The content of the invention
The defect of the switching that capacitor switching technology of the present invention just to prior art is present not in time is thrown there is provided a kind of electric capacity
Blanking method and device, can be according to the optimal capacitor switching group of the undercompensation capacity or overcompensation calculation of capacity of current electric grid
Close, and switching operation is carried out to the corresponding capacitance of capacitor box according to optimal capacitor switching combination, switching is timely, compensation effect
It is good.
The present invention solve its technical problem use technical scheme be:A kind of capacitor switching method, including following step are provided
Suddenly:
The capacity for the electric capacity being had been put into S11, detection current electric grid undercompensation capacity and capacitor box;
S12, by undercompensation capacity and the capacity having been put into summation to obtain total capacity;
S13, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided put into capacitor combination;
S14, according to the first preset strategy from it is described put into capacitor combination in select optimal input capacitor combination;
S15, according to it is described it is optimal input capacitor combination in the capacitor box corresponding capacitance carry out switching.
Preferably, the capacitor box includes multichannel electric capacity, is encoded per road electric capacity according to its compensation capacity, from first tool
The electric capacity for having maximum compensation capacity starts, and the compensation capacity of each road electric capacity is maximum compensation capacity afterwards.
Preferably, the described first default plan includes one or more following substrategy:
The substrategy of minimum foundation is shaken with power network;
With the substrategy for the minimum foundation of electric capacity quantity that work is participated in after switching;
With the substrategy of electric capacity by the number of times of switching at least for foundation;
For identical capacity electric capacity with the most short substrategy for foundation of working time;
With the substrategy of response speed most soon for foundation.
A kind of capacitor switching method is provided, comprised the following steps:
The capacity of the electric capacity cut off in S21, detection current electric grid overcompensation capacity and capacitor box;
S22, by overcompensation capacity and the capacity cut off summation to obtain total capacity;
S23, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided cut off capacitor combination;
S24, according to the second preset strategy from it is described cut off capacitor combination in select optimal excision capacitor combination;
S25, according to it is described it is optimal excision capacitor combination in the capacitor box corresponding capacitance carry out switching.
Preferably, the capacitor box includes multichannel electric capacity, is encoded per road electric capacity according to its compensation capacity, from first tool
The electric capacity for having maximum compensation capacity starts, and the compensation capacity of each road electric capacity is maximum compensation capacity afterwards.
Preferably, second preset strategy includes one or more following substrategy:
The substrategy of minimum foundation is shaken with power network;
With the substrategy for the minimum foundation of electric capacity quantity that work is participated in after switching;
With the substrategy of electric capacity by the number of times of switching at least for foundation;
For identical capacity electric capacity with the substrategy of the up to foundation of working time;
With the substrategy of response speed most soon for foundation.
A kind of capacitor switching method is provided, comprised the following steps:
S300, the state of current electric grid is judged for undercompensation state or overcompensation state, if undercompensation state is then held
Row step S301-S305, if overcompensation state then performs step S306-S310;
The capacity for the electric capacity being had been put into S301, detection current electric grid undercompensation capacity and capacitor box;
S302, by undercompensation capacity and the capacity having been put into summation to obtain total capacity;
S303, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided put into capacitor combination;
S304, according to the first preset strategy from it is described put into capacitor combination in select optimal input capacitor combination;
S305, according to it is described it is optimal input capacitor combination in the capacitor box corresponding capacitance carry out switching;
The capacity of the electric capacity cut off in S306, detection current electric grid overcompensation capacity and capacitor box;
S307, by overcompensation capacity and the capacity cut off summation to obtain total capacity;
S308, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided cut off capacitor combination;
S309, according to the second preset strategy from it is described cut off capacitor combination in select optimal excision capacitor combination;
S310, according to it is described it is optimal excision capacitor combination in the capacitor box corresponding capacitance carry out switching.
A kind of capacitor switching device is provided, including:
First detection unit, the appearance for detecting the electric capacity being had been put into current electric grid undercompensation capacity and capacitor box
Amount;
First sum unit, for undercompensation capacity and the capacity having been put into be summed to obtain total capacity;
Capacitor combination computing unit can be put into, total appearance can be provided by being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box
That measures puts into capacitor combination;
Optimal input capacitor combination selecting unit, for according to the first preset strategy from it is described put into capacitor combination in select
Select out optimal input capacitor combination;
First control unit, for being carried out according to the optimal input capacitor combination to the corresponding capacitance in the capacitor box
Switching.
A kind of capacitor switching device is provided, including:
Second detection unit, the appearance for detecting the electric capacity cut off in current electric grid overcompensation capacity and capacitor box
Amount;
Second sum unit, for overcompensation capacity and the capacity cut off to be summed to obtain total capacity;
Capacitor combination computing unit can be cut off, total appearance can be provided by being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box
That measures cuts off capacitor combination;
Optimal excision capacitor combination selecting unit, for according to the second preset strategy from it is described cut off capacitor combination in select
Select out optimal excision capacitor combination;
Second control unit, for being carried out according to the optimal excision capacitor combination to the corresponding capacitance in the capacitor box
Switching.
A kind of capacitor switching device is provided, including:
Judging unit, for judging the state of current electric grid for undercompensation state or overcompensation state;
First detection unit, for current electric grid be undercompensation state when, detection current electric grid undercompensation capacity and
The capacity for the electric capacity being had been put into capacitor box;
First sum unit, for undercompensation capacity and the capacity having been put into be summed to obtain total capacity;
Capacitor combination computing unit can be put into, total appearance can be provided by being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box
That measures puts into capacitor combination;
Optimal input capacitor combination selecting unit, for according to the first preset strategy from it is described put into capacitor combination in select
Select out optimal input capacitor combination;
First control unit, for being carried out according to the optimal input capacitor combination to the corresponding capacitance in the capacitor box
Switching;
Second detection unit, for when current electric grid state is overcompensation state, detecting current electric grid overcompensation capacity
And the capacity of the electric capacity cut off in capacitor box;
Second sum unit, for overcompensation capacity and the capacity cut off to be summed to obtain total capacity;
Capacitor combination computing unit can be cut off, total appearance can be provided by being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box
That measures cuts off capacitor combination;
Optimal excision capacitor combination selecting unit, for according to the second preset strategy from it is described cut off capacitor combination in select
Select out optimal excision capacitor combination;
Second control unit, for being carried out according to the optimal excision capacitor combination to the corresponding capacitance in the capacitor box
Switching.
The capacitor switching method and device of the present invention has the advantages that:Can be according to the undercompensation of current electric grid
Capacity or the optimal capacitor switching combination of overcompensation calculation of capacity, and according to phase of the optimal capacitor switching combination to capacitor box
Electric capacity is answered to carry out switching operation, can be according to the timely switching capacitance of actual conditions of power network, and the electricity that switching is brought can be reduced
Net concussion.
Embodiment
The embodiment of the present invention provides a kind of capacitor switching method and device, solve in existing capacitor switching technology by
In every time can only one electric capacity of switching and the defect of the switching that causes not in time, by the undercompensation capacity according to current electric grid or
The optimal capacitor switching combination of person's overcompensation calculation of capacity, and according to corresponding capacitance of the optimal capacitor switching combination to capacitor box
Switching operation is carried out, so that capacitor switching is timely and reactive-load compensation effect is good.
Below in conjunction with drawings and examples the present invention will be further explained explanation.
Fig. 1 is the flow chart of the capacitor switching method first embodiment of the present invention, as shown in figure 1, in the present embodiment, electricity
Hold operation/cutting method to comprise the following steps:
The capacity for the electric capacity being had been put into S11, detection current electric grid undercompensation capacity and capacitor box;
S12, by undercompensation capacity and the capacity having been put into summation to obtain total capacity;
S13, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided put into capacitor combination;
S14, according to the first preset strategy from it is described put into capacitor combination in select optimal input capacitor combination;
S15, according to it is described it is optimal input capacitor combination in the capacitor box corresponding capacitance carry out switching.
The capacitor switching method of the present invention can apply to static var compensator (SVGC), and SVGC is based on the actual need of power network
What is compensated is idle, switching operation is carried out to the electric capacity in capacitor box, so as to provide corresponding compensation capacity for power network.
Specifically, in step s 11, the under-compensated capacity of static var compensator detection current electric grid (also need to for
Power network provide compensation capacity), and the electric capacity being had been put into capacitance present cabinet capacity (capacity having been compensated for).
In the present embodiment, capacitor box includes multichannel electric capacity, is encoded per road electric capacity according to its compensation capacity, has maximum benefit from first
The electric capacity for repaying capacity starts, and the compensation capacity of each road electric capacity is maximum compensation capacity afterwards.That is, a capacitor box pair
Should a kind of coding, in capacitor box the way of the way of electric capacity and coding can it is same can also be different.Different situations are for example, be encoded to
1:2:3:6 capacitor box only has the first via electric capacity that three road electric capacity, i.e. compensation capacity are 1Kvar, and compensation capacity is the of 2Kvar
Two road electric capacity, compensation capacity is 3Kvar the 3rd road electric capacity, and the 4th road electric capacity can not be used.Identical situation is for example, be encoded to 1:
2:3:6 capacitor box has the first via electric capacity that four road electric capacity, i.e. compensation capacity are 1Kvar, and compensation capacity is 2Kvar the second tunnel
Electric capacity, the 3rd road electric capacity that compensation capacity is 3Kvar and the 4th road electric capacity that compensating electric capacity is 6Kvar.In addition, it is assumed that electric capacity
Cabinet using N roads coding (N belongs to natural number), first there is maximum be encoded to X roads (X be less than or equal to N), then the
The coding on X road to N roads is maximum.The corresponding electric capacity of 1 coding to X-1 roads is referred to as to adjust electric capacity, X is arrived on road
The corresponding electric capacity of coding on N roads is referred to as maximum capacitor, and the order of adjustment electric capacity can be random, but must be with coding pair
Should, such as 1.3.2.6 coding, the compensation capacity of the capacity on first to fourth road be successively 1Kvar, 3Kvar, 2Kvar and
6Kvar。
Because since first electric capacity with maximum compensation capacity, the compensation capacity of each road electric capacity is maximum afterwards
Compensation capacity, capacitive encoder such as 1:1:1:1、1:2:4:4:、1:1:2:4、1:2:3:6 and 1:2:3:6:6, such electric capacity is compiled
Code have a feature, when electric capacity in capacitor box way be more than or equal to adjustment electric capacity way when, maximum compensation capacity with
Interior any compensation capacity can be realized by the combination of electric capacity.When the way of electric capacity is less than the way for adjusting electric capacity,
Any compensation capacity within maximum compensation capacity in capacitor combination closest to the capacitor combination of the compensation capacity by realizing.
Now so that the way of electric capacity is more than the way of adjustment electric capacity and is equal to the way of coding as an example, such as 1:2:3:6 coding, it first
The capacity of road electric capacity is 1Kvar, and the capacity of the second road electric capacity is 2Kvar, and the capacity of the 3rd road electric capacity is 3Kvar and the 4th tunnel
The capacity of electric capacity is 6Kvar, maximum capacity be arbitrary integer capacity in 6Kvar, 1-6Kvar can by 1,2,3 and 6 group
Close to realize.
In step s 12, static var compensator is by the under-compensated capacity of current electric grid and the appearance of electric capacity having been put into
Amount is summed, and obtains total capacity.With 1:2:3:Exemplified by 6, the under-compensated capacity of current electric grid is 4Kvar, in four road electric capacity
Second road electric capacity, which has been put into, to be used, and the total capacity (not putting into total undercompensation capacity during electric capacity) that both summations are drawn is 4+
2=6Kvar.
In step s 13, what is calculated in capacitive encoder and step S12 of the static var compensator according to capacitor box is total
The combination of the electric capacity of total capacity can be provided in capacity, the multichannel electric capacity for calculating capacitor box, you can input capacitor combination.As before
The total capacity calculated in example, step S12 is 6Kvar, and the capacitive encoder of capacitor box is 1:2:3:6, therefore, it is possible to provide
6Kvar capacitor combination is 1:2:3 and 6 both, i.e., put into the first via simultaneously and to the 3rd tunnel or only put into the 6th tunnel.It is right
It is less than the situation of the way of adjustment electric capacity in the way of electric capacity, selects the compensation capacity that can be provided closest to the total appearance calculated
The capacitor combination of amount.
Static var compensator stores the first preset strategy, will be according to the first preset strategy from step in step S14
What S13 was calculated, which put into capacitor combination, selects optimal input capacitor combination.First preset strategy include with next or
The multiple substrategys of person:Minimum (i.e. the capacitance of synchronization switching is minimum) is shaken for the substrategy of foundation, with throwing with power network
The substrategy of the minimum foundation of electric capacity quantity of work, the son with electric capacity by the number of times of switching at least for foundation are participated in after cutting
Strategy, for identical capacity electric capacity with the most short substrategy for foundation of working time and with most fast (the i.e. institute of response speed
State that can to put into the action of capacitor switching in capacitor combination minimum) be foundation substrategy.User can select according to the actual needs
Arbitrary substrategy is combined.
When using the substrategy with the minimum foundation of the capacitance of synchronization switching, power network concussion is enabled to most
Smallization.Such as precedent, the capacitor combination that puts into selected in step s 13 is 1:2:3 and 6, and the second road electric capacity thrown
Enter.If selection 1:2:3 combinations, then need successively the input first via and the 3rd road electric capacity, and power network synchronization needs to bear 3 lists
The concussion that bit capacity is caused.If selection 6 is combined, need to cut off the second road electric capacity, put into the 4th road electric capacity, power network synchronization
It is subjected to the concussion that 6 specific capacitances are caused.Therefore, according to the sub- plan of the minimum foundation of the capacitance of synchronization switching
Slightly, 1 will be selected:2:3 are combined as most preferably putting into capacitor combination.
When the substrategy for the minimum foundation of electric capacity quantity for participating in work after using with switching, electricity can be protected well
Hold the multiplex circuit in cabinet.Such as precedent, the capacitor combination that puts into selected in step s 13 is 1:2:3 and 6, and second
Road electric capacity has been put into.If selection 1:2:3 combinations, then need 3 electric capacity in work, it is meant that the first to the 3rd tunnel totally 3 electricity
Appearance is subject loss.If selection 6 is combined, need to cut off the second road electric capacity, put into the 4th road electric capacity, only the 4th road electric capacity
In loss.Therefore, according to the substrategy for the minimum foundation of electric capacity quantity that work is participated in after switching, selection 6 is combined as most
Good input capacitor combination.
Because the switching frequency of electric capacity is limited, therefore use with electric capacity by the number of times of switching at least for foundation
Substrategy, the multiplex circuit in capacitor box can be protected well.Each electric capacity per switching once, in static var compensator
Number of times of being breathed freely will increase once.Such as precedent, the capacitor combination that puts into selected in step s 13 is 1:2:3 and
6, and the second road electric capacity has been put into.First via capacitor switching 1 time, the 3rd road capacitor switching 4 times, the 4th road capacitor switching
2 times.Therefore, according to the substrategy with electric capacity by the number of times of switching at least for foundation, selection 6 is combined as optimal input
Capacitor combination.For another example capacitance group is encoded to 1:2:3:4:4:4, now need to compensate 4Kvar capacity, the 4th road electric capacity again
Switching 5 times, the 5th road capacitor switching 4 times, the 6th road capacitor switching 3 times, their capacity is 4, according to switching
Number is criterion, then the 6th tunnel of selection input.
When substrategy for foundation most short with the working time using the electric capacity for identical capacity, work will be preferentially cut off
Make the electric capacity of time length, time of preferentially devoting oneself to work short electric capacity can protect electric capacity well.Capacitance group is encoded to 1:2:
3:4:4:4, now need to compensate 4Kvar capacity again, the time that the four, the 5th and the 6th road electric capacity has worked is respectively
10th, 20 and 30 hours, the capacity of 4 units need to such as be put into, then the 4th road electric capacity of preferential input.
After each switching, it is required for being delayed by switching, therefore works as use to put into electric capacity in capacitor combination
When switching action is at least the substrategy of foundation, most fast response speed can be obtained, target is most reached soon.Such as 1:2:3:6
Coding, each road electric capacity is not put into, now needs to put into the capacity of 6 units, if selection 1:2:3 combinations then need action 3 times, choosing
Select 6 combinations and only need to action once.Therefore, selection 6 is combined, i.e. the 4th road electric capacity is optimal input capacitor combination.
Sometimes, using single substrategy, the optimal input capacitor combination selected is not unique.For example, 1:2:3:
6:6:The capacitance group of 6 codings, has 6 road electric capacity, it is necessary to put into the capacity of 6 units, that is selected in step S13 puts into electricity
Appearance is combined as 6 combinations, and 6 combinations include the 4th road electric capacity, the 5th road electric capacity and the 6th road electric capacity.In step S14, if uniquely
Use that the minimum substrategy for foundation of capacitor switching action in capacitor combination, and input the four, the 5th or the 6th can be put into
Road electric capacity only needs to action once, causes no rule one to select most preferably to put into capacitor combination.At this point it is possible to select from a variety of symbols
It is any in the combination of zygote strategy to select all the way as optimal input capacitor combination.The group of multiple substrategys can also be used
Close.At this time, it may be necessary to be the multiple substrategys distribution priority used, the high substrategy of first the use priority is from can put into capacitance group
Optimal input capacitor combination is selected to obtain the first result in conjunction, if combining not unique in the first result, the use priority time is high
Substrategy select most preferably to put into capacitor combination ... by that analogy from the first result, until selecting unique optimal input
Capacitor combination.For example, for can put into the action of capacitor switching in capacitor combination it is minimum be foundation substrategy distribution highest it is preferential
Level, is to distribute secondary high priority by the substrategy that the number of times of switching is at least foundation with electric capacity, is for identical capacity
Electric capacity minimum priority is distributed with the most short substrategy for foundation of working time, according to priority from high to low suitable
Sequence, can put into capacitor combination using above-mentioned three kinds of substrategys pair and screen, and drawn when using some substrategy unique
Result, then screening terminate.In this embodiment, due to having used the electric capacity of identical capacity with the most short son for foundation of working time
Strategy, and the switching time of electric capacity can not possibly be equal, described is not in that All Policies have all screened the also not unique feelings of result
Condition.But for other substrategys combination when when, it is as a result not unique it is possible that after having screened all word strategies
Situation, now gives tacit consent to and chooses one as most preferably putting into capacitor combination.
Finally in step S15, static var compensator is according to the optimal input capacitor combination pair selected in step S14
Corresponding capacitance in capacitor box carries out switching.
In the first embodiment of the capacitor switching method of the present invention, the electric capacity from first with maximum compensation capacity is opened
Begin, the compensation capacity of each road electric capacity is maximum compensation capacity afterwards, from one to the arbitrary target value between maximum compensation capacity
It is idle can realize seamless compensation, while also efficiently avoid mend or owe mend cause switching concussion, protect well
Electric capacity.Furthermore, optimal input capacitor combination is filtered out from all capacitor combinations put into using the first preset strategy, is led to
The configuration of the first preset strategy is crossed, can further reduce the concussion of power network, and/or preferably protect electric capacity, and/or obtain more
Fast response speed.
Fig. 2 is the flow chart of the capacitor switching method second embodiment of the present invention, as shown in Fig. 2 in the present embodiment, electricity
Hold operation/cutting method to comprise the following steps:
The capacity of the electric capacity cut off in S21, detection current electric grid overcompensation capacity and capacitor box;
S22, by overcompensation capacity and the capacity cut off summation to obtain total capacity;
S23, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided cut off capacitor combination;
S24, according to the second preset strategy from it is described cut off capacitor combination in select optimal excision capacitor combination;
S25, according to optimal excision capacitor combination switching is carried out to the corresponding capacitance in the capacitor box.
Different from the capacitor switching method first embodiment of the present invention, in the present embodiment, concern is primarily with power network mistake
The situation of compensation.
In the step s 21, static var compensator detects capacity (the unnecessary electricity put into of current electric grid overcompensation
Hold), and the electric capacity cut off in capacitance present cabinet capacity (i.e. in excision state electric capacity capacity).In this implementation
In example, capacitor box includes multichannel electric capacity, is encoded per road electric capacity according to its compensation capacity, has maximum compensation capacity from first
Electric capacity start, the compensation capacity of each road electric capacity is maximum compensation capacity afterwards.That is, a capacitor box correspondence is a kind of
Coding, the way of electric capacity same can be differed also with the way encoded.Capacitive encoder such as 1:1:1:1、1:2:4:4:、1:1:2:4、
1:2:3:6 and 1:2:3:6:6.Such capacitive encoder has any compensation capacity within a feature, maximum compensation capacity
It can be realized by the combination of electric capacity.It is equal to the way of coding, 1 with the way of electric capacity:2:3:Exemplified by 6 coding, it first
The capacity of road electric capacity is 1Kvar, and the capacity of the second road electric capacity is 2Kvar, and the capacity of the 3rd road electric capacity is 3Kvar and the 4th tunnel
The capacity of electric capacity is 6Kvar, maximum capacity be arbitrary integer capacity in 6Kvar, 1-6Kvar can by 1,2,3 and 6 group
Close to realize.
In step S22, static var compensator is by the capacity of current electric grid overcompensation and the appearance of electric capacity cut off
Amount is summed, and obtains total capacity.With 1:2:3:Exemplified by 6, during the capacity of current electric grid overcompensation is 4Kvar, four road electric capacity
Second road electric capacity is already cut off (i.e. in excision state), and the total capacity that both summations are drawn is 4+2=6Kvar.
In step S23, it is total that static var compensator is calculated in the capacitive encoder and step S22 according to capacitor box
The combination of the electric capacity of total capacity can be provided in capacity, the multichannel electric capacity for calculating capacitor box, you can excision capacitor combination.As before
The total capacity calculated in example, step S22 is 6Kvar, and the capacitive encoder of capacitor box is 1:2:3:6, therefore, it is possible to provide
6Kvar capacitor combination is 1:2:3 and 6 both (can cut off capacitor combination), i.e., cause the first via as the 3rd tunnel simultaneously
It is in excision state or only causes the 6th tunnel to be in excision state.
Static var compensator stores the second preset strategy, in step s 24 will be according to the second preset strategy from step
What S23 was calculated, which cut off, selects optimal excision capacitor combination in capacitor combination.Second default plan include with next or
Multiple substrategys:Minimum (i.e. the capacitance of synchronization switching is minimum) is shaken for the substrategy of foundation, with switching with power network
Substrategy, the sub- plan with electric capacity by the number of times of switching at least for foundation of the minimum foundation of electric capacity quantity of work are participated in afterwards
Slightly, most soon (can it be cut with the substrategy of the up to foundation of working time and with response speed for the electric capacity of identical capacity
Except capacitor switching action is minimum in capacitor combination) be foundation substrategy.User can select arbitrary according to the actual needs
Substrategy is combined.
When using the substrategy with the minimum foundation of the capacitance of synchronization switching, power network concussion is enabled to most
Smallization.Such as precedent, the capacitor combination that puts into selected in step S23 is 1:2:3 and 6, and the second road electric capacity located
In excision state.If selection 1:2:3 combinations, then need successively the excision first via and the 3rd road electric capacity, and power network synchronization needs
Bear the concussion that 3 unit capacitys are caused.If selection 6 is combined, need to put into the second road electric capacity, then cut off the 4th road electric capacity,
Power network synchronization is subjected to the concussion that 6 specific capacitances are caused.Therefore, it is minimum according to the capacitance with synchronization switching
For the substrategy of foundation, 1 will be selected:2:3 are combined as most preferably cutting off capacitor combination.
When the substrategy for the minimum foundation of electric capacity quantity for participating in work after using with switching, electricity can be protected well
Hold the multiplex circuit in cabinet.Such as precedent, the capacitor combination that cuts off selected in step S23 is 1:2:3 and 6, and second
Road electric capacity is in excision state.If selection 1:2:3 combinations, then need the 4th road electric capacity work, i.e., only 1 electric capacity is being held
By loss.If selection 6 is combined, need to put into the second road electric capacity, cut off the 4th road electric capacity, the first via, the second tunnel and the
Three road electric capacity are in work, bear loss.Therefore, according to the son for the minimum foundation of electric capacity quantity that work is participated in after switching
Strategy, will select 1:2:3 are combined as most preferably cutting off capacitor combination.
Because the switching frequency of electric capacity is limited, therefore use with electric capacity by the number of times of switching at least for foundation
Substrategy, the multiplex circuit in capacitor box can be protected well.Each electric capacity per switching once, in static var compensator
Number of times of being breathed freely will increase once.Such as precedent, the capacitor combination that cuts off selected in step S23 is 1:2:3 and
6, and the second road electric capacity cut off.First via capacitor switching 1 time, the second road capacitor switching 1 time, the 3rd road capacitor switching
4 times, the 4th road capacitor switching 2 times.Therefore, according to the substrategy with electric capacity by the number of times of switching at least for foundation,
Selection 6 is combined as most preferably putting into capacitor combination.For another example capacitance group is encoded to 1:2:3:4:4:4, existing overcompensation 4Kvar
Capacity, the 4th road capacitor switching 5 times, the 5th road capacitor switching 4 times, the 6th road capacitor switching 3 times, their capacity
It is 4, is criterion according to switching frequency, then the 6th road electric capacity of selection input.
When using the electric capacity for identical capacity with the substrategy of working time up to foundation, work will be preferentially cut off
The electric capacity of time length, time of preferentially devoting oneself to work short electric capacity, electric capacity can be protected well.Capacitance group is encoded to 1:2:3:
4:4:4, existing overcompensation 4Kvar capacity, the time that the four, the 5th and the 6th road electric capacity has worked be respectively 10,20 with
And 30 hours, it need to such as cut off the capacity of 4 units, then the 6th road electric capacity of preferential excision.
After each switching, it is required for being delayed by switching, therefore works as use to cut off electric capacity in capacitor combination
When switching action is at least the substrategy of foundation, most fast response speed can be obtained, target is most reached soon.Such as 1:2:3:6
Coding, each road electric capacity has been put into, and now needs to cut off the capacity of 6 units, if selection 1:2:3 combinations then need action 3 times, choosing
Select 6 combinations and only need to action once.Therefore, selection 6 is combined, i.e. the 4th road electric capacity is optimal excision capacitor combination.
Sometimes, using single substrategy, the optimal excision capacitor combination selected is not unique.For example, 1:2:3:
6:6:The capacitance group of 6 codings, has 6 road electric capacity, it is necessary to cut off the capacity of 6 units, that is selected in step S23 cuts off electricity
Appearance is combined as 6 combinations, and 6 combinations include the 4th road electric capacity, the 5th road electric capacity and the 6th road electric capacity.In step s 24, if uniquely
Use so that the minimum substrategy for foundation of capacitor switching action in capacitor combination can be put into, due to the four, the 5th or the 6th tunnel
Electric capacity only needs to action once, causes no rule one to select most preferably to cut off capacitor combination.At this point it is possible to select to meet from a variety of
It is any in the combination of substrategy to select all the way as optimal excision capacitor combination.The combination of multiple substrategys can also be used.
At this time, it may be necessary to be the multiple substrategys distribution priority used, the high substrategy of first the use priority is from can cut off capacitor combination
The middle optimal excision capacitor combination of selection is to obtain the first result, if combining not unique in the first result, the use priority time is high
Substrategy select most preferably to cut off capacitor combination ... by that analogy from the first result, until selecting unique optimal excision
Capacitor combination.For example, for can cut off the action of capacitor switching in capacitor combination it is minimum be foundation substrategy distribution highest it is preferential
Level, is to distribute secondary high priority by the substrategy that the number of times of switching is at least foundation with electric capacity, is for identical capacity
Electric capacity minimum priority is distributed with the substrategy of working time up to foundation, according to the order of priority from high to low,
Capacitor combination can be cut off using above-mentioned three kinds of substrategys pair to screen, and unique knot has been drawn when using some substrategy
Really, then screening terminates.
In the second embodiment of the capacitor switching method of the present invention, due to having the electricity of maximum compensation capacity from first
Appearance starts, and the compensation capacity of each road electric capacity is maximum compensation capacity afterwards, according to coding the characteristics of so that from one to maximum benefit
The overcompensation capacity repaid between capacity can realize seamless excision, efficiently avoid switching concussion, electric capacity is protected well.
Furthermore, optimal excision capacitor combination is filtered out from all resectable capacitor combinations using the second preset strategy, passes through second
The configuration of preset strategy, can further reduce the concussion of power network, and/or preferably protect electric capacity, and/or rung faster
Answer speed.
Fig. 3 is the flow chart of the capacitor switching method 3rd embodiment of the present invention, as shown in figure 3, in the present embodiment, electricity
Hold operation/cutting method to comprise the following steps:
S300, the state of current electric grid is judged for undercompensation state or overcompensation state, if undercompensation state is then held
Row step S301-S305, if overcompensation state then performs step S306-S310;
The capacity for the electric capacity being had been put into S301, detection current electric grid undercompensation capacity and capacitor box;
S302, by undercompensation capacity and the capacity having been put into summation to obtain total capacity;
S303, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided put into capacitor combination;
S304, according to the first preset strategy from it is described put into capacitor combination in select optimal input capacitor combination;
S305, according to it is described it is optimal input capacitor combination in the capacitor box corresponding capacitance carry out switching;
The capacity of the electric capacity cut off in S306, detection current electric grid overcompensation capacity and capacitor box;
S307, by overcompensation capacity and the capacity cut off summation to obtain total capacity;
S308, fall into a trap from the multichannel electric capacity of capacitor box calculate the total capacity can be provided cut off capacitor combination;
S309, according to the second preset strategy from it is described cut off capacitor combination in select optimal excision capacitor combination;
S310, according to optimal excision capacitor combination switching is carried out to the corresponding capacitance in the capacitor box.
The present embodiment and the difference of the embodiment of capacitor switching method first and second are, are provided simultaneously with capacity compensation function
And capacity cuts off function during overcompensation.Detection power network first is in overcompensation state or undercompensation state, then according to inspection
Survey result and carry out capacity compensation or capacity excision operation accordingly.
Fig. 4 is the logic diagram of the first embodiment of capacitor switching device 100 of the present invention, as shown in figure 4, capacitor switching is filled
Putting 100 includes:
First detection unit 10, for detecting the electric capacity being had been put into current electric grid undercompensation capacity and capacitor box
Capacity;
First sum unit 11, for undercompensation capacity and the capacity having been put into be summed to obtain total capacity;
Capacitor combination computing unit 12 can be put into, being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box can provide described total
Capacity puts into capacitor combination;
Optimal input capacitor combination selecting unit 13, for putting into capacitor combination from described according to the first preset strategy
Select optimal input capacitor combination;
First control unit 14, for entering according to the optimal input capacitor combination to the corresponding capacitance in the capacitor box
Row switching.
Specifically, the first detection unit 10 detection under-compensated capacity of current electric grid (also needs to the benefit provided for power network
Repay capacity), and the electric capacity being had been put into capacitance present cabinet capacity (capacity having been compensated for).In the present embodiment,
Capacitor box multichannel electric capacity, is encoded per road electric capacity according to its compensation capacity, and the electric capacity from first with maximum compensation capacity is opened
Begin, the compensation capacity of each road electric capacity is maximum compensation capacity afterwards.That is, an a kind of coding of capacitor box correspondence, electricity
The way of appearance same can also can be differed with the way encoded.Since first electric capacity with maximum compensation capacity, afterwards
The compensation capacity of each road electric capacity is maximum compensation capacity, capacitive encoder such as 1:1:1:1、1:2:4:4:、1:1:2:4、1:2:3:6
And 1:2:3:6:6.Such capacitive encoder has the task combination within a feature, maximum capacity to realize.Now with
The way of electric capacity is identical with the way encoded, and 1:2:3:Exemplified by 6 coding, the capacity of its first via electric capacity is 1Kvar, the second tunnel
The capacity of electric capacity is 2Kvar, and the capacity of the 3rd road electric capacity is 3Kvar and the capacity of the 4th road electric capacity is 6Kvar, maximum capacity
For 6Kvar, the arbitrary integer capacity in 1-6Kvar can be realized by 1,2,3 and 6 combination.
The capacity of electric capacity of first sum unit 11 by the under-compensated capacity of current electric grid with having been put into is summed, and is obtained
To total capacity.With 1:2:3:Exemplified by 6, the under-compensated capacity of current electric grid is 4Kvar, and the second road electric capacity in four road electric capacity is
Come into operation, the total capacity (not putting into total undercompensation capacity during electric capacity) that both summations are drawn is 4+2=6Kvar.
Capacitor combination computing unit 12 can be put into according to the capacitive encoder of capacitor box and the total capacity calculated, electricity is calculated
The combination of the electric capacity of total capacity can be provided in the multichannel electric capacity for holding cabinet, you can input capacitor combination.Such as precedent, what is calculated is total
Capacity is 6Kvar, and the capacitive encoder of capacitor box is 1:2:3:6, it is 1 therefore, it is possible to provide 6Kvar capacitor combination:2:3 and
6 both, i.e., put into the first via simultaneously and as the 3rd tunnel or only put into the 6th tunnel.
The first preset strategy is stored in capacitor switching device 100, the optimal capacitor combination selecting unit 13 that puts into is by basis
First preset strategy from calculate put into capacitor combination in select optimal input capacitor combination.First preset strategy includes
One or more substrategy below:With the substrategy of the minimum foundation of the capacitance of synchronization switching, with ginseng after switching
Substrategy with the minimum foundation of electric capacity quantity of work, with electric capacity be at least the substrategy of foundation by the number of times of switching,
Electric capacity in capacitor combination most short put into for the substrategy of foundation and with described with the working time for the electric capacity of identical capacity
The minimum substrategy for foundation of switching action.User can select arbitrary substrategy to be combined according to the actual needs.
When using the substrategy with the minimum foundation of the capacitance of synchronization switching, power network concussion is enabled to most
Smallization.Such as precedent, the capacitor combination that puts into selected is 1:2:3 and 6, and the second road electric capacity has been put into.If selection 1:
2:3 combinations, then need the successively input first via and the 3rd road electric capacity, and power network synchronization needs to bear 3 unit capacitys to cause
Concussion.If selection 6 is combined, need to cut off the second road electric capacity, put into the 4th road electric capacity, power network synchronization is subjected to 6
The concussion that specific capacitance is caused.Therefore, according to the substrategy of the minimum foundation of the capacitance of synchronization switching, it will select
1:2:3 are combined as most preferably putting into capacitor combination.
When the substrategy for the minimum foundation of electric capacity quantity for participating in work after using with switching, electricity can be protected well
Hold the multiplex circuit in cabinet.Such as precedent, the capacitor combination that puts into selected is 1:2:3 and 6, and the second road electric capacity thrown
Enter.If selection 1:2:3 combinations, then need 3 electric capacity in work, it is meant that totally 3 electric capacity are subject damage on the first to the 3rd tunnel
Consumption.If selection 6 is combined, need to cut off the second road electric capacity, put into the 4th road electric capacity, only the 4th road electric capacity is in loss.Therefore,
According to the substrategy for the minimum foundation of electric capacity quantity for participating in work after switching, selection 6 is combined as most preferably putting into capacitance group
Close.
Because the switching frequency of electric capacity is limited, therefore use with electric capacity by the number of times of switching at least for foundation
Substrategy, the multiplex circuit in capacitor box can be protected well.Each electric capacity per switching once, in static var compensator
Number of times of being breathed freely will increase once.Such as precedent, the capacitor combination that puts into selected is 1:2:3 and 6, and the second road electricity
Appearance has been put into.First via capacitor switching 1 time, the 3rd road capacitor switching 4 times, the 4th road capacitor switching 2 times.Therefore,
According to the substrategy with electric capacity by the number of times of switching at least for foundation, selection 6 is combined as most preferably putting into capacitor combination.Again
For example, capacitance group is encoded to 1:2:3:4:4:4, now need to compensate 4Kvar capacity again, the 4th road capacitor switching 5 times,
Five road capacitor switchings 4 times, the 6th road capacitor switching 3 times, their capacity is 4, be criterion according to switching frequency, then select
Select the 6th tunnel of input.
When substrategy for foundation most short with the working time using the electric capacity for identical capacity, work will be preferentially cut off
The electric capacity of time length, time of preferentially devoting oneself to work short electric capacity, electric capacity can be protected well.Capacitance group is encoded to 1:2:3:
4:4:4, now need to compensate 4Kvar capacity again, the time that the four, the 5th and the 6th road electric capacity has worked is respectively 10,
20 and 30 hours, it need to such as put into the capacity of 4 units, then the 4th road electric capacity of preferential input.
After each switching, it is required for being delayed by switching, therefore works as use to put into electric capacity in capacitor combination
When switching action is at least the substrategy of foundation, most fast response speed can be obtained, target is most reached soon.Such as 1:2:3:6
Coding, each road electric capacity is not put into, now needs to put into the capacity of 6 units, if selection 1:2:3 combinations then need action 3 times, choosing
Select 6 combinations and only need to action once.Therefore, selection 6 is combined, i.e. the 4th road electric capacity is optimal input capacitor combination.
Sometimes, using single substrategy, the optimal input capacitor combination selected is not unique.For example, 1:2:3:
6:6:The capacitance group of 6 codings, has 6 road electric capacity, it is necessary to put into the capacity of 6 units, that is selected in step S13 puts into electricity
Appearance is combined as 6 combinations, and 6 combinations include the 4th road electric capacity, the 5th road electric capacity and the 6th road electric capacity.If unique use to put into
Capacitor switching acts the minimum substrategy for foundation in capacitor combination, and the four, the 5th or the 6th road electric capacity of input is only needed
Act once, cause no rule one to select most preferably to put into capacitor combination.At this point it is possible to select from a variety of groups for meeting substrategy
It is any in conjunction to select all the way as optimal input capacitor combination.The combination of multiple substrategys can also be used.At this time, it may be necessary to be
The multiple substrategys distribution priority used, the high substrategy of first the use priority selects optimal throwing from can put into capacitor combination
Enter capacitor combination and obtain the first result, if combining not unique in the first result, the high substrategy of the use priority time is from first
As a result middle selection is optimal puts into capacitor combination ... by that analogy, until selecting unique optimal input capacitor combination.For example,
For with can put into the action of capacitor switching in capacitor combination it is minimum be foundation substrategy assigned highest priority, be with electric capacity
It is at least time high priority of the substrategy distribution of foundation by the number of times of switching, is the electric capacity for identical capacity with the working time
The most short substrategy for foundation distributes minimum priority, according to the order of priority from high to low, uses above-mentioned three seeds plan
It slightly pair can put into capacitor combination to screen, unique result has been drawn when using some substrategy, then screening terminates.
Finally, the first control unit 14 is entered according to the optimal input capacitor combination selected to the corresponding capacitance in capacitor box
Row switching.
In the first embodiment of the capacitor switching device of the present invention, due to having the electricity of maximum compensation capacity from first
Appearance starts, and the compensation capacity of each road electric capacity is maximum compensation capacity afterwards, according to coding the characteristics of so that from one to maximum benefit
Seamless compensation can be realized by repaying the idle of the arbitrary target value between capacity, while also efficiently avoid the switching mended and caused
Concussion, protects electric capacity well.Furthermore, filtered out using the first preset strategy from all capacitor combinations put into most preferably
Capacitor combination is put into, by the configuration of the first preset strategy, can further reduce the concussion of power network, and/or preferably protect
Electric capacity, and/or obtain faster response speed.
Fig. 5 is the logic diagram of the second embodiment of capacitor switching device 100 of the present invention, as shown in figure 5, in the present embodiment
In, capacitor switching device 100 includes:
Second detection unit 20, for detecting the electric capacity cut off in current electric grid overcompensation capacity and capacitor box
Capacity;
Second sum unit 21, for overcompensation capacity and the capacity cut off to be summed to obtain total capacity;
Capacitor combination computing unit 22 can be cut off, being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box can provide described total
Capacity cuts off capacitor combination;
Optimal excision capacitor combination selecting unit 23, for cutting off capacitor combination from described according to the second preset strategy
Select optimal excision capacitor combination;
Second control unit 24, for entering according to the optimal excision capacitor combination to the corresponding capacitance in the capacitor box
Row switching.
Different from the first embodiment of capacitor switching device 100 of the present invention, in the present embodiment, concern is primarily with power network
The situation of overcompensation.
Second detection unit 20 detects the capacity (the unnecessary electric capacity put into) of current electric grid overcompensation, and current electricity
Hold the capacity (capacity of the electric capacity i.e. in excision state) of the electric capacity cut off in cabinet.In the present embodiment, capacitor box bag
Multichannel electric capacity is included, is encoded per road electric capacity according to its compensation capacity, since first electric capacity with maximum compensation capacity, it
The compensation capacity of Hou Ge roads electric capacity is maximum compensation capacity.That is, an a kind of coding of capacitor box correspondence, the road of electric capacity
Number same can be differed also with the way encoded.Since first electric capacity with maximum compensation capacity, each road electric capacity afterwards
Compensation capacity be maximum compensation capacity, capacitive encoder such as 1:1:1:1、1:2:4:4:、1:1:2:4、1:2:3:6 and 1:2:
3:6:6, such capacitive encoder has the task compensation capacity within a feature, maximum capacity can be by capacitor combination come real
It is existing.It is now identical with the way encoded with the way of electric capacity, 1:2:3:Exemplified by 6 coding, the capacity of its first via electric capacity is
1Kvar, the capacity of the second road electric capacity is 2Kvar, and the capacity of the 3rd road electric capacity is 3Kvar and the capacity of the 4th road electric capacity is
6Kvar, maximum capacity is that the arbitrary integer capacity in 6Kvar, 1-6Kvar can be realized by 1,2,3 and 6 combination.
The capacity of electric capacity of second sum unit 21 by the capacity of current electric grid overcompensation with having cut off is summed, and is obtained
To total capacity.With 1:2:3:Exemplified by 6, the capacity of current electric grid overcompensation be the second road electric capacity in 4Kvar, four road electric capacity
(i.e. in excision state) is removed, the total capacity that both summations are drawn is 4+2=6Kvar.
Capacitor combination computing unit 22 can be cut off according to the capacitive encoder of capacitor box and the total capacity calculated, electricity is calculated
The combination of the electric capacity of total capacity can be provided in the multichannel electric capacity for holding cabinet, you can excision capacitor combination.In such as precedent, step S22
The total capacity calculated is 6Kvar, and the capacitive encoder of capacitor box is 1:2:3:6, therefore, it is possible to provide 6Kvar capacitor combination
For 1:2:3 and 6 both (capacitor combination can be cut off), i.e., simultaneously cause the first via as the 3rd tunnel be in excision state or
Person only causes the 6th tunnel to be in excision state.
Capacitor switching device 100 stores the second preset strategy, and optimal excision capacitor combination selecting unit 23 will be according to the
Two preset strategies from calculate cut off capacitor combination in select optimal excision capacitor combination.Second default plan includes following
One or more substrategy:With the substrategy of the minimum foundation of the capacitance of synchronization switching, to participate in work after switching
The substrategy of the minimum foundation of electric capacity quantity of work, with electric capacity by the number of times of switching at least for the substrategy of foundation, for
The electric capacity of identical capacity is acted with the substrategy of working time up to foundation and can cut off capacitor switching in capacitor combination
Minimum is the substrategy of foundation.User can select arbitrary substrategy to be combined according to the actual needs.
When using the substrategy with the minimum foundation of the capacitance of synchronization switching, power network concussion is enabled to most
Smallization.Such as precedent, the capacitor combination that puts into selected is 1:2:3 and 6, and the second road electric capacity is in excision state.
If selection 1:2:3 combinations, then need successively the excision first via and the 3rd road electric capacity, and power network synchronization needs to bear 3 units
The concussion that capacity is caused.If selection 6 is combined, need to put into the second road electric capacity, then cut off the 4th road electric capacity, power network synchronization
It is subjected to the concussion that 6 specific capacitances are caused.Therefore, according to the sub- plan of the minimum foundation of the capacitance of synchronization switching
Slightly, 1 will be selected:2:3 are combined as most preferably cutting off capacitor combination.
When the substrategy for the minimum foundation of electric capacity quantity for participating in work after using with switching, electricity can be protected well
Hold the multiplex circuit in cabinet.Such as precedent, the capacitor combination that cuts off selected is 1:2:3 and 6, and the second road electric capacity located
In excision state.If selection 1:2:3 combinations, then need the 4th road electric capacity work, i.e., only 1 electric capacity is subject loss.If
Selection 6 is combined, then needs to put into the second road electric capacity, cut off the 4th road electric capacity, the first via, the second tunnel and the 3rd road electric capacity are located
In work, loss is born.Therefore, according to the substrategy for the minimum foundation of electric capacity quantity that work is participated in after switching, it will select
1:2:3 are combined as most preferably cutting off capacitor combination.
Because the switching frequency of electric capacity is limited, therefore use with electric capacity by the number of times of switching at least for foundation
Substrategy, the multiplex circuit in capacitor box can be protected well.Each electric capacity per switching once, in static var compensator
Number of times of being breathed freely will increase once.Such as precedent, the capacitor combination that cuts off selected is 1:2:3 and 6, and the second road electricity
Appearance has been cut off.First via capacitor switching 1 time, the second road capacitor switching 1 time, the 3rd road capacitor switching 4 times, the 4th tunnel
Capacitor switching 2 times.Therefore, according to the substrategy with electric capacity by the number of times of switching at least for foundation, selection 6 is combined as
Optimal input capacitor combination.For another example capacitance group is encoded to 1:2:3:4:4:4, existing overcompensation 4Kvar capacity, the 4th tunnel
Capacitor switching 5 times, the 5th road capacitor switching 4 times, the 6th road capacitor switching 3 times, their capacity is 4, according to throwing
Number of times is cut for criterion, then the 6th road electric capacity of selection input.
When using the electric capacity for identical capacity with the substrategy of working time up to foundation, work will be preferentially cut off
The electric capacity of time length, time of preferentially devoting oneself to work short electric capacity, electric capacity can be protected well.Capacitance group is encoded to 1:2:3:
4:4:4, existing overcompensation 4Kvar capacity, the time that the four, the 5th and the 6th road electric capacity has worked be respectively 10,20 with
And 30 hours, it need to such as cut off the capacity of 4 units, then the 6th road electric capacity of preferential excision.
After each switching, it is required for being delayed by switching, therefore works as use to cut off electric capacity in capacitor combination
When switching action is at least the substrategy of foundation, most fast response speed can be obtained, target is most reached soon.Such as 1:2:3:6
Coding, each road electric capacity has been put into, and now needs to cut off the capacity of 6 units, if selection 1:2:3 combinations then need action 3 times, choosing
Select 6 combinations and only need to action once.Therefore, selection 6 is combined, i.e. the 4th road electric capacity is optimal excision capacitor combination.
Sometimes, using single substrategy, the optimal excision capacitor combination selected is not unique.For example, 1:2:3:
6:6:The capacitance group of 6 codings, has 6 road electric capacity, it is necessary to cut off the capacity of 6 units, and the capacitor combination that cuts off selected is 6
Combination, 6 combinations include the 4th road electric capacity, the 5th road electric capacity and the 6th road electric capacity.If unique use that capacitor combination can be put into
The minimum substrategy for foundation of middle capacitor switching action, because the four, the 5th or the 6th road electric capacity only needs to action once,
No rule one is caused to select most preferably to cut off capacitor combination.At this point it is possible to select arbitrarily to select from a variety of combinations for meeting substrategy
Select out all the way as optimal excision capacitor combination.The combination of multiple substrategys can also be used.At this time, it may be necessary to multiple for what is used
Substrategy distributes priority, and the high substrategy of first the use priority selects most preferably to cut off capacitor combination from can cut off capacitor combination
To obtain the first result, if combining not unique in the first result, the high substrategy of the use priority time is selected from the first result
Optimal excision capacitor combination ... is selected by that analogy, until selecting unique optimal excision capacitor combination.For example, for can cut
It is by switching with electric capacity except the minimum substrategy assigned highest priority for foundation of capacitor switching action in capacitor combination
Number of times is at least time high priority of the substrategy distribution of foundation, be for identical capacity electric capacity with the working time up to according to
According to substrategy distribute minimum priority, according to the order of priority from high to low, can be cut using above-mentioned three kinds of substrategys pair
Except capacitor combination is screened, unique result is drawn when using some substrategy, then screening terminates.When having used
When result is not still unique after some substrategys, then acquiescence chooses one as most preferably putting into capacitor combination.
In the second embodiment of capacitor switching device 100 of the present invention, due to having maximum compensation capacity from first
Electric capacity starts, and the compensation capacity of each road electric capacity is maximum compensation capacity afterwards, the characteristics of according to coding so that from one to maximum
Overcompensation capacity between compensation capacity can realize seamless excision, efficiently avoid switching concussion, electricity is protected well
Hold.Furthermore, optimal excision capacitor combination is filtered out from all resectable capacitor combinations using the second preset strategy, by the
The configuration of two preset strategies, can further reduce the concussion of power network, and/or preferably protect electric capacity, and/or obtain faster
Response speed.
Fig. 6 is the logic diagram of the 3rd embodiment of capacitor switching device 100 of the present invention, as shown in fig. 6, in the present embodiment
In, capacitor switching device 100 includes:
Judging unit 30, for judging the state of current electric grid for undercompensation state or overcompensation state;
First detection unit 10, for current electric grid be undercompensation state when, detection current electric grid undercompensation capacity with
And the capacity for the electric capacity being had been put into capacitor box;
First sum unit 11, for undercompensation capacity and the capacity having been put into be summed to obtain total capacity;
Capacitor combination computing unit 12 can be put into, being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box can provide described total
Capacity puts into capacitor combination;
Optimal input capacitor combination selecting unit 13, for putting into capacitor combination from described according to the first preset strategy
Select optimal input capacitor combination;
First control unit 14, for entering according to the optimal input capacitor combination to the corresponding capacitance in the capacitor box
Row switching;
Second detection unit 20, for when current electric grid state is overcompensation state, the overcompensation of detection current electric grid to be held
The capacity of the electric capacity cut off in amount and capacitor box;
Second sum unit 21, for overcompensation capacity and the capacity cut off to be summed to obtain total capacity;
Capacitor combination computing unit 22 can be cut off, being calculated for being fallen into a trap from the multichannel electric capacity of capacitor box can provide described total
Capacity cuts off capacitor combination;
Optimal excision capacitor combination selecting unit 23, for cutting off capacitor combination from described according to the second preset strategy
Select optimal excision capacitor combination;
Second control unit 24, for entering according to the optimal excision capacitor combination to the corresponding capacitance in the capacitor box
Row switching.
The present embodiment and the difference of the embodiment of capacitor switching device 100 first and second are, are provided simultaneously with capacity compensation
Capacity cuts off function when function and overcompensation.Detection power network first is in overcompensation state or undercompensation state, Ran Hougen
Carry out capacity compensation or capacity excision operation accordingly according to testing result.
The preferred embodiments of the present invention are the foregoing is only, are not intended to limit the invention, for the skill of this area
For art personnel, the present invention can have various modifications and variations.Within the spirit and principles of the invention, that is made any repaiies
Change, equivalent substitution, improvement etc., should be included within scope of the presently claimed invention.