CN104555716A - Method for hoisting panel - Google Patents
Method for hoisting panel Download PDFInfo
- Publication number
- CN104555716A CN104555716A CN201410773080.4A CN201410773080A CN104555716A CN 104555716 A CN104555716 A CN 104555716A CN 201410773080 A CN201410773080 A CN 201410773080A CN 104555716 A CN104555716 A CN 104555716A
- Authority
- CN
- China
- Prior art keywords
- arm
- arms
- gripping
- bolt hole
- hoisting
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C1/00—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles
- B66C1/10—Load-engaging elements or devices attached to lifting or lowering gear of cranes or adapted for connection therewith for transmitting lifting forces to articles or groups of articles by mechanical means
- B66C1/22—Rigid members, e.g. L-shaped members, with parts engaging the under surface of the loads; Crane hooks
- B66C1/28—Duplicate, e.g. pivoted, members engaging the loads from two sides
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G21/00—Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
- E04G21/14—Conveying or assembling building elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a method for hoisting a panel. The method comprises the following steps: (1) preparing a hoisting device, specifically comprising the following steps: (a) preparing two hoisting arms same in structure; and (b) respectively mounting the two hoisting arms same in structure at the front and rear ends of two full reinforcing steel bars which are arranged at an interval, wherein the two full reinforcing steel bars are fixedly connected with the bottom end of a grapnel of a long grapper on a same side with the two hoisting arms, respectively; and (2) putting a to-be-hoisted prefabricated panel between the two full reinforcing steel bars and respectively hooking rotary shafts of the two hoisting arms by virtue of lifting hooks of hoisting machinery, wherein the prefabricated panel is locked between the two full reinforcing steel bars till being hoisted to an appointed position. The method disclosed by the invention has the advantages that the method is simple in mounting process, convenient to mount, simple to operate and safe and reliable, and local materials can be used for manufacturing a device for mounting the hoisted prefabricated panel. The prefabricated panel is safely and reliably hoisted without damaging the prefabricated panel. The project quality is ensured and the construction period is shortened.
Description
Technical field
The present invention relates to lifting buck plate material construction structural field, particularly relate to the construction method of a kind of multi-function device lifting sheet material.
Background technology
The application of assembled integral building system not only shortens the duration, decrease the consumption of on-the-spot material and facility, alleviate traditional architecture to construct the harm such as airborne dust, noise caused society, and possessed energy-saving heat preserving, fully improve the advantage that building usable floor area etc. benefits the nation and the people.The wherein factorial praluction of prefabricated panel, consequently reduces the holding time of construction machinery, scaffold etc., and shortens construction work time horizon of vestment.But how job site prefabricated panel did not damage safely is lifted into assigned address, it is a difficult problem for puzzlement builing industry always.
Application number is: the Chinese patent of 200410093439X discloses " clamp for hoisting fabricated construction parts made from cement ".It is long-armed that this stone tongs comprises a connector, a galianconism being rotationally connected with connector one end and of being rotationally connected with on galianconism on the position leaving galianconism and the connector place of being rotationally connected certain distance.Long-armedly be provided with a hanging column, can insert in a hole for hoist on cement prefab, in the process upwards lifting cement prefab, long-armed and galianconism can clamp cement prefab.This patent needs to arrange hole for hoist on cement prefab, weakens the intensity of component like this.And this fixture must be that special producer makes, job site purchase cost is higher.
Summary of the invention
The object of the present invention is to provide a kind of method that lift sheet material of hoisting prefabricated sheet material to appointed part that a kind of job site fabrication and installation technique is convenient, connect convenient, safe and reliable, the reasonable stress of lifting.
Lift a method for sheet material, it comprises the following steps:
(1) prepare hanging apparatus, specifically comprise the following steps;
A () prepares the identical ceiling mounted arm of two nested structures, ceiling mounted arm described in every suit includes the gripping arm that two time intervals are arranged, gripping arm described in each includes two long gripping arms and two linking arms, long gripping arm one end has bolt hole and the other end has the grapple of L shape, and described linking arm two ends have bolt hole; Two long gripping arms are arranged in a crossed manner, one end that two long gripping arms have a bolt hole respectively with a linking arm one end by being flexibly connected through the bolt of both bolts hole; In the other end bolt hole of two linking arms in the bolt hole that the two ends of a rotating shaft are arranged on the other end of two linking arms in a gripping arm respectively and in another gripping arm, four linking arms can around described axis of rotation, and the top of the long gripping arm grapple that the time interval being positioned at same side in two gripping arms is arranged is fixedly connected with respectively by connecting reinforcement;
B ceiling mounted arm identical for two nested structures is arranged on the rear and front end of about two spaced elongated reinforcing bars by () respectively, two elongated reinforcing bars overlap the bottom that ceiling mounted arm is positioned at the grapple of the long gripping arm of the same side respectively and are fixedly linked with two;
(2) prefabricated panels that will lift is placed between two elongated reinforcing bars, catches on the rotating shaft of two cover ceiling mounted arm with the suspension hook of lifting appliance respectively, and prefabricated panels is clamped between two elongated reinforcing bars, until be lifted into assigned address.
The invention has the advantages that: mounting process is simple, install device convenient, easy and simple to handle, safe and reliable, can to gather materials on the spot the hoisting prefabricated sheet material of fabrication and installation.Hoisting prefabricated plate is safe and reliable, there will not be the phenomenon damaging prefabricated panels.Ensure that workmanship and shorten the construction period.
Accompanying drawing explanation
Accompanying drawing is the hanging apparatus schematic diagram that a kind of method lifting sheet material of the present invention adopts.
Detailed description of the invention
Below in conjunction with the drawings and specific embodiments, the present invention is described in detail.
A kind of method lifting sheet material of the present invention as shown in drawings, it comprises the following steps: (1) prepares hanging apparatus, specifically comprises the following steps; A () prepares the identical ceiling mounted arm of two nested structures, ceiling mounted arm described in every suit includes the gripping arm that two time intervals are arranged, gripping arm described in each includes two long gripping arms 1 and two linking arms 2, long gripping arm 1 one end has bolt hole and the other end has the grapple 1-2 of L shape, and described linking arm two ends have bolt hole; Two long gripping arms 1 are arranged in a crossed manner, one end that two long gripping arms 1 have a bolt hole respectively with a linking arm one end by being flexibly connected through the bolt of both bolts hole; In the other end bolt hole of two linking arms 2 in the bolt hole that the two ends of a rotating shaft 3 are arranged on the other end of two linking arms 2 in a gripping arm respectively and in another gripping arm, four linking arms 2 can around described axis of rotation, and the top of the long gripping arm 1 grapple 1-2 that the time interval being positioned at same side in two gripping arms is arranged is fixedly connected with respectively by connecting reinforcement 4; B ceiling mounted arm identical for two nested structures is arranged on the rear and front end of about two spaced elongated reinforcing bars 6 by () respectively, two elongated reinforcing bars 6 overlap the bottom that ceiling mounted arm is positioned at the grapple of the long gripping arm of the same side respectively and are fixedly linked with two; (2) prefabricated panels 7 that will lift is placed between two elongated reinforcing bars 6, catches on the rotating shaft 3 of two cover ceiling mounted arm with the suspension hook of lifting appliance respectively, and prefabricated panels 7 is clamped between two elongated reinforcing bars 6, until be lifted into assigned address.
Embodiment 1
(1) prepare hanging apparatus, specifically comprise the following steps; A () prepares the identical ceiling mounted arm of two nested structures, ceiling mounted arm described in every suit includes the gripping arm that two time intervals are arranged, gripping arm described in each includes two long gripping arms 1 and two linking arms 2, long gripping arm 1 one end has bolt hole and the other end has the grapple 1-2 of L shape, and described linking arm two ends have bolt hole; Two long gripping arms 1 are arranged in a crossed manner, one end that two long gripping arms 1 have a bolt hole respectively with a linking arm one end by being flexibly connected through the bolt of both bolts hole; In the other end bolt hole of two linking arms 2 in the bolt hole that the two ends of a rotating shaft 3 are arranged on the other end of two linking arms 2 in a gripping arm respectively and in another gripping arm, four linking arms 2 can around described axis of rotation, and the top of the long gripping arm 1 grapple 1-2 that the time interval being positioned at same side in two gripping arms is arranged is fixedly connected with respectively by connecting reinforcement 4; B ceiling mounted arm identical for two nested structures is arranged on the rear and front end of about two spaced elongated reinforcing bars 6 by () respectively, two elongated reinforcing bars 6 overlap the bottom that ceiling mounted arm is positioned at the grapple of the long gripping arm of the same side respectively and are fixedly linked with two; (2) prefabricated panels 7 that will lift is placed between two elongated reinforcing bars 6, catches on the rotating shaft 3 of two cover ceiling mounted arm with the suspension hook of lifting appliance respectively, and prefabricated panels 7 is clamped between two elongated reinforcing bars 6, until be lifted into assigned address.
Adopt this method hoisting prefabricated sheet material to assigned address, hoisting process is safe and reliable, and the phenomenon of no damage occurred prefabricated panels, operation lifts practical convenient.And the device of the hoisting prefabricated sheet material of fabrication and installation of can gathering materials on the spot.Solve prefabricated panels in assembled integral building system and after transporting to scene, be lifted into a difficult problem for construction part.Not only ensure that workmanship and shorten the construction period, and reducing engineering cost.
Claims (1)
1. lift a method for sheet material, it is characterized in that it comprises the following steps:
(1) prepare hanging apparatus, specifically comprise the following steps;
A () prepares the identical ceiling mounted arm of two nested structures, ceiling mounted arm described in every suit includes the gripping arm that two time intervals are arranged, gripping arm described in each includes two long gripping arms and two linking arms, long gripping arm one end has bolt hole and the other end has the grapple of L shape, and described linking arm two ends have bolt hole; Two long gripping arms are arranged in a crossed manner, one end that two long gripping arms have a bolt hole respectively with a linking arm one end by being flexibly connected through the bolt of both bolts hole; In the other end bolt hole of two linking arms in the bolt hole that the two ends of a rotating shaft are arranged on the other end of two linking arms in a gripping arm respectively and in another gripping arm, four linking arms can around described axis of rotation, and the top of the long gripping arm grapple that the time interval being positioned at same side in two gripping arms is arranged is fixedly connected with respectively by connecting reinforcement;
B ceiling mounted arm identical for two nested structures is arranged on the rear and front end of about two spaced elongated reinforcing bars by () respectively, two elongated reinforcing bars overlap the bottom that ceiling mounted arm is positioned at the grapple of the long gripping arm of the same side respectively and are fixedly linked with two;
(2) prefabricated panels that will lift is placed between two elongated reinforcing bars, catches on the rotating shaft of two cover ceiling mounted arm with the suspension hook of lifting appliance respectively, and prefabricated panels is clamped between two elongated reinforcing bars, until be lifted into assigned address.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410773080.4A CN104555716A (en) | 2014-12-13 | 2014-12-13 | Method for hoisting panel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410773080.4A CN104555716A (en) | 2014-12-13 | 2014-12-13 | Method for hoisting panel |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104555716A true CN104555716A (en) | 2015-04-29 |
Family
ID=53072940
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410773080.4A Pending CN104555716A (en) | 2014-12-13 | 2014-12-13 | Method for hoisting panel |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104555716A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109019302A (en) * | 2018-09-07 | 2018-12-18 | 重庆雅克塑料制品有限公司 | Resin tile hanging apparatus |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0952689A (en) * | 1995-08-10 | 1997-02-25 | Aoi Roll Kk | Plate material holding device |
CN201459976U (en) * | 2009-08-31 | 2010-05-12 | 焦予平 | Combined curtain glass suspension clamp |
CN201932810U (en) * | 2010-12-10 | 2011-08-17 | 安徽池州家用机床股份有限公司 | Lifting hook |
CN102275808A (en) * | 2011-06-19 | 2011-12-14 | 湖北三江航天江河化工科技有限公司 | Device for hoisting irregular-shape object |
CN203269354U (en) * | 2013-05-08 | 2013-11-06 | 中铁六局集团石家庄铁路建设有限公司 | Transport sling for prefabricated slab |
CN203767854U (en) * | 2014-03-24 | 2014-08-13 | 中核华泰建设有限公司 | Pipeline hoisting frame |
-
2014
- 2014-12-13 CN CN201410773080.4A patent/CN104555716A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0952689A (en) * | 1995-08-10 | 1997-02-25 | Aoi Roll Kk | Plate material holding device |
CN201459976U (en) * | 2009-08-31 | 2010-05-12 | 焦予平 | Combined curtain glass suspension clamp |
CN201932810U (en) * | 2010-12-10 | 2011-08-17 | 安徽池州家用机床股份有限公司 | Lifting hook |
CN102275808A (en) * | 2011-06-19 | 2011-12-14 | 湖北三江航天江河化工科技有限公司 | Device for hoisting irregular-shape object |
CN203269354U (en) * | 2013-05-08 | 2013-11-06 | 中铁六局集团石家庄铁路建设有限公司 | Transport sling for prefabricated slab |
CN203767854U (en) * | 2014-03-24 | 2014-08-13 | 中核华泰建设有限公司 | Pipeline hoisting frame |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109019302A (en) * | 2018-09-07 | 2018-12-18 | 重庆雅克塑料制品有限公司 | Resin tile hanging apparatus |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104480930B (en) | A kind of filling pile cage of reinforcement hangs fixing construction method | |
CN103420264A (en) | Stretcher jaw clamping device and mounting method thereof | |
CN102381625B (en) | Large-diameter reinforcing steel bar lifting tongs | |
CN104179342A (en) | Hanging cage and construction method thereof for mounting profiled steel sheets on steel structural workshop wall surface | |
CN203474231U (en) | Steel bar tower safety hoisting device | |
CN104555716A (en) | Method for hoisting panel | |
CN203889942U (en) | Lifting device | |
CN102061810B (en) | Construction method of safe flat net positioned on periphery of building | |
CN104131124B (en) | Blast furnace cooling stave laid on end edge brick construction method | |
CN204057659U (en) | The prefabricated superimposed panel lifting appliance of super large | |
CN204370818U (en) | A kind of hanging apparatus lifting sheet material | |
CN201598093U (en) | Hoisting fixture for large-sized sectional box-type beam | |
CN104444843B (en) | A kind of full circle swinging small-sized crane | |
CN101723240A (en) | Special fixture for hoisting rectangular section steel column and hoisting method by using same | |
CN204529154U (en) | Cement brick hoisting machine | |
CN104528519A (en) | Clamping tool for assisting in hoisting cement electric poles | |
CN205773023U (en) | A kind of construction site boom hoisting | |
CN104118799A (en) | Steel tube lifting device | |
CN203806932U (en) | Guy cable type portable drum-shaped joint component lifting clamping tool | |
CN104632085A (en) | Derrick lifting holding pole for oil well and lifting method | |
CN204569127U (en) | Steel upright post hoisting jig | |
CN102774739A (en) | Hoisting device and replacing method of hammer head of reaction hammer type crusher | |
CN203903876U (en) | Convenient embedded part lifting adjusting device | |
CN202609780U (en) | Titanium sponge lump clamp | |
CN220928641U (en) | Detachable building hanging basket |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150429 |
|
RJ01 | Rejection of invention patent application after publication |