CN104571454A - Method for seamless monitoring management of blade server - Google Patents
Method for seamless monitoring management of blade server Download PDFInfo
- Publication number
- CN104571454A CN104571454A CN201510065702.2A CN201510065702A CN104571454A CN 104571454 A CN104571454 A CN 104571454A CN 201510065702 A CN201510065702 A CN 201510065702A CN 104571454 A CN104571454 A CN 104571454A
- Authority
- CN
- China
- Prior art keywords
- bmc
- battery
- blade
- monitoring management
- backboard
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F1/00—Details not covered by groups G06F3/00 - G06F13/00 and G06F21/00
- G06F1/26—Power supply means, e.g. regulation thereof
- G06F1/30—Means for acting in the event of power-supply failure or interruption, e.g. power-supply fluctuations
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F11/00—Error detection; Error correction; Monitoring
- G06F11/30—Monitoring
- G06F11/34—Recording or statistical evaluation of computer activity, e.g. of down time, of input/output operation ; Recording or statistical evaluation of user activity, e.g. usability assessment
- G06F11/3466—Performance evaluation by tracing or monitoring
- G06F11/3476—Data logging
Abstract
The invention provides a method for seamless monitoring management of a blade server, and relates to a blade server monitoring management technology. A main board is combined with a back board for providing electricity to a BMC by virtue of a battery; when a blade is taken down, the BMC and a memory of the BMC are powered by the battery, so that normal operation of the BMC is ensured; when the blade is put back to a machine case after being maintained or debugged, the back board further provides electricity for the BMC and other assemblies; the power supply output of the battery is stopped; the battery is charged by the back board; and the BMC is always in a working state, and completely records a system operation log, so that seamless monitoring management is achieved.
Description
Technical field
The present invention relates to blade server monitoring management technology, particularly relate to the method for the seamless monitoring management of a kind of blade server.
Background technology
BMC(Baseboard Management Controller, baseboard management controller) support the IPMI specification of industry standard.This specification describes the management function be built on mainboard.These functions comprise: local and remote diagnosis, control desk support, configuration management, hardware management and failture evacuation.BMC provides following function: the pulse width regulator input with the compatibility of IPMI 1.0, the velocity gauge that monitors for rotation speed of the fan, controlled for rotation speed of the fan exports, input for the button of front panel button and switch, carry out a multiplex serial port, remote access and ICMB(Intelligent Chassis Management Bus, intelligent case management bus with server console port) supports, three I2C master ports and standby port (one of them port is for intelligent case management bus).
In the server, basic management controller (BMC) manages the working condition of local cpu, internal memory, South Bridge chip (PCH) and I/O device as a band external equipment, and monitors environment temperature and electric power thus supplied.In common blade server, BMC and CPU, internal memory, PCH, I/O device are co-located on a blade node, are all powered by backboard.In server node maintenance and fault recovery and R&D process during hardware debug, node can be taken out and operate, after having operated, place back cabinet again.In this process, the band of whole node is outer and be with interior equipment all without power supply, cannot work.Place back after cabinet powers, because BMC is an ARM chip and ROM and its internal memory composition, need a period of time to load kernel program after the power-up from ROM, 30 seconds at least, a few minutes at most, this period of time BMC cannot carry out monitor and managment to this node, is the blank time of management.This section of blank time may cause the omission in server running log and event, adds the difficulty of maintenance to node and fault diagnosis.
Summary of the invention
In order to solve this problem, the present invention proposes a kind of seamless monitoring management scheme of blade server.
A method for monitoring management that blade server is seamless, mainboard uses one piece of battery and back plate joint power for BMC, when blade is removed, is powered by the internal memory of battery to BMC and BMC, the normal operation of guarantee BMC; When blade safeguard or debug complete placement return cabinet time, continue as BMC and other assemblies by backboard and continue power supply, powered battery exports and stops, and is that battery charges by backboard.
Described method, is characterized in that, battery is lithium battery or polymer battery.
Described method, is characterized in that, when blade takes off, backboard is powered stopping, switching power supply to battery, continued to power to BMC by battery by feed circuit automatically by BMC and its internal memory.
Described method, is characterized in that, when blade safeguard or debug complete placement return cabinet time, the feed circuit of BMC automatically switch back to backboard and power, and by battery charger be battery charging.
This method can make BMC be in duty all the time, even if node off-line debugging or when safeguarding, BMC still can continue monitor node and collect information, and the daily record of complete documentation system cloud gray model, achieves seamless monitoring management.
Accompanying drawing explanation
Fig. 1 is of the prior art for electrical schematic.
Fig. 2 is the confession electrical schematic when blade is removed.
Fig. 3 is the confession electrical schematic when blade is put back to.
Embodiment
More detailed elaboration is carried out to content of the present invention below:
Mainboard uses one piece of lithium battery and back plate joint power for BMC, when blade is removed, powered by the internal memory of battery to BMC and BMC, the normal operation of guarantee BMC, as shown in Figure 2.When blade safeguard or debug complete placement return cabinet time, continue as BMC and other assemblies by backboard and continue power supply, powered battery exports and stops, and is that battery charges by backboard, as shown in Figure 3.
1, this invention is made up of rechargeable battery, battery charger and feed circuit.
2, when blade node takes out from cabinet, system power supply stops, and switch power supply to battery by feed circuit automatically by BMC and its internal memory, continued to power to BMC by battery, because BMC power consumption is little, battery can ensure BMC off-line operation several hours.
3, when completing debugging to the blade node taken out and safeguarding and place back cabinet, system power supply recovers, and the feed circuit of BMC switch back to system power supply automatically, and is battery charging by battery charger, in order to off-line debugging maintenance next time.
Claims (4)
1. a method for the seamless monitoring management of blade server, is characterized in that, mainboard uses one piece of battery and back plate joint power for BMC, when blade is removed, is powered by the internal memory of battery to BMC and BMC, the normal operation of guarantee BMC; When blade safeguard or debug complete placement return cabinet time, continue as BMC and other assemblies by backboard and continue power supply, powered battery exports and stops, and is that battery charges by backboard.
2. method according to claim 1, is characterized in that, battery is lithium battery or polymer battery.
3. method according to claim 1, is characterized in that, when blade takes off, backboard is powered stopping, switching power supply to battery, continued to power to BMC by battery by feed circuit automatically by BMC and its internal memory.
4. method according to claim 1, is characterized in that, when blade safeguard or debug complete placement return cabinet time, the feed circuit of BMC automatically switch back to backboard and power, and by battery charger be battery charging.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510065702.2A CN104571454A (en) | 2015-02-09 | 2015-02-09 | Method for seamless monitoring management of blade server |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510065702.2A CN104571454A (en) | 2015-02-09 | 2015-02-09 | Method for seamless monitoring management of blade server |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104571454A true CN104571454A (en) | 2015-04-29 |
Family
ID=53087742
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510065702.2A Pending CN104571454A (en) | 2015-02-09 | 2015-02-09 | Method for seamless monitoring management of blade server |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104571454A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109165047A (en) * | 2018-09-03 | 2019-01-08 | 英业达科技有限公司 | The method for maintaining the orthochronous of graphics processor mainboard |
CN109756004A (en) * | 2019-03-22 | 2019-05-14 | 苏州浪潮智能科技有限公司 | A kind of server and its charging unit and method |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200805136A (en) * | 2005-12-13 | 2008-01-16 | Ibm | System support storage and computer system |
CN101741575A (en) * | 2009-12-25 | 2010-06-16 | 浪潮电子信息产业股份有限公司 | 220A/12V direct current hot plug soft start device |
CN102064968A (en) * | 2010-12-31 | 2011-05-18 | 成都市华为赛门铁克科技有限公司 | Method, device and system for preventing embedded BYPASS device from powering down |
CN102854969A (en) * | 2011-06-29 | 2013-01-02 | 鸿富锦精密工业(深圳)有限公司 | Server |
US20130238911A1 (en) * | 2012-03-07 | 2013-09-12 | Bo Tian | Power supply device for computer systems and computer system using the power supply device |
-
2015
- 2015-02-09 CN CN201510065702.2A patent/CN104571454A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
TW200805136A (en) * | 2005-12-13 | 2008-01-16 | Ibm | System support storage and computer system |
CN101741575A (en) * | 2009-12-25 | 2010-06-16 | 浪潮电子信息产业股份有限公司 | 220A/12V direct current hot plug soft start device |
CN102064968A (en) * | 2010-12-31 | 2011-05-18 | 成都市华为赛门铁克科技有限公司 | Method, device and system for preventing embedded BYPASS device from powering down |
CN102854969A (en) * | 2011-06-29 | 2013-01-02 | 鸿富锦精密工业(深圳)有限公司 | Server |
US20130238911A1 (en) * | 2012-03-07 | 2013-09-12 | Bo Tian | Power supply device for computer systems and computer system using the power supply device |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109165047A (en) * | 2018-09-03 | 2019-01-08 | 英业达科技有限公司 | The method for maintaining the orthochronous of graphics processor mainboard |
CN109165047B (en) * | 2018-09-03 | 2021-10-12 | 英业达科技有限公司 | Method for maintaining correct time of graphics processor mainboard |
CN109756004A (en) * | 2019-03-22 | 2019-05-14 | 苏州浪潮智能科技有限公司 | A kind of server and its charging unit and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8201009B2 (en) | Computer management and power backup system and device | |
CN104953694A (en) | Power distribution system | |
CN201965215U (en) | Storage battery pack on-line monitoring system | |
CN105867196A (en) | Express delivery cabinet and power control board | |
CN106826825A (en) | A kind of many mechanical arm controlled in wireless cabinets and many mechanical arm control systems | |
US7045914B2 (en) | System and method for automatically providing continuous power supply via standby uninterrupted power supplies | |
CN105760241A (en) | Exporting method and system for memory data | |
CN104199757A (en) | Off-line alarming method for fault messages of server system | |
CN104571454A (en) | Method for seamless monitoring management of blade server | |
US20040073817A1 (en) | Method for automatically saving in-process programs before shutdown | |
CN109117404B (en) | Server BBU device capable of hot plugging | |
CN109976489A (en) | Automatically reset realization method and system under a kind of iic bus abnormal conditions | |
CN202433033U (en) | Monitoring system for seismograph station | |
CN201383095Y (en) | PLC redundancy rotation-speed monitoring device | |
CN103995758A (en) | Method for displaying main board fault information in delayed mode | |
CN108347079A (en) | Power-supply controller of electric and robot with the power-supply controller of electric | |
CN207251298U (en) | Backup power supply alarm system based on industrial ethernet switch | |
Xiaofei et al. | How to ensure the modular UPS with high reliability | |
CN113595222A (en) | Power supply control method applied to analog equipment | |
CN103995767A (en) | Automatic electrifying method for keeping alarm indicating lamp in mainboard normally on | |
CN207612081U (en) | A kind of electric inspection process robot battery extension power supply and charging unit | |
CN201945945U (en) | Computer uninterruptible power supply | |
CN206249235U (en) | A kind of supply unit with redundant battery | |
CN206541142U (en) | A kind of processor of double mcu oil mist monitoring system | |
RU209982U1 (en) | Power supply device for electronic computing equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20150429 |
|
WD01 | Invention patent application deemed withdrawn after publication |