CN104573997A - Distribution network formed map and thematic map application architecture designing method - Google Patents
Distribution network formed map and thematic map application architecture designing method Download PDFInfo
- Publication number
- CN104573997A CN104573997A CN201510048395.7A CN201510048395A CN104573997A CN 104573997 A CN104573997 A CN 104573997A CN 201510048395 A CN201510048395 A CN 201510048395A CN 104573997 A CN104573997 A CN 104573997A
- Authority
- CN
- China
- Prior art keywords
- data
- distribution
- layer
- thematic map
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 41
- 238000000034 method Methods 0.000 title claims abstract description 12
- 238000004458 analytical method Methods 0.000 claims description 14
- 238000004519 manufacturing process Methods 0.000 claims description 9
- 238000010586 diagram Methods 0.000 claims description 6
- 230000002093 peripheral effect Effects 0.000 claims description 6
- 230000001360 synchronised effect Effects 0.000 claims description 6
- 238000005516 engineering process Methods 0.000 claims description 4
- 230000005540 biological transmission Effects 0.000 claims description 3
- 238000004891 communication Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 claims description 3
- 238000005538 encapsulation Methods 0.000 claims description 3
- 238000003860 storage Methods 0.000 claims description 3
- 230000009466 transformation Effects 0.000 claims description 3
- 230000000694 effects Effects 0.000 abstract description 2
- 238000009412 basement excavation Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0631—Resource planning, allocation, distributing or scheduling for enterprises or organisations
- G06Q10/06312—Adjustment or analysis of established resource schedule, e.g. resource or task levelling, or dynamic rescheduling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Health & Medical Sciences (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Entrepreneurship & Innovation (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Operations Research (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Educational Administration (AREA)
- Game Theory and Decision Science (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Primary Health Care (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a distribution network formed map and thematic map application architecture designing method. A definition grid graph management assisting function includes opening-closing setting, grounding setting and electrical topology initialization. By setting opening-closing setting, grounding setting and electrical topology initialization, data are used accurately, quickly and conveniently, so that comprehensive management capability is improved; by using distribution network data in a PMS in realtime, so that effect of a grid graph in scheduling command is fully utilized, and energy of the distribution network data is mined further.
Description
Technical field
The present invention relates to a kind of architecture design method, particularly relate to a kind of distribution one-tenth figure and thematic map application architecture method for designing.
Background technology
Along with the typing of distribution data, and the automatic generation of the grid graph such as service area figure and dispatching system figure, line chart, switchyard figure, basic data perfect, upgrade in time, as the scheduling of core department of power office, how accurately, fast and be convenient to use these data, improve the ability of integrated management, become the next problem that we solve, therefore propose to build distribution thematic map application module.
Summary of the invention
Object of the present invention is just to provide a kind of distribution one-tenth figure and thematic map application architecture method for designing to solve the problem.
The present invention is achieved through the following technical solutions above-mentioned purpose:
The present invention defines grid graph managing auxiliary function and comprises switch set, ground connection set and electric topology initialization, described switch set is the symbol of alternation switch, change the folding condition in attribute simultaneously, the electriferous state of the corresponding circuit of initialization, equipment, switch folding condition in synchronous vacations Unit account of plant, records Operation Log information in systems in which; Described ground connection set is the symbol changing grounding switch, changes the folding condition of grounding switch in attribute, the folding condition of grounding switch in synchronous vacations production system simultaneously, records Operation Log information in systems in which; Described electric topology is initialized as on off state and sets up, and carries out electric state renewal rewards theory, and selected zone or circuit carry out electric state renewal, charged, the not electriferous state of initialization area or line facility; Build distribution become figure and thematic map application architecture for standard management, managing power network resources, asset management, electrical network O&M overhaul management.
Further, in described managing power network resources, comprise network system figure, the figure of the power network resources such as all kinds of grid equipment, facility and user access point, machine account information are managed; All kinds of thematic maps such as network system figure, underground utilities sectional view, operation of power networks environment and electrical network power transmission and transformation three-dimensional picture are managed; Realize peripheral equipment analysis, area equipment analysis, Shortest Path Analysis, equipment wiring relationship analysis, power supply point review, for power failure range analysis and radius of electricity supply analytic function.
Further, described network system figure comprises major network system diagram, service area figure, feeder line communication chart, distribution network systems sketch, distribution network systems detail drawing, network distribution single line diagram and low-voltage platform area.
Further, described electrical network O&M overhaul management comprise scheduling operation management, delisted, the switch set of realizing listing, ground connection set and electric function of initializing.
