CN104569748B - The pressure resistant test method of high pressure plug-in 35kV power transformer - Google Patents

The pressure resistant test method of high pressure plug-in 35kV power transformer Download PDF

Info

Publication number
CN104569748B
CN104569748B CN201410678329.3A CN201410678329A CN104569748B CN 104569748 B CN104569748 B CN 104569748B CN 201410678329 A CN201410678329 A CN 201410678329A CN 104569748 B CN104569748 B CN 104569748B
Authority
CN
China
Prior art keywords
transformer
oil
test
voltage
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410678329.3A
Other languages
Chinese (zh)
Other versions
CN104569748A (en
Inventor
杜良俊
汪洋
方迪民
金华明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Qiantang River Electric Group Co Ltd
Original Assignee
Hangzhou Qiantang River Electric Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Qiantang River Electric Group Co Ltd filed Critical Hangzhou Qiantang River Electric Group Co Ltd
Priority to CN201410678329.3A priority Critical patent/CN104569748B/en
Publication of CN104569748A publication Critical patent/CN104569748A/en
Application granted granted Critical
Publication of CN104569748B publication Critical patent/CN104569748B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The present invention relates to a kind of pressure resistant test method more particularly to a kind of pressure resistant test methods of high pressure plug-in 35kV power transformer.Hand hole for installing sleeve → reflux → inspection leakproofness → standing → preheating → ground connection operation → wiring test is opened and sequentially includes the following steps: and hangs in → draining the oil → that → test voltage → applies the hand hole for installing sleeve → disassembly bushing shell for transformer → oil return again → of pressure test → pressure resistance Adjustment Tests → pressure build-up test → disassembly test lead → again to check again for outside.The pressure resistant test method of high pressure plug-in 35kV power transformer is compact-sized, and test operation is easy, promotes safety in utilization.

Description

The pressure resistant test method of high pressure plug-in 35kV power transformer
Technical field
The present invention relates to a kind of pressure resistant test method more particularly to a kind of pressure resistances of high pressure plug-in 35kV power transformer Test method.
Background technique
With the rapid development of power industry, requirement of the client to power product especially transformer is also higher and higher, no It requires nothing more than product quality performance to reach a standard, there are also to product appearance and operated with particular/special requirement.Applying pressure test outside is also to examine The basic insulation of nucleus product major insulation voltage strength is tested, and is whether discovery insulation is reasonable, insulating materials has zero defect and manufacture Whether technique is one of the important means of reasonable, due to the particularity of plug-in cable head, can not be directly according to conventional transformer Pressure resistant test method.
Summary of the invention
The present invention mainly solves the deficiencies in the prior art, provides a kind of compact-sized, further promotes product Quality improves the pressure resistant test method of the high pressure plug-in 35kV power transformer of safety.
Above-mentioned technical problem of the invention is mainly to be addressed by following technical proposals:
A kind of pressure resistant test method of high pressure plug-in 35kV power transformer, sequentially includes the following steps:
(1), it hangs in:
Transformer to be tested is hung in into laboratory designated position;
(2), it drains the oil:
Transformer oil filling pipe is accessed into fuel outlet valve, valve is opened according to transformer hand hole for installing sleeve position and calculates change Depressor needs the weight released, until transformer oil is released from 100mm under hand hole for installing sleeve;
(3), hand hole for installing sleeve is opened:
After oil level is put into designated position, it will be opened until transformer hand hole for installing sleeve;Select ordinary porcelain bushing BLQW-35/600 installs respective sleeve in O, A, B, C respectively;
(4), it flows back:
Again oil fuel tube is accessed into pouring orifice, by transformer oil injection transformer, oil surface level arrival meets defined position Set, to oil filled bushing, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, conservator successively from low to high to convex portion It deflates, until flowing oil, checks again for oil level instruction;
(5), leakproofness is checked:
It checks the sealing situation of transformer, the sealing ring of sleeve position, and has checked whether transformer oil exudation;
(6), it stands:
Inspection finishes, and puts transformer is quiet 12 hours;
(7), it preheats:
Whether there is or not insecurity factor presence for checkout facility environment;It is preheated if no, ac voltage withstanding testing transformer is switched on 5min is checked whether the test equipment is placed in the voltage gear required for the test, and whether adjusting leakage current values meet the requirements;
(8), ground connection operation:
By the A of bushing shell for transformer, B, C three-phase is connected with bare copper wire short circuit, and remaining winding is connected with bare copper wire short circuit, and with Shell is grounded together;Protective ball gap, divider, the effective reliable ground of grounding rod;
(9), wiring is tested:
By the high-pressure side wiring of high voltage control case and testing transformer, regulated power supply is connected with conducting wire, testing transformer, Protective resistance, step-up side, protective ball gap high pressure end and pressure divider high pressure end;
(10), test voltage:
The waveform of test voltage answers approximate sine wave, and the frequency of test voltage should be less than 80% rated frequency;Testing transformer Under test voltage, steady-state shortcircuit current should be less than 1A;
(11), pressure test is applied outside:
With external industrial frequency AC high pressure 85kV, it is applied to the winding terminals of the tested transformer, winding each section is in In idiostatic situation, power-frequency voltage 1min is born;
(12), pressure-resistant Adjustment Tests:
Protective ball gap gap is adjusted, it is corresponding to 1.1 ~ 1.2 times of test voltage, do not puncture three times continuously, is opened every time from zero Begin to boost, to discharge when pressure resistance adjustment ball gap every time;
(13), pressure build-up test:
Start from scratch boosting, voltage is increased slowly with the speed of 2-3kV/s, after test voltage reaches 75%, makes the rate of rise The withstanding voltage for keeping per second 2% continues 1min after being added to test voltage, test voltage is uniformly then down to zero point as early as possible, Power supply, final cutting power supply are successively closed again;
(14), test lead is dismantled:
By porcelain vase discharge treatment, dismantling connection test lead;
(15), hand hole for installing sleeve again:
Transformer oil filling pipe is accessed into fuel outlet valve again, opens valve, according to transformer hand hole for installing sleeve position, is calculated Transformer needs the weight released out, until transformer oil is released from 100mm under hand hole for installing sleeve;
(16), bushing shell for transformer is dismantled:
Bushing shell for transformer BLQW-35/600 is dismantled, accesses plug-in connection cable head from hand hole position by winding leads, Wire length is configured according to actual range;
(17), increase sealing ring cover:
Sealing plate encryption seal is covered again, is then fastened;
(18), oil return again:
Oil fuel tube is accessed into pouring orifice again, by transformer oil injection transformer, oil surface level arrival meets defined position It sets, the convex portion deflation of the tubing and casing that liquidates, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, until flowing oil, Check again for oil level instruction;
(19), it checks again for:
Check again for until hand hole and cable plug head that whether there is or not permeabilitys.
Therefore, the pressure resistant test method of high pressure plug-in 35kV power transformer of the invention, compact-sized, test operation Simplicity promotes safety in utilization.
Specific embodiment
Below by embodiment, the technical solutions of the present invention will be further described.
Embodiment 1: a kind of pressure resistant test method of high pressure plug-in 35kV power transformer sequentially includes the following steps:
(1), it hangs in:
Transformer to be tested is hung in into laboratory designated position;
(2), it drains the oil:
Transformer oil filling pipe is accessed into fuel outlet valve, valve is opened according to transformer hand hole for installing sleeve position and calculates change Depressor needs the weight released, until transformer oil is released from 100mm under hand hole for installing sleeve;
(3), hand hole for installing sleeve is opened:
After oil level is put into designated position, it will be opened until transformer hand hole for installing sleeve;Select ordinary porcelain bushing BLQW-35/600 installs respective sleeve in O, A, B, C respectively;
(4), it flows back:
Again oil fuel tube is accessed into pouring orifice, by transformer oil injection transformer, oil surface level arrival meets defined position Set, to oil filled bushing, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, conservator successively from low to high to convex portion It deflates, until flowing oil, checks again for oil level instruction;
(5), leakproofness is checked:
It checks the sealing situation of transformer, the sealing ring of sleeve position, and has checked whether transformer oil exudation;
(6), it stands:
Inspection finishes, and puts transformer is quiet 12 hours;
(7), it preheats:
Whether there is or not insecurity factor presence for checkout facility environment;It is preheated if no, ac voltage withstanding testing transformer is switched on 5min is checked whether the test equipment is placed in the voltage gear required for the test, and whether adjusting leakage current values meet the requirements;
(8), ground connection operation:
By the A of bushing shell for transformer, B, C three-phase is connected with bare copper wire short circuit, and remaining winding is connected with bare copper wire short circuit, and with Shell is grounded together;Protective ball gap, divider, the effective reliable ground of grounding rod;
(9), wiring is tested:
By the high-pressure side wiring of high voltage control case and testing transformer, regulated power supply is connected with conducting wire, testing transformer, Protective resistance, step-up side, protective ball gap high pressure end and pressure divider high pressure end;
(10), test voltage:
The waveform of test voltage answers approximate sine wave, and the frequency of test voltage should be less than 80% rated frequency;Testing transformer Under test voltage, steady-state shortcircuit current should be less than 1A;
(11), pressure test is applied outside:
With external industrial frequency AC high pressure 85kV, it is applied to the winding terminals of the tested transformer, winding each section is in In idiostatic situation, power-frequency voltage 1min is born;
(12), pressure-resistant Adjustment Tests:
Protective ball gap gap is adjusted, it is corresponding to 1.1 times of test voltage, do not puncture three times continuously, liter of starting from scratch every time Pressure will discharge when pressure resistance adjustment ball gap every time;
(13), pressure build-up test:
Start from scratch boosting, voltage is increased slowly with the speed of 2kV/s, after test voltage reaches 75%, protects the rate of rise The withstanding voltage for holding per second 2% continues 1min after being added to test voltage, test voltage is uniformly then down to zero point as early as possible, then Successively close power supply, final cutting power supply;
(14), test lead is dismantled:
By porcelain vase discharge treatment, dismantling connection test lead;
(15), hand hole for installing sleeve again:
Transformer oil filling pipe is accessed into fuel outlet valve again, opens valve, according to transformer hand hole for installing sleeve position, is calculated Transformer needs the weight released out, until transformer oil is released from 100mm under hand hole for installing sleeve;
(16), bushing shell for transformer is dismantled:
Bushing shell for transformer BLQW-35/600 is dismantled, accesses plug-in connection cable head from hand hole position by winding leads, Wire length is configured according to actual range;
(17), increase sealing ring cover:
Sealing plate encryption seal is covered again, is then fastened;
(18), oil return again:
Oil fuel tube is accessed into pouring orifice again, by transformer oil injection transformer, oil surface level arrival meets defined position It sets, the convex portion deflation of the tubing and casing that liquidates, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, until flowing oil, Check again for oil level instruction;
(19), it checks again for:
Check again for until hand hole and cable plug head that whether there is or not permeabilitys.
Embodiment 2: a kind of pressure resistant test method of high pressure plug-in 35kV power transformer sequentially includes the following steps:
(1), it hangs in:
Transformer to be tested is hung in into laboratory designated position;
(2), it drains the oil:
Transformer oil filling pipe is accessed into fuel outlet valve, valve is opened according to transformer hand hole for installing sleeve position and calculates change Depressor needs the weight released, until transformer oil is released from 100mm under hand hole for installing sleeve;
(3), hand hole for installing sleeve is opened:
After oil level is put into designated position, it will be opened until transformer hand hole for installing sleeve;Select ordinary porcelain bushing BLQW-35/600 installs respective sleeve in O, A, B, C respectively;
(4), it flows back:
Again oil fuel tube is accessed into pouring orifice, by transformer oil injection transformer, oil surface level arrival meets defined position Set, to oil filled bushing, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, conservator successively from low to high to convex portion It deflates, until flowing oil, checks again for oil level instruction;
(5), leakproofness is checked:
It checks the sealing situation of transformer, the sealing ring of sleeve position, and has checked whether transformer oil exudation;
(6), it stands:
Inspection finishes, and puts transformer is quiet 12 hours;
(7), it preheats:
Whether there is or not insecurity factor presence for checkout facility environment;It is preheated if no, ac voltage withstanding testing transformer is switched on 5min is checked whether the test equipment is placed in the voltage gear required for the test, and whether adjusting leakage current values meet the requirements;
(8), ground connection operation:
By the A of bushing shell for transformer, B, C three-phase is connected with bare copper wire short circuit, and remaining winding is connected with bare copper wire short circuit, and with Shell is grounded together;Protective ball gap, divider, the effective reliable ground of grounding rod;
(9), wiring is tested:
By the high-pressure side wiring of high voltage control case and testing transformer, regulated power supply is connected with conducting wire, testing transformer, Protective resistance, step-up side, protective ball gap high pressure end and pressure divider high pressure end;
(10), test voltage:
The waveform of test voltage answers approximate sine wave, and the frequency of test voltage should be less than 80% rated frequency;Testing transformer Under test voltage, steady-state shortcircuit current should be less than 1A;
(11), pressure test is applied outside:
With external industrial frequency AC high pressure 85kV, it is applied to the winding terminals of the tested transformer, winding each section is in In idiostatic situation, power-frequency voltage 1min is born;
(12), pressure-resistant Adjustment Tests:
Protective ball gap gap is adjusted, it is corresponding to 1.15 times of test voltage, do not puncture three times continuously, liter of starting from scratch every time Pressure will discharge when pressure resistance adjustment ball gap every time;
(13), pressure build-up test:
Start from scratch boosting, voltage is increased slowly with the speed of 2.5kV/s, after test voltage reaches 75%, makes the rate of rise The withstanding voltage for keeping per second 2% continues 1min after being added to test voltage, test voltage is uniformly then down to zero point as early as possible, Power supply, final cutting power supply are successively closed again;
(14), test lead is dismantled:
By porcelain vase discharge treatment, dismantling connection test lead;
(15), hand hole for installing sleeve again:
Transformer oil filling pipe is accessed into fuel outlet valve again, opens valve, according to transformer hand hole for installing sleeve position, is calculated Transformer needs the weight released out, until transformer oil is released from 100mm under hand hole for installing sleeve;
(16), bushing shell for transformer is dismantled:
Bushing shell for transformer BLQW-35/600 is dismantled, accesses plug-in connection cable head from hand hole position by winding leads, Wire length is configured according to actual range;
(17), increase sealing ring cover:
Sealing plate encryption seal is covered again, is then fastened;
(18), oil return again:
Oil fuel tube is accessed into pouring orifice again, by transformer oil injection transformer, oil surface level arrival meets defined position It sets, the convex portion deflation of the tubing and casing that liquidates, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, until flowing oil, Check again for oil level instruction;
(19), it checks again for:
Check again for until hand hole and cable plug head that whether there is or not permeabilitys.
Embodiment 3: a kind of pressure resistant test method of high pressure plug-in 35kV power transformer sequentially includes the following steps:
(1), it hangs in:
Transformer to be tested is hung in into laboratory designated position;
(2), it drains the oil:
Transformer oil filling pipe is accessed into fuel outlet valve, valve is opened according to transformer hand hole for installing sleeve position and calculates change Depressor needs the weight released, until transformer oil is released from 100mm under hand hole for installing sleeve;
(3), hand hole for installing sleeve is opened:
After oil level is put into designated position, it will be opened until transformer hand hole for installing sleeve;Select ordinary porcelain bushing BLQW-35/600 installs respective sleeve in O, A, B, C respectively;
(4), it flows back:
Again oil fuel tube is accessed into pouring orifice, by transformer oil injection transformer, oil surface level arrival meets defined position Set, to oil filled bushing, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, conservator successively from low to high to convex portion It deflates, until flowing oil, checks again for oil level instruction;
(5), leakproofness is checked:
It checks the sealing situation of transformer, the sealing ring of sleeve position, and has checked whether transformer oil exudation;
(6), it stands:
Inspection finishes, and puts transformer is quiet 12 hours;
(7), it preheats:
Whether there is or not insecurity factor presence for checkout facility environment;It is preheated if no, ac voltage withstanding testing transformer is switched on 5min is checked whether the test equipment is placed in the voltage gear required for the test, and whether adjusting leakage current values meet the requirements;
(8), ground connection operation:
By the A of bushing shell for transformer, B, C three-phase is connected with bare copper wire short circuit, and remaining winding is connected with bare copper wire short circuit, and with Shell is grounded together;Protective ball gap, divider, the effective reliable ground of grounding rod;
(9), wiring is tested:
By the high-pressure side wiring of high voltage control case and testing transformer, regulated power supply is connected with conducting wire, testing transformer, Protective resistance, step-up side, protective ball gap high pressure end and pressure divider high pressure end;
(10), test voltage:
The waveform of test voltage answers approximate sine wave, and the frequency of test voltage should be less than 80% rated frequency;Testing transformer Under test voltage, steady-state shortcircuit current should be less than 1A;
(11), pressure test is applied outside:
With external industrial frequency AC high pressure 85kV, it is applied to the winding terminals of the tested transformer, winding each section is in In idiostatic situation, power-frequency voltage 1min is born;
(12), pressure-resistant Adjustment Tests:
Protective ball gap gap is adjusted, it is corresponding to 1.2 times of test voltage, do not puncture three times continuously, liter of starting from scratch every time Pressure will discharge when pressure resistance adjustment ball gap every time;
(13), pressure build-up test:
Start from scratch boosting, voltage is increased slowly with the speed of 3kV/s, after test voltage reaches 75%, protects the rate of rise The withstanding voltage for holding per second 2% continues 1min after being added to test voltage, test voltage is uniformly then down to zero point as early as possible, then Successively close power supply, final cutting power supply;
(14), test lead is dismantled:
By porcelain vase discharge treatment, dismantling connection test lead;
(15), hand hole for installing sleeve again:
Transformer oil filling pipe is accessed into fuel outlet valve again, opens valve, according to transformer hand hole for installing sleeve position, is calculated Transformer needs the weight released out, until transformer oil is released from 100mm under hand hole for installing sleeve;
(16), bushing shell for transformer is dismantled:
Bushing shell for transformer BLQW-35/600 is dismantled, accesses plug-in connection cable head from hand hole position by winding leads, Wire length is configured according to actual range;
(17), increase sealing ring cover:
Sealing plate encryption seal is covered again, is then fastened;
(18), oil return again:
Oil fuel tube is accessed into pouring orifice again, by transformer oil injection transformer, oil surface level arrival meets defined position It sets, the convex portion deflation of the tubing and casing that liquidates, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, until flowing oil, Check again for oil level instruction;
(19), it checks again for:
Check again for until hand hole and cable plug head that whether there is or not permeabilitys.

Claims (1)

1. a kind of pressure resistant test method of high pressure plug-in 35kV power transformer, it is characterised in that sequentially include the following steps:
(1), it hangs in:
Transformer to be tested is hung in into laboratory designated position;
(2), it drains the oil:
Transformer oil filling pipe is accessed into fuel outlet valve, valve is opened according to transformer hand hole for installing sleeve position and calculates transformer The weight for needing to release, until transformer oil is released from 100mm under hand hole for installing sleeve;
(3), hand hole for installing sleeve is opened:
After oil level is put into designated position, transformer hand hole for installing sleeve is opened;Select ordinary porcelain bushing BLQW-35/ 600, respective sleeve is installed respectively in 0 phase, A phase, B phase, C phase;
(4), it flows back:
Again oil fuel tube is accessed into pouring orifice, by transformer oil injection transformer, oil surface level arrival meets defined position, right Oil filled bushing, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors, conservator successively from low to high to convex portion deflate, Until flowing oil, oil level instruction variation is checked;
(5), leakproofness is checked:
It checks the sealing situation of transformer: the sealing ring of sleeve position and having checked whether transformer oil exudation;
(6), it stands:
Inspection finishes, and puts transformer is quiet 12 hours;
(7), it preheats:
Whether there is or not insecurity factor presence for checkout facility environment;If no, ac voltage withstanding testing transformer, which is switched on, preheats 5min, It checks whether the test equipment is placed in the voltage gear required for the test, whether adjusting leakage current values meet the requirements;
(8), ground connection operation:
By the A of bushing shell for transformer, B, C three-phase is connected with bare copper wire short circuit, and remaining winding is connected with bare copper wire short circuit, and and shell It is grounded together;Protective ball gap, divider, the effective reliable ground of grounding rod;
(9), wiring is tested:
By the high-pressure side wiring of high voltage control case and testing transformer, regulated power supply, testing transformer, guarantor are connected with conducting wire Protect resistance, step-up side, protective ball gap high pressure end and pressure divider high pressure end;
(10), test voltage:
The waveform of test voltage answers approximate sine wave, and the frequency of test voltage should be less than 80% rated frequency;Testing transformer exists Under test voltage, steady-state shortcircuit current should be less than 1A;
(11), pressure test is applied outside:
It with external industrial frequency AC high pressure 85kV, is applied to the winding terminals of the tested transformer, winding each section is in electricity In the case where position, power-frequency voltage 1min is born;
(12), pressure-resistant Adjustment Tests:
Protective ball gap gap is adjusted, it is corresponding to 1.1~1.2 times of test voltage, do not puncture three times continuously, liter of starting from scratch every time Pressure will discharge when pressure resistance adjustment ball gap every time;
(13), pressure build-up test:
Start from scratch boosting, voltage is increased slowly with the speed of 2-3kV/s, after test voltage reaches 75%, protects the rate of rise The withstanding voltage for holding per second 2% continues 1min after being added to test voltage, test voltage is uniformly then down to zero point as early as possible, Power supply, final cutting power supply are successively closed again;
(14), test lead is dismantled:
By casing discharge treatment, test lead is dismantled;
(15), hand hole for installing sleeve again:
Transformer oil filling pipe is accessed into fuel outlet valve again, valve is opened according to transformer hand hole for installing sleeve position and calculates change Depressor needs the weight released, until transformer oil is released from 100mm under hand hole for installing sleeve;
(16), bushing shell for transformer is dismantled:
Bushing shell for transformer BLQW-35/600 is dismantled, accesses plug-in connection cable head, lead from hand hole position by winding leads Length is configured according to actual range;
(17), increase sealing ring cover:
Sealing plate encryption seal is covered again, is then fastened;
(18), oiling again:
Oil fuel tube is accessed into pouring orifice again, by transformer oil injection transformer, oil surface level arrival meets defined position, right The convex portion deflation for rushing tubing and casing, load ratio bridging switch, bushing lifting seat, low voltage electrical connectors is examined again until flowing oil Look into oil level instruction;
(19), leakproofness is checked again for:
Check again for the sealing situation of transformer: whether the sealing ring of sleeve position and periphery have transformer oil exudation.
CN201410678329.3A 2014-11-24 2014-11-24 The pressure resistant test method of high pressure plug-in 35kV power transformer Active CN104569748B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410678329.3A CN104569748B (en) 2014-11-24 2014-11-24 The pressure resistant test method of high pressure plug-in 35kV power transformer

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410678329.3A CN104569748B (en) 2014-11-24 2014-11-24 The pressure resistant test method of high pressure plug-in 35kV power transformer

Publications (2)

Publication Number Publication Date
CN104569748A CN104569748A (en) 2015-04-29
CN104569748B true CN104569748B (en) 2019-02-01

Family

ID=53086279

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410678329.3A Active CN104569748B (en) 2014-11-24 2014-11-24 The pressure resistant test method of high pressure plug-in 35kV power transformer

Country Status (1)

Country Link
CN (1) CN104569748B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116699346A (en) * 2023-08-08 2023-09-05 西安高压电器研究院股份有限公司 Power frequency withstand voltage test loop and power frequency withstand voltage test method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5276402A (en) * 1992-02-28 1994-01-04 Hipotronics, Inc. Three-phase transformer testing method and system
CN101145433A (en) * 2007-08-21 2008-03-19 山东达驰电气股份有限公司 Transformer conducting bar and winding leads connection structure
CN102110520A (en) * 2010-12-30 2011-06-29 陕西化建工程有限责任公司 Construction process for installing and debugging large transformer
CN102879697A (en) * 2012-10-30 2013-01-16 中国二十二冶集团有限公司 Optimized power transformer testing method
CN103163436A (en) * 2013-04-07 2013-06-19 株洲市变压器有限公司 Method and device for switching high voltage and low voltage and automatically reducing high voltage in withstand voltage test of transformer

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5276402A (en) * 1992-02-28 1994-01-04 Hipotronics, Inc. Three-phase transformer testing method and system
CN101145433A (en) * 2007-08-21 2008-03-19 山东达驰电气股份有限公司 Transformer conducting bar and winding leads connection structure
CN102110520A (en) * 2010-12-30 2011-06-29 陕西化建工程有限责任公司 Construction process for installing and debugging large transformer
CN102879697A (en) * 2012-10-30 2013-01-16 中国二十二冶集团有限公司 Optimized power transformer testing method
CN103163436A (en) * 2013-04-07 2013-06-19 株洲市变压器有限公司 Method and device for switching high voltage and low voltage and automatically reducing high voltage in withstand voltage test of transformer

Also Published As

Publication number Publication date
CN104569748A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN102156242B (en) Method for testing transformer insulation combination
CN107171245B (en) Live working of distribution network zero potential control method
CN106226564B (en) Routine test transfer box for high-voltage capacitance type voltage transformer without disassembling lead
CN105785247A (en) Circuit-breaker alternating current and direct current mixing voltage withstanding wiring loop used for alternating current filter and test method thereof
CN105353283A (en) AC voltage-withstand test method for 500kV GIL equipment
CN105137305A (en) Simulator and simulation system of internal faults of transformer
CN104569748B (en) The pressure resistant test method of high pressure plug-in 35kV power transformer
CN204142901U (en) A kind of high voltage power cable test device
CN102680871A (en) Test method for unshaded corona onset voltage of medium-voltage crosslinked polyethylene cable
CN111123050B (en) Transformer partial discharge test device for transformer and GIS in GIL connection mode
CN206832926U (en) For searching cable fault and carrying out the integrated apparatus of alternating current-direct current voltage-withstand test
CN205692974U (en) Allocated radio bridge joint ground wire insulation earthing device
CN205901152U (en) American case of improved generation 10kV becomes with simple eye through -hole and safety cover
CN205789467U (en) Self-protecting Three-Phase Distribution Transformers
CN202041553U (en) Combined wiring device for transformer test
CN202182930U (en) Voltage current double applying test device used in electrical device
CN206237027U (en) Modified 10kV American Unit Substations with eyes through hole and protective cover
CN205248085U (en) Superhigh pressure device of being qualified for next round of competitions
CN205810555U (en) 10kV automatic earthing AC transformer
CN106291296B (en) A kind of partial discharge of transformer defects simulation device and method
CN103941165B (en) GIS device experimental rig and method
CN205210234U (en) Transformer internal fault analogue means and system
CN105717334A (en) Simple high voltage and heavy current generation system for cables
CN106383291B (en) Test wiring device and method for testing leakage current of lightning arrester on site
CN205643550U (en) Lightning arrester tester

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant