CN104594353B - Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device - Google Patents

Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device Download PDF

Info

Publication number
CN104594353B
CN104594353B CN201510024101.7A CN201510024101A CN104594353B CN 104594353 B CN104594353 B CN 104594353B CN 201510024101 A CN201510024101 A CN 201510024101A CN 104594353 B CN104594353 B CN 104594353B
Authority
CN
China
Prior art keywords
reinforcement cage
vibration hammer
steel
steel pipe
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510024101.7A
Other languages
Chinese (zh)
Other versions
CN104594353A (en
Inventor
张海滨
刘钟
张楚福
张义
陈天雄
吕美东
平振东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Kun Innovation Geotechnical Engineering Co Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
Original Assignee
Zhejiang Kun Innovation Geotechnical Engineering Co Ltd
Central Research Institute of Building and Construction Co Ltd MCC Group
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Kun Innovation Geotechnical Engineering Co Ltd, Central Research Institute of Building and Construction Co Ltd MCC Group filed Critical Zhejiang Kun Innovation Geotechnical Engineering Co Ltd
Priority to CN201510024101.7A priority Critical patent/CN104594353B/en
Publication of CN104594353A publication Critical patent/CN104594353A/en
Application granted granted Critical
Publication of CN104594353B publication Critical patent/CN104594353B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D13/00Accessories for placing or removing piles or bulkheads, e.g. noise attenuating chambers
    • E02D13/04Guide devices; Guide frames

Landscapes

  • Engineering & Computer Science (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a movable automatic righting device for reinforcement cage and vibratory hammer and a construction method of the device, relates to an auxiliary tool in the bored pile construction field and a construction method thereof, and aims to provide the movable automatic righting device for the reinforcement cage and the vibratory hammer and the construction method of the device, which have the advantage that the reinforcement cage can keep a vertical state under the vibration function of the vibratory hammer and then is implanted into a bored concrete pile. The automatic righting device for the reinforcement cage and the vibratory hammer comprises a vibratory hammer locator (1) and a sliding device (2); the sliding device (2) is mounted in a mode of sliding up and down; the vibratory hammer locator (1) comprises a vertically arranged sleeve (101) which is fixedly connected to the sliding device (2). The construction method for utilizing the automatic righting device for the reinforcement cage and the vibratory hammer comprises the following steps of (1) preparing; (2) lifting and aligning; (3) implanting the reinforcement cage.

Description

Movable reinforcement cage, vibration hammer auto-strengthening device and its construction method
Technical field
The present invention relates to field of civil engineering, more particularly to a kind of aid for filling pile construction field and its Construction method.
Background technology
In filling pile construction field, the implantation that hangs of steel reinforcement cage is an important construction link.For long spire perfusion The bored concrete pile of stake and the bar planting after interior first cast concrete of bidirectional screw soil compaction bored concrete pile, due to the resistance work of cast-in-place concrete With leading to that the difficulty inserted using steel reinforcement cage self gravitation is very big, perpendicularity is difficult to ensure that, therefore, first irrigates at present simultaneously The technique implanting filling pile cage of reinforcement after concrete needs to assist using vibration hammer, so that it is successfully inserted at by vibrating steel reinforcement cage Specified location.Vibration hammer must loosen the steel wire rope of upper lifting in vibration, but the problem brought therewith is: vibration hammer because Lack support and shift, so that the steel reinforcement cage of insertion pile body is followed and offset, had a strong impact on bored pile piling quality.This apply Work quality problems generally existing in pile foundation construction industry at present, does not have the technical solution of maturation so far.
Content of the invention
The technical problem to be solved in the present invention is that offer is a kind of makes steel reinforcement cage can keep under the effect of vibration of vibration hammer Plumbness implants movable reinforcement cage, vibration hammer auto-strengthening device and its construction method of cast-in-place concrete pile.
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, including vibration hammer localizer and the dress that slides Put, described carriage slides up and down installation, described vibration hammer localizer includes a sleeve being vertically arranged, and described sleeve is fixed It is connected on carriage, described carriage includes the first plate, a side of described first plate is fixed with two pieces mutually The second parallel plate, described first plate and the second plate are designed with the roller for sliding up and down, the lower port of described sleeve It is shaped as trumpet type, that is, the bore of lower port becomes larger from top to bottom, described sleeve passes through in an extension arm and carriage The first plate be fixedly connected, described extension arm is fixedly connected on the first plate side relative with the second plate.
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, wherein said extension arm is a steel pipe, institute State steel pipe and include the first steel pipe and the second steel pipe, one end of the first steel pipe is welded on the first panel, and the other end of the first steel pipe leads to Cross flange and bolt to be fixedly connected with the second steel pipe, the other end of the second steel pipe is fixed with described sleeve, flange is near slip Device side is arranged.
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, wherein said first plate is provided with lifting hole(eyelet).
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, wherein said first plate and described second The junction of plate is provided with ribbed stiffener.
Utilization movable reinforcement cage in the present invention, the construction method of vibration hammer auto-strengthening device, walk including following Rapid:
1) preparation: pile work drilling machine is in place, is drilled stake holes concrete perfusion according to projected depth, vibration hammer upper and lower End is separately installed with guiding steel pipe, and guiding steel pipe is coaxially arranged with vibration hammer, the guiding steel pipe composition of vibration hammer and its upper and lower side Vibration hammer system, vibration hammer lower end guiding steel pipe is penetrated in steel reinforcement cage in ground level, and steel reinforcement cage is fixed with vibration hammer Connect, the first steel wire rope decentralization of steel reinforcement cage will be hung, and pass through the sleeve on auto-strengthening device, the first steel from top to bottom Cord lower end is guided steel pipe by vibration hammer upper end and is connected with vibration hammer top;
2) lift by crane and be aligned: after hanging to whole steel reinforcement cage and vibration hammer system, adjust boom hoisting position, make the first steel Cord, steel reinforcement cage, vibration hammer are in vertical state and make steel reinforcement cage align piles position hole simultaneously placed in the middle;
3) implanted reinforced bar cage: the position of carriage to be controlled is to ensure vibration hammer in the whole process of steel reinforcement cage implantation Upper end guiding steel pipe all the time in sleeve to reach auto-strengthening effect, the upper end guiding steel pipe of vibration hammer can in sleeve It is freely moved up and down, and its transverse shifting is limited, in steel reinforcement cage implantation operation, first rely on the deadweight of steel reinforcement cage slowly to insert Enter bored concrete pile, when relying on deadweight can not continue into, Vibration on Start-up is hammered into shape, loosens the first steel wire rope, so that steel reinforcement cage is made in vibration With the lower continuous connection transferred to projected depth, be then turned off vibration hammer and steel reinforcement cage, then delayed by the continuous shaking of vibration hammer Slowly extract the lower end guiding steel pipe of vibration hammer.
Utilization movable reinforcement cage in the present invention, the construction method of vibration hammer auto-strengthening device, by carriage It is arranged in the vertical rails in front of pile work drilling machine pile frame, it is vertical that the roller on the first plate and the second plate all contacts enforcement with slide rail Slide, the lifting hole(eyelet) of the first plate be connected with the second steel wire rope, the other end of the second steel wire rope is connected on pile frame power head mechanism, Make carriage and the position of pile frame power head mechanism keep being relatively fixed, to be controlled by controlling power head mechanism to move up and down The position of carriage.
Movable reinforcement cage of the present invention, vibration hammer auto-strengthening device and its construction method difference from prior art It is that the present invention can realize the auto-strengthening to vibration hammer with the sleeve that carriage slides up and down by one, will The upper end guiding steel pipe of vibration hammer is interspersed in sleeve, when enabling vibration hammer, controls carriage moving down with vibration hammer And move down, make vibration hammer upper end guide steel pipe be always positioned in sleeve, such vibration hammer be in all the time plumb position without In the vertical direction shifts, and is capable of steel reinforcement cage implantation overall process automatic vertical centering, simple to operate, method is reliable, Efficiency of construction and construction quality are greatly improved.
In utilization movable reinforcement cage in the present invention, the construction method of vibration hammer auto-strengthening device, effectively utilizes Vertical rails in front of pile work drilling machine pile frame, in addition need not configure for movable reinforcement cage, vibration hammer auto-strengthening device Lowering or hoisting gear, makes auto-strengthening device directly be connected with pile frame power head mechanism, package unit and pile frame power head mechanism position Holding is relatively fixed, and can move up and down to control movable reinforcement cage, vibration hammer automatic by controlling power head mechanism The position of erection device is it is ensured that the efficient utilization of resource.
The invention will be further described below in conjunction with the accompanying drawings.
Brief description
Fig. 1 is the movable reinforcement cage in the present invention, the axonometric chart of vibration hammer auto-strengthening device;
Fig. 2 is the movable reinforcement cage in the present invention, the top view of vibration hammer auto-strengthening device;
Fig. 3 is the movable reinforcement cage in the present invention, the use state figure of vibration hammer auto-strengthening device.
Specific embodiment
As shown in figure 1, simultaneously with reference to Fig. 2, the movable reinforcement cage in the present invention, vibration hammer auto-strengthening device include shaking Dynamic hammer localizer 1 and carriage 2, described carriage 2 slides up and down installation, and it is vertical that described vibration hammer localizer 1 includes one Arrangement sleeve 101, the lower port of sleeve 101 be shaped as trumpet type, that is, the bore of lower port becomes larger from top to bottom, institute State sleeve 101 to be fixedly connected on carriage 2.
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, wherein said carriage 2 includes first Plate 201, a side of described first plate 201 is fixed with two blocks of second plates 202 being parallel to each other, described first plate 201 and Roller 203 for sliding up and down is designed with the second plate 202.All it is respectively symmetrically on every block of plate and 4 rollers are equably installed 203, in conjunction with shown in Fig. 3, this 12 rollers 203 are contacted such that it is able to implement vertically movable with the vertical rails 3 in front of pile frame. The junction of the first plate 201 and the second plate 202 is provided with ribbed stiffener 204, for strengthening between the first plate 201 and the second plate 202 Coupling stiffness.
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, wherein said sleeve 101 passes through one and extends Arm is fixedly connected with the first plate 201 in carriage 2, and described extension arm is fixedly connected on the first plate 201 and the second plate 202 phase To side on.
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, wherein said extension arm is a steel pipe, institute State steel pipe and include the first steel pipe 102 and the second steel pipe 103, one end of the first steel pipe 102 is welded on the first plate 201, the first steel The other end of pipe 102 passes through flange 104 and bolt is fixedly connected with the second steel pipe 103, and the other end fixation of the second steel pipe 103 sets There is described sleeve 101, flange 104 is arranged near carriage 2 side.The purpose of setting flange 104 is to change different length Second steel pipe 103 of degree, to meet different duty requirements.
Movable reinforcement cage in the present invention, vibration hammer auto-strengthening device, wherein said first plate 201 is provided with and hangs Hole 205, lifting hole(eyelet) 205 is used for connecting power device, to realize sliding up and down of carriage 2.
Utilization movable reinforcement cage in the present invention, the construction method of vibration hammer auto-strengthening device, walk including following Rapid:
1) preparation: pile work drilling machine is in place, is drilled stake holes concrete perfusion according to projected depth, vibration hammer 4 upper Lower end is separately installed with guiding steel pipe 5,6, and guiding steel pipe 5,6 is coaxially arranged with vibration hammer 4, the leading of vibration hammer 4 and its upper and lower side Form vibration hammer system to steel pipe 5,6, vibration hammer lower end is guided steel pipe 6 and penetrates in steel reinforcement cage 7 in ground level, and by reinforcing bar Cage 7 is fixedly connected with vibration hammer 4, and the first steel wire rope 8 hanging steel reinforcement cage 7 is transferred, and passes through auto-strengthening from top to bottom Sleeve 101 on device, the first steel wire rope 8 lower end is guided steel pipe 5 by vibration hammer upper end and is connected with vibration hammer 4 top;
2) lift by crane and be aligned: after hanging to whole steel reinforcement cage 7 and vibration hammer system, adjust boom hoisting position, make first Steel wire rope 8, steel reinforcement cage 7, vibration hammer 4 are in vertical state and make steel reinforcement cage 7 align piles position hole simultaneously placed in the middle;
3) implanted reinforced bar cage: the position of carriage 2 to be controlled is to ensure to vibrate in the whole process of steel reinforcement cage 7 implantation The upper end guiding steel pipe 5 of hammer 4 all the time sleeve 101 in reach auto-strengthening effect, the upper end of vibration hammer 4 guides steel pipe 5 and exists Can be freely moved up and down in sleeve 101, and its transverse shifting is limited, in steel reinforcement cage 7 implantation operation, first rely on reinforcing bar Bored concrete pile is slowly inserted in the deadweight of cage 7, when relying on deadweight can not continue into, Vibration on Start-up hammer 4, and loosen the first steel wire rope 8, So that steel reinforcement cage 7 is continuously transferred to projected depth under effect of vibration, be then turned off the connection of vibration hammer 4 and steel reinforcement cage 7, then pass through The lower end guiding steel pipe 6 of vibration hammer 4 is slowly extracted in the continuous shaking of vibration hammer 4.
As shown in figure 3, utilization movable reinforcement cage in the present invention, the construction method of vibration hammer auto-strengthening device, Carriage 2 is arranged in the vertical rails 3 in front of pile work drilling machine pile frame, the roller on the first plate 201 and the second plate 202 203 all contact with slide rail enforcement vertically slidable, the lifting hole(eyelet) 205 of the first plate 201 is connected with the second steel wire rope 9, the second steel wire rope 9 The other end be connected on pile frame power head mechanism, make the position of carriage 2 and pile frame power head mechanism keep being relatively fixed, Move up and down the position to control carriage 2 by controlling power head mechanism.
The each spot size parameter of carriage 2 in the present invention determines according to the size of the vertical rails 3 in front of pile frame, set The internal diameter size of cylinder 101 to determine, that is, the internal diameter of sleeve 101 is than vibration hammer according to the diameter that vibration hammer upper end guides steel pipe 5 Upper end guides the big 2-3 of diameter of steel pipe 5.
Embodiment described above is only that the preferred embodiment of the present invention is described, the not model to the present invention Enclose and be defined, on the premise of without departing from design spirit of the present invention, the technical side to the present invention for the those of ordinary skill in the art Various modifications and improvement that case is made, all should fall in the protection domain of claims of the present invention determination.

Claims (6)

1. a kind of movable reinforcement cage, vibration hammer auto-strengthening device, including vibration hammer localizer (1) and carriage (2), Described carriage (2) slides up and down installation, and described vibration hammer localizer (1) includes a sleeve (101) being vertically arranged, described Sleeve (101) is fixedly connected on carriage (2), and described carriage (2) includes the first plate (201), described first plate (201) two blocks of second plates (202) being parallel to each other, described first plate (201) and the second plate (202) are fixed with a side On be designed with for sliding up and down roller (203), the lower port of described sleeve (101) be shaped as trumpet type, i.e. lower port Bore become larger from top to bottom it is characterised in that: described sleeve (101) is passed through in an extension arm and carriage (2) First plate (201) is fixedly connected, and described extension arm is fixedly connected on the first plate (201) side relative with the second plate (202).
2. movable reinforcement cage according to claim 1, vibration hammer auto-strengthening device it is characterised in that: described stretch Long-armed is a steel pipe, and described steel pipe includes the first steel pipe (102) and the second steel pipe (103), one end welding of the first steel pipe (102) On the first plate (201), the other end of the first steel pipe (102) passes through flange (104) and bolt and the second steel pipe (103) is fixing even Connect, the other end of the second steel pipe (103) is fixed with described sleeve (101), flange (104) sets near carriage (2) side Put.
3. movable reinforcement cage according to claim 2, vibration hammer auto-strengthening device it is characterised in that: described One plate (201) is provided with lifting hole(eyelet) (205).
4. movable reinforcement cage according to claim 3, vibration hammer auto-strengthening device it is characterised in that: described One plate (201) is provided with ribbed stiffener (204) with the junction of described second plate (202).
5., using the movable reinforcement cage described in claim 4, the construction method of vibration hammer auto-strengthening device, its feature exists In: comprise the following steps,
1) preparation: pile work drilling machine is in place, is drilled stake holes concrete perfusion according to projected depth, vibration hammer (4) upper and lower End is separately installed with guiding steel pipe (5,6), and guiding steel pipe (5,6) is coaxially arranged with vibration hammer (4), vibration hammer (4) and its upper and lower Guiding steel pipe (5,6) the composition vibration hammer system at end, vibration hammer lower end guiding steel pipe (6) is penetrated steel reinforcement cage in ground level (7) in, and steel reinforcement cage (7) is fixedly connected with vibration hammer (4), the first steel wire rope (8) decentralization of steel reinforcement cage (7) will be hung, And from top to bottom pass through auto-strengthening device on sleeve (101), the first steel wire rope (8) lower end by vibration hammer upper end guide steel Pipe (5) is connected with vibration hammer (4) top;
2) lift by crane and be aligned: after hanging to whole steel reinforcement cage (7) and vibration hammer system, adjust boom hoisting position, make the first steel Cord (8), steel reinforcement cage (7), vibration hammer (4) are in vertical state and make steel reinforcement cage (7) align piles position hole simultaneously placed in the middle;
3) implanted reinforced bar cage: the position of carriage (2) to be controlled is to ensure to vibrate in the whole process that steel reinforcement cage (7) is implanted Upper end guiding steel pipe (5) of hammer (4) all the time sleeve (101) in reach auto-strengthening effect, the upper end of vibration hammer (4) guides Steel pipe (5) can be freely moved up and down in sleeve (101), and its transverse shifting is limited, and implants operation in steel reinforcement cage (7) In, first rely on the deadweight of steel reinforcement cage (7) slowly to insert bored concrete pile, when relying on deadweight can not continue into, Vibration on Start-up is hammered into shape (4), loosen the first steel wire rope (8), so that steel reinforcement cage (7) is continuously transferred to projected depth under effect of vibration, be then turned off vibrating Hammer (4) and the connection of steel reinforcement cage (7), then steel is guided by the lower end that vibration hammer (4) is slowly extracted in the continuous shaking of vibration hammer (4) Pipe (6).
6. construction method according to claim 5 it is characterised in that: carriage (2) is arranged on pile work drilling machine pile frame In the vertical rails (3) in front, the first plate (201) all contacts enforcement vertically with the roller (203) on the second plate (202) with slide rail Slide, the lifting hole(eyelet) (205) of the first plate (201) is connected with the second steel wire rope (9), the other end of the second steel wire rope (9) is connected to On pile frame power head mechanism, carriage (2) and the position of pile frame power head mechanism is made to keep being relatively fixed, by controlling power Head mechanism moves up and down the position to control carriage (2).
CN201510024101.7A 2015-01-19 2015-01-19 Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device Active CN104594353B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510024101.7A CN104594353B (en) 2015-01-19 2015-01-19 Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510024101.7A CN104594353B (en) 2015-01-19 2015-01-19 Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device

Publications (2)

Publication Number Publication Date
CN104594353A CN104594353A (en) 2015-05-06
CN104594353B true CN104594353B (en) 2017-01-18

Family

ID=53120380

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510024101.7A Active CN104594353B (en) 2015-01-19 2015-01-19 Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device

Country Status (1)

Country Link
CN (1) CN104594353B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105421342A (en) * 2015-11-04 2016-03-23 上海十三冶建设有限公司 Reinforcement cage feeding method of long auger drilling press-grouting pile

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP3625892B2 (en) * 1995-04-24 2005-03-02 株式会社鴻池組 Construction method of underground structure using precast concrete column
CN103161155A (en) * 2011-12-19 2013-06-19 毕建东 Pile machine special for immersed tube pressure filling pile, using method thereof and application thereof
CN102787600B (en) * 2012-05-17 2014-11-12 中国一冶集团有限公司 Precise control method of steel pile inserting verticality
CN202925545U (en) * 2012-11-28 2013-05-08 烟台海州机械有限公司 Guide sleeve special for steel reinforcement cage
CN203625888U (en) * 2013-09-30 2014-06-04 王汉良 Novel cage insertion equipment for bored pile machine
CN204608784U (en) * 2015-01-19 2015-09-02 宁波市坤德创新岩土工程有限公司 Movable reinforcement cage, vibrating hammer auto-strengthening device

Also Published As

Publication number Publication date
CN104594353A (en) 2015-05-06

Similar Documents

Publication Publication Date Title
CN107217910A (en) Supply line's electric pole plants lever apparatus and its plants bar method
CN213476877U (en) Vibration pile sinking device
AU2007314059B2 (en) System for mounting a pile driver
CN107938666B (en) Pile end inner hammering pile sinking with pile shoe and synchronous end grouting structure and process
CN101550693B (en) Method for reinforcing base with bored pile in the underground structure of high groundwater level
CN104594353B (en) Movable automatic righting device for reinforcement cage and vibratory hammer and construction method of device
CN210370522U (en) Drilling pile machine provided with double guide rails and double drilling machines
CN106869125B (en) A kind of steel pipe pile construction method
CN106468058A (en) A kind of architectural engineering fluid pressure type static pile press
CN204608784U (en) Movable reinforcement cage, vibrating hammer auto-strengthening device
CN207277312U (en) A kind of compacting pile construction device
CN207193962U (en) A kind of overhead transmission line concrete precast pipe pile is implanted into pile-driving system
CN207193959U (en) A kind of filling pile cage of reinforcement carries fixing device
CN212479071U (en) Guiding device for construction of SMW construction method pile and SMW construction method pile construction equipment
CN101349059A (en) New technique of long screw driller for press pouring reinforced concrete
CN209384226U (en) A kind of Manual hole pile digging device in shifting sand layers
CN110424390A (en) A kind of pile-grafting machine of prefabricated pile implantation
KR101882192B1 (en) Multi punching device for grouting method to road subsided by weak ground
CN206784370U (en) A kind of steel reinforcement cage positioner
CN110410019B (en) Drilling pile machine with double guide rails and double drilling machines
CN205954609U (en) High frequency compaction grooving bridge type ground is wall construction professional equipment even
CN109797635A (en) A kind of automatic construction method of concrete-pouring template for construction of the highway and corollary apparatus
CN203625888U (en) Novel cage insertion equipment for bored pile machine
CN219469424U (en) Hoisting tool for empty piles of reinforcement cage
KR102586201B1 (en) File construction apparatus

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information

Address after: 315048 B2 801, R & D Park, Lane 999, sailing Road, hi tech Zone, Zhejiang, Ningbo

Applicant after: Zhejiang Kun innovation Geotechnical Engineering Co., Ltd.

Applicant after: MCC Central Research Institute of Building and Construction Co., Ltd.

Address before: 315048 B2 801, R & D Park, Lane 999, sailing Road, hi tech Zone, Zhejiang, Ningbo

Applicant before: NINGBO KUNDE INNOVATIVE GEOTECHNICAL ENGINEERING CO., LTD.

Applicant before: MCC Central Research Institute of Building and Construction Co., Ltd.

COR Change of bibliographic data
C14 Grant of patent or utility model
GR01 Patent grant