Further, described distribution one-tenth figure and thematic map application technology framework comprise data Layer, data access layer, application service layer, applied logic layer and presentation layer, described data Layer is that distribution one-tenth figure and thematic map application build based on production management system and power network GIS platform, its application data layer data mainly comprises distribution one-tenth figure and thematic map application data base, primarily of management data and business datum composition, for the service data visitation on upper strata provides information source; Grid equipment data, it provides grid equipment machine account, grid equipment topological data; Spatial data, mainly stores basic map data, electrical network geographical spatial data; Unstructured data, main storage non-relational data, the data for file, picture, photo etc. store.The data access layer that described data access layer is production management system provides the unified Access Management Access of platform base data, business datum; Power network GIS platform safeguards the vector figure data, raster data, grid topology data, attribute data etc. that are stored in database and file by unified data access interface; Described application service layer application service layer provides platform base service and all kinds of service application service.Serve and realized by encapsulation logic module, also can call the service of other operation systems to realize partial function.These services can supply contact bed types of applications, also externally issue by ESB, for peripheral applications system call.Described applied logic layer is that applied logic layer mainly comprises distribution one-tenth figure and thematic map applied business logic module and GIS platform application service assembly two parts.
Beneficial effect of the present invention is:
The invention provides a kind of distribution one-tenth figure and thematic map application architecture method for designing, by arranging switch set, ground connection set and electric topology initialization, accurately, fast and be convenient to use these data, improve the ability of integrated management, by the distribution data in real-time use PMS, make full use of the effect of grid graph in dispatch control, larger excavation distribution data energy.
Embodiment
The invention will be further described below:
The present invention defines grid graph managing auxiliary function and comprises switch set, ground connection set and electric topology initialization, described switch set is the symbol of alternation switch, change the folding condition in attribute simultaneously, the electriferous state of the corresponding circuit of initialization, equipment, switch folding condition in synchronous vacations Unit account of plant, records Operation Log information in systems in which, described ground connection set is the symbol changing grounding switch, changes the folding condition of grounding switch in attribute, the folding condition of grounding switch in synchronous vacations production system simultaneously, records Operation Log information in systems in which, described electric topology is initialized as on off state and sets up, and carries out electric state renewal rewards theory, and selected zone or circuit carry out electric state renewal, charged, the not electriferous state of initialization area or line facility, build distribution become figure and thematic map application architecture for standard management, managing power network resources, asset management, electrical network O&M overhaul management, comprise network system figure in described managing power network resources, the figure of the power network resources such as all kinds of grid equipment, facility and user access point, machine account information are managed, all kinds of thematic maps such as network system figure, underground utilities sectional view, operation of power networks environment and electrical network power transmission and transformation three-dimensional picture are managed, realize peripheral equipment analysis, area equipment is analyzed, Shortest Path Analysis, equipment wiring relationship analysis, power supply point is reviewed, for power failure range analysis and radius of electricity supply analytic function, described network system figure comprises major network system diagram, service area figure, feeder line communication chart, distribution network systems sketch, distribution network systems detail drawing, network distribution single line diagram and low-voltage platform area, described electrical network O&M overhaul management comprises scheduling operation management, realization is listed delisted, switch set, ground connection set and electric function of initializing, described distribution one-tenth figure and thematic map application technology framework comprise data Layer, data access layer, application service layer, applied logic layer and presentation layer, described data Layer is that distribution one-tenth figure and thematic map application build based on production management system and power network GIS platform, its application data layer data mainly comprises distribution one-tenth figure and thematic map application data base, primarily of management data and business datum composition, for the service data visitation on upper strata provides information source, grid equipment data, it provides grid equipment machine account, grid equipment topological data, spatial data, mainly stores basic map data, electrical network geographical spatial data, unstructured data, main storage non-relational data, the data for file, picture, photo etc. store.The data access layer that described data access layer is production management system provides the unified Access Management Access of platform base data, business datum; Power network GIS platform safeguards the vector figure data, raster data, grid topology data, attribute data etc. that are stored in database and file by unified data access interface; Described application service layer application service layer provides platform base service and all kinds of service application service.Serve and realized by encapsulation logic module, also can call the service of other operation systems to realize partial function.These services can supply contact bed types of applications, also externally issue by ESB, for peripheral applications system call.Described applied logic layer is that applied logic layer mainly comprises distribution one-tenth figure and thematic map applied business logic module and GIS platform application service assembly two parts.
Above-described embodiment is preferred embodiment of the present invention, is not the restriction to technical solution of the present invention; As long as without the technical scheme that creative work can realize on the basis of above-described embodiment, all should be considered as falling within the scope of the rights protection of patent of the present invention.
Claims (5)
1. a distribution becomes figure and thematic map application architecture method for designing, it is characterized in that: definition grid graph managing auxiliary function comprises switch set, ground connection set and electric topology initialization, described switch set is the symbol of alternation switch, change the folding condition in attribute simultaneously, the electriferous state of the corresponding circuit of initialization, equipment, switch folding condition in synchronous vacations Unit account of plant, records Operation Log information in systems in which; Described ground connection set is the symbol changing grounding switch, changes the folding condition of grounding switch in attribute, the folding condition of grounding switch in synchronous vacations production system simultaneously, records Operation Log information in systems in which; Described electric topology is initialized as on off state and sets up, and carries out electric state renewal rewards theory, and selected zone or circuit carry out electric state renewal, charged, the not electriferous state of initialization area or line facility; Build distribution become figure and thematic map application architecture for standard management, managing power network resources, asset management, electrical network O&M overhaul management.
2. a kind of distribution according to claim 1 becomes figure and thematic map application architecture method for designing, it is characterized in that: in described managing power network resources, comprise network system figure, the figure of the power network resources such as all kinds of grid equipment, facility and user access point, machine account information are managed; All kinds of thematic maps such as network system figure, underground utilities sectional view, operation of power networks environment and electrical network power transmission and transformation three-dimensional picture are managed; Realize peripheral equipment analysis, area equipment analysis, Shortest Path Analysis, equipment wiring relationship analysis, power supply point review, for power failure range analysis and radius of electricity supply analytic function.
3. a kind of distribution according to claim 2 becomes figure and thematic map application architecture method for designing, it is characterized in that: described network system figure comprises major network system diagram, service area figure, feeder line communication chart, distribution network systems sketch, distribution network systems detail drawing, network distribution single line diagram and low-voltage platform area.
4. a kind of distribution according to claim 1 becomes figure and thematic map application architecture method for designing, it is characterized in that: described electrical network O&M overhaul management comprises scheduling operation management, it is delisted to realize listing, switch set, ground connection set and electric function of initializing.
5. a kind of distribution according to claim 1 becomes figure and thematic map application architecture method for designing, it is characterized in that: described distribution one-tenth figure and thematic map application technology framework comprise data Layer, data access layer, application service layer, applied logic layer and presentation layer, described data Layer is that distribution one-tenth figure and thematic map application build based on production management system and power network GIS platform, its application data layer data mainly comprises distribution one-tenth figure and thematic map application data base, primarily of management data and business datum composition, for the service data visitation on upper strata provides information source; Grid equipment data, it provides grid equipment machine account, grid equipment topological data; Spatial data, mainly stores basic map data, electrical network geographical spatial data; Unstructured data, main storage non-relational data, the data for file, picture, photo etc. store.The data access layer that described data access layer is production management system provides the unified Access Management Access of platform base data, business datum; Power network GIS platform safeguards the vector figure data, raster data, grid topology data, attribute data etc. that are stored in database and file by unified data access interface; Described application service layer application service layer provides platform base service and all kinds of service application service.Serve and realized by encapsulation logic module, also can call the service of other operation systems to realize partial function.These services can supply contact bed types of applications, also externally issue by ESB, for peripheral applications system call.Described applied logic layer is that applied logic layer mainly comprises distribution one-tenth figure and thematic map applied business logic module and GIS platform application service assembly two parts.2 -->
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510048395.7A CN104573997B (en) | 2015-01-30 | 2015-01-30 | Distribution network mapping and thematic map application architecture design method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510048395.7A CN104573997B (en) | 2015-01-30 | 2015-01-30 | Distribution network mapping and thematic map application architecture design method |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104573997A true CN104573997A (en) | 2015-04-29 |
CN104573997B CN104573997B (en) | 2020-10-16 |
Family
ID=53090006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510048395.7A Active CN104573997B (en) | 2015-01-30 | 2015-01-30 | Distribution network mapping and thematic map application architecture design method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104573997B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106845761A (en) * | 2016-12-12 | 2017-06-13 | 国网北京市电力公司 | The detection method and device of power network resources data |
CN107071013A (en) * | 2017-03-30 | 2017-08-18 | 国网福建省电力有限公司 | A kind of the service response method and service system of intelligent substation access regulation and control main website |
CN112019498A (en) * | 2020-07-10 | 2020-12-01 | 贵州电网有限责任公司 | Power grid operation safety monitoring management information system based on GIS system |
CN116166366A (en) * | 2023-04-24 | 2023-05-26 | 国网江西省电力有限公司信息通信分公司 | Automatic one-stop power grid multi-style thematic map forming system and method |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103077479A (en) * | 2013-01-04 | 2013-05-01 | 湖州电力局 | Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system |
CN103280894A (en) * | 2013-06-14 | 2013-09-04 | 山东理工大学 | Power distribution network control application network topology automatic identifying method |
CN104102790A (en) * | 2014-07-29 | 2014-10-15 | 国家电网公司 | GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram |
CN104201669A (en) * | 2014-08-22 | 2014-12-10 | 国家电网公司 | Distribution network call circuit line loss statistical technology based on distribution network thematic map switch setting |
-
2015
- 2015-01-30 CN CN201510048395.7A patent/CN104573997B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103077479A (en) * | 2013-01-04 | 2013-05-01 | 湖州电力局 | Method for temporarily changing electric network topology structure in pattern dispatching operation ticket system |
CN103280894A (en) * | 2013-06-14 | 2013-09-04 | 山东理工大学 | Power distribution network control application network topology automatic identifying method |
CN104102790A (en) * | 2014-07-29 | 2014-10-15 | 国家电网公司 | GIS (Geographic Information System)-based automatic diagram forming system and method of power supply diagram |
CN104201669A (en) * | 2014-08-22 | 2014-12-10 | 国家电网公司 | Distribution network call circuit line loss statistical technology based on distribution network thematic map switch setting |
Non-Patent Citations (1)
Title |
---|
史剑锋 等: "基于GIS的企业级一体化平台在浙江电网的应用", 《电力信息与通信技术》 * |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106845761A (en) * | 2016-12-12 | 2017-06-13 | 国网北京市电力公司 | The detection method and device of power network resources data |
CN106845761B (en) * | 2016-12-12 | 2020-08-11 | 国网北京市电力公司 | Power grid resource data detection method and device |
CN107071013A (en) * | 2017-03-30 | 2017-08-18 | 国网福建省电力有限公司 | A kind of the service response method and service system of intelligent substation access regulation and control main website |
CN112019498A (en) * | 2020-07-10 | 2020-12-01 | 贵州电网有限责任公司 | Power grid operation safety monitoring management information system based on GIS system |
CN116166366A (en) * | 2023-04-24 | 2023-05-26 | 国网江西省电力有限公司信息通信分公司 | Automatic one-stop power grid multi-style thematic map forming system and method |
Also Published As
Publication number | Publication date |
---|---|
CN104573997B (en) | 2020-10-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103093024B (en) | A kind of planning power grid visualization methods of exhibiting based on WEBGIS | |
CN102957205B (en) | A kind of method and system setting up electricity distribution network model | |
CN102385739B (en) | A kind of county power supply company integration information management platform | |
CN102722764B (en) | Integration network optimization computer-aided decision support System | |
CN104123675A (en) | Power distribution network simulation research and analysis system and method based on network-wide data | |
CN103093392A (en) | Electrical power system three-dimensional digitalization operation platform | |
CN102800033A (en) | Distribution production and marketing business integration system | |
CN102508989A (en) | Dynamic power grid panorama display system on basis of virtual reality | |
CN104573997A (en) | Distribution network formed map and thematic map application architecture designing method | |
CN104966245A (en) | Visualized power supply scheme auxiliary compilation method based on power grid GIS (Gas Insulated Switchgear) | |
CN104866613A (en) | Method for establishing three-dimensional component model database of power grid equipment and facility | |
CN104616101A (en) | Integrated power grid resource model and construction and maintenance method | |
CN102254251A (en) | Power grid three-dimensional design result data management system and digital management method thereof | |
CN102722786A (en) | Intelligent scheduling support platform for power grid professional systems | |
CN106452887A (en) | Electric power communication system visual display system based on diagram-model-data integration | |
CN102646223A (en) | Multi-user remote parallel computation system | |
CN104168138A (en) | Electric power communication network system centralized topology generation and display method | |
CN104123443A (en) | General and quick access method for power distribution network operating data and power distribution data of electric system | |
Flamini et al. | BIM and SCADA integration: the Dynamic Digital Twin | |
CN104809664A (en) | Information integration method for power distribution master station | |
CN204425403U (en) | A kind of power distribution automation framework | |
CN103500384A (en) | Comprehensive management system for power distribution and consumption side communication basic resources | |
CN102831550A (en) | Three-dimensional operation management system of intelligent power grid | |
Yin et al. | Research on network topology analysis method of distribution management based on gis | |
CN202374041U (en) | Design apparatus for intelligent distribution room of power distribution network |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |