CN104597789A - Charging pile self-checking device, system and method - Google Patents

Charging pile self-checking device, system and method Download PDF

Info

Publication number
CN104597789A
CN104597789A CN201410800001.4A CN201410800001A CN104597789A CN 104597789 A CN104597789 A CN 104597789A CN 201410800001 A CN201410800001 A CN 201410800001A CN 104597789 A CN104597789 A CN 104597789A
Authority
CN
China
Prior art keywords
unit
main control
individual event
control unit
task
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410800001.4A
Other languages
Chinese (zh)
Other versions
CN104597789B (en
Inventor
杨忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Vehicle Electric Network Co Ltd
Shenzhen Clou Electronics Co Ltd
Original Assignee
Shenzhen Clou Electronics Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Clou Electronics Co Ltd filed Critical Shenzhen Clou Electronics Co Ltd
Priority to CN201410800001.4A priority Critical patent/CN104597789B/en
Publication of CN104597789A publication Critical patent/CN104597789A/en
Application granted granted Critical
Publication of CN104597789B publication Critical patent/CN104597789B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/04Programme control other than numerical control, i.e. in sequence controllers or logic controllers
    • G05B19/042Programme control other than numerical control, i.e. in sequence controllers or logic controllers using digital processors
    • G05B19/0428Safety, monitoring
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01RMEASURING ELECTRIC VARIABLES; MEASURING MAGNETIC VARIABLES
    • G01R31/00Arrangements for testing electric properties; Arrangements for locating electric faults; Arrangements for electrical testing characterised by what is being tested not provided for elsewhere
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/20Pc systems
    • G05B2219/26Pc applications
    • G05B2219/2604Test of external equipment

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Automation & Control Theory (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Charge And Discharge Circuits For Batteries Or The Like (AREA)

Abstract

The invention relates to a charging pile self-checking device. The charging pile self-checking device comprises a main control unit, a receiving unit, an execution unit, a task unit and a communication unit; the receiving unit, the execution unit, the task unit and the communication unit are connected with the main control unit; the receiving unit is used for receiving the task list information transmitted from an external host server through the communication unit and transmitting the task list information to the main control unit; the main control unit is used for transmitting the task list information to the task unit, reading the single task information from the task unit one by one and transmitting the single task information to the execution unit one by one; the execution unit is used for performing self-checking according to the single task information, generating single result data and transmitting the single result data to the main control unit; the main control unit is also used for transmitting the single result data to the external host server through the communication unit.

Description

A kind of self-checking unit of charging pile, system and method
Technical field
The present invention relates to charging pile, particularly relate to a kind of device, system and method for charging pile self-inspection.
Background technology
Current charging pile detects the mode adopted to be had: checkout equipment directly connects with charging pile interface for needs technician by a kind of mode, then relevant item is detected, and need charging pile to be detected to quit work, another kind of mode realizes closely patrolling and examining to charging pile by handheld terminal exactly; Also need technician to reach the spot closely to operate just can reach testing goal.These two kinds of mode detection efficiencies are low, waste a large amount of costs of human resources and waste time cost.
Summary of the invention
Object of the present invention is exactly that detection mode detection efficiency in order to solve existing charging pile is low, and the technical matters of waste of manpower resource, the invention provides a kind of charging pile self-checking unit.Concrete technical scheme of the present invention is as follows:
The invention provides a kind of self-checking unit of charging pile, comprise main control unit, receiving element, performance element, TU task unit and communication unit, described receiving element, performance element, TU task unit and communication unit are all connected with described main control unit, described receiving element receives the task list information of external host server transmission by described communication unit, and described task list information is transferred to described main control unit, described task list is transferred to described TU task unit by described main control unit, described main control unit reads individual event mission bit stream one by one from described TU task unit, and described single-phase mission bit stream is transferred to described performance element one by one, described performance element carries out execution self-inspection according to described single-phase mission bit stream, generate individual event result data, and individual event result data is transferred to described main control unit, described individual event result data is transferred to external host server by described communication unit by described main control unit.
Further, comprise storage unit, described storage unit is connected with described main control unit, described storage unit is for storing described individual event result data, described individual event result data is transferred to described main control unit by described performance element one by one, described individual event result data is transferred to described storage unit by described main control unit one by one, described main control unit obtains and is stored in described whole individual event result datas corresponding with described task list information in storage unit, and described whole individual event result data is transferred to described external host server.
Further, comprise detecting unit, described detecting unit is connected with described main control unit, described detecting unit is for depositing the current individual event mission bit stream treating self-inspection, described main control unit reads described individual event mission bit stream from described TU task unit, and described individual event mission bit stream is left in described detecting unit, described individual event mission bit stream is transferred to described performance element by described main control unit simultaneously.
Further, comprise Condition Monitoring Unit, described Condition Monitoring Unit is connected with described main control unit, described Condition Monitoring Unit is used for work or the idle condition of charging pile described in Real-Time Monitoring, the work of described charging pile or free message are transferred to described main control unit by described Condition Monitoring Unit, and described main control unit issues steering order according to the work of described charging pile or free message to described receiving element and described performance element.
A self checking method for charging pile, described method comprises the steps:
Described receiving element receives task list information by described communication unit;
Described task list information is transferred to described main control unit by described receiving element, and described task list information is transferred to described TU task unit by described main control unit;
Described main control unit reads the individual event mission bit stream in task list information one by one;
Described individual event mission bit stream is transferred to described performance element by described main control unit one by one;
Described performance element performs described individual event mission bit stream, and generates individual event result data;
Described individual event result data is transferred to described main control unit by described performance element, and described individual event result data is transferred to described external host server by described main control unit.
Further, the concrete grammar that described receiving element receives task list information by described communication unit comprises:
The work of charging pile described in described Condition Monitoring Unit Real-Time Monitoring or idle condition;
If described charging pile is idle condition, described main control unit issues reception instruction to described receiving element, and described receiving element is task list information according to described reception command reception;
If described charging is being duty, described main control unit is issuing suspended market order to described receiving element, and described receiving element stops to receive described task list information according to described command for stopping, and waits for described reception instruction.
Further, the method that described individual event mission bit stream transfers to described performance element also comprises by described main control unit one by one:
Described individual event mission bit stream is transferred to described detecting unit by described main control unit, described individual event mission bit stream is transferred to described performance element simultaneously;
The work of charging pile described in described Condition Monitoring Unit Real-Time Monitoring or idle condition;
If described charging pile is duty, described main control unit issues hang-up instruction to described performance element, and described performance element, according to described hang-up instruction, hangs up the current individual event task treating self-inspection, continues wait instruction;
If described charging pile is idle condition, described main control unit issues execution instruction to described performance element, and described performance element reads the current individual event mission bit stream treating self-inspection according to described execution instruction from described detecting unit, performs described individual event task.
Further, described performance element performs described individual event mission bit stream one by one, and the method generating individual event result data also comprises:
Described performance element performs described individual event task one by one, generate individual event task result data, and described individual event task result data is stored to described storage unit one by one, described main control unit obtains and is stored in whole individual event result datas corresponding with described task list information in storage unit, and described whole individual event result data is transferred to described external host server.
Further, described whole individual event result data transfers to described external host server in the lump, and described method also comprises:
By described communication unit, described whole individual event result data is transferred to described host server; If Communications failure or communicating interrupt, described whole individual event result data is uploaded or breakpoint transmission again, until complete end of transmission.
A kind of self-checking system of charging pile, comprise host server and self-checking unit, described host server and described self-checking unit communicate to connect, described host server is used for issuing task list to described self-checking unit, described self-checking unit receives described task list, the individual event task that described self-checking unit is executed the task in list one by one according to described task list, and generate result data, described result data is transferred to described host server by described self-checking unit, and described host server carries out data analysis according to described result data.
Compared to prior art, the main beneficial effect that the invention provides a kind of self-checking unit of charging pile is: the self-checking unit of described charging pile receives the task list information of external host server transmission, described self-checking unit detects communication and the circuit state of unit in charging pile automatically, and testing result is reported to external host server, provide a kind of more convenient, fast, effective self-checking unit and method, the unnecessary erecting stage to charging pile of technician, can the detection of inter-related task of operated from a distance time charging pile, reach reduction maintenance cost, improve the beneficial effect of detection efficiency.
Accompanying drawing explanation
Fig. 1 is the frame structure schematic diagram of the self-checking unit of the embodiment of the present invention 1 charging pile.
Fig. 2 is the frame structure schematic diagram of the self-checking unit of the embodiment of the present invention 2 charging pile.
Fig. 3 is the steps flow chart schematic diagram of the self checking method of the embodiment of the present invention 3 charging pile.
Fig. 4 is the frame structure schematic diagram of the self-checking system of the embodiment of the present invention 4 charging pile.
Embodiment
In order to make object of the present invention, technical scheme and advantage clearly understand, below in conjunction with drawings and Examples, the present invention is further elaborated.Should be appreciated that specific embodiment described herein only in order to explain the present invention, be not used for limiting the present invention.
Embodiment 1
Refer to shown in Fig. 1.
The invention provides a kind of self-checking unit of charging pile, comprise main control unit, receiving element, performance element, TU task unit and communication unit, described receiving element, performance element, TU task unit and communication unit are all connected with described main control unit, described receiving element receives the task list information of external host server transmission by described communication unit, and described task list information is transferred to described main control unit, described task list is transferred to described TU task unit by described main control unit, described main control unit reads individual event mission bit stream one by one from described TU task unit, and described single-phase mission bit stream is transferred to described performance element one by one, described performance element carries out execution self-inspection according to described single-phase mission bit stream, generate individual event result data, and individual event result data is transferred to described main control unit, described individual event result data is transferred to external host server by described communication unit by described main control unit.
It should be noted that, described host server is according to the self-inspection data in each described charging pile early stage and recent service data, generate task list, and each described task list is issued to the charging pile of described correspondence, described host server is according to the time of charging pile erecting stage service condition specifying suggestion self-inspection tasks carrying, and namely described charging pile is not to the time that external unit charges.
Embodiment 2
Refer to shown in Fig. 2.
The invention provides a kind of self-checking unit of charging pile, comprise main control unit, receiving element, performance element, TU task unit and communication unit, described receiving element, performance element, TU task unit and communication unit are all connected with described main control unit, described receiving element receives the task list information of external host server transmission by described communication unit, and described task list information is transferred to described main control unit, described task list is transferred to described TU task unit by described main control unit, described main control unit reads individual event mission bit stream one by one from described TU task unit, and described single-phase mission bit stream is transferred to described performance element one by one, described performance element carries out execution self-inspection according to described single-phase mission bit stream, generate individual event result data, and individual event result data is transferred to described main control unit, described individual event result data is transferred to external host server by described communication unit by described main control unit.
Comprise storage unit further, described storage unit is connected with described main control unit, described storage unit is for storing described individual event result data, described individual event result data is transferred to described main control unit by described performance element one by one, described individual event result data is transferred to described storage unit by described main control unit one by one, described main control unit obtains and is stored in described whole individual event result datas corresponding with described task list information in storage unit, when the whole individual event tasks in described task list, all to be performed self-inspection complete, described whole individual event result data is transferred to described external host server by described communication unit by described main control unit.
Comprise detecting unit further, described detecting unit is connected with described main control unit, described detecting unit is for depositing the current individual event mission bit stream treating self-inspection, described main control unit reads described individual event mission bit stream from described TU task unit, and described individual event mission bit stream is left in described detecting unit, described individual event mission bit stream is transferred to described performance element by described main control unit simultaneously.
Further, comprise Condition Monitoring Unit, described Condition Monitoring Unit is connected with described main control unit, described Condition Monitoring Unit is used for work or the idle condition of charging pile described in Real-Time Monitoring, the work of described charging pile or free message are transferred to described main control unit by described Condition Monitoring Unit, and described main control unit issues steering order according to the work of described charging pile or free message to described receiving element and described performance element.
If described charging pile is idle condition, described main control unit issues reception instruction to described receiving element, and described receiving element is task list information according to described reception command reception.
If described charging pile is duty, described main control unit issues suspended market order to described receiving element, and described receiving element stops to receive described task list information according to described command for stopping, and waits for described reception instruction.
Be understandable that, if described charging pile is in running order or charging pile enters duty described in reception task process, then self-inspection task suspension waited for; Treat that described charging pile enters idle condition again, then the reception task of receiving element proceeds; Until receive described task list.
It should be noted that, described duty is charging pile is the state that external unit charges; Described idle condition is that described charging pile is not to the state that external unit charges.
Embodiment 3
Refer to shown in Fig. 3.
The invention provides a kind of self checking method of charging pile, described method comprises the steps:
S1: described receiving element receives task list information by described communication unit.
Be understandable that, the work of charging pile described in described Condition Monitoring Unit Real-Time Monitoring or idle condition;
If described charging pile is idle condition, described main control unit issues reception instruction to described receiving element, and described receiving element is task list information according to described reception command reception;
If described charging is being duty, described main control unit is issuing suspended market order to described receiving element, and described receiving element stops to receive described task list information according to described command for stopping, and waits for described reception instruction.
S2: described task list information is transferred to described main control unit by described receiving element, described task list information is transferred to described TU task unit by described main control unit.
S3: described main control unit reads the individual event mission bit stream in task list information one by one.
S4: described individual event mission bit stream is transferred to described performance element by described main control unit one by one.
It should be noted that, described individual event mission bit stream is transferred to described detecting unit by described main control unit, described individual event mission bit stream is transferred to described performance element simultaneously;
The work of charging pile described in described Condition Monitoring Unit Real-Time Monitoring or idle condition;
If described charging pile is duty, described main control unit issues hang-up instruction to described performance element, and described performance element, according to described hang-up instruction, hangs up the current individual event task treating self-inspection, continues wait instruction;
If described charging pile is idle condition, described main control unit issues execution instruction to described performance element, and described performance element reads the current individual event mission bit stream treating self-inspection according to described execution instruction from described detecting unit, performs described individual event task.
S5: described performance element performs described individual event mission bit stream, and generates individual event result data.
Described performance element performs described individual event task one by one, generate individual event task result data, and described individual event task result data is stored to described storage unit one by one, described main control unit obtains and is stored in whole individual event result datas corresponding with described task list information in storage unit, and described whole individual event result data is transferred to described external host server.
S6: described individual event result data is transferred to described main control unit by described performance element, described individual event result data is transferred to described external host server by described main control unit.
By described communication unit, described whole individual event result data is transferred to described host server; If Communications failure or communicating interrupt, described whole individual event result data is uploaded or breakpoint transmission again, until complete end of transmission.
Embodiment 4
Refer to shown in Fig. 4.
On the basis of embodiment 1-3, the invention provides a kind of self-checking system of charging pile, comprise host server and self-checking unit, described host server and described self-checking unit communicate to connect, and described host server is used for issuing task list to described self-checking unit; Described self-checking unit receives described task list, the individual event task that described self-checking unit is executed the task in list one by one according to described task list, and generate result data, described result data is transferred to described host server by described self-checking unit, and described host server carries out data analysis according to described result data.
It should be noted that, described host server is according to the self-inspection data in each described charging pile early stage and recent service data, generate task list, and each described task list is issued to the charging pile of described correspondence, described host server is according to the time of described charging pile erecting stage service condition specifying suggestion self-inspection tasks carrying, and namely described charging pile is not to the time that external unit charges.
It should be noted that, above embodiment is only in order to illustrate technical scheme of the present invention and unrestricted, although with reference to preferred embodiment to invention has been detailed description, those of ordinary skill in the art is to be understood that, can modify to technical scheme of the present invention or equivalent replacement, and not departing from the spirit and scope of technical solution of the present invention, it all should be encompassed in the middle of right of the present invention.

Claims (10)

1. a self-checking unit for charging pile, is characterized in that, comprises main control unit, receiving element, performance element, TU task unit and communication unit, described receiving element, performance element, TU task unit and communication unit are all connected with described main control unit, described receiving element receives the task list information of external host server transmission by described communication unit, and described task list information is transferred to described main control unit, described task list is transferred to described TU task unit by described main control unit, described main control unit reads individual event mission bit stream one by one from described TU task unit, and described single-phase mission bit stream is transferred to described performance element one by one, described performance element carries out execution self-inspection according to described single-phase mission bit stream, generate individual event result data, and individual event result data is transferred to described main control unit, described individual event result data is transferred to external host server by described communication unit by described main control unit.
2. the self-checking unit of charging pile according to claim 1, it is characterized in that, comprise storage unit further, described storage unit is connected with described main control unit, described storage unit is for storing described individual event result data, described individual event result data is transferred to described main control unit by described performance element one by one, described individual event result data is transferred to described storage unit by described main control unit one by one, described main control unit obtains and is stored in described whole individual event result datas corresponding with described task list information in storage unit, and described whole individual event result data is transferred to described external host server.
3. the self-checking unit of charging pile according to claim 1, it is characterized in that, comprise detecting unit further, described detecting unit is connected with described main control unit, described detecting unit is for depositing the current individual event mission bit stream treating self-inspection, described main control unit reads described individual event mission bit stream from described TU task unit, and leaves in described detecting unit by described individual event mission bit stream, and described individual event mission bit stream is transferred to described performance element by described main control unit simultaneously.
4. the self-checking unit of charging pile according to claim 1, it is characterized in that, comprise Condition Monitoring Unit, described Condition Monitoring Unit is connected with described main control unit, described Condition Monitoring Unit is used for work or the idle condition of charging pile described in Real-Time Monitoring, the work of described charging pile or free message are transferred to described main control unit by described Condition Monitoring Unit, and described main control unit issues steering order according to the work of described charging pile or free message to described receiving element and described performance element.
5. a self checking method for charging pile, is characterized in that, described method comprises the steps:
Described receiving element receives task list information by described communication unit;
Described task list information is transferred to described main control unit by described receiving element, and described task list information is transferred to described TU task unit by described main control unit;
Described main control unit reads the individual event mission bit stream in task list information one by one;
Described individual event mission bit stream is transferred to described performance element by described main control unit one by one;
Described performance element performs described individual event mission bit stream, and generates individual event result data;
Described individual event result data is transferred to described main control unit by described performance element, and described individual event result data is transferred to described external host server by described main control unit.
6. the self checking method of charging pile according to claim 5, is characterized in that, the concrete grammar that described receiving element receives task list information by described communication unit comprises:
The work of charging pile described in described Condition Monitoring Unit Real-Time Monitoring or idle condition;
If described charging pile is idle condition, described main control unit issues reception instruction to described receiving element, and described receiving element is task list information according to described reception command reception;
If described charging pile is duty, described main control unit issues suspended market order to described receiving element, and described receiving element stops to receive described task list information according to described command for stopping, and waits for described reception instruction.
7. the self checking method of charging pile according to claim 5, is characterized in that, the method that described individual event mission bit stream transfers to described performance element also comprises by described main control unit one by one:
Described individual event mission bit stream is transferred to described detecting unit by described main control unit, described individual event mission bit stream is transferred to described performance element simultaneously;
The work of charging pile described in described Condition Monitoring Unit Real-Time Monitoring or idle condition;
If described charging pile is duty, described main control unit issues hang-up instruction to described performance element, and described performance element, according to described hang-up instruction, hangs up the current individual event task treating self-inspection, continues wait instruction;
If described charging pile is idle condition, described main control unit issues execution instruction to described performance element, and described performance element reads the current individual event mission bit stream treating self-inspection according to described execution instruction from described detecting unit, performs described individual event task.
8. the self checking method of charging pile according to claim 5, is characterized in that, described performance element performs described individual event mission bit stream one by one, and the method generating individual event result data also comprises:
Described performance element performs described individual event task one by one, generate individual event task result data, and described individual event task result data is stored to described storage unit one by one, described main control unit obtains and is stored in whole individual event result datas corresponding with described task list information in storage unit, and described whole individual event result data is transferred to described external host server.
9. the self checking method of charging pile according to claim 8, is characterized in that, described whole individual event result data transfers to described external host server in the lump, and described method also comprises:
By described communication unit, described whole individual event result data is transferred to described host server; If Communications failure or communicating interrupt, described whole individual event result data is uploaded or breakpoint transmission again, until complete end of transmission.
10. the self-checking system of a charging pile, it is characterized in that, comprise host server and the arbitrary described self-checking unit of claim 1-4, described host server and described self-checking unit communicate to connect, described host server is used for issuing task list to described self-checking unit, described self-checking unit receives described task list, the individual event task that described self-checking unit is executed the task in list one by one according to described task list, and generate result data, described result data is transferred to described host server by described self-checking unit, described host server carries out data analysis according to described result data.
CN201410800001.4A 2014-12-19 2014-12-19 A kind of self-checking unit of charging pile, system and method Active CN104597789B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410800001.4A CN104597789B (en) 2014-12-19 2014-12-19 A kind of self-checking unit of charging pile, system and method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410800001.4A CN104597789B (en) 2014-12-19 2014-12-19 A kind of self-checking unit of charging pile, system and method

Publications (2)

Publication Number Publication Date
CN104597789A true CN104597789A (en) 2015-05-06
CN104597789B CN104597789B (en) 2017-07-28

Family

ID=53123653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410800001.4A Active CN104597789B (en) 2014-12-19 2014-12-19 A kind of self-checking unit of charging pile, system and method

Country Status (1)

Country Link
CN (1) CN104597789B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105553038A (en) * 2016-02-04 2016-05-04 董岩 Intelligent charging station based on charging state detection
CN107817394A (en) * 2017-08-17 2018-03-20 山东电工豪迈节能科技有限公司 A kind of device and method of charging pile long-distance intelligent self-test
CN108711904A (en) * 2018-05-25 2018-10-26 北京方智科技股份有限公司 A kind of charging pile inspection terminal
CN109004720A (en) * 2018-08-31 2018-12-14 福建百城新能源科技有限公司 A kind of new-energy automobile charging station cloud management platform
CN109725216A (en) * 2018-12-20 2019-05-07 国网北京市电力公司 The data interactive method and device of charging pile detection device
CN110988565A (en) * 2019-12-24 2020-04-10 重庆国翰能源发展有限公司 Self-checking method for one-machine four-pile charging pile system

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1770845A2 (en) * 2005-08-29 2007-04-04 Pinnacle West Capital Corporation Battery charger and method of charging a battery
CN101188846A (en) * 2007-12-10 2008-05-28 中兴通讯股份有限公司 A system and method for realizing remote detection of base station
CN102035053A (en) * 2010-01-19 2011-04-27 王春生 Charging method of charging pile for supplying charging service to electromobile
CN104029602A (en) * 2014-03-05 2014-09-10 广州供电局有限公司 Alternating current charging pile system on basis of TD-LTE (time division long term evolution) network

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP1770845A2 (en) * 2005-08-29 2007-04-04 Pinnacle West Capital Corporation Battery charger and method of charging a battery
CN101188846A (en) * 2007-12-10 2008-05-28 中兴通讯股份有限公司 A system and method for realizing remote detection of base station
CN102035053A (en) * 2010-01-19 2011-04-27 王春生 Charging method of charging pile for supplying charging service to electromobile
CN104029602A (en) * 2014-03-05 2014-09-10 广州供电局有限公司 Alternating current charging pile system on basis of TD-LTE (time division long term evolution) network

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
胡勇等: "《基于IEC61970/61850的电动汽车充电站监控系统建模方案》", 《电力系统自动化》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105553038A (en) * 2016-02-04 2016-05-04 董岩 Intelligent charging station based on charging state detection
CN107817394A (en) * 2017-08-17 2018-03-20 山东电工豪迈节能科技有限公司 A kind of device and method of charging pile long-distance intelligent self-test
CN108711904A (en) * 2018-05-25 2018-10-26 北京方智科技股份有限公司 A kind of charging pile inspection terminal
CN109004720A (en) * 2018-08-31 2018-12-14 福建百城新能源科技有限公司 A kind of new-energy automobile charging station cloud management platform
CN109004720B (en) * 2018-08-31 2019-05-21 福建百城新能源科技有限公司 A kind of new-energy automobile charging station cloud management platform
CN109725216A (en) * 2018-12-20 2019-05-07 国网北京市电力公司 The data interactive method and device of charging pile detection device
CN110988565A (en) * 2019-12-24 2020-04-10 重庆国翰能源发展有限公司 Self-checking method for one-machine four-pile charging pile system
CN110988565B (en) * 2019-12-24 2021-12-07 重庆国翰能源发展有限公司 Self-checking method for one-machine four-pile charging pile system

Also Published As

Publication number Publication date
CN104597789B (en) 2017-07-28

Similar Documents

Publication Publication Date Title
CN104597789A (en) Charging pile self-checking device, system and method
CN104618940B (en) Electric power acquisition terminal network long distance control system and method for supervising thereof
CN105140886B (en) Relay protection system and the method for using it to collection data
CN103955205A (en) Remote debugging system and method of elevator controller
CN104270273A (en) Self-configuring communication manager
CN103514133A (en) Method for PCIE high-speed link management
RU2015147980A (en) SEPARATE MOBILE TERMINAL AND METHOD FOR PROCESSING INTERACTION FOR COMMUNICATION EVENTS
CN104104519B (en) A kind of power-off restarting method, apparatus and system
CN102621898A (en) Digital household appliance control apparatus, control method and control system thereof
CN105427198A (en) Remote monitoring method and remote monitoring system for electric power consumption data
CN203849573U (en) Transformer station comprehensive automation equipment remote control restarting system
CN108388228B (en) Synchronous debugging method and device for multi-channel embedded control system
CN203754167U (en) Handheld terminal for elevator debugging and maintenance
CN105388891A (en) Fault diagnosis device and method for fieldbus system
US8996737B1 (en) Method for emulating communication standards of transceiver modules for native host devices
CN203151411U (en) Multi-motor intelligent servo system
CN105553865A (en) FC switch chip communication credit management testing method
CN204013616U (en) Intelligent instrument and intelligent monitor system
CN109951309B (en) Electric energy cloud acquisition system network node maintenance method and device
CN104899144B (en) A kind of adjustment method interrupted based on serial ports
CN104898616A (en) Portable power monitoring device
CN103699092A (en) Spray dust suppression system
CN104363118A (en) Multi-mode communication hand-held device, management system and method based on community management
CN203311624U (en) Signal conversion processing circuit
CN204761593U (en) Wireless image sensor of low -power consumption

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20180301

Address after: 518000 Shenzhen, Guangdong Province, Guangming New Area sightseeing Road, No. 3009, A6, Guangming Science Park, China Merchants' Bureau, 2A

Co-patentee after: Shenzhen vehicle electric network Co., Ltd.

Patentee after: Kelu Electronic Science-Technology Co., Ltd., Shenzhen

Address before: 518000 A, B area five floor, T2 building, South District of Nanshan District high tech Industrial Park, Shenzhen City, Guangdong

Patentee before: Kelu Electronic Science-Technology Co., Ltd., Shenzhen