CN104572408B - Progress bar display processing method and device - Google Patents
Progress bar display processing method and device Download PDFInfo
- Publication number
- CN104572408B CN104572408B CN201410850914.7A CN201410850914A CN104572408B CN 104572408 B CN104572408 B CN 104572408B CN 201410850914 A CN201410850914 A CN 201410850914A CN 104572408 B CN104572408 B CN 104572408B
- Authority
- CN
- China
- Prior art keywords
- progress
- progress value
- value
- bar
- display
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000003672 processing method Methods 0.000 title claims abstract description 13
- 238000000034 method Methods 0.000 claims abstract description 11
- 238000012544 monitoring process Methods 0.000 claims description 11
- 230000005540 biological transmission Effects 0.000 claims description 8
- 238000012545 processing Methods 0.000 claims description 7
- 238000005516 engineering process Methods 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
Abstract
The embodiment of the invention discloses a kind of progress bar display processing method and device.Methods described includes:Determine the first progress value x0 of current file operation;Monitor the second progress value x1 that third party library sends;Determine the second progress value x1 whether more than the first progress value x0, if it is determined that the second progress value x1 is more than the first progress value x0, then display progress bar is updated according to the first progress value x0, ensure that progress bar updates the even variation of progress, and be capable of the true progress of accurate reflection file operation.
Description
Technical field
The present embodiments relate to mobile communication technology, more particularly to a kind of progress bar display processing method and device.
Background technology
During user's using terminal is operated to file, wherein, operation includes compression, replicates, deletes, pasting
Or download, the progress bar shown on terminal interface is often can be appreciated that, with the progress for pointing out user file to operate.
At present, progress bar display processing method is:Terminal by monitor third party library return progress value, according to progress value
(progress value is usually 0 to 100 or 0.01 to 1 numeral) progress bar is shown on interface.
But, unexpected situation often occurs during display, such as user enters during file is replicated
Angle value once just changes to 95 from 0, and progress bar will be parked in this numeral afterwards, is finished until file is replicated.Therefore, direct basis
Third party library provide progress value shown, the true progress of file operation can not be reflected.
The content of the invention
In view of this, the embodiment of the present invention provides a kind of progress bar display processing method and device, with optimize it is existing enter
Degree bar Display Processing Technology, is capable of the true progress of accurate reflection file operation.
In a first aspect, the embodiment of the invention provides a kind of progress bar display processing method, including:
Determine the first progress value x0 of current file operation;
Monitor the second progress value x1 that third party library sends;
Determine the second progress value x1 whether more than the first progress value x0, however, it is determined that the second progress value x1 is big
In the first progress value x0, then display progress bar is updated according to the first progress value x0.
In second aspect, a kind of progress bar display processing unit is the embodiment of the invention provides, including:
Determining module, the first progress value x0 for determining current file operation;
Module is monitored, the second progress value x1 for monitoring third party library transmission;
Judge module, for determining the second progress value x1 whether more than the first progress value x0;
Update module, for the judge module determine the second progress value x1 more than the first progress value x0 it
Afterwards, display progress bar is updated according to the first progress value x0.
The embodiment of the present invention monitors third party library sends second by determining the first progress value x0 that current file is operated
Progress value x1, it is then determined that whether the second progress value x1 is more than the first progress value x0, however, it is determined that second progress
Value x1 is more than the first progress value x0, then update display progress bar according to the first progress value x0, can be accurate anti-
Reflect the true progress of file operation.
Brief description of the drawings
Fig. 1 is a kind of schematic flow sheet of progress bar display processing method that first embodiment of the invention is provided;
Fig. 2 is a kind of schematic flow sheet of progress bar display processing method that second embodiment of the invention is provided;
Fig. 3 is a kind of structural representation of progress bar display processing unit that third embodiment of the invention is provided.
Specific embodiment
In order that the object, technical solutions and advantages of the present invention are clearer, below in conjunction with the accompanying drawings to specific reality of the invention
Example is applied to be described in further detail.It is understood that specific embodiment described herein is used only for explaining the present invention,
Rather than limitation of the invention.It also should be noted that, for the ease of description, be illustrate only in accompanying drawing related to the present invention
Part rather than full content.
First embodiment
Fig. 1 is a kind of schematic flow sheet of progress bar display processing method that first embodiment of the invention is provided, this implementation
The method of example can be by being integrated in terminal device (including mobile terminal device and fixed terminal equipment such as desktop computer)
Progress bar display processing unit is performed, and the device can be realized by way of hardware and/or software, this is not limited
System.Accordingly, the method for the present embodiment specifically includes following steps:
Step 11, the first progress value x0 for determining current file operation, perform step 12.
Here, in order to distinguish the different progress value of front and rear appearance in the embodiment of the present invention, will occur first herein
Progress value be referred to as the first progress value, the follow-up progress value for occurring is referred to as the second progress value, the second progress value successively, the 3rd is entered
Angle value etc..Wherein, file operation includes compressed file, download file, duplication file, deletion file etc..First progress value x0
It is the current schedules of progress bar during file operation.
Step 12, the second progress value x1 for monitoring third party library transmission, perform step 13.
Step 13, determine the second progress value x1 whether more than the first progress value x0.
If it is determined that the second progress value x1 is more than the first progress value x0, then step 14 is performed.
For example, when the second progress value x1 that the third party library for listening to sends is more than the first progress value x0, then really
It is wrong to determine the second progress value x1 of third party library transmission, it is impossible to the current schedules of correct reflection progress bar, then perform step
14。
Step 14, according to the first progress value x0 update display progress bar.
The present embodiment monitors the second progress that third party library sends by determining the first progress value x0 that current file is operated
Value x1, it is then determined that whether the second progress value x1 is more than the first progress value x0, however, it is determined that the second progress value x1
More than the first progress value x0, then display progress bar is updated according to the first progress value x0, ensure that progress bar updates
The even variation of progress, and it is capable of the true progress of accurate reflection file operation.
Exemplary, on the basis of the present embodiment, the above method also includes:
If it is determined that the second progress value x1 is less than or equal to the first progress value x0, then according to second progress value
X1 updates display progress bar.
Exemplary, on the basis of the present embodiment, before the first progress value x0 for determining current file operation, also
Including:
The Mean Speed and current file for obtaining history file operation operate corresponding file size;
The first progress value x0 for determining current file operation, including:
The first progress value x0 that current file is operated is determined according to the Mean Speed and file size.
For example, before being operated to current file, identical operation is carried out to multiple files, whole operation is recorded
During the size of file that is normally carried out of progress bar progress and progress bar update the total time for completing, size according to file,
Progress bar updates and the total time for completing calculates Mean Speed a, and unit is progress value/file total size per second.
Exemplary, it is above-mentioned that the first progress value that current file is operated is determined according to the Mean Speed and file size,
Including:
Determine that the first progress value x0 is equal to the product of the Mean Speed and file size.
For example, the size of current file is b, then the first progress value x0=b*a can be calculated.
It is exemplary, on the basis of the present embodiment, it is above-mentioned according to the first progress value x0 update display progress bar it
Afterwards, also include:
Using the first progress value x0 as the 3rd progress value y1;
Determine the 4th progress value x2=y1+x0 of current file operation;
Monitor the 5th progress value x3 that third party library sends;
Determine the 5th progress value x3 whether more than the 4th progress value x2, however, it is determined that the 5th progress value x3 is big
In the 4th progress value x2, then display progress bar is updated according to the 4th progress value x2, however, it is determined that the 5th progress value
X3 is less than or equal to the 4th progress value x2, then update display progress bar according to the 5th progress value x3.
For example, a progress bar can be updated every Preset Time (such as 1s), until progress bar updates finishing.This is more
New is updating again after and then step 14.
It is exemplary, on the basis of the present embodiment, it is above-mentioned according to the second progress value x1 update display progress bar it
Afterwards, also include:
Using the second progress value x1 as the 3rd progress value y1;
Determine the 4th progress value x2=y1+x0 of current file operation;
Monitor the 5th progress value x3 that third party library sends;
Determine the 5th progress value x3 whether more than the 4th progress value x2, however, it is determined that the 5th progress value x3 is big
In the 4th progress value x2, then display progress bar is updated according to the 4th progress value x2, however, it is determined that the 5th progress value
X3 is less than or equal to the 4th progress value x2, then update display progress bar according to the 5th progress value x3.
For example, a progress bar can be updated every Preset Time (such as 1s), until progress bar updates finishing.This is more
New step is that the renewal again after display progress bar is updated according to the second progress value x1.
Exemplary, on the basis of the present embodiment, it is determined that the second progress value x1 is more than first progress value
Before display progress bar is updated after x0, according to the first progress value x0, also include:
Determine whether the second progress value x1 adds predetermined threshold value more than the first progress value x0;
It is described to update display progress bar according to the first progress value x0, including:
After it is determined that the second progress value x1 adds predetermined threshold value more than the first progress value x0, according to described first
Progress value x0 updates display progress bar.
For example, in order that progress bar updates more uniform smooth, it is determined that the second progress value x1 is more than described first
Progress value x0 and according to the first progress value x0 update display progress bar between, further increase step and determine described second
Whether progress value x1 adds predetermined threshold value more than the first progress value x0, wherein, predetermined threshold value can be by self-defined setting, example
Such as it is set to 10.
Second embodiment
Fig. 2 is a kind of schematic flow sheet of progress bar display processing method that second embodiment of the invention is provided, specific bag
Include following steps:
Step 21, the Mean Speed for obtaining history file operation and the corresponding file size of current file operation, perform step
Rapid 22.
Referring specifically to associated description of the above-described embodiment one on this step, it is described again here.
Step 22, the first progress value x0 that current file operation is determined according to the Mean Speed and file size, perform
Step 23.
Referring specifically to associated description of the above-described embodiment one on this step, it is described again here.
Step 23, the second progress value x1 for monitoring third party library transmission, perform step 24;
Step 24, whether the second progress value x1 is determined more than the first progress value x0, and determine that described second enters
Whether angle value x1 adds predetermined threshold value more than the first progress value x0.
If it is determined that the second progress value x1 is more than the first progress value x0, and simultaneously greater than described first progress value x0
Plus predetermined threshold value (such as 10), then step 25 is performed.Otherwise, step 212 is performed.
Step 25, according to the first progress value x0 update display progress bar, perform step 26.
Step 26, using the first progress value x0 as the 3rd progress value y1, perform step 27.
Step 27, the 4th progress value x2=y1+x0 for determining current file operation, perform step 28.
Step 28, the 5th progress value x3 for monitoring third party library transmission, perform step 29.
Step 29, whether the 5th progress value x3 is determined more than the 4th progress value x2, and determine that the described 5th enters
Whether angle value x3 adds predetermined threshold value more than the 4th progress value x2.
If it is determined that the 5th progress value x3 is more than the 4th progress value x2, and determine to be more than the 4th progress simultaneously
Value x2 adds predetermined threshold value (such as 10), then perform step 210.Otherwise, step 211 is performed.
Step 210, according to the 4th progress value x2 update display progress bar.
Step 211, according to the 5th progress value x3 update display progress bar.
Step 212, according to the second progress value x1 update display progress bar, perform step 213.
Step 213, using the second progress value x1 as the 3rd progress value y1, perform step 214.
Step 214, the 4th progress value x2=y1+x0 for determining current file operation, perform step 215.
Step 215, the 5th progress value x3 for monitoring third party library transmission, perform step 216.
Step 216, whether the 5th progress value x3 is determined more than the 4th progress value x2, and determine that the described 5th enters
Whether angle value x3 adds predetermined threshold value more than the 4th progress value x2.
If it is determined that the 5th progress value x3 is more than the 4th progress value x2, and simultaneously greater than described 4th progress value x2
Plus predetermined threshold value, then step 217 is performed.Otherwise perform step 218.
Step 217, according to the 4th progress value x2 update display progress bar.
Step 218, according to the 5th progress value x3 update display progress bar.
This implementation updated a progress bar every 1 second, wherein, step 21~step 25 and step 212 are corresponded to first second
Operation, step 26~step 211 and step 213~step 218 correspondence operation of the renewal of first second are updated, using similar side
Method, is similar to successively, until progress bar updates finishing.
The present embodiment monitors the second progress that third party library sends by determining the first progress value x0 that current file is operated
Value x1, it is then determined that whether the second progress value x1 is more than the first progress value x0, however, it is determined that the second progress value x1
More than the first progress value x0, then update display progress bar according to the first progress value x0, using similar method until
Progress bar updates and finishes, and ensure that progress bar updates the even variation of progress, and being capable of accurate reflection file operation
True progress.
3rd embodiment
Fig. 3 is a kind of structural representation of progress bar display processing unit that third embodiment of the invention is provided, specific bag
Include determining module 31, monitor module 32, judge module 33 and update module 34.
Determining module 31 is used to determine the first progress value x0 of current file operation;
Monitoring module 32 is used to monitor the second progress value x1 of third party library transmission;
Whether judge module 33 is used to determine the second progress value x1 more than the first progress value x0;
Update module 34 is used to determine that the second progress value x1 is more than the first progress value x0 in the judge module
Afterwards, display progress bar is updated according to the first progress value x0.
Exemplary, on the basis of the present embodiment, above-mentioned update module 34 is additionally operable to determine in the judge module 33
The second progress value x1 less than or equal to after the first progress value x0, updated according to the second progress value x1 show into
Degree bar.
Exemplary, on the basis of the present embodiment, said apparatus also include:
Acquisition module 35 was used for before the first progress value x0 that the determining module 31 determines current file operation, obtained
The Mean Speed and current file of history file operation operate corresponding file size;
The determining module 31 according to the Mean Speed and file size specifically for determining current file is operated the
One progress value x0.
It is exemplary, the determining module 31 specifically for determine the first progress value x0 be equal to the Mean Speed and
The product of file size.
It is exemplary, on the basis of the present embodiment, the determining module 31 be additionally operable to the update module 34 according to
The first progress value x0 is updated after display progress bar, using the first progress value x0 as the 3rd progress value y1;It is determined that working as
4th progress value x2=y1+x0 of preceding document operation;
The module 32 of monitoring is additionally operable to monitor the 5th progress value x3 that third party library sends;
Whether the judge module 33 is additionally operable to determine the 5th progress value x3 more than the 4th progress value x2;
The update module 34 is additionally operable to determine that the 5th progress value x3 is more than the described 4th in the judge module 33
After progress value x2, display progress bar is updated according to the 4th progress value x2;Or determine in the judge module 33 described
5th progress value x3 updates display progress less than or equal to after the 4th progress value x2 according to the 5th progress value x3
Bar.
It is exemplary, on the basis of the present embodiment, the determining module 31 be additionally operable to the update module 34 according to
The second progress value x1 is updated after display progress bar, using the second progress value x1 as the 3rd progress value y1;It is determined that working as
4th progress value x2=y1+x0 of preceding document operation;
The module 32 of monitoring is additionally operable to monitor the 5th progress value x3 that third party library sends;
Whether the judge module 33 is additionally operable to determine the 5th progress value x3 more than the 4th progress value x2;
The update module 34 is additionally operable to determine that the 5th progress value x3 is more than the described 4th in the judge module 33
After progress value x2, display progress bar is updated according to the 4th progress value x2;Or determine in the judge module 33 described
5th progress value x3 updates display progress less than or equal to after the 4th progress value x2 according to the 5th progress value x3
Bar.
Exemplary, on the basis of the present embodiment, the judge module 33 is additionally operable to it is determined that second progress value
X1 more than after the first progress value x0, the update module according to the first progress value x0 update display progress bar it
Before, determine whether the second progress value x1 adds predetermined threshold value more than the first progress value x0;
The update module 34 in the judge module 33 specifically for determining the second progress value x1 more than described the
One progress value x0 updates display progress bar plus after predetermined threshold value according to the first progress value x0.
The progress bar display processing unit that the embodiment of the present invention is provided can be used to perform any embodiment offer of the present invention
Progress bar display processing method, possess corresponding functional module, realize identical beneficial effect.
Obviously, it will be understood by those skilled in the art that above-mentioned of the invention each module or each step can be by as above
Described server implementation.Alternatively, the program that the embodiment of the present invention can be can perform with computer installation be realized, so that can
To be stored in being performed by processor in storage device, described program can be stored in a kind of computer-readable storage
In medium, storage medium mentioned above can be read-only storage, disk or CD etc.;Or be fabricated to them respectively each
Individual integrated circuit modules, or the multiple modules or step in them are fabricated to single integrated circuit module to realize.So,
The present invention is not restricted to the combination of any specific hardware and software.
The preferred embodiments of the present invention are the foregoing is only, is not intended to limit the invention, for those skilled in the art
For, the present invention can have various changes and change.It is all any modifications made within spirit and principles of the present invention, equivalent
Replace, improve etc., should be included within the scope of the present invention.
Claims (10)
1. a kind of progress bar display processing method, it is characterised in that including:
Determine the first progress value x0 of current file operation;
Monitor the second progress value x1 that third party library sends;
Determine the second progress value x1 whether more than the first progress value x0, however, it is determined that the second progress value x1 is more than institute
The first progress value x0 is stated, then updates display progress bar according to the first progress value x0;
Wherein, before the first progress value x0 for determining current file operation, also include:
The Mean Speed and current file for obtaining history file operation operate corresponding file size;
The first progress value x0 for determining current file operation, including:
Determine that the first progress value x0 is equal to the product of the Mean Speed and file size.
2. method according to claim 1, it is characterised in that methods described also includes:
If it is determined that the second progress value x1 is less than or equal to the first progress value x0, then according to the second progress value x1 more
New display progress bar.
3. method according to claim 1, it is characterised in that described to update display progress according to the first progress value x0
After bar, also include:
Using the first progress value x0 as the 3rd progress value y1;
Determine the 4th progress value x2=y1+x0 of current file operation;
Monitor the 5th progress value x3 that third party library sends;
Determine the 5th progress value x3 whether more than the 4th progress value x2, however, it is determined that the 5th progress value x3 is more than institute
The 4th progress value x2 is stated, then updates display progress bar according to the 4th progress value x2, however, it is determined that the 5th progress value x3 is small
In or equal to the 4th progress value x2, then display progress bar is updated according to the 5th progress value x3.
4. method according to claim 2, it is characterised in that described to update display progress according to the second progress value x1
After bar, also include:
Using the second progress value x1 as the 3rd progress value y1;
Determine the 4th progress value x2=y1+x0 of current file operation;
Monitor the 5th progress value x3 that third party library sends;
Determine the 5th progress value x3 whether more than the 4th progress value x2, however, it is determined that the 5th progress value x3 is more than institute
The 4th progress value x2 is stated, then updates display progress bar according to the 4th progress value x2, however, it is determined that the 5th progress value x3 is small
In or equal to the 4th progress value x2, then display progress bar is updated according to the 5th progress value x3.
5. method according to claim 1, it is characterised in that it is determined that the second progress value x1 enters more than described first
Before display progress bar is updated after angle value x0, according to the first progress value x0, also include:
Determine whether the second progress value x1 adds predetermined threshold value more than the first progress value x0;
It is described to update display progress bar according to the first progress value x0, including:
After it is determined that the second progress value x1 adds predetermined threshold value more than the first progress value x0, according to first progress
Value x0 updates display progress bar.
6. a kind of progress bar display processing unit, it is characterised in that including:
Determining module, the first progress value x0 for determining current file operation;
Module is monitored, the second progress value x1 for monitoring third party library transmission;
Judge module, for determining the second progress value x1 whether more than the first progress value x0;
Update module, after determining the second progress value x1 more than the first progress value x0 in the judge module,
Display progress bar is updated according to the first progress value x0;
Wherein, described device also includes:
Acquisition module, for before the first progress value x0 that the determining module determines current file operation, obtaining history text
The Mean Speed and current file of part operation operate corresponding file size;
The determining module specifically for:
Determine that the first progress value x0 is equal to the product of the Mean Speed and file size.
7. device according to claim 6, it is characterised in that the update module is additionally operable to:
After the judge module determines the second progress value x1 less than or equal to the first progress value x0, according to described
Second progress value x1 updates display progress bar.
8. device according to claim 6, it is characterised in that the determining module is additionally operable to:
After the update module updates display progress bar according to the first progress value x0, the first progress value x0 is made
It is the 3rd progress value y1;Determine the 4th progress value x2=y1+x0 of current file operation;
The monitoring module, is additionally operable to monitor the 5th progress value x3 that third party library sends;
Whether the judge module, be additionally operable to determine the 5th progress value x3 more than the 4th progress value x2;
The update module is additionally operable to:Determine that the 5th progress value x3 is more than the 4th progress value x2 in the judge module
Afterwards, display progress bar is updated according to the 4th progress value x2;Or determine the 5th progress value in the judge module
X3 updates display progress bar less than or equal to after the 4th progress value x2 according to the 5th progress value x3.
9. device according to claim 7, it is characterised in that the determining module is additionally operable to:
After the update module updates display progress bar according to the second progress value x1, the second progress value x1 is made
It is the 3rd progress value y1;Determine the 4th progress value x2=y1+x0 of current file operation;
The monitoring module, is additionally operable to monitor the 5th progress value x3 that third party library sends;
Whether the judge module, be additionally operable to determine the 5th progress value x3 more than the 4th progress value x2;
The update module is additionally operable to:Determine that the 5th progress value x3 is more than the 4th progress value x2 in the judge module
Afterwards, display progress bar is updated according to the 4th progress value x2;Or determine the 5th progress value in the judge module
X3 updates display progress bar less than or equal to after the 4th progress value x2 according to the 5th progress value x3.
10. device according to claim 6, it is characterised in that the judge module is additionally operable to:It is determined that described second enters
Angle value x1 updates display progress bar more than after the first progress value x0, in the update module according to the first progress value x0
Before, determine whether the second progress value x1 adds predetermined threshold value more than the first progress value x0;
The update module specifically for:
After the judge module determines that the second progress value x1 adds predetermined threshold value more than the first progress value x0, according to
The first progress value x0 updates display progress bar.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410850914.7A CN104572408B (en) | 2014-12-29 | 2014-12-29 | Progress bar display processing method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410850914.7A CN104572408B (en) | 2014-12-29 | 2014-12-29 | Progress bar display processing method and device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104572408A CN104572408A (en) | 2015-04-29 |
CN104572408B true CN104572408B (en) | 2017-06-09 |
Family
ID=53088542
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410850914.7A Expired - Fee Related CN104572408B (en) | 2014-12-29 | 2014-12-29 | Progress bar display processing method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104572408B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111818109B (en) * | 2019-04-10 | 2022-09-23 | 腾讯科技(深圳)有限公司 | Progress display method and device, computer readable storage medium and computer equipment |
CN112764627B (en) * | 2021-01-28 | 2022-08-26 | 青岛海信传媒网络技术有限公司 | Upgrade package installation progress display method and display device |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103049451A (en) * | 2011-10-14 | 2013-04-17 | 腾讯科技(深圳)有限公司 | Method and device for tracking network content updates |
CN103365761A (en) * | 2012-03-09 | 2013-10-23 | 苹果公司 | Progress bar |
CN103631646A (en) * | 2013-11-29 | 2014-03-12 | 北京京东尚科信息技术有限公司 | Method and system for calculating task schedule |
CN103927248A (en) * | 2014-04-01 | 2014-07-16 | 可牛网络技术(北京)有限公司 | Progress display control method and device and electronic device |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US9354797B2 (en) * | 2013-01-14 | 2016-05-31 | Lenovo (Beijing) Co., Ltd. | Progress adjustment method and electronic device |
-
2014
- 2014-12-29 CN CN201410850914.7A patent/CN104572408B/en not_active Expired - Fee Related
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103049451A (en) * | 2011-10-14 | 2013-04-17 | 腾讯科技(深圳)有限公司 | Method and device for tracking network content updates |
CN103365761A (en) * | 2012-03-09 | 2013-10-23 | 苹果公司 | Progress bar |
CN103631646A (en) * | 2013-11-29 | 2014-03-12 | 北京京东尚科信息技术有限公司 | Method and system for calculating task schedule |
CN103927248A (en) * | 2014-04-01 | 2014-07-16 | 可牛网络技术(北京)有限公司 | Progress display control method and device and electronic device |
Also Published As
Publication number | Publication date |
---|---|
CN104572408A (en) | 2015-04-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11645817B2 (en) | Information processing method and apparatus, terminal device, and computer readable storage medium on displaying decoupled virtual objects in a virtual scene | |
CN112200167B (en) | Image recognition method, device, equipment and storage medium | |
CN105847367A (en) | Service request processing method and apparatus | |
CN104536776A (en) | Method and device for running plug-in application in plug-in running environment at host end | |
CN106445243A (en) | Touch responding device and method for intelligent equipment | |
US9824072B2 (en) | Adjusting layout size of hyperlink | |
CN104572408B (en) | Progress bar display processing method and device | |
WO2014173327A1 (en) | Method and device for adjusting a button identification region | |
CN104702703A (en) | Method and device for updating data | |
CN104506636B (en) | A kind of method of data synchronization and device | |
AU2003256174A1 (en) | Irregular mesh and embedded geometric description in a computer graphics system | |
CN112994980A (en) | Time delay testing method and device, electronic equipment and storage medium | |
CN104423612A (en) | Key-identifying method, device and electronic equipment | |
CN106610755A (en) | Touch screen calibration method and apparatus | |
CN105045490A (en) | Image display control method and mobile terminal | |
CN104780055B (en) | A kind of processing method and processing device of data flow | |
CN105005492A (en) | Embedded equipment and software upgrading method | |
CN112083902B (en) | Control method of storage cabinet, storage cabinet and readable storage medium | |
CN104023086B (en) | A kind of WEB cluster codes update method, apparatus and system | |
CN110750313B (en) | Middleware hot loading method and device, electronic equipment and storage medium | |
CN104035813A (en) | Cross-platform interaction detection method and device | |
CN104199632A (en) | Method and device used for determining setting of sound effect | |
CN107666495B (en) | Disaster recovery method and terminal for application | |
CN105404439A (en) | Folder creation method and apparatus | |
CN112559277A (en) | Crash information processing method, system, vehicle-mounted device, server, electronic device and storage medium |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Changan town in Guangdong province Dongguan 523860 usha Beach Road No. 18 Patentee after: GUANGDONG OPPO MOBILE TELECOMMUNICATIONS Corp.,Ltd. Address before: Changan town in Guangdong province Dongguan 523860 usha Beach Road No. 18 Patentee before: GUANGDONG OPPO MOBILE TELECOMMUNICATIONS Corp.,Ltd. |
|
CP01 | Change in the name or title of a patent holder | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170609 |
|
CF01 | Termination of patent right due to non-payment of annual fee |