CN104601396B - Electric network data monitoring method and device - Google Patents
Electric network data monitoring method and device Download PDFInfo
- Publication number
- CN104601396B CN104601396B CN201410737651.9A CN201410737651A CN104601396B CN 104601396 B CN104601396 B CN 104601396B CN 201410737651 A CN201410737651 A CN 201410737651A CN 104601396 B CN104601396 B CN 104601396B
- Authority
- CN
- China
- Prior art keywords
- concentrator
- network data
- electric network
- control parameter
- payment control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000012544 monitoring process Methods 0.000 title claims abstract description 81
- 238000000034 method Methods 0.000 title claims abstract description 42
- 238000012806 monitoring device Methods 0.000 claims description 15
- 238000001514 detection method Methods 0.000 claims description 12
- 238000004458 analytical method Methods 0.000 description 22
- 238000007726 management method Methods 0.000 description 17
- 230000002159 abnormal effect Effects 0.000 description 11
- 238000005516 engineering process Methods 0.000 description 10
- 230000005611 electricity Effects 0.000 description 9
- 238000010586 diagram Methods 0.000 description 4
- 230000004069 differentiation Effects 0.000 description 3
- 230000000694 effects Effects 0.000 description 3
- 230000008569 process Effects 0.000 description 3
- 230000005856 abnormality Effects 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 241000208340 Araliaceae Species 0.000 description 1
- 241001269238 Data Species 0.000 description 1
- 235000005035 Panax pseudoginseng ssp. pseudoginseng Nutrition 0.000 description 1
- 235000003140 Panax quinquefolius Nutrition 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 238000003869 coulometry Methods 0.000 description 1
- 238000013497 data interchange Methods 0.000 description 1
- 239000000284 extract Substances 0.000 description 1
- 235000008434 ginseng Nutrition 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 230000003993 interaction Effects 0.000 description 1
- 230000004043 responsiveness Effects 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 238000004148 unit process Methods 0.000 description 1
Landscapes
- Data Exchanges In Wide-Area Networks (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
The invention discloses a kind of electric network data monitoring method and devices.The electric network data monitoring method includes:Monitoring instruction is received, wherein, the monitoring instructs to be used to indicate the instruction for being monitored electric network data;Pre-payment control parameter is detected according to the monitoring instruction;Judge that the pre-payment control parameter issues whether to fail;If it is judged that the pre-payment control parameter issues failure, then perform pre-payment control parameter and issue and unsuccessfully alert.By the present invention, the monitoring efficiency of power grid is improved.
Description
Technical field
The present invention relates to electrical network field, in particular to a kind of electric network data monitoring method and device.
Background technology
It is constantly promoted with intelligent grid construction process and incrementally step price Reform Mode carries resident accordingly
Go out, the progress of the popularization of state's net intelligent electric energy meter also without any confusion.For further genralrlization application intelligent electric energy meter, coordinate state
Net company " SG186 engineerings " sales service system construction, in order to meet Guo Wang companies to power information acquisition system " all standing,
Full acquisition, full pre-payment " requirement, ensures the safe and stable operation of collecting device, Utilities Electric Co. must strengthen to intelligent electric energy meter
And the operation monitoring work of gathered data.
Gathered data operation monitor supervision platform is an important decision-making foundation of intelligent electric energy meter popularization, passes through operation
Monitor supervision platform can carry out the installing of state's net intelligent electric energy meter, practical analysis, gather coulometric analysis, collecting device early warning statistics etc.
Analysis and service operation analysis are carried out in various work, have good directive function to carrying out state's net intelligent electric energy meter.
In the prior art to electric network data monitor there are monitoring efficiency than it is relatively low the problem of.
For electric network data is monitored in correlation technique there are monitoring efficiency than it is relatively low the problem of, not yet propose at present effective
Solution.
The content of the invention
It is a primary object of the present invention to provide a kind of electric network data acquisition method and device, to solve to supervise electric network data
Control there are monitoring efficiency than it is relatively low the problem of.
To achieve these goals, according to an aspect of the invention, there is provided a kind of electric network data monitoring method.The electricity
Network data monitoring method includes:Monitoring instruction is received, wherein, the monitoring instruction is monitored electric network data to be used to indicate
Instruction;Pre-payment control parameter is detected according to the monitoring instruction;Judging that the pre-payment control parameter issues is
No failure;If it is judged that the pre-payment control parameter issues failure, then perform pre-payment control parameter and issue and unsuccessfully alert.
Further, if it is judged that the pre-payment control parameter issues failure, then perform under pre-payment control parameter
Unsuccessfully alarm includes hair:The first alarm command is sent to default concentrator, wherein, first alarm command is used to indicate collection
Middle device performs alarm;The concentrator execution pre-payment control parameter is controlled to issue unsuccessfully to alert.
Further, after monitoring instruction is received, the electric network data monitoring method further includes:Detect the concentrator
Whether go offline;If the concentrator goes offline, the duration that goes offline of the concentrator is obtained;Judge falling for the concentrator
The line time whether overlength;And if it is judged that the time overlength that goes offline of the concentrator, then perform the time overlength alarm that goes offline.
Further, after monitoring instruction is received, the electric network data monitoring method further includes:Detect same concentrator
The meter reading success rate with intelligent meter;Judge same concentrator the meter reading success rate with intelligent meter whether reach default success rate
Value;And if it is judged that same concentrator the meter reading success rate with intelligent meter be not up to the default success ratio values, then hold
Row success rate alerts.
Further, after monitoring instruction is received, the electric network data monitoring method further includes:Judge the intelligent meter
Whether the time of no data reaches preset time;If it is judged that when whether the time of the intelligent meter no data reaches default
Between, then perform no data alarm.
Further, if it is judged that the pre-payment control parameter issues failure, then the electric network data monitoring method
It further includes:It obtains pre-set pre-payment control parameter and issues unsuccessfully after-treatment flow;Perform the pre-payment control ginseng
Number issues unsuccessfully after-treatment flow.
To achieve these goals, according to another aspect of the present invention, a kind of electric network data monitoring device is provided.It should
Electric network data monitoring device includes:Receiving unit, for receiving monitoring instruction, wherein, the monitoring instruction is is used to indicate pair
The instruction that electric network data is monitored;First detection unit, for being carried out according to the monitoring instruction to pre-payment control parameter
Detection;Whether the first judging unit fails for judging that the pre-payment control parameter issues;First execution unit, for
When judging that the pre-payment control parameter issues unsuccessfully, execution pre-payment control parameter, which issues, unsuccessfully to be alerted.
Further, first execution unit includes:Sending module, for sending the first alarm to default concentrator
Instruction, wherein, first alarm command is used to indicate concentrator and performs alarm;And control module, for controlling the collection
Middle device execution pre-payment control parameter, which issues, unsuccessfully to be alerted.
Further, the electric network data monitoring device further includes:Second detection unit is for detecting the concentrator
It is no to go offline;Acquiring unit, for when the concentrator goes offline, then obtaining the duration that goes offline of the concentrator;Second sentences
Disconnected unit, for judge the concentrator go offline the time whether overlength;Second execution unit, for judging the concentration
Device go offline time overlength when, then perform go offline time overlength alarm.
Further, the electric network data monitoring device further includes:3rd detection unit, for detecting same concentrator institute
Meter reading success rate with intelligent meter;3rd judging unit, for judge same concentrator the meter reading success rate with intelligent meter be
It is no to reach default success ratio values;And the 3rd execution unit, for judge same concentrator the meter reading with intelligent meter into
Power is not up to the default success ratio values, the then rate that runs succeeded alarm.
By the present invention, using the electric network data monitoring method comprised the following steps:Monitoring instruction is received, wherein, it is described
Monitoring instruction is to be used to indicate the instruction being monitored to electric network data;According to it is described monitoring instruction to pre-payment control parameter into
Row detection;Judge that the pre-payment control parameter issues whether to fail;If it is judged that the pre-payment control parameter issues mistake
It loses, then performs pre-payment control parameter and issue and unsuccessfully alert, solve and electric network data is monitored there are monitoring efficiency than relatively low
Problem, and then improve the effect of power system monitor efficiency.
Description of the drawings
The attached drawing for forming the part of the application is used for providing a further understanding of the present invention, schematic reality of the invention
Example and its explanation are applied for explaining the present invention, is not constituted improper limitations of the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of electric network data monitoring method according to embodiments of the present invention;
Fig. 2 is the schematic diagram of electric network data monitoring device according to embodiments of the present invention;
Fig. 3 is the schematic diagram of the first technology model in electric network data acquisition monitoring method according to embodiments of the present invention;With
And
Fig. 4 is the schematic diagram of the second technology model in electric network data acquisition monitoring method according to embodiments of the present invention.
Specific embodiment
It should be noted that in the case where there is no conflict, the feature in embodiment and embodiment in the application can phase
Mutually combination.The present invention will be described in detail below with reference to the accompanying drawings and in conjunction with the embodiments.
In order to which those skilled in the art is made to more fully understand application scheme, below in conjunction in the embodiment of the present application
The technical solution in the embodiment of the present application is clearly and completely described in attached drawing, it is clear that described embodiment is only
The embodiment of the application part, instead of all the embodiments.Based on the embodiment in the application, ordinary skill people
Member's all other embodiments obtained without making creative work should all belong to the model of the application protection
It encloses.
It should be noted that term " first " in the description and claims of this application and above-mentioned attached drawing, "
Two " etc. be the object for distinguishing similar, without being used to describe specific order or precedence.It should be appreciated that it so uses
Data can exchange in the appropriate case, so as to embodiments herein described herein.In addition, term " comprising " and " tool
Have " and their any deformation, it is intended that cover it is non-exclusive include, for example, containing series of steps or unit
Process, method, system, product or equipment are not necessarily limited to those steps or unit clearly listed, but may include without clear
It is listing to Chu or for the intrinsic other steps of these processes, method, product or equipment or unit.
An embodiment of the present invention provides a kind of electric network data monitoring methods.
Fig. 1 is the flow chart of electric network data monitoring method according to embodiments of the present invention.
As shown in Figure 1, the electric network data monitoring method includes:
Step S102 receives monitoring instruction, wherein, the monitoring instruction, which is used to indicate, is monitored electric network data
Instruction.
Step S104 is detected pre-payment control parameter according to the monitoring instruction.
Whether step S106 judges that the pre-payment control parameter issues and fails.
Step S108 if it is judged that the pre-payment control parameter issues failure, is then performed under pre-payment control parameter
Hair unsuccessfully alerts.
Preferably, if it is judged that the pre-payment control parameter issues failure, then perform pre-payment control parameter and issue
Failure alarm includes:The first alarm command is sent to default concentrator, wherein, first alarm command is used to indicate concentration
Device performs alarm;The concentrator execution pre-payment control parameter is controlled to issue unsuccessfully to alert.
Preferably, after monitoring instruction is received, the electric network data monitoring method further includes:Detecting the concentrator is
It is no to go offline;If the concentrator goes offline, the duration that goes offline of the concentrator is obtained;Judge going offline for the concentrator
Time whether overlength;And if it is judged that the time overlength that goes offline of the concentrator, then perform the time overlength alarm that goes offline.
Preferably, after monitoring instruction is received, the electric network data monitoring method further includes:Detect same concentrator institute
Meter reading success rate with intelligent meter;Judge same concentrator the meter reading success rate with intelligent meter whether reach default success rate
Value;And if it is judged that same concentrator the meter reading success rate with intelligent meter be not up to the default success ratio values, then hold
Row success rate alerts.
Preferably, after monitoring instruction is received, the electric network data monitoring method further includes:Judge the intelligent meter without
Whether the time of data reaches preset time;If it is judged that whether the time of the intelligent meter no data reaches preset time,
Then perform no data alarm.
Preferably, if it is judged that the pre-payment control parameter issues failure, then the electric network data monitoring method is also
Including:It obtains pre-set pre-payment control parameter and issues unsuccessfully after-treatment flow;Perform the pre-payment control parameter
Issue unsuccessfully after-treatment flow.
It should be noted that step shown in the flowchart of the accompanying drawings can be in such as a group of computer-executable instructions
It is performed in computer system, although also, show logical order in flow charts, it in some cases, can be with not
The order being same as herein performs shown or described step.
Fig. 2 is the schematic diagram of electric network data monitoring device according to embodiments of the present invention.
As shown in Fig. 2, the electric network data monitoring device includes:
Receiving unit 10, for receiving monitoring instruction, wherein, the monitoring instruction carries out electric network data to be used to indicate
The instruction of monitoring.
First detection unit 20, for being detected according to the monitoring instruction to pre-payment control parameter.
Whether the first judging unit 30 fails for judging that the pre-payment control parameter issues.
