CN104594898B - 一种坚硬顶板注水卸压处理方法 - Google Patents
一种坚硬顶板注水卸压处理方法 Download PDFInfo
- Publication number
- CN104594898B CN104594898B CN201410628054.2A CN201410628054A CN104594898B CN 104594898 B CN104594898 B CN 104594898B CN 201410628054 A CN201410628054 A CN 201410628054A CN 104594898 B CN104594898 B CN 104594898B
- Authority
- CN
- China
- Prior art keywords
- roof
- processing method
- high pressure
- water filling
- top board
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH DRILLING; MINING
- E21C—MINING OR QUARRYING
- E21C37/00—Other methods or devices for dislodging with or without loading
- E21C37/06—Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole
- E21C37/12—Other methods or devices for dislodging with or without loading by making use of hydraulic or pneumatic pressure in a borehole by injecting into the borehole a liquid, either initially at high pressure or subsequently subjected to high pressure, e.g. by pulses, by explosive cartridges acting on the liquid
Abstract
本发明公开了一种坚硬顶板注水卸压处理方法,包括步骤:S1、根据岩层柱状图,结合岩石力学性质试验初步分析顶板离层裂隙产生的层位及发育情况;S2、在工作面由开切眼推进13m~17m时,沿工作面推进方向以一定角度向顶板打一排孔钻孔,利用钻孔摄像仪观测顶板岩层裂隙发育情况;S3、采用双端堵水器探测系统进一步掌握顶板裂隙发育情况;S4、根据上述三个步骤结果最终确定顶板岩层裂隙发育范围及深度;通过高压水泵向裂隙注入高压水,破坏坚硬顶板的整体性、降低岩体的强度;S5、待顶板前次卸压后,工作面继续推进,重复上述过程,直至工作面开采结束。本发明既能够精确定位待预裂顶板位置又能够充分借助顶板离层裂隙空间而无需人工增设预裂空间。
Description
技术领域
本发明属于煤矿开采安全技术领域,涉及一种煤矿采场围岩控制技术,特别涉及一种坚硬顶板注水卸压处理方法。
背景技术
在我国,属于坚硬顶板的煤层约占三分之一左右,且分布在50%以上的矿区。坚硬顶板工作面悬顶大,矿压显现时间集中、强度大,对回采工作面构成极大威胁,而且可能诱发大的结构突变失稳,造成冲击地压等相关灾害,对煤层的安全开采构成巨大威胁。
坚硬顶板条件下,只有当工作面由开切眼推进30-40m甚至更大以后才会垮落,这种垮落具有突发性和不可预测性,对工作面破坏性极大,甚至摧垮工作面,造成巨大经济损失。
现有技术中对于坚硬顶板处理大致分为两类:一类通过爆破破坏坚硬顶板完整结构达到卸压目的。然而该类方案存在一个致命缺陷,即在高瓦斯矿井无法实现。另一类通过高压注水破坏坚硬顶板完整结构达到卸压目的,具体做法为:1、向预设深度顶板处打钻,更换钻头,开设楔形槽,封孔高压注水;2、通过钻孔进行水力割缝,增加预裂空间,封孔高压注水。
不难看出,以上两类处理方法均存在以下不足:1、人为选取预裂顶板位置,这种处理极易造成目标选取不准确,针对性不强,容易造成只是对部分顶板卸压,在工作面推进过程中仍有冲击危险的发生。2、在欲裂位置通过更换钻头人工开设预裂空间,进而通过高压注水达到泄压目的,这种处理工序繁琐,工作量大,实用性较差且与预期效果存在较大差距。
发明内容
针对现有技术中存在的上述技术问题,本发明提出了一种坚硬顶板注水卸压处理方法,采用该卸压处理方法,既能够精确定位待预裂顶板位置,又能够充分借助顶板离层裂隙空间而无需人工增设预裂空间。
为了实现上述目的,本发明采用如下技术方案:
一种坚硬顶板注水卸压处理方法,包括如下步骤:
S1、根据岩层柱状图,结合岩石力学性质试验初步分析顶板离层裂隙产生的层位及发育情况;
S2、在工作面由开切眼推进13m~17m时,沿工作面推进方向以一定角度向顶板打一排孔间距5m~8m的钻孔,首先利用钻孔摄像仪观测顶板岩层裂隙发育情况;
S3、采用双端堵水器探测系统进一步掌握顶板裂隙发育情况;
S4、根据步骤S1、S2和S3的结果最终确定顶板岩层裂隙发育范围及深度;通过高压水泵向裂隙注入高压水,破坏坚硬顶板的整体性、降低岩体的强度,一次卸压完成;
S5、待顶板前次卸压后,工作面继续推进,重复上述过程,直至工作面开采结束。
进一步,上述步骤S2中,在向顶板打钻孔时的角度范围在30°~70°。
进一步,上述步骤S4中,在向裂隙注入高压水时,采用一个钻孔注入高压水。
进一步,上述步骤S4中,在向裂隙注入高压水时,开设一组等间距平行钻孔,同步注水卸压。
本发明具有如下优点:
1、通过理论计算与现场探测相结合,精确定位待预裂坚硬顶板位置,向顶板较大离层空腔处实施有针对性的高压水力压裂技术,破坏了坚硬顶板的完整结构,促使坚硬顶板及时分层、分块垮落,在达到卸压目的的同时,避免了靠人为选取待预裂顶板的盲目性,同时极大减少了工作量,能保证了工作面的安全开采;
2、若顶板进坚硬岩层较厚,施加的水压还可致使后硬顶版分层,从而减小岩层的有效厚度,即岩梁的高度,进而达到卸压的目的。
附图说明
图1为本发明实施例中坚硬顶板注水卸压处理方法的流程示意图;
图2为本发明的实施例中工作面的综合柱状图;
图3为本发明的实施例中不同孔深段的液体流量图。
具体实施方式
下面结合附图以及具体实施方式对本发明作进一步详细说明:
结合图1所示,一种坚硬顶板注水卸压处理方法,包括如下步骤:
第一步:选取某矿7605工作面为研究对象,工作面综合柱状图如图2所示,以岩石力学实验数据为依据,计算离层产生的层位,具体参数见表1。
表1 岩性参数
其中,直接顶离层层位计算按照公式(1)计算:
(wi+1)1=E1h1 3(γ1h1+γi+1hi+1)/(E1h1 3+Ei+1hi+1 3) (1)
其中,i取值分别为0、1、2。
经计算确定,第二、三岩层将产生离层即离层产生于1.43m孔深处。以第三岩层为初始岩层,判别基本顶产生离层层位。
其中,基本顶离层层位按照公式(2)计算:
(wi+3)3=E3h3 3(γ3h3+γi+3hi+3)/(E3h3 3+Ei+3hi+3 3) (2)
其中,i取值分别为0、1、2。
经计算,顶板第四、五岩层将产生离层即离层产生于12.53m孔深处。
第二步:根据第一步计算的深度在工作面推进距开切眼15m时,按一定角度向顶板打一排孔间距5m~8m的钻孔,并利用钻孔摄像仪观测离层裂隙发育情况,观测发现在孔深1.5m、13m这附近产生明显离层。
此处,在向顶板打钻孔时的角度范围在30°~70°,方便现场施工和钻孔摄像仪观测。
第三步:采用双端堵水器对钻孔进一步研究,探测相同时间内不同孔深段液体流量,观测发现,在孔深2m~3m及13m~15m处液体流量明显增大,观测结果见图3。
由此可进一步确定2m~3m及13m~15m处产生较大离层。
第四步:综合前三步最终确定向顶板13m离层裂隙处注入高压水对顶板进行预裂。
本例中,考虑到注水离层裂隙位于顶板13m处,厚度相对较小,在向裂隙注入高压水时,可以采用一个钻孔注入高压水,也可以开设一组等间距平行钻孔同步注水卸压。当预裂顶板厚度(≤15m)较小情况下,考虑到工程进度及经济因素,宜选用一个钻孔注水;反之,为使顶板充分预裂,更高效的解决预裂顶板,可选用一组等间距平行钻孔注水。
第五步:待顶板首次卸压后,工作面继续推进,重复上述过程,直至工作面开采结束。
当然,以上说明仅仅为本发明的较佳实施例,本发明并不限于列举上述实施例,应当说明的是,任何熟悉本领域的技术人员在本说明书的教导下,所做出的所有等同替代、明显变形形式,均落在本说明书的实质范围之内,理应受到本发明的保护。
Claims (4)
1.一种坚硬顶板注水卸压处理方法,其特征在于,包括如下步骤:
S1、根据岩层柱状图,结合岩石力学性质试验初步分析顶板离层裂隙产生的层位及发育情况;
S2、在工作面由开切眼推进13m~17m时,沿工作面推进方向以一定角度向顶板打一排孔间距5m~8m的钻孔,首先利用钻孔摄像仪观测顶板岩层裂隙发育情况;
S3、采用双端堵水器探测系统进一步掌握顶板裂隙发育情况;
S4、根据步骤S1、S2和S3的结果最终确定顶板岩层裂隙发育范围及深度;通过高压水泵向裂隙注入高压水,破坏坚硬顶板的整体性、降低岩体的强度,一次卸压完成;
S5、待顶板前次卸压后,工作面继续推进,重复上述过程,直至工作面开采结束。
2.根据权利要求1所述的一种坚硬顶板注水卸压处理方法,其特征在于,所述步骤S2中,在向顶板打钻孔时的角度范围在30°~70°。
3.根据权利要求1所述的一种坚硬顶板注水卸压处理方法,其特征在于,所述步骤S4中,在向裂隙注入高压水时,采用一个钻孔注入高压水。
4.根据权利要求1所述的一种坚硬顶板注水卸压处理方法,其特征在于,所述步骤S4中,在向裂隙注入高压水时,开设一组等间距平行钻孔,同步注水卸压。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410628054.2A CN104594898B (zh) | 2014-11-10 | 2014-11-10 | 一种坚硬顶板注水卸压处理方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410628054.2A CN104594898B (zh) | 2014-11-10 | 2014-11-10 | 一种坚硬顶板注水卸压处理方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104594898A CN104594898A (zh) | 2015-05-06 |
CN104594898B true CN104594898B (zh) | 2016-08-31 |
Family
ID=53120907
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410628054.2A Expired - Fee Related CN104594898B (zh) | 2014-11-10 | 2014-11-10 | 一种坚硬顶板注水卸压处理方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104594898B (zh) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107304676A (zh) * | 2016-04-22 | 2017-10-31 | 黑龙江龙煤鹤岗矿业有限责任公司 | 一种遗留煤柱下冲击地压的防治方法 |
CN108625897B (zh) * | 2018-03-14 | 2020-04-24 | 山东大学 | 一种隧道外侧富水区的人工引流泄压方法 |
CN110067592B (zh) * | 2019-03-25 | 2021-04-09 | 晋能控股煤业集团有限公司 | 基于坚硬顶板地面压裂的顶板瓦斯协同控制方法 |
CN112576305B (zh) * | 2020-10-23 | 2023-04-07 | 中煤科工集团西安研究院有限公司 | 工作面离层水害的防治方法 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2487997C1 (ru) * | 2011-12-21 | 2013-07-20 | АКЦИОНЕРНАЯ КОМПАНИЯ "АЛРОСА" (открытое акционерное общество) | Способ подготовки обводненного газонасыщенного массива горных пород к разработке подземным способом |
CN102536240B (zh) * | 2012-01-17 | 2015-03-11 | 河南省煤层气开发利用有限公司 | 一种高压致裂防治冲击地压的方法 |
CN103603652B (zh) * | 2013-11-20 | 2016-05-04 | 华北科技学院 | 一种随钻封隔煤岩裂隙注水测试装置 |
CN103821516B (zh) * | 2014-03-10 | 2016-09-21 | 平顶山天安煤业股份有限公司 | 二次卸压防治冲击地压的方法 |
CN104005765A (zh) * | 2014-04-29 | 2014-08-27 | 中国矿业大学 | 一种坚硬顶板型冲击地压的立体式防治方法 |
CN104181611B (zh) * | 2014-08-28 | 2016-02-24 | 山东科技大学 | 一种矿井工作面顶底板采动破坏裂隙发育动态监测方法 |
-
2014
- 2014-11-10 CN CN201410628054.2A patent/CN104594898B/zh not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN104594898A (zh) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104763432B (zh) | 一种高应力巷道围岩卸压控制大变形的方法 | |
US20180080320A1 (en) | Method for over-pit and under-pit cooperative control of roofs of far and near fields of an extra-large stoping space | |
CN106285679B (zh) | 一种预裂和软化火成岩坚硬顶板的方法 | |
CN106368701A (zh) | 利用水力压裂卸压控制回采巷道留巷的方法及装置 | |
CN104594898B (zh) | 一种坚硬顶板注水卸压处理方法 | |
CN112593936B (zh) | 一种深部矿井多灾害区域超前综合防治方法 | |
CN107120137B (zh) | 一种煤巷掘进沿煤层底板深孔预裂爆破抽采方法 | |
CN112780340B (zh) | 一种煤矿井上下区域超前防治冲击地压的方法 | |
Huang et al. | Field investigation into directional hydraulic fracturing for hard roof in Tashan Coal Mine | |
CN104790951A (zh) | 弱化距煤层100~350m高位坚硬顶板的方法及装置 | |
CN102536240A (zh) | 一种高压致裂防治冲击地压的方法 | |
CN112160792A (zh) | 一种井下坚硬顶板的分段水力压裂工作方法 | |
Zhang et al. | Control technology of direct passing karstic collapse pillar in longwall top-coal caving mining | |
CN114293989B (zh) | 一种近直立巨厚煤层分段水力压裂区域防冲方法 | |
Shilova et al. | Protection of operating degassing holes from air inflow from underground excavations | |
RU2571464C1 (ru) | Способ предварительной дегазации свиты угольных пластов и выработанного пространства | |
CN113216912A (zh) | 降低矿震等级用射孔枪及水压致裂降低矿震等级方法 | |
CN102758629B (zh) | 一种钻孔弱化岩石使综采工作面直接过陷落柱的方法 | |
Yang et al. | Application of coalbed methane hydraulic jet-increasing permeability-nitrogen injection to increase production in Shanxi mining area | |
CN115030719B (zh) | 水力压裂厚硬岩层与煤层卸压相结合的冲击矿压防治方法 | |
CN112031772A (zh) | 一种利用高压水射流诱导上覆残留煤柱整体破坏的方法 | |
CN110985123A (zh) | 一种高压水力预裂解危冲击矿压顺槽巷道钻孔布置方法 | |
RU2664281C1 (ru) | Способ разработки кимберлитовых месторождений | |
Sidorenko et al. | Substantiation of parameters of the technology of mining thick flat beds by underground method with splitting the bed into two | |
CN114382483A (zh) | 一种遗留煤柱下坚硬顶板工作面开采强矿压防治方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
EXSB | Decision made by sipo to initiate substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20160831 Termination date: 20211110 |