flow
CN111880078A (en) * 2020-07-20 2020-11-03 上海龙旗科技股份有限公司 Method and equipment for automated instruction testing

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101568042A (en) * 2008-04-21 2009-10-28 鸿富锦精密工业(深圳)有限公司 Mobile phone keyboard lamp testing system and mobile phone keyboard lamp testing method
CN103607492B (en) * 2013-08-26 2018-01-16 上海斐讯数据通信技术有限公司 A kind of test system and method for testing to cell phone mainboard function

Also Published As

Publication number Publication date
CN104601771A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN104601771B (en) A kind of cell phone mainboard method of testing and its system
CN100493226C (en) Test system of the mobile terminal power consumption
CN103149526B (en) PCBA board test macro and method
CN102023922B (en) System and method for testing automotive electronic diagnostic software
CN104483959A (en) Fault simulation and test system
CN107122304B (en) JTAG remote debugging method
CN107071123A (en) Mobile terminal sound chamber method for testing tightness and test device
CN206400286U (en) A kind of test system based on hardware in loop equipment
CN104076806B (en) A kind of electric control gear to automobile carries out the method and apparatus of automatic test
CN109144036B (en) Manipulator simulation test system and test method based on FPGA chip
CN108346404B (en) Parameter debugging method for time schedule controller and screen driving circuit
CN109726061B (en) SoC chip verification method
CN102479132A (en) Test system and test method for multiple chips
CN102346234B (en) Functional test method of I2S (Inter-IC Sound Bus) interface
CN107631750A (en) For testing the method, apparatus, terminal and storage medium of terminal to be measured
KR100794130B1 (en) Automatic Function Testing Equipment for Application Software and Additional Service of Mobile Communication Terminal
CN103558849A (en) Method for achieving control strategy adjustment and network testing of blade electric vehicle
CN102201877B (en) Method and apparatus for testing air interface of TTCN (Testing and Test Control Notation)-3-based digital interphone
KR100758850B1 (en) Appaturus and method for test using test script in mobile communication system
CN106708688A (en) Module testing method and terminal
TW201321765A (en) Automatic test system of communication device
CN204517822U (en) A kind of result with WIFI can be reviewed bluetooth and automatically be detected frock
CN102955096A (en) Cable testing mechanism
CN101216529B (en) Combined test action group test system of micro-electric communication processing structure
CN114578790A (en) Unmanned aerial vehicle flight control automatic test method, system, equipment and medium

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant