Prior art keywords
screw pile
speed
pile
screw
pile body
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410579855.4A
Other languages
Chinese (zh)
Other versions
CN104563102B (en
Inventor
朱奎
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Caoxian Mingchao Wood Products Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410579855.4A priority Critical patent/CN104563102B/en
Publication of CN104563102A publication Critical patent/CN104563102A/en
Application granted granted Critical
Publication of CN104563102B publication Critical patent/CN104563102B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/58Prestressed concrete piles
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/02Methods or machines specially adapted for the production of tubular articles by casting into moulds
    • B28B21/10Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means
    • B28B21/22Methods or machines specially adapted for the production of tubular articles by casting into moulds using compacting means using rotatable mould or core parts
    • B28B21/30Centrifugal moulding
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B28WORKING CEMENT, CLAY, OR STONE
    • B28BSHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
    • B28B21/00Methods or machines specially adapted for the production of tubular articles
    • B28B21/56Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts
    • B28B21/60Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements
    • B28B21/62Methods or machines specially adapted for the production of tubular articles incorporating reinforcements or inserts prestressed reinforcements circumferential laterally tensioned
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/56Screw piles
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D7/00Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
    • E02D7/22Placing by screwing down

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Manufacturing & Machinery (AREA)
  • Chemical & Material Sciences (AREA)
  • Ceramic Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a screw pile, a manufacture method thereof, and a construction method of the screw pile. The screw pile is characterized by comprising a prestress precasting tubular pile body, wherein the prestress precasting tubular pile body is made of high-strength concrete, the pile body is provided with stiffening ribs which are spirally rotated and extruded around the pile body, and the bottom end of the pile body is provided with a blade foot. The manufacture method of the screw pile comprises the following steps: 1) filling a die; 2) arranging materials; 3) tensioning prestressed reinforcements; 4) carrying out centrifugal shaping; 5) carrying out normal-pressure steam curing; 6) demoulding; 7) carrying out autoclave curing; 8) carrying out natural curing. Compared with the traditional pile material, the screw pile has the advantages that cost is reduced by 25-35%.

Description

The construction method of a kind of screw pile and manufacture method and screw pile
Technical field
The present invention relates to a kind of screw pile, be applicable to civil engineering groundwork basic field.The invention still further relates to manufacture method and the construction method of above-mentioned screw pile.
Background technology
Stake is the effective means of soft ground treatment, and can be divided into preformed pile and non-preformed pile according to stake production method, traditional construction of prefabricated piles mode is generally static pressure and squeezes into or hammer driven.By comparing screw pile and straight stake, because screw pile is spiral injection, and straight stake is directly squeezed into, and the frictional force that obvious screw pile can provide is more much bigger than straight stake, thus the straight pile capacity of screw pile bearing capacity ratio wants large.Given this, being destroyed as long as screw pile is unlikely when constructing, if replace traditional driven pile to significantly improve pile capacity with screw pile, being obtained obvious economic benefit.
Summary of the invention
Technical problem to be solved by this invention is to provide a kind of screw pile with larger frictional resistance.Technical problem to be solved by this invention also comprises the manufacture method providing a kind of above-mentioned screw pile.Technical problem to be solved by this invention also comprises the construction method providing a kind of above-mentioned screw pile.
For this reason, screw pile provided by the invention, comprise by the prestressing force prefabricated pipe pile body adopting high-strength concrete to make, pile body rotates protruding stiffening rib with around pile body shape of threads, and the bottom of pile body is with sword pin.
Present invention also offers a kind of construction method of above-mentioned screw pile, its screw pile construction equipment adopts the screw pile machine of termination band cross-shaped fixtures, the cross bath at the cross-shaped fixtures docking pile body top of screw pile machine is adopted, then by screw pile spiral press-in soil layer during construction.
Present invention also offers a kind of manufacture method of above-mentioned screw pile, comprise the following steps:
1. die-filling
First configure the split cavity mated with screw pile, die-filling front upper, female die is cleaned out, release agent should be brushed evenly, stretch board, anchor plate should be cleaned out one by one, and coat machine oil on contact site, and cage of reinforcement enters mould palpus centering, when steel hoop enters mould, two ends should be placed smooth-going, depression must not be there is or tilt phenomenon, accomplishing that steel hoop and punching block are close to, with mortar leakage prevention;
2. cloth
Adopt material distributing machine cloth, during cloth, stake mould temperature is no more than 45 DEG C, and cloth requires evenly, first cloth two-end part, and rear cloth middle part, ensures that there are enough concrete at two ends;
3. prestressed reinforcement of tensioning
Determine after the stretching force of screw pile should calculate; And stress and stretch value two ore control should be adopted to guarantee the control of stretching force; When there is following situations in manufacturing process for the moment, again tensioning equipment should be verified: during stretch-draw, occur the abnormal conditions such as prestressed reinforcement ruptures continuously; Jack leakage of oil; Gauge hand can not return zero point; Pressure meter changed by jack;
4. centrifugal forming
Centrifugal forming was divided into for four stages: low speed, low-medium speed, middling speed, at a high speed, low speed is the upset of green concrete compound by steel form, makes it recover good mobility; Low-medium speed is the cloth stage, makes green concrete material be uniformly distributed in template inwall; Middling speed is transition stage, makes it to continue uniform distribution and overcome centrifugal force to uprush, and reduces inside and outside layering, improves density and the impermeability of screw pile; Fast phase makes the closely knit shaping of mixture under centrifugal action;
5. atmospheric steam curing
The medium of stake maintenance should adopt saturated steam.
Stream curing be divided into quietly to stop, heat up, constant temperature, cooling four-stage, the quiet general control that stops is at 1 ~ 2h, and programming rate controls at 20 ~ 25 DEG C/h, and thermostat temperature controls, at 70 DEG C ± 5 DEG C, to make concrete reach regulation demoulding strength, and cooling need slowly be carried out;
6. the demoulding
Screw pile demoulding strength must not lower than 40MPa, and prestressing force is put should to take symmetry, staggeredly put Zhang Fangfa;
7. autoclave curing
Enter pressure steaming still after the demoulding and carry out autoclave curing, during autoclave curing constant voltage, Steam pressure control is at 0.9 ~ 1.0MPa, and relevant temperature, at about 180 DEG C, when Pressure Drop in still is consistent to the outer atmospheric pressure of still, just can open still door after getting rid of residual air; When the outer temperature of still is lower or the outer wind speed of still is larger, forbid that stake being transported immediately still lowers the temperature, and avoids because excessive temperature differentials rate of temperature fall is too fast and causes temperature difference crack outward.
8. natural curing
Need to proceed moisture-keeping maintaining after the screw pile demoulding on finished product stockyard, to ensure that concrete surface soaks, prevent shrinkage crack, when guaranteeing that screw pile dispatches from the factory, strength grade is not less than C60.
Screw pile provided by the invention with stiffening rib can produce very large frictional resistance, therefore in same bearer power situation compared with bored pile, material cost can save 25% ~ 35%.
Accompanying drawing explanation
Fig. 1 is the structural representation of screw pile provided by the invention.
Fig. 2 is screw pile stake top provided by the invention floor map.
In each accompanying drawing: 1, cross bath, 2, stiffening rib, 3, pile lining, 4, sword pin.
Detailed description of the invention
As shown in Figure 1 and Figure 2, screw pile provided by the invention comprises by the prestressing force prefabricated pipe pile body 3 adopting high-strength concrete to make, and pile body 3 rotates protruding stiffening rib 2 with around pile body 3 shape of threads, and the bottom of pile body 3 is with sword pin 4.Screw pile inner hollow, pile wall thickness is 120mm ~ 150mm, and pile body (3) top offers cross bath (1), and stake top cross bath 1 degree of depth is 100mm.The every 50cm of pile body arranges stiffening rib 2, and stiffening rib 2 is ring-type, and stiffening rib evagination outermost edge is of a size of 100mm ~ 150mm from stake outward flange, and stiffening rib height is 100mm ~ 150mm, and evagination size and screw pile wall thickness match.Side direction appearance is circular arc, is convenient to a spiral injection; The stake end, arranges sword pin 4, and sword pin 4 is turbination, and sword pin 4 is solid, and sword pin 4 is configured with and is beneficial to cutting soil layer.
Its construction method is as follows: screw pile construction equipment adopts the screw pile machine of termination band cross-shaped fixtures, adopts the cross bath 1 at cross-shaped fixtures docking pile body 3 top of screw pile machine, then by screw pile spiral press-in soil layer during construction.The speed that during construction, pile body screws in adjusts according to different geology, and entering mud speed is 0.9 ~ 1m/min, and screw pile machine rotating speed is 140 ~ 170r/min; Entering argillic horizon speed is 0.7 ~ 0.8m/min, and screw pile machine rotating speed is 110 ~ 130r/min; Entering powder soil horizon speed is 0.5 ~ 0.6m/minm/min, and screw pile machine rotating speed is 70 ~ 100r/min; Entering layer of sand speed is 0.3 ~ 0.4m/min, and screw pile machine rotating speed is 30 ~ 60r/min.
Screw pile making step comprises:
1. die-filling
First configure the split cavity mated with screw pile, die-filling front upper, female die is cleaned out, release agent should be brushed evenly, stretch board, anchor plate should be cleaned out one by one, and coat machine oil on contact site, and cage of reinforcement enters mould palpus centering, when steel hoop enters mould, two ends should be placed smooth-going, depression must not be there is or tilt phenomenon, accomplishing that steel hoop and punching block are close to, with mortar leakage prevention;
2. cloth
Adopt material distributing machine cloth, during cloth, stake mould temperature is no more than 45 DEG C, and cloth requires evenly, first cloth two-end part, and rear cloth middle part, ensures that there are enough concrete at two ends;
3. prestressed reinforcement of tensioning
Determine after the stretching force of screw pile should calculate; And stress and stretch value two ore control should be adopted to guarantee the control of stretching force; When there is following situations in manufacturing process for the moment, again tensioning equipment should be verified: during stretch-draw, occur the abnormal conditions such as prestressed reinforcement ruptures continuously; Jack leakage of oil; Gauge hand can not return zero point; Pressure meter changed by jack;
4. centrifugal forming
Centrifugal forming comprised for four stages: low speed, low-medium speed, middling speed, at a high speed, low speed speed is 200 ~ 300r/min, low-medium speed speed is 400 ~ 600r/min, middling speed speed is 700 ~ 900r/min, high speed speed is 1000 ~ 1100r/min.Low speed is the upset of green concrete compound by steel form, makes it recover good mobility; Low-medium speed is the cloth stage, makes green concrete material be uniformly distributed in template inwall; Middling speed is transition stage, makes it to continue uniform distribution and overcome centrifugal force to uprush, and reduces inside and outside layering, improves density and the impermeability of screw pile; Fast phase makes the closely knit shaping of mixture under centrifugal action;
5. atmospheric steam curing
The medium of stake maintenance should adopt saturated steam.
Stream curing be divided into quietly to stop, heat up, constant temperature, cooling four-stage, the quiet general control that stops is at 1 ~ 2h, and programming rate controls at 20 ~ 25 DEG C/h, and thermostat temperature controls, at 70 DEG C ± 5 DEG C, to make concrete reach regulation demoulding strength, and cooling need slowly be carried out;
6. the demoulding
Screw pile demoulding strength must not lower than 40MPa, and prestressing force puts Zhang Shunxu, should take symmetry, interlock and put Zhang Fangfa;
7. autoclave curing
Enter pressure steaming still after the demoulding and carry out autoclave curing, during autoclave curing constant voltage, Steam pressure control is at 0.9 ~ 1.0MPa, and relevant temperature, at about 180 DEG C, when Pressure Drop in still is consistent to the outer atmospheric pressure of still, just can open still door after getting rid of residual air; When the outer temperature of still is lower or the outer wind speed of still is larger, forbid that stake being transported immediately still lowers the temperature, and avoids because excessive temperature differentials rate of temperature fall is too fast and causes temperature difference crack outward.
8. natural curing
Need to proceed moisture-keeping maintaining after the screw pile demoulding on finished product stockyard, to ensure that concrete surface soaks, prevent shrinkage crack, when guaranteeing that screw pile dispatches from the factory, strength grade is not less than C60.

Claims (8)

1. a screw pile, it is characterized in that: comprise by the prestressing force prefabricated pipe pile body (3) adopting high-strength concrete to make, pile body (3) rotates protruding stiffening rib (2) with around pile body (3) shape of threads, and the bottom of pile body (3) is with sword pin (4).
2. screw pile according to claim 1, is characterized in that: cross bath (1) is offered at described pile body (3) top.
3. screw pile according to claim 1 and 2, it is characterized in that: pile wall thickness is 120mm ~ 150mm, the every 50cm of pile body (3) arranges stiffening rib (2), stiffening rib (2) is ring-type, stiffening rib evagination outermost edge is of a size of 100mm ~ 150mm from stake outward flange, stiffening rib height is 100mm ~ 150mm, and side direction appearance is circular arc.
4. screw pile according to claim 1 and 2, is characterized in that: sword pin (4) is turbination, and sword pin (4) is for solid.
5. the construction method of screw pile described in a claim 1 or 2, it is characterized in that: screw pile construction equipment adopts the screw pile machine of termination band cross-shaped fixtures, the cross bath (1) at cross-shaped fixtures docking pile body (3) top of screw pile machine is adopted, then by screw pile spiral press-in soil layer during construction.
6. the manufacture method of screw pile according to claim 5, is characterized in that: the speed that during construction, pile body screws in adjusts according to different geology, and entering mud speed is 0.9 ~ 1m/min, and screw pile machine rotating speed is 140 ~ 170r/min; Entering argillic horizon speed is 0.7 ~ 0.8m/min, and screw pile machine rotating speed is 110 ~ 130r/min; Entering powder soil horizon speed is 0.5 ~ 0.6m/min m/min, and screw pile machine rotating speed is 70 ~ 100r/min; Entering layer of sand speed is 0.3 ~ 0.4m/min, and screw pile machine rotating speed is 30 ~ 60r/min.
7. a method for screw pile described in manufacturing claims 1 or 2, is characterized in that: comprise the following steps:
1. die-filling
First configure the split cavity mated with screw pile, die-filling front upper, female die is cleaned out, release agent should be brushed evenly, stretch board, anchor plate should be cleaned out one by one, and coat machine oil on contact site, and cage of reinforcement enters mould palpus centering, when steel hoop enters mould, two ends should be placed smooth-going, depression must not be there is or tilt phenomenon, accomplishing that steel hoop and punching block are close to, with mortar leakage prevention;
2. cloth
Adopt material distributing machine cloth, during cloth, stake mould temperature is no more than 45 DEG C, and cloth requires evenly, first cloth two-end part, and rear cloth middle part, ensures that there are enough concrete at two ends;
3. prestressed reinforcement of tensioning
Determine after the stretching force of screw pile should calculate; And stress and stretch value two ore control should be adopted to guarantee the control of stretching force; When there is following situations in manufacturing process for the moment, again tensioning equipment should be verified: during stretch-draw, occur the abnormal conditions such as prestressed reinforcement ruptures continuously; Jack leakage of oil; Gauge hand can not return zero point; Pressure meter changed by jack;
4. centrifugal forming
Centrifugal forming was divided into for four stages: low speed, low-medium speed, middling speed, at a high speed, low speed is the upset of green concrete compound by steel form, makes it recover good mobility; Low-medium speed is the cloth stage, makes green concrete material be uniformly distributed in template inwall; Middling speed is transition stage, makes it to continue uniform distribution and overcome centrifugal force to uprush, and reduces inside and outside layering, improves density and the impermeability of screw pile; Fast phase makes the closely knit shaping of mixture under centrifugal action;
5. atmospheric steam curing
The medium of stake maintenance should adopt saturated steam.
Stream curing be divided into quietly to stop, heat up, constant temperature, cooling four-stage, the quiet general control that stops is at 1 ~ 2h, and programming rate controls at 20 ~ 25 DEG C/h, and thermostat temperature controls, at 70 DEG C ± 5 DEG C, to make concrete reach regulation demoulding strength, and cooling need slowly be carried out;
6. the demoulding
Screw pile demoulding strength must not lower than 40Mpa, and prestressing force is put should to take symmetry, staggeredly put Zhang Fangfa;
7. autoclave curing
Enter pressure steaming still after the demoulding and carry out autoclave curing, during autoclave curing constant voltage, Steam pressure control is at 0.9 ~ 1.0MPa, and relevant temperature, at about 180 DEG C, when Pressure Drop in still is consistent to the outer atmospheric pressure of still, just can open still door after getting rid of residual air; When the outer temperature of still is lower or the outer wind speed of still is larger, forbid that stake being transported immediately still lowers the temperature, and avoids because excessive temperature differentials rate of temperature fall is too fast and causes temperature difference crack outward.
8. natural curing
Need to proceed moisture-keeping maintaining after the screw pile demoulding on finished product stockyard, to ensure that concrete surface soaks, prevent shrinkage crack, when guaranteeing that screw pile dispatches from the factory, strength grade is not less than C60.
8. the manufacture method of screw pile according to claim 7, is characterized in that: during centrifugal forming, low speed speed is 200 ~ 300r/min, low-medium speed speed is 400 ~ 600r/min, middling speed speed is 700 ~ 900r/min, high speed speed is 1000 ~ 1100r/min.
CN201410579855.4A 2014-10-13 2014-10-13 A kind of screw pile and manufacture method thereof and the construction method of screw pile Expired - Fee Related CN104563102B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410579855.4A CN104563102B (en) 2014-10-13 2014-10-13 A kind of screw pile and manufacture method thereof and the construction method of screw pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410579855.4A CN104563102B (en) 2014-10-13 2014-10-13 A kind of screw pile and manufacture method thereof and the construction method of screw pile

Publications (2)

Publication Number Publication Date
CN104563102A true CN104563102A (en) 2015-04-29
CN104563102B CN104563102B (en) 2016-08-24

Family

ID=53080115

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410579855.4A Expired - Fee Related CN104563102B (en) 2014-10-13 2014-10-13 A kind of screw pile and manufacture method thereof and the construction method of screw pile

Country Status (1)

Country Link
CN (1) CN104563102B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284307A (en) * 2016-10-14 2017-01-04 福州大学 Threaded prefabricated U HPC pile tube and making construction method thereof
CN108193670A (en) * 2017-12-20 2018-06-22 中冶天工集团有限公司 A kind of concrete prefabricated screw pile and its construction method
CN109183783A (en) * 2018-10-24 2019-01-11 南宁职业技术学院 It is a kind of to exempt from broken apart concrete filling pile head

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2160680Y (en) * 1993-02-16 1994-04-06 肖铁英 Prefabricated screw pile
CN1482308A (en) * 2003-07-03 2004-03-17 彭桂皎 Half screw pile and its pile forming method thereof
JP2006342499A (en) * 2005-06-07 2006-12-21 Seiko Kensetsu:Kk Bearing pile and intrusion method for bearing pile
CN1904307A (en) * 2005-07-27 2007-01-31 张超 Improved structure of spiral anger and profiled semi screw pole body
JP2010048039A (en) * 2008-08-25 2010-03-04 Japan Pile Corp Prestressed reinforced concrete pile
CN102699996A (en) * 2012-06-29 2012-10-03 江苏建华管桩有限公司 Prestressed pipe pile and production method thereof
CN203034472U (en) * 2012-12-11 2013-07-03 河北省电力勘测设计研究院 Tubular threaded pile foundation and tubular threaded pile forming apparatus
CN204475320U (en) * 2014-10-13 2015-07-15 叶长青 A kind of screw pile

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2160680Y (en) * 1993-02-16 1994-04-06 肖铁英 Prefabricated screw pile
CN1482308A (en) * 2003-07-03 2004-03-17 彭桂皎 Half screw pile and its pile forming method thereof
JP2006342499A (en) * 2005-06-07 2006-12-21 Seiko Kensetsu:Kk Bearing pile and intrusion method for bearing pile
CN1904307A (en) * 2005-07-27 2007-01-31 张超 Improved structure of spiral anger and profiled semi screw pole body
JP2010048039A (en) * 2008-08-25 2010-03-04 Japan Pile Corp Prestressed reinforced concrete pile
CN102699996A (en) * 2012-06-29 2012-10-03 江苏建华管桩有限公司 Prestressed pipe pile and production method thereof
CN203034472U (en) * 2012-12-11 2013-07-03 河北省电力勘测设计研究院 Tubular threaded pile foundation and tubular threaded pile forming apparatus
CN204475320U (en) * 2014-10-13 2015-07-15 叶长青 A kind of screw pile

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106284307A (en) * 2016-10-14 2017-01-04 福州大学 Threaded prefabricated U HPC pile tube and making construction method thereof
CN106284307B (en) * 2016-10-14 2018-07-20 福州大学 Threaded prefabricated U HPC pile piles and its making construction method
CN108193670A (en) * 2017-12-20 2018-06-22 中冶天工集团有限公司 A kind of concrete prefabricated screw pile and its construction method
CN109183783A (en) * 2018-10-24 2019-01-11 南宁职业技术学院 It is a kind of to exempt from broken apart concrete filling pile head
CN109183783B (en) * 2018-10-24 2023-10-24 南宁职业技术学院 Breaking-free separated pile head of concrete filling pile

Also Published As

Publication number Publication date
CN104563102B (en) 2016-08-24

Similar Documents

Publication Publication Date Title
CN105926802B (en) A kind of reinforcement structure of 3D printing reinforced masonry shear wall structure
CN104859049A (en) Pre-stressed concrete solid square pile production device
CN104005404A (en) Prestressed pipe pile coated with active material pile body and construction method
CN104563102A (en) Screw pile, manufacture method thereof, and construction method of screw pile
CN204551455U (en) A kind of grouting behind shaft or drift lining prestressing concrete hollow pile
CN102211353A (en) Process for manufacturing centrifugal concrete pile
CN107700480A (en) A kind of concrete-pile suitable for basement process
CN203639903U (en) Side friction enhancement type precast tube pile structure
CN103603337B (en) Slip casting prefabricated pile and grouting method
CN203994171U (en) A kind of building prefabricated components becomes punch die
CN104141304B (en) The construction method of a kind of extrusion molding preformed pile stiff-core cement soil Y shape stake
CN104972550B (en) The polygonal mould and preparation method of a kind of in-situ precast concrete-pile
CN104727315B (en) Post-grouting prestressed concrete hollow pile and manufacturing method thereof
Khasanov et al. Production of extra-strong concrete axisymmetric products
CN104532831B (en) A kind of large-diameter hollow screw stake and preparation method
CN100487203C (en) Construction method for single wall screw plastic casing on-site concrete pile
RU2679172C1 (en) Cast-in-place pile manufacturing method and a device for its implementation
CN203961099U (en) A kind of high strength hollow constructional column template brick and the constructional column of building thereof
CN104032777B (en) Geotechnique's cloth bag combined miniature stake lifting inclination-correcting builds/method of structure
CN207419452U (en) A kind of concrete-pile suitable for basement process
CN206928283U (en) A kind of pile for prestressed pipe pile grouting constructing device
CN202850017U (en) Modified type prestress high-strength concrete hollow square pile
CN104908150B (en) A kind of piping shaft making template and the method based on factorial praluction piping shaft
CN204059343U (en) The stake of extrusion molding preformed pile stiff-core cement soil Y shape
CN201857608U (en) Synthetic pile

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP02 Change in the address of a patent holder

Address after: 236000 Room 403, unit 2, building 3, Chengmei jadeite mansion, Zhenge North Road, Yingshang County, Fuyang City, Anhui Province

Patentee after: Ye Changqing

Address before: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Patentee before: Ye Changqing

CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder
CP02 Change in the address of a patent holder

Address after: 325000 No. 4, Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, China

Patentee after: Ye Changqing

Address before: 236000 Room 403, unit 2, building 3, Chengmei jadeite mansion, Zhenge North Road, Yingshang County, Fuyang City, Anhui Province

Patentee before: Ye Changqing

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201216

Address after: Miaokou administrative village Jia Zhuang Cun, pulianji Town, Caoxian County, Heze City, Shandong Province

Patentee after: Caoxian Mingchao Wood Products Co.,Ltd.

Address before: 325000 Jinchuan Road, Tianhe street, Wenzhou economic and Technological Development Zone, Zhejiang, 4

Patentee before: Ye Changqing

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160824

Termination date: 20211013