CN104594281B - Running dispatching diagram drawing method capable of enabling comprehensive benefits of reservoir to be optimal - Google Patents
Running dispatching diagram drawing method capable of enabling comprehensive benefits of reservoir to be optimal Download PDFInfo
- Publication number
- CN104594281B CN104594281B CN201410565138.6A CN201410565138A CN104594281B CN 104594281 B CN104594281 B CN 104594281B CN 201410565138 A CN201410565138 A CN 201410565138A CN 104594281 B CN104594281 B CN 104594281B
- Authority
- CN
- China
- Prior art keywords
- water
- year
- output
- day part
- combination
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02B—HYDRAULIC ENGINEERING
- E02B1/00—Equipment or apparatus for, or methods of, general hydraulic engineering, e.g. protection of constructions against ice-strains
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E60/00—Enabling technologies; Technologies with a potential or indirect contribution to GHG emissions mitigation
Abstract
The invention discloses a running dispatching diagram drawing method capable of enabling comprehensive benefits of a reservoir to be optimal. The method comprises the following steps that 1, all-period breakage-proof water level or water quantity, water supply limiting water level or water quantity and water abandoning prevention water level or water quantity combinations meeting the annual design water supply guarantee ratio are calculated; 2, water supply quantity value indexes of all periods are set; 3, the water supply quantities of all periods within the year of the water supply quantity combinations meeting the annual design water supply guarantee ratio are multiplied by the value indexes of the corresponding periods; 4, the combination with the maximum whole-year water supply quantity value is extracted from all the combinations in the step 3. The problem that in tradition typical year method calculation, due to the fact that typical years and year number selection vary with each individual, different design persons draw different dispatching diagrams is solved, and the problem that the whole breakage year is removed through a breakage year removal method, and the water supply guarantee ratio samples of all periods within the year are reduced is solved. Water resources can be fully utilized, the running safety and reliability of the reservoir are improved, and the difference of the water supply quantities within different periods can be reflected.
Description
Technical field
The present invention relates to a kind of traffic control drawing drawing method for making reservoir comprehensive benefit optimum, belongs to reservoir operational management
Technical field.
Background technology
Multiple purpose reservoir ruuning situation becomes a mandarin closely related with reservoir, and the change of natural river flow is often relatively more multiple
Miscellaneous, at present because scientific level is limited, can't forecast with unerring accuracy following long-period runoff process, and this storehouse operation of just feeding water brings
Very big difficulty.In order to be able to reasonably carry out dam safety evaluation, water resource is made full use of on the basis of safe and reliable, needed in run duration
The objective criteria for wanting a reservoir of planning strategies for store, discharge water, here it is using the starting point of graph of reservoir operation.
Graph of reservoir operation by tamper-proof line, limit supply line and it is anti-abandon the water levels such as waterline or water-retention discharge hydrograph is constituted, this
A little graphs are divided into several dispatch areas scheduling graph.When reservoir level or reservoir storage Luo Mou area, area's defined is just pressed
Quantity is discharging water.Graph of reservoir operation is the instrument for instructing year or carry-over storage operation, it assumes that past Streamflow Data is anti-
Following hydrologic regime is reflected, is formed using Streamflow Data drafting is lasted.
Reservoir operation is carried out using scheduling graph, the twenties in 20th century is started from, is proposed by Soviet Union scholar AA Vladimir Morozovs,
So far still it is widely used.It is using last Streamflow Data be adjusted calculate, various scheduling schemes are safely solved partially
The scope of application, i.e., for same decision-making (as ensured to supply water or increasing, reduce supplying water), with the hydrology of respective respective design fraction
The outer envelope curve of the various reservoir levels being likely to occur of situation is required scheduling line, and constitutes scheduling graph by them.According to scheduling
Figure carries out reservoir operation, can reach:When meeting with design low flow year, reservoir can guarantee that and each use water by method of operation work is ensured
The requirement of the normal water requirement in family and water level;When meeting with flat, high flow year, reservoir can be carried out by way of supplying water is increased, can be reasonably
Increase the output to each water user;When meeting with the special low flow year, reservoir can reasonably reduce each by way of supplying water work is reduced
The output of water user, to mitigate the normal benefit of each water user and effect loss of energy;Design flood is met with flood season or check mark
During quasi- flood, can guarantee that dam safety is passed the flood period, or meet with downstream flood control standard flood, the flood control requirement of sheltered ground can be met.
The method for drafting of annual-storage reservoir scheduling graph
1st, the drafting of tamper-proof line
According to the statistics of reservoir run-off, from the several of the close design dependability Po of the year water yield (or delivery period water yield)
The typical cases of different distribution become a mandarin process in individual year, and repair by the year water yield (or the delivery period water yield) control of respective design fraction
Just, i.e., the runoff process of each Typical Year is zoomed in or out by certain ratio so that their the year water yield (or delivery period water
Amount) it is equal to the analog value in design dependability time.Then from the beginning of from the end of term of supplying water by level of dead water, the Runoff adjustment of inverse time sequence is carried out
Calculate, obtain to the water-retention beginning by the reservoir storage (or water level) at the beginning of the period, it is desirable to which water-retention beginning water level is equal to level of dead water.Anti-
In pushing away calculating process, when water storage level reaches normal pool level, reservoir works by natural reservoir inflow.Take each year reservoir level process
Upper envelope curve be tamper-proof line.The all Fuzzy Period of Runoff Series (not being controlled scaling) after the destruction time can also be rejected, be pressed
Said method Extrapolation year by year, takes the upper envelope curve of reservoir level process over the years, as tamper-proof line.
2nd, the drafting of forced partial outage (water supply) line
Forced partial outage (water supply) line is inquired into tamper-proof line similar approach, and up time sequence is adjusted calculating, and draws each year water
Reservoir filling process, it is exactly forced partial outage (water supply) line then to remove envelope curve.
3rd, prevent abandoning the drafting of waterline
According to two Phase flow statistics of variables data, entered for the typical case of 1-Po from the fraction of the year water yield or the wet season water yield
Storehouse runoff process, power station discharges water by maximum discharge capacity or works by installed capacity, is opened by normal pool level from the water-retention end of term
Begin, inverse time sequence is counter to push away each moon reservoir level, to normal pool level is reached in delivery period, the reservoir level for connecting day part is as prevented abandoning
Waterline.Conditional power station, can calculate a series of actual measurement water year according to said method, but should not include these years
Year water yield is the time water yield of 1-Po more than fraction, then takes the interior envelope curve of each year reservoir level, as prevents abandoning waterline.
The method for drafting of carry-over storage scheduling graph
1st, the drafting of tamper-proof line
Method one:Select the time with such two Phase flow process to be the 1 calculating year, i.e., in the year, self-water-supplying
End of term reservoir stores full overyear storage and starts, and inverse time sequence is adjusted calculating, and to water-retention end of term reservoir level normal storage is reached
Water level, and the water-retention beginning reservoir level that arrives just has returned to the storage of overyear storage and worked to the last minute, in this year the interior water yield is much, no
Many, the reservoir level for connecting day part is tamper-proof line.If necessary, the unfavorable Typical Year of several Tendency analysis, the water yield can be chosen
Scale by proper proportion control, then carry out the regulating calculation of inverse time sequence, take the upper envelope curve of each year reservoir level process, as prevent broken
Bad line.
Method two:Using hydroelectric station design low water section two Phase flow process, self-water-supplying end of term reservoir stores full storage capacity for many years and opens
Begin, inverse time sequence is adjusted calculating, and takes the outer envelope curve of each year reservoir level graph, as tamper-proof line.
2nd, the drafting of forced partial outage (water supply) line
Method one:The time with such two Phase flow process is selected to be the 1 calculating year, from the end of term and the stagnant water of supplying water
Position starts, and carries out inverse time sequence regulating calculation, still disappears and drops down onto level of dead water to water-retention beginning reservoir level, and in this year the interior water yield is not
Less, seldom, the reservoir level for connecting day part is forced partial outage (water supply) line.
Method two:Aforementioned tamper-proof line is translated downwards, makes the water supply end of term and water-retention beginning reservoir level Chong Die with level of dead water,
As limit supply line.
3rd, prevent abandoning the drafting of waterline
The carry-over storage very high for regulation performance, can not draw it is anti-abandon waterline because this kind of reservoir abandons the water yield
It is general little, and abandon regimen condition and mostly occur in the flood season of continuous high flow year group, and the utilization of raising head can make up abandon water and
The electric quantity loss for causing, therefore often by normal pool level exerting oneself area as increasing down to tamper-proof line area above.
The deficiency of traditional method:Traditional method can be divided into Typical Year method when runoff process is chosen and remove the destruction time
Method.Typical Year method is the typical cases of different distribution in the several years for select the year water yield (or delivery period water yield) close design dependability Po
Become a mandarin process, and by the year water yield (or delivery period water yield) the control amendment of respective design fraction, i.e., by certain ratio by each allusion quotation
The runoff process in type year is zoomed in or out so that their the year water yield (or delivery period water yield) is equal to the design dependability time
Analog value;It is all Fuzzy Period of Runoff Series that scaling is not controlled after rejecting destroys the time to remove destruction time method.Using typical case
Year method exists in real work to be chosen and varies with each individual to Typical Year time, year, the scheduling for causing different designs personnel to draw
Figure is different.Variation analyses deficiency of the destruction time method to the fraction period is removed, water supply project is in design typically with year guarantee
Rate is designed, and scheduling graph then embodies day part in year and ensures water supply fraction, destruction is removed the whole year in time, it is possible to make year
Interior day part water supply fraction sample reduces, and affects the drafting precision of day part line in scheduling graph year.In addition, traditional method is calculated
The safe and reliable of reservoir operation operation guaranteed extent is paid attention in principle and theoretical foundation on the basis of water supply meets fraction, only,
Consideration shortcoming is made full use of to water resource;In one-year age, the requirement of quantity and guaranteed extent of the water user to supplying water is different
, such as rice ear sprouting period than the soaked field phase with greater need for supply water ensure, the power station withered phase come the water yield number carry out the water yield than flood season
The impact of how many pairs of annual electricity generating capacities is bigger, but traditional method does not more embody difference of the delivery period importance in different periods.
The content of the invention
It is an object of the present invention to provide a kind of traffic control drawing drawing method for making reservoir comprehensive benefit optimum, to solve
The deficiency of certainly existing reservoir operation drawing drawing method.
Technical scheme:
A kind of traffic control drawing drawing method for making reservoir comprehensive benefit optimum, the method is drawn according to the following steps:
The first step, meet year output design dependability the tamper-proof water level of day part or the water yield, limit water level or
The water yield, anti-abandon water water level or water yield combination calculation;
Second step, sets up day part output value index nember;
3rd step, meet year output design dependability output combination year in day part output be multiplied by correspondence the period valency
Value index number;
4th step, extracts the combination of annual output value numerical value maximum in all combinations of the 3rd step as graph of reservoir operation
Drafting foundation.
In preceding method, the first step calculates all day parts for meeting year output design dependability by zooming
Tamper-proof water level or the water yield, limit water level or the water yield, anti-abandon water water level or water yield combination, i.e., every group water level or the equal energy of the water yield
The time for making N=(n+1) × Po in two Phase flow sequence meets year designed supply capacity, other time destructions, is unsatisfactory for what is required
Exclude, when calculating the tamper-proof water level of day part or the water yield and preventing abandoning water water level or water yield combination, meet year output design and ensure
If occurring a certain water level or the water yield for combining one of them period in rate combination is more than another combination, but design year output achievement
It is constant, at this moment retain the low or little combination of the water level or the water yield of this period;Calculate day part and limit water level or water yield group
During conjunction, if meeting occur in year output design dependability combination a certain water level or the water yield for combining one of them period more than another
One combination, but design year output achievement is constant, at this moment retains the high or big combination of the water level or the water yield of this period.
In preceding method, the Po is design dependability, and n is two Phase flow sequence year.With water lev el control, it is accurate to
cm;With water rate control, ten thousand m are accurate to3。
In preceding method, the output value index nember in the second step is weighted value or ratio value.
In preceding method, the second step is to set up day part output value in year for different water user's concrete conditions
Index;Output value index nember can be economic numerical value, such as unit/m3, or relative weighting, such as 1.1 or 1.2;In a word, use
The indoor day part output value index nember of water is set up for practical situation.If day part output value index nember is equal,
Then day part output value index nember is 1.
In preceding method, it is described state the 4th step statistics meet year output design dependability output combination year in it is each when
Section output is multiplied by the year total value of correspondence period value index nember, and total value maximum time in year corresponding tamper-proof line, limit are extracted respectively
Supply line processed, anti-waterline of abandoning adopt drafting line as graph of reservoir operation.
Compared with prior art, the present invention based on two Phase flow sequence data year by year by the period calculate, it is to avoid tradition
Typical Year method is chosen and is varied with each individual in calculating to Typical Year time, year, and the scheduling graph for causing different designs personnel to draw is different
Problem, while calculating all time day parts, it is to avoid remove destruction the time method will destroy the whole year in time remove, make
The problem that day part water supply fraction sample reduces in year;In addition can except the safety for paying attention to reservoir operation operation guaranteed extent
Lean on, and pay attention to making full use of water resource, and introduce reflection delivery period different periods water yield value index, to reflect water supply
Measure the important gender gap in different periods.
Description of the drawings
Fig. 1 is present system flow chart;
Fig. 2 is that the present invention meets the tamper-proof water level of day part or the water yield of year output design dependability, limits water supply water
Position or the water yield, anti-abandon water water level or water yield combination calculation system flow chart;
Fig. 3 is that day part output value index nember sets up schematic diagram in year of the invention;
Fig. 4 is the computing system flow chart of day part output value variance in present invention reflection year;
Fig. 5 is the extraction system flow chart that annual output is worth numerical value greatest combined in all combinations of the invention.
Specific embodiment
With reference to the accompanying drawings and examples the present invention is described in further detail, but not as to any of the present invention
Limit.
A kind of traffic control drawing drawing method for making reservoir comprehensive benefit optimum, as shown in Figure 1.The method is according to the following steps
Draw:
The first step, meets the tamper-proof water level of the day part (or water yield) of year output design dependability, forced partial outage and (supplies
Water) water level (or water yield), anti-abandon water water level (or water yield) combination calculation.
This step is computationally intensive, need to set up on the basis of zooming.By zooming, calculate it is all meet year output design
The tamper-proof water level of the day part (or water yield) of fraction, forced partial outage (water supply) water level (or water yield), anti-abandon water water level (or water
Amount) combination, i.e., every group water level (or water yield) meet can the time of N=(n+1) × Po in two Phase flow sequence to be designed in year
The water yield, other time destructions.It is unsatisfactory for desired exclusion.Calculate the tamper-proof water level (or water yield) of day part and prevent abandoning water water level
When (or water yield) is combined, if meeting occur in year output design dependability combination a certain water level for combining one of them period
(or water yield) is more than another combination, but design year output achievement is constant, and the water level (or water yield) at this moment retaining this period is low
The combination of (little);When calculating day part forced partial outage (water supply) water level (or water yield) combination, year output design dependability is met
If occurring a certain water level (or water yield) for combining one of them period in combination is more than another combination, but design year output achievement
It is constant, at this moment retain the combination of the water level (or water yield) height (big) of this period.
Explanation:Po is design dependability, and n is two Phase flow sequence year.With water lev el control, it is proposed that be accurate to cm;With water
Amount control, it is proposed that be accurate to ten thousand m3。
Second step, sets up day part output to be worth (weight, ratio etc.) index.
Day part output value index nember in year is set up for different water user's concrete conditions.Output value index nember can be with
It is economic numerical value, such as unit/m3, or relative weighting, such as 1.1,1.2, and so on.In a word, day part is supplied in water user
Water yield value index nember is set up for practical situation.If day part output value index nember is equal, day part output
Value index nember is 1.
3rd step, meet year output design dependability output combination year in day part output be multiplied by correspondence the period valency
Value index number.
4th step, the maximum combination of annual output value numerical value in all combinations of extraction step three.
Statistics meets day part output in the year of year output design dependability output combination and is multiplied by correspondence period valency
The year total value of value index number, extracts respectively total value maximum time in year corresponding tamper-proof line, limits supply line, prevents abandoning waterline as water
Storehouse scheduling graph is using drafting line.
In order to solve the deficiency of existing reservoir operation drawing drawing method, the present invention provides the side that a kind of graph of reservoir operation is drawn
Method, based on two Phase flow sequence data, according to tamper-proof line, forced partial outage (water supply) line, prevents that abandon waterline is calculated with conventional method
Go out tamper-proof water level (or water yield), forced partial outage (water supply) water level of all day parts for meeting year output design dependability
(or water yield), the anti-all combinations for abandoning water water level (or water yield), then calculate one by one a year output according to combinations thereof, take all
Combine the maximum corresponding tamper-proof line of combination of middle aged output, forced partial outage (water supply) line, prevent abandoning waterline as reservoir operation
Figure is using drafting line.
In order to embody the difference of day part output importance in year, for different water user's concrete conditions day part is set up
Output is worth (weight, ratio etc.) index.Meet year output design dependability combination and calculate day part water supply in year one by one
Amount, day part output is multiplied by correspondence period value index nember in year, and the value numerical value for taking annual output in all combinations is maximum
The corresponding tamper-proof line of combination, forced partial outage (water supply) line, anti-abandon waterline as graph of reservoir operation using drawing line.
Of the invention is exactly mainly year by year by period calculating based on the long sequence data of two Phase flow, it is to avoid traditional Typical Year
Method is chosen and is varied with each individual in calculating to Typical Year time, year, the problem for causing the scheduling graph that different designs personnel draw different,
All time day parts are calculated simultaneously, it is to avoid remove destruction time method and remove destruction the whole year in time, cause in year
The problem that day part water supply fraction sample reduces.Be embodied in simultaneously it is safe and reliable on the basis of make full use of water resource principle, and
And water user's day part output value index nember is set up, embody difference of the delivery period importance in different periods.
When being embodied as, the said method of the present invention can be processed using traditional computer.
Embodiment
This example is chosen certain service reservoir runoff regulation with year regulation performance and is illustrated as example, tool
Body realizes that process is as follows:
First, engineering data
Reservoir engineering task is supplied water to county town.Reservoir operation scheme 511.00m, the following storage capacity of normal pool level
1734m3, level of dead water 496m, the m of minimum capacity of a reservoir 3,340,0003, utilizable capacity 1400m3, project scale is medium-sized, and project scale or rank of project is III etc..
County town water supply fraction P=95%, year 30100000 m of designed supply capacity3, and the annual uniform m of the decentralization environment water yield 6,150,0003。
Two Phase flow that engineering is adopted series for 1963~2009 years totally 46 years (water years) (5~August is by ten days) month by month
Average run-off.
2nd, meet the tamper-proof water yield of day part of year output design dependability, limit water-supply quantity combination calculation
The tamper-proof storage capacity of day part for meeting year output design dependability calculated using conventional Calculation Method is combined into
Fruit is shown in Table 1, and the day part for meeting year output design dependability calculated using conventional Calculation Method is limited for reservoir capacity combination
Achievement is shown in Table 2.The tamper-proof storage capacity combination day part output achievement for meeting year output design dependability is shown in Table 3, meets year
The restriction of output design dependability is shown in Table 4 for reservoir capacity combination day part output achievement.
This example is controlled with the water yield, and it is 10,000 m that the water yield adjusts calculation amplitude3.(there is no increasing and supply water in urban water supply, therefore
This engineering is not calculated prevents abandoning waterline)
3rd, day part output value index nember is set up
All it is identical according to day part output value index nember in its importance analysis county town water supply year.In order to embody year
Impact of the interior day part output value index nember difference to scheduling figure line shape, this example artificially sets up the discrepant confession of day part
Water yield value index nember.Using economic numerical value, identical element/m3.Day part output value index nember is shown in Table 5 in year.
4th, meet year output design dependability output and respectively combine economic indexes calculation
Day part output value in year is multiplied by the tamper-proof water yield combination of day part for meeting year output design dependability
Index, is met year tamper-proof water yield of output design dependability day part and respectively combines economic indicator, and it is total to count year over the years
Value, calculating process is shown in Table 6;Day part in year is multiplied by the day part restriction water-supply quantity combination for meeting year output design dependability
Output value index nember, is met a year output design dependability day part restriction water-supply quantity and respectively combines economic indicator, and
Year total value over the years is counted, calculating process is shown in Table 7.
5th, the maximum combination of the economic numerical value of extraction year total supply.
Day part output economic worth achievement (table 6) is combined from the tamper-proof storage capacity for meeting year output design dependability
In as can be seen that 17 years total economic numerical value of combination is maximum, be 15497 yuan, then extract and meet each of year output design dependability
The tamper-proof storage capacity of day part of combination 17 is used as the tamper-proof storage capacity of employing for drawing scheduling graph in period tamper-proof storage capacity (table 1)
Line;Combine in day part output economic worth achievement (table 7) for reservoir capacity from the restriction for meeting year output design dependability
As can be seen that 7 years total economic numerical value of combination is maximum, and be 15454 yuan, then extract the day part for meeting year output design dependability
Limit the day part restriction for combining 7 in reservoir capacity (table 2) and supply reservoir capacity as the employing restriction for drawing scheduling graph for reservoir capacity
Line.Draw the tamper-proof storage capacity line of employing of scheduling graph, restriction and be shown in Table 8 for reservoir capacity line achievement.
Table 5:Day part water yield value index nember in year
Period | Value index nember (unit/ten thousand m3) |
3 the end of month | 3 |
4 the end of month | 3 |
The first tenday period of a month Mo in May | 5 |
Mid-May Mo | 6 |
Late May Mo | 6 |
Early June Mo | 7 |
Mid-June Mo | 8 |
Late June Mo | 8 |
Early July Mo | 8 |
Mid-July Mo | 8 |
Late July Mo | 8 |
Early August Mo | 8 |
Mid-August Mo | 8 |
Late August Mo | 8 |
September end | 7 |
10 the end of month | 6 |
11 the end of month | 5 |
12 the end of month | 4 |
1 the end of month | 3 |
2 the end of month | 2 |
3 the end of month | 2 |
Table 8:Draw the tamper-proof storage capacity line of employing of scheduling graph, limit for reservoir capacity line achievement
Period | Tamper-proof line (ten thousand m3) | Limit supply line (ten thousand m3) |
3 the end of month | 334 | 334 |
4 the end of month | 518 | 334 |
The first tenday period of a month Mo in May | 390 | 334 |
Mid-May Mo | 395 | 334 |
Late May Mo | 370 | 334 |
Early June Mo | 344 | 334 |
Mid-June Mo | 344 | 334 |
Late June Mo | 376 | 334 |
Early July Mo | 632 | 334 |
Mid-July Mo | 709 | 334 |
Late July Mo | 1305 | 334 |
Early August Mo | 1726 | 334 |
Mid-August Mo | 1726 | 334 |
Late August Mo | 1681 | 334 |
September end | 1636 | 334 |
10 the end of month | 1640 | 334 |
11 the end of month | 1278 | 334 |
12 the end of month | 1066 | 334 |
1 the end of month | 825 | 430 |
2 the end of month | 568 | 371 |
3 the end of month | 334 | 334 |
Claims (1)
1. a kind of traffic control drawing drawing method for making reservoir comprehensive benefit optimum, it is characterised in that:The method is according to the following steps
Draw:
The first step, by zooming calculate all tamper-proof water levels of day part or the water yield for meeting year output design dependability,
Limit water level or the water yield, prevent abandoning water water level or water yield combination, i.e., every group water level or the water yield can make N in two Phase flow sequence
=(n+1)The time of × Po meets year designed supply capacity, in the two Phase flow sequence expression formula:Po is design dependability, and n is
Two Phase flow sequence year;Cm is accurate to during with water lev el control;Ten thousand m are accurate to during with water rate control3;Other time destructions, no
The exclusion that satisfaction is required, when calculating the tamper-proof water level of day part or the water yield and preventing abandoning water water level or water yield combination, meets year water supply
If occurring a certain water level or the water yield for combining one of them period in amount design dependability combination is more than another combination, but design year
Output achievement is constant, at this moment retains the low or little combination of the water level or the water yield of this period;Calculate day part and limit water supply water
Position or the water yield combine when, if meet year output design dependability combination in occur it is a certain combine one of them period water level or
The water yield is more than another combination, but design year output achievement is constant, and the water level or the water yield at this moment retaining this period is high or big
Combination,
Second step, sets up day part output value index nember;
3rd step, output combination:Day part output is multiplied by correspondence period value index nember in year should meet a year output design
Fraction;
4th step, extracts maximum combination the painting as graph of reservoir operation of annual output value numerical value in all combinations of the 3rd step
Foundation processed.
2. method according to claim 1, it is characterised in that:Output value index nember in the second step be weighted value or
Ratio value.
3. method according to claim 1, it is characterised in that:The day part output value index nember is set up to be in the second step
Day part output value index nember in year is set up for different water user's concrete conditions;Output value index nember is economic numerical value,
Day part output value index nember is set up for practical situation in water user's year, if day part output value index nember is equal
, then day part output value index nember is 1.
4. method according to claim 1, it is characterised in that:Extract complete in all combinations of the 3rd step described in 4th step
The maximum combination of year output value numerical value as graph of reservoir operation drafting according to being that statistics meets year output design and ensures
Day part output is multiplied by the year total value of correspondence period value index nember in the year of rate output combination, and year total value maximum is extracted respectively
Time corresponding tamper-proof line, forced partial outage supply line, anti-waterline of abandoning adopt drafting line as graph of reservoir operation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410565138.6A CN104594281B (en) | 2014-10-22 | 2014-10-22 | Running dispatching diagram drawing method capable of enabling comprehensive benefits of reservoir to be optimal |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410565138.6A CN104594281B (en) | 2014-10-22 | 2014-10-22 | Running dispatching diagram drawing method capable of enabling comprehensive benefits of reservoir to be optimal |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104594281A CN104594281A (en) | 2015-05-06 |
CN104594281B true CN104594281B (en) | 2017-04-19 |
Family
ID=53120308
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410565138.6A Active CN104594281B (en) | 2014-10-22 | 2014-10-22 | Running dispatching diagram drawing method capable of enabling comprehensive benefits of reservoir to be optimal |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104594281B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106638448B (en) * | 2016-08-03 | 2020-02-07 | 湖北省水利水电规划勘测设计院 | Drawing method and calculating method of secondary runoff regulation and dispatching diagram of reservoir mainly based on urban and rural water supply and irrigation |
CN111862265A (en) * | 2020-06-19 | 2020-10-30 | 中国电建集团昆明勘测设计研究院有限公司 | Hydropower station water storage period scheduling graph compilation method based on water level control and application |
CN112529339A (en) * | 2021-01-12 | 2021-03-19 | 黄河勘测规划设计研究院有限公司 | Method for optimizing reservoir power generation dispatching diagram by using improved particle swarm optimization |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101714186A (en) * | 2009-12-29 | 2010-05-26 | 北京师范大学 | Method of optimizing and determining water supply type reservoir dispatching diagram considering human and ecological needs |
CN102004835A (en) * | 2010-11-26 | 2011-04-06 | 武汉大学 | Power generation risk-oriented hydropower station optimal operation chart drawing method |
CN102708248A (en) * | 2012-05-10 | 2012-10-03 | 湖北省电力公司 | Dispatching function optimization method based on multi-objective genetic algorithm |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20140136171A1 (en) * | 2012-11-13 | 2014-05-15 | Chevron U.S.A. Inc. | Unstructured Grids For Modeling Reservoirs |
-
2014
- 2014-10-22 CN CN201410565138.6A patent/CN104594281B/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101714186A (en) * | 2009-12-29 | 2010-05-26 | 北京师范大学 | Method of optimizing and determining water supply type reservoir dispatching diagram considering human and ecological needs |
CN102004835A (en) * | 2010-11-26 | 2011-04-06 | 武汉大学 | Power generation risk-oriented hydropower station optimal operation chart drawing method |
CN102708248A (en) * | 2012-05-10 | 2012-10-03 | 湖北省电力公司 | Dispatching function optimization method based on multi-objective genetic algorithm |
Also Published As
Publication number | Publication date |
---|---|
CN104594281A (en) | 2015-05-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10825113B2 (en) | Method for short-term generation scheduling of cascade hydropower plants coupling cluster analysis and decision tree | |
CN105096004B (en) | A kind of multi-reservoir supplies water transfer system real-time scheduling method | |
CN106485346A (en) | A kind of series-parallel connection reservoir impoundment ahead Multiobjective Optimal Operation method | |
CN104594281B (en) | Running dispatching diagram drawing method capable of enabling comprehensive benefits of reservoir to be optimal | |
CN104091240B (en) | Hydropower station hierarchical scheduling method and system with combination of medium and long term forecasts | |
CN105068567A (en) | Water supply network regulation and storage method based on water tank | |
CN102080366A (en) | Method for drawing joint scheduling graph of step reservoir | |
CN107609679A (en) | The preferred method for drafting of multi-parameter and system of a kind of annual-storage reservoir power generation dispatching figure | |
CN108985585A (en) | It is a kind of to consider the uncertain Reservoir Flood utilization of resources venture countermeasure decision-making technique influenced of forecast | |
CN115099477A (en) | Reservoir drought limit water level optimization and drought resisting scheduling method | |
CN114358379A (en) | Optimization method, device and system for dry water limit level dispatching line of cascade reservoir | |
CN104594282B (en) | A kind of reservoir capacity adjustment drawing drawing method | |
Kracman et al. | Stochastic optimization of the highland lakes system in Texas | |
CN108090671B (en) | Cross-basin load distribution method for multi-stage inter-domain-intra-domain feedback iteration | |
CN108876199A (en) | A kind of commercial bid evaluation method based on multidimensional Weighted Fuzzy Study on similar degree method | |
CN109886543B (en) | Reservoir optimal scheduling method based on uniform design | |
Dudley et al. | Integrating irrigation water demand, supply, and delivery management in a stochastic environment | |
CN106638448B (en) | Drawing method and calculating method of secondary runoff regulation and dispatching diagram of reservoir mainly based on urban and rural water supply and irrigation | |
Obersteiner et al. | Influence of market rules on the economic value of wind power: an Austrian case study | |
Morabito et al. | The quality of service provided by the irrigation department to the users associations, Tunuyan System, Mendoza, Argentina | |
CN110991759A (en) | Comprehensive utilization reservoir water storage and discharge rule making method considering forecast information | |
Umetsu et al. | The efficient management of water user associations: the case of Lower Seyhan Irrigation Project in Turkey | |
Awadallah et al. | An integrated water resources and economic approach for optimizing water allocation policies | |
Chebotareva | The Impact of Political Risk on the Economic Efficiency of Russian Renewable Energy Projects | |
CN107292414A (en) | The resident's distribution online optimal selection method predicted based on peak-valley electric energy |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 550002 No. 27 South Baoshan Road, Nanming District, Guizhou, Guiyang Patentee after: Guizhou water conservancy and Hydropower Survey, design and Research Institute Co., Ltd Address before: 550002 No. 27 South Baoshan Road, Nanming District, Guizhou, Guiyang Patentee before: GUIZHOU SURVEY & DESIGN Research Institute FOR WATER RESOURCES AND HYDROPOWER |
|
CP01 | Change in the name or title of a patent holder |