First execution unit 40, for when judging that the pre-payment control parameter issues unsuccessfully, performing pre-payment control
Parameter processed, which issues, unsuccessfully to be alerted.
Preferably, first execution unit includes:Sending module refers to for sending the first alarm to default concentrator
Order, wherein, first alarm command is used to indicate concentrator and performs alarm;And control module, for controlling the concentration
Device execution pre-payment control parameter, which issues, unsuccessfully to be alerted.
Preferably, the electric network data monitoring device further includes:Second detection unit, for whether detecting the concentrator
It goes offline;Acquiring unit, for when the concentrator goes offline, then obtaining the duration that goes offline of the concentrator;Second judges
Unit, for judge the concentrator go offline the time whether overlength;Second execution unit, for judging the concentrator
Go offline time overlength when, then perform go offline time overlength alarm.
Preferably, the electric network data monitoring device further includes:3rd detection unit, for detecting same concentrator institute band
The meter reading success rate of intelligent meter;3rd judging unit, for judge same concentrator the meter reading success rate with intelligent meter whether
Reach default success ratio values;And the 3rd execution unit, for judge same concentrator the meter reading success with intelligent meter
Rate is not up to the default success ratio values, the then rate that runs succeeded alarm.
By the present invention, using the electric network data monitoring method comprised the following steps:Monitoring instruction is received, wherein, it is described
Monitoring instruction is to be used to indicate the instruction being monitored to electric network data;According to it is described monitoring instruction to pre-payment control parameter into
Row detection;Judge that the pre-payment control parameter issues whether to fail;If it is judged that the pre-payment control parameter issues mistake
It loses, then performs pre-payment control parameter and issue and unsuccessfully alert, solve and electric network data is monitored there are monitoring efficiency than relatively low
Problem, and then improve the effect of power system monitor efficiency.
The embodiment of the present invention employs following technology:
Big data Macro or mass analysis, real time data inspecting abnormal conditions, various dimensions, multimode carry out abnormal positioning analysis, weight
Point user annotation, strengthens Very Important Person differentiation good service, trouble ticket dispatch standardization, and workload embodies variation, the present invention
Technical solution is conducive to instruct the propulsion work of intelligent electric energy meter, by gathered data run monitor supervision platform, to various data into
The analysis and assessment of row comprehensively, comprehensive carry out timely processing to the abnormal conditions analyzed, can finally instruct state of Utilities Electric Co. net
The propulsion work of intelligent electric energy meter, realizes being simple and efficient for service management, and system will be at all kinds of complexity in all operation flows
It manages details and carries out inter-process, pass through the instruments such as pre-defined business processing model, mathematical logic rule, input-output analysis
Internal arithmetic is carried out, staff and administrative staff only need to provide a small amount of necessary condition and data message, you can are completed
Corresponding service operation and management work.
The present invention realizes the omnibearing management of gathered data:
Gathered data runs monitor supervision platform and carries out management and control to all gathered datas, records the pilot process data of all operations
And result data, and the standard results record set of formatting is generated as requested.The final comprehensive pipe realized to gathered data
Reason.
The present invention can be to the independent monitoring analysis of emphasis user
Important power customer is included the emphasis service object of Utilities Electric Co., individual data monitoring is carried out to emphasis user
And analysis, strengthen the good service of Very Important Person from management system, added by information-based means and advanced management theory
By force to the management and control dynamics of important client secure Control of Hidden link, Very Important Person safety utilization of electric power is established in promotion, further promotes weight
It wants client horizontal for Electrical Safety integrated management, strengthens Very Important Person differentiation good service, provide comprehensive, efficient, good
Personalized service.
The technical principle of big data Macro or mass analysis technology of the present invention is as follows:
The system passes through the cross-platform connection acquisition system database of ORACLE DBLINK connection modes and marketing SG186
System database extracts data from two systems, and status data is issued including acquisition system ammeter operation data, power purchase;Battalion
Pin system ammeter file data, subscriber profile data;Two number formularies are according to the system data interchange platform is aggregated into, by pre-defined
Business processing model, mathematical logic rule carry out analysis summary, the results show to foreground interface including acquisition situation, issues
Situation, abnormal conditions, voltage, current trend situation, file data, trouble ticket dispatch situation, workload situation.
The technical principle of real time data inspecting technology of the present invention is as follows:
Judge real time data abnormal conditions, client root according to set business rule and data logic rules by obtaining data
A small amount of real-time refresh data of necessary condition is inputted according to oneself demand to be monitored, and timely processing is carried out for abnormal conditions.Judge
Logic rules are as follows:Pre-payment control parameter issues failure, the alarm of concentrator clock, the alarm of intelligent meter clock, regular electricity price announcement
Alert, electricity charge remaining sum alarm, concentrator go offline the alarm of time overlength, same concentrator institute with intelligent meter same day meter reading success
No data alarm, the electricity consumption of intelligent meter day stop walking alarm for three days on end, intelligent meter daily power consumption flies away alarm, electricity for rate, single intelligent meter
It measures under the uneven alarm of abnormality alarming, current zero abnormality alarming, current three-phase, electric voltage exception alarm, pre-payment control parameter
Hair failure after-treatment, emergent sale of electricity issue failure.
The present invention is that various dimensions anomaly analysis is embodied in a variety of methods:
Tentatively judged by overall monitoring, analyzing and positioning abnormal area and date
Anomaly analysis is carried out by electric current, electricity, voltage curve
Exception information is fed back by collecting device and carries out anomaly analysis
Anomaly analysis is carried out by customers' responsiveness
The logic rules defined by data interaction platform interior carry out anomaly analysis
Various ways:
System platform program is analyzed
Staff feeds back manual analysis
The threshold values for whether exceeding business rule by analyzing data and defining, carries out anomaly analysis, and defines each exception
Abnormal cause.
Emphasis user annotation analytical technology
Technical principle
By inquiring about marketing system data, user is paid close attention to according to business rule definition, emphasis user is carried out independent
Data monitoring and analysis, strengthen the good service of Very Important Person from management system, by information-based means and advanced
Management philosophy strengthens the management and control dynamics trouble ticket dispatch technology to important client secure Control of Hidden link.
Trouble ticket dispatch technology
Technical principle
By specification worksheet flow, by responsibility to people, flow be divided into distribute, handle, receipt, filing, will flow
Journey standardize, digitization, can real time inspection abnormal data issue handling result and processing progress, ensure the efficient of work and number
According to omnibearing management.
Workload variation embodiment technology
Technical principle
By different input condition calling data set is needed to carry out workload displaying, understand working condition.
The advantageous effect that technical solution of the present invention is brought
Acquisition coverage rate is improved in practical applications, copies passband, has promoted the popularization of state's net intelligent meter.
It realizes client's purchase of electricity quickly to issue, abnormal phenomenon is found in time and handles solution, ensure that client just
Common electricity improves the service quality of Utilities Electric Co..
Being simple and efficient for service management is realized, everyone has responsibility, ensure that work quality.
The omnibearing management of gathered data is realized, accomplishes have number that can look into, it is evidence-based, it is convenient that working condition is divided
Analysis and adjustment.
It is horizontal for Electrical Safety integrated management to improve Very Important Person, enhances Very Important Person differentiation good service, carries
Comprehensive, efficient, good personalized service is supplied.
The system is truly realized the high efficiency of service management, the omnibearing management of gathered data.And it can send out in time
Existing problem, and analysis solution is carried out to abnormal problem, it ensure that service quality, the further genralrlization for state's net intelligent meter provides
Very big facility.
Obviously, those skilled in the art should be understood that each module of the above-mentioned present invention or each step can be with general
Computing device realize that they can concentrate on single computing device or be distributed in multiple computing devices and be formed
Network on, optionally, they can be realized with the program code that computing device can perform, it is thus possible to which they are stored
In the storage device by computing device come perform either they are fabricated to respectively each integrated circuit modules or by they
In multiple modules or step be fabricated to single integrated circuit module to realize.In this way, the present invention is not limited to any specific
Hardware and software combines.
The foregoing is only a preferred embodiment of the present invention, is not intended to limit the invention, for the skill of this field
For art personnel, the invention may be variously modified and varied.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should all be included in the protection scope of the present invention.
Claims (10)
1. a kind of electric network data monitoring method, which is characterized in that including:
Monitoring instruction is received, wherein, the monitoring instructs to be used to indicate the instruction for being monitored electric network data;
Pre-payment control parameter is detected according to the monitoring instruction;
Judge that the pre-payment control parameter issues whether to fail;And
If it is judged that the pre-payment control parameter issues failure, then perform pre-payment control parameter and issue and unsuccessfully alert.
2. electric network data monitoring method according to claim 1, which is characterized in that if it is judged that the pre-payment controls
Parameter issues failure, then performing pre-payment control parameter and issuing unsuccessfully to alert includes:
The first alarm command is sent to default concentrator, wherein, first alarm command is used to indicate concentrator and performs announcement
It is alert;And
The concentrator execution pre-payment control parameter is controlled to issue unsuccessfully to alert.
3. electric network data monitoring method according to claim 2, which is characterized in that described after monitoring instruction is received
Electric network data monitoring method further includes:
Detect whether the concentrator goes offline;
If the concentrator goes offline, the duration that goes offline of the concentrator is obtained;
Whether the time that goes offline for judging the concentrator is more than predetermined length;And
If it is judged that the time that goes offline of the concentrator more than predetermined length, then performs the time overlength alarm that goes offline.
4. electric network data monitoring method according to claim 2, which is characterized in that described after monitoring instruction is received
Electric network data monitoring method further includes:
Detect the concentrator the meter reading success rate with intelligent meter;
Judge the concentrator the meter reading success rate with intelligent meter whether reach default success ratio values;And
If it is judged that the concentrator the meter reading success rate with intelligent meter be not up to the default success ratio values, then perform into
Power alerts.
5. electric network data monitoring method according to claim 4, which is characterized in that described after monitoring instruction is received
Electric network data monitoring method further includes:
Judge whether the time of the intelligent meter no data reaches preset time;
If it is judged that the time of the intelligent meter no data reaches preset time, then no data alarm is performed.
6. electric network data monitoring method according to claim 1, which is characterized in that if it is judged that the pre-payment controls
Parameter issues failure, then the electric network data monitoring method further includes:
It obtains pre-set pre-payment control parameter and issues unsuccessfully after-treatment flow;And
It performs the pre-payment control parameter and issues unsuccessfully after-treatment flow.
7. a kind of electric network data monitoring device, which is characterized in that including:
Receiving unit, for receiving monitoring instruction, wherein, the monitoring instruction, which is used to indicate, is monitored electric network data
Instruction;
First detection unit, for being detected according to the monitoring instruction to pre-payment control parameter;
Whether the first judging unit fails for judging that the pre-payment control parameter issues;And
First execution unit, for when judging that the pre-payment control parameter issues unsuccessfully, performing pre-payment control parameter
It issues and unsuccessfully alerts.
8. electric network data monitoring device according to claim 7, which is characterized in that first execution unit includes:
Sending module, for sending the first alarm command to default concentrator, wherein, first alarm command is used to indicate
Concentrator performs alarm;And
Control module unsuccessfully alerts for the concentrator execution pre-payment control parameter to be controlled to issue.
9. electric network data monitoring device according to claim 8, which is characterized in that the electric network data monitoring device also wraps
It includes:
Second detection unit, for detecting whether the concentrator goes offline;
Acquiring unit, for when the concentrator goes offline, then obtaining the duration that goes offline of the concentrator;
Second judgment unit, whether the time that goes offline for judging the concentrator is more than predetermined length;And
Second execution unit, when going offline for when judging that the time that goes offline of the concentrator is more than predetermined length, then performing
Between overlength alert.
10. electric network data monitoring device according to claim 8, which is characterized in that the electric network data monitoring device is also
Including:
3rd detection unit, for detect the concentrator the meter reading success rate with intelligent meter;
3rd judging unit, for judge the concentrator the meter reading success rate with intelligent meter whether reach default success rate
Value;And
3rd execution unit, for judge the concentrator the meter reading success rate with intelligent meter is not up to described is preset to
Performance number, the then rate that runs succeeded alarm.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410737651.9A CN104601396B (en) | 2014-12-04 | 2014-12-04 | Electric network data monitoring method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410737651.9A CN104601396B (en) | 2014-12-04 | 2014-12-04 | Electric network data monitoring method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104601396A CN104601396A (en) | 2015-05-06 |
CN104601396B true CN104601396B (en) | 2018-06-01 |
Family
ID=53126920
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410737651.9A Active CN104601396B (en) | 2014-12-04 | 2014-12-04 | Electric network data monitoring method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104601396B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105184688A (en) * | 2015-11-03 | 2015-12-23 | 国网冀北电力有限公司经济技术研究院 | Remote real-time cost control management for power network |
CN113488994A (en) * | 2021-06-28 | 2021-10-08 | 国网重庆市电力公司营销服务中心 | Electric energy charge control method and device |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101447107A (en) * | 2008-12-11 | 2009-06-03 | 深圳市科陆电子科技股份有限公司 | Power use monitoring system, prepayment terminal and center server |
CN101951027A (en) * | 2010-09-01 | 2011-01-19 | 中国电力科学研究院 | Uniform data acquisition and monitoring system of low-medium voltage power distribution network |
DE102010000249A1 (en) * | 2010-01-28 | 2011-08-18 | Softing AG, 85540 | Method for checking electrical characteristics of twisted-pair cable between measuring and switching points in professional bus network, involves remotely-controlling measurement or setting of switch device by measuring device |
CN103580284A (en) * | 2013-10-31 | 2014-02-12 | 广州瑞信电力科技有限公司 | Low-voltage integrated reading system |
CN104112345A (en) * | 2014-07-29 | 2014-10-22 | 深圳华越南方电子技术有限公司 | Data monitoring method of remote wireless meter reading system |
-
2014
- 2014-12-04 CN CN201410737651.9A patent/CN104601396B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101447107A (en) * | 2008-12-11 | 2009-06-03 | 深圳市科陆电子科技股份有限公司 | Power use monitoring system, prepayment terminal and center server |
DE102010000249A1 (en) * | 2010-01-28 | 2011-08-18 | Softing AG, 85540 | Method for checking electrical characteristics of twisted-pair cable between measuring and switching points in professional bus network, involves remotely-controlling measurement or setting of switch device by measuring device |
CN101951027A (en) * | 2010-09-01 | 2011-01-19 | 中国电力科学研究院 | Uniform data acquisition and monitoring system of low-medium voltage power distribution network |
CN103580284A (en) * | 2013-10-31 | 2014-02-12 | 广州瑞信电力科技有限公司 | Low-voltage integrated reading system |
CN104112345A (en) * | 2014-07-29 | 2014-10-22 | 深圳华越南方电子技术有限公司 | Data monitoring method of remote wireless meter reading system |
Also Published As
Publication number | Publication date |
---|---|
CN104601396A (en) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20160187864A1 (en) | Apparatus and System for Providing Energy Information | |
CN106156269A (en) | One is opposed electricity-stealing precise positioning on-line monitoring method | |
CN108537394B (en) | Real-time safety early warning method and device for smart power grid | |
CN104809663B (en) | Power specialty technological service safeguards system and its measure of supervision | |
CN106771448A (en) | A kind of electric energy meter shunting anti-electricity-theft early warning analysis method of analysis | |
CN110703009B (en) | Abnormal analysis and processing method for line loss rate of transformer area | |
CN107798395A (en) | A kind of power grid accident signal automatic diagnosis method and system | |
CN105588995A (en) | Line-loss anomaly detection method for electric power measurement automation system | |
CN104820953A (en) | Power distribution network operation safety assessment and warning system | |
CN107622342B (en) | MVC (model view controller) architecture-based distribution network area data analysis system | |
CN104835311B (en) | A kind of power information collecting device data transmission performance analysis system | |
CN108037343A (en) | A kind of voltage monitoring Management System Data deepens analysis method | |
CN104601396B (en) | Electric network data monitoring method and device | |
CN104483566A (en) | Power grid data acquisition method and device | |
CN115798155A (en) | Natural gas metering and analyzing system | |
CN115908046A (en) | Visual power distribution system based on airport terminal building BIM | |
CN107356835A (en) | A kind of intelligent electrical energy monitoring analysis system | |
CN105932773B (en) | A kind of intelligent charging electricity anti-theft system | |
CN110855012A (en) | Real-time line loss intelligent analysis system for transformer area | |
CN109581115B (en) | Power distribution network low-voltage diagnosis system and diagnosis method | |
CN115511656A (en) | Demand planning auxiliary decision system based on mining power grid data value | |
CN109858807A (en) | A kind of method and system of enterprise operation monitoring | |
CN106709623B (en) | Power grid marketing inspection risk control method based on risk calculation model | |
CN106405224B (en) | Energy-saving diagnosis method and system based on mass electric energy data | |
CN102944790A (en) | Enterprise power consumption information detection method and system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |