CN104551611B - Ball assembly fixture - Google Patents

Ball assembly fixture Download PDF

Info

Publication number
CN104551611B
CN104551611B CN201310501012.8A CN201310501012A CN104551611B CN 104551611 B CN104551611 B CN 104551611B CN 201310501012 A CN201310501012 A CN 201310501012A CN 104551611 B CN104551611 B CN 104551611B
Authority
CN
China
Prior art keywords
ball
middle mold
mould
assembly tooling
location hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310501012.8A
Other languages
Chinese (zh)
Other versions
CN104551611A (en
Inventor
罗发飞
曹改娟
李涛
吴居良
陈志锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gree Electric Appliances Inc of Zhuhai
Original Assignee
Gree Electric Appliances Inc of Zhuhai
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gree Electric Appliances Inc of Zhuhai filed Critical Gree Electric Appliances Inc of Zhuhai
Priority to CN201310501012.8A priority Critical patent/CN104551611B/en
Publication of CN104551611A publication Critical patent/CN104551611A/en
Application granted granted Critical
Publication of CN104551611B publication Critical patent/CN104551611B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23PMETAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
    • B23P19/00Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes
    • B23P19/02Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same
    • B23P19/027Machines for simply fitting together or separating metal parts or objects, or metal and non-metal parts, whether or not involving some deformation; Tools or devices therefor so far as not provided for in other classes for connecting objects by press fit or for detaching same using hydraulic or pneumatic means

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Automatic Assembly (AREA)
  • Insertion Pins And Rivets (AREA)

Abstract

The invention provides a ball assembling tool, which is used for assembling balls into a mounting hole of a support frame, and comprises: the positioning assembly is provided with a positioning hole corresponding to the mounting hole; and the assembly component comprises a press fitting bulge matched with the positioning hole so as to press the ball arranged in the positioning hole into the mounting hole. By applying the ball assembling tool, the balls arranged in the positioning holes can be assembled into the mounting holes of the support frame through the positioning assemblies and the assembling assemblies, so that the aim of improving the working efficiency can be fulfilled, and the labor intensity of workers can be further reduced.

Description

Ball assembly tooling
Technical field
The present invention relates to process equipment applications, in particular to a kind of ball assembly tooling.
Background technology
A cabinet machine of the prior art needs eight bracing frames, and a bracing frame need to assemble seven balls.And prior art In typically by the way of staff's hand assembled, all carry out ball installation, that is, staff once can only assemble a rolling Pearl, thus low using this kind of assembling mode operating efficiency, and intensity of workers is big.
Content of the invention
The present invention is intended to provide a kind of ball assembly tooling, to reach the purpose improving operating efficiency.
To achieve these goals, the invention provides a kind of ball assembly tooling, for the installation in the hole to bracing frame Assembling ball, ball assembly tooling includes: positioning component, is provided with the location hole corresponding with installing hole;Assembling assembly, including With location hole cooperation press-fit projection, be placed on position in the hole ball press-in installing hole in.
Further, positioning component includes: the first middle mold, and location hole is arranged in the first middle mold;Second middle mold, is arranged on The top of the first middle mold, including for guiding the guide portion of ball and being used for and the resigning hole press-fiting male cooperation, the second middle mold There is the second place making primary importance that guide portion connected with location hole and making resigning hole connect with location hole.
Further, the first middle mold includes mould body in first, and mould body in first is provided with the first sliding part, and second Middle mold includes mould body in second, and mould body in second is provided with the second sliding part being matched with the first sliding part.
Further, the first middle mold includes in first mould body and is arranged on first of mould body two opposed ends in first Limiting section and the second limiting section, in primary importance, the second middle mold is abutted with the first limiting section, in the second place, in second Mould is abutted with the second limiting section.
Further, the second middle mold includes mould body in second, and guide portion includes being arranged on drawing on mould body in second Guide groove and the bullport connecting with guiding groove, in primary importance, bullport is connected with location hole to be placed in guiding groove Ball is directed in location hole.
Further, ball assembly tooling also includes importing assembly, connects with guiding groove, ball is directed into guiding groove Interior.
Further, ball assembly tooling also includes the storage assembly for storing ball, imports assembly away from guiding groove One end connect with storage assembly.
Further, assembling assembly includes: mould on first, press-fits projection and is arranged at mould on first;Mould on second, with On one, mould is fixedly connected, to support mould on first.
Further, positioning component also includes bed die, is provided with the mounting groove for installing bracing frame.
Further, ball assembly tooling also includes protecting assembly, is provided with for accommodating positioning component and assembling assembly Receiving space.
The ball assembly tooling of the application present invention, it is fixed to be more quickly placed on by positioning component and assembling assembly The ball of position in the hole is assembled to the installation in the hole of bracing frame such that it is able to reach the purpose improving operating efficiency, further may be used To reduce intensity of workers.
Brief description
The Figure of description constituting the part of the application is used for providing a further understanding of the present invention, and the present invention shows Meaning property embodiment and its illustrate for explaining the present invention, does not constitute inappropriate limitation of the present invention.In the accompanying drawings:
Fig. 1 is the decomposition texture schematic diagram according to ball assembly tooling in first embodiment of the invention;
Fig. 2 is the assembling structure schematic diagram according to ball assembly tooling in first embodiment of the invention;
Fig. 3 is the structural representation according to the first middle mold in first embodiment of the invention;
Fig. 4 is the structural representation according to the second middle mold in first embodiment of the invention;
Fig. 5 is the sectional view according to the second middle mold in first embodiment of the invention;
Fig. 6 is the structural representation according to mould in first embodiment of the invention first;
Fig. 7 is the structural representation according to bed die in first embodiment of the invention;
Fig. 8 is the assembling schematic diagram according to funnel in storage assembly in first embodiment of the invention and support;
Fig. 9 is the structural representation according to inclined tube in storage assembly in first embodiment of the invention;
Figure 10 is the decomposition texture schematic diagram according to ball assembly tooling in second embodiment of the invention.
In figure reference: 10, positioning component;11st, the first middle mold;12nd, the second middle mold;13rd, bed die;111st, location hole; 112nd, the first limiting section;113rd, the second limiting section;114th, the first sliding part;115th, recess;121st, resigning hole;122nd, guiding groove; 123rd, bullport;124th, the second sliding part;131st, mounting groove;20th, assembling assembly;21st, mould on first;22nd, mould on second;211、 Press-fit projection;30th, import assembly;31st, pipe;32nd, clip;40th, storage assembly;41st, funnel;42nd, support;43rd, inclined tube;431、 Import;50th, protect assembly;90th, bracing frame;91st, installing hole.
Specific embodiment
It should be noted that in the case of not conflicting, the embodiment in the application and the feature in embodiment can phases Mutually combine.To describe the present invention below with reference to the accompanying drawings and in conjunction with the embodiments in detail.
As shown in Figures 1 to 9, first embodiment of the invention provides a kind of ball assembly tooling, for bracing frame 90 Installing hole 91 in assembling ball.Ball assembly tooling includes positioning component 10 and assembling assembly 20.Wherein, positioning component 10 sets It is equipped with the location hole 111 corresponding with installing hole 91.Assembling assembly 20 include with location hole 111 cooperation press-fit raised 211, with It is placed in the ball press-in installing hole 91 in location hole 111.
It is assembled to by the ball that positioning component 10 and assembling assembly 20 can more quickly be placed in location hole 111 Such that it is able to reach the purpose improving operating efficiency in the installing hole 91 of bracing frame 90, staff further can be reduced Labour intensity.
As depicted in figs. 1 and 2, positioning component 10 includes the first middle mold 11 and the second middle mold 12.Above-mentioned location hole 111 is arranged In the first middle mold 11.Above-mentioned second middle mold 12 and the first middle mold 11 coordinate, including for guiding the guide portion of ball and being used for With the resigning holes 121 press-fiting raised 211 cooperations, the second middle mold 12 have the primary importance that guide portion connected with location hole 111 and The second place that resigning hole 121 is connected with location hole 111.
Specifically, as shown in figure 3, the first middle mold 11 includes mould body in first, mould body in first is provided with first Sliding part 114, the second middle mold 12 includes mould body in second, mould body in second is provided with and matches with the first sliding part 114 The second sliding part 124 closing.
First sliding part 114 and the second sliding part 124 are set and the first middle mold 11 and the can be reduced by above-mentioned sliding part Friction between two middle molds 12, can also position to above-mentioned first middle mold 11 and the second middle mold 12 simultaneously.In the present embodiment The first sliding part 114 be slide protrusion, the second sliding part 124 is the chute with slide protrusion cooperation.
Preferably, in first, first limiting section 112 and the second limiting section 113 can be set mould body two opposed ends, In primary importance, the second middle mold 12 is abutted with the first limiting section 112, and in the second place, the second middle mold 12 is spacing with second Portion 113 abuts.
First limiting section 112 and the second limiting section 113 are set, by above-mentioned limiting section, the second middle mold 12 can be limited Position is such that it is able to make the second middle mold 12 more accurately reach primary importance or the second place of setting, it is to avoid because of Wrong localization And there is operational error.The first limiting section 112 in the present embodiment and the second limiting section 113 are and are arranged in the first middle mold 11 Positioning convex.
Further, above-mentioned first limiting section 112 and the second limiting section 113 can make Split type structure, by bolt or Screw is fixed in above-mentioned first middle mold 11.
Fixed part for fixing cylinder is additionally provided with above-mentioned first middle mold 11, above-mentioned second middle mold 12 can pass through gas Cylinder promotes, and for promoting the cylinder of the second middle mold 12 motion can be arranged on fixation portions.
As shown in Figure 4 and Figure 5, guide portion include the guiding groove 122 being arranged on mould body in second and with guiding groove 122 The bullport 123 of connection.In primary importance, bullport 123 is connected with location hole 111 to be placed on the rolling in guiding groove 122 Pearl is directed in location hole 111, and in the second place, resigning hole 121 is connected with location hole 111.
Preferably, the top of above-mentioned guiding groove 122 can be provided for preventing the lid of ball abjection, and above-mentioned lid can To be made using transparent material, observe in order to staff.
Meanwhile, the shape of above-mentioned guiding groove 122 and arranged direction all can be modified according to need of work, every can Ensureing that each ball can be transferred through technical scheme that corresponding bullport 123 enters in corresponding location hole 111 all should be in the application Protection domain within.
Bullport 123 in the present embodiment is placed in the bottom of mould body in second, i.e. the obliquely downward of guiding groove, at first When putting, above-mentioned bullport 123 is alignd with location hole 111, and the ball in guiding groove 122 can roll in location hole 111, but by Size in bullport 123 and location hole 111 is adapted, therefore can only enter a ball, remaining ball in each location hole 111 Can only enter in the location hole 111 do not have ball such that it is able to guarantee all to have ball in each location hole 111.
It should be noted that the guiding groove 122 in the present embodiment and resigning hole 121 are multiple, the adjacent guiding of each two Separated by resigning hole 121 one direction between groove 122, that is, according to width guiding groove 122 and the setting number of the second middle mold Resigning hole 121 arranged for interval.
As shown in fig. 7, above-mentioned positioning component 10 also includes bed die 13, it is provided with the mounting groove for installing bracing frame 90 131.Setting mounting groove 131 can limit to the position of bracing frame 90, to prevent bracing frame 90 from occurring in assembling process Displacement.
Certainly above-mentioned mounting groove 131 it can also be provided that other structures, every bracing frame 90 can be carried out spacing.
Assembling assembly 20 in the present embodiment includes on first mould 21 and for supporting second of mould 21 on above-mentioned first Mould 22.Wherein, press-fit raised 211 to be arranged at mould 21 on first.In assembling, ball is placed in location hole 111, and now allows Position hole 121 is aligned with location hole 111, now pushes mould 21 on first, makes to press-fit raised 211 through resigning hole 121 and location hole After 111, ball is pressed in installing hole 91, to complete the assembly manipulation of ball.
It should be noted that mould 21 can arrange the groove with guiding groove cooperation on above-mentioned first, press-fit projection to reduce 211 height, certainly, when the height press-fiting raised 211 is enough it is also possible to be not provided with above-mentioned groove.
Further, above-mentioned press-fit raised 211 can make with first on mould 21 split structure, during use, by spiral shell Nail fixation is fixed on mould 21 on first, will press-fit projection and 211 be arranged to Split type structure, when some or several pressure When dress raised 211 damages, it is not required to change to mould 21 is overall on first.
On above-mentioned second, mould 22 is made using hard material, to be supported to mould 21 on above-mentioned first.Using rigid material Material is prevented from the deformation that on first, mould 21 produces because of insufficient strength.And only need to change on first when mould 21 damage on first Mould 21, on second, mould 22 can be continuing with, and reduce and waste.
Preferably, mould 22 can pass through the driving elements such as cylinder and drives, thus driving mould on above-mentioned first on above-mentioned second 21 motions.
The above-mentioned quantity press-fiting raised 211, location hole 111 and resigning hole 121 all can be adjusted according to need of work.
Further, ball assembly tooling also includes protecting assembly 50, is provided with for accommodating positioning component 10 and assembling The receiving space of assembly 20.Protection assembly 50 in the present embodiment is the casing of a face opening, to reach protection staff's The purpose of safety.Certainly, other sealing surfaces of above-mentioned casing may be alternatively configured network structure.
As depicted in figs. 1 and 2, ball assembly tooling also includes importing assembly 30, through the opening of above-mentioned protection assembly 50 And connect with guiding groove 122, ball is directed in guiding groove 122.Wherein, the importing assembly 30 in the present embodiment includes managing Son 31 and the clip 32 for fixing tube 31, above-mentioned pipe 31 is fixed in the first middle mold 11 by clip 32.Preferably, on State and be additionally provided with recess 115 in the first middle mold 11, connect to allow pipe 31 to pass through and with guiding groove 122.
Inductive switch and retention device can also be arranged on above-mentioned clip 32, to open by sensing in the embodiment of the present invention Close sensing and enter the quantity of ball thus controlling retention device that pipe 31 is closed, to ensure that ball will not reboot groove Pile up in 122.
It should be noted that the shape of pipe 31 in the present embodiment and arrangement can be set as needed, Every technical scheme that ensure that ball smooth flow all should be in the protection domain of the application.
Preferably, above-mentioned ball assembly tooling also includes the storage assembly 40 for storing ball, import assembly 30 away from One end of guiding groove 122 is connected with storage assembly 40.
Storage assembly 40 in the present embodiment includes funnel 41, support 42 and inclined tube 43.Above-mentioned funnel 41 passes through support 42 It is supported on protection assembly 50.Above-mentioned inclined tube 43 is placed in the port of export of funnel 41, and its miner diameter end is connected with pipe 31.This inclined tube It is provided with multiple imports 431, when above-mentioned middle mold moves up and down, inclined tube 43 moves with pipe 31, is placed in break on 43 The balance of the ball in funnel 41 is such that it is able to make ball roll in pipe 31.
The upper end of above-mentioned inclined tube 43 can suitably lengthen and make cylinder, the lower end cone transition of inclined tube 43, cone End internal diameter be slightly larger than ball diameter, so more imports 431 can be opened on inclined tube 43, can allow and more roll Pearl rolls into.
When ball assembly tooling in the application embodiment of the present invention works: be first placed on bed die 13 corresponding 8 bracing frames 90 Mounting groove 131, and by ball add funnel 41 in.Activate switch, make the first middle mold 11 drive the second middle mold 12, clip 32, Inclined tube 43 and pipe 31 move downwardly together.
Treat that the first middle mold 11 moves to setting position, the second middle mold 12 starts to move forward, until withstanding the first limiting section 112, Now the groove of the second middle mold 12 is directed at the outlet of pipe 31 lower end.
Further, when pipe 31 moves downward, ball enters pipe 31 along inclined tube 43, under pipe 31, when When outlet is alignd with the entrance of the second middle mold 12 guiding groove 122, ball rolls in groove, and the lower end of guiding groove 122 has bullport 123, ball is rolled in location hole 111 along bullport 123, then enters into the installing hole 91 of bracing frame 90 along location hole 111 Interior.
When the guiding groove 122 of the second middle mold 12 is full of ball, must all have in 7 in guiding groove 122 bullport 123 Ball, all has ball at the 7 of bracing frame 90 installing hole 91.
Now, the second middle mold 12 is retreated, makes the second middle mold 12 push up the second limiting section 113 of the first middle mold 11 rear end, So that resigning hole 121 and location hole 111 are to it, and just directly over the installing hole 91 of bracing frame 90, in each location hole 111 All there is 1 ball.
Push mould 22 on mould 21 and second on first, make the projection 211 that press-fits on mould 21 on first pass through resigning hole 121 He After location hole 111, ball is pressed in installing hole 91.
Finally, position will be moved back on mould 22 on mould on first 21 and second, and take out the bracing frame 90 assembling ball.As figure Shown in 10, second embodiment of the invention additionally provides a kind of ball assembly tooling, including the storage assembly offering multiple through holes 40 and be provided with the importing assembly 30 of locating ring or positioning convex point, wherein, above-mentioned importing assembly 30 passes through on first mould 21 and the On mould 22 on two setting through hole and abut with the second middle mold 12, with for the second middle mold 12 provide ball.Above-mentioned second middle mold 12 On be provided with sliding tray, to prevent above-mentioned importing assembly 30 from misplacing.
It should be noted that second embodiment is in addition to features described above, other are all identical with first embodiment, and the second enforcement The operation principle of example is identical with the operation principle of first embodiment.
When applying the ball assembly tooling in above-mentioned second embodiment to work: be first placed on bed die 13 right 8 bracing frames 90 In the draw-in groove answered, ball is added storage assembly 40;Now pipe 31 passes through the second middle mold 12, pushes up the upper table of the first middle mold 11 Face.
Secondly, activate switch, the first middle mold 11 drives the second middle mold 12 to move down, pipe 31 is under self gravitation effect, Move down.Now, ball is rolled in the pipe 31 moving down by storage assembly 40, and arrives pipe 31 bottom, is parked in the second middle mold Resigning hole upper surface.
When the first middle mold 11 pushes and puts in place, the locating ring of pipe 31 withstands the upper surface of the second middle mold 12, now pipe 31 weight is undertaken by locating ring, and pipe low side is on the upper surface of the second middle mold 12, but the upper surface with the second middle mold 12 Distance be less than the diameter of half ball, to prevent ball from deviating from from pipe 31.
Second middle mold 12 promotes reach by cylinder, withstands the locating piece of the first middle mold 11 leading portion.Mould 21 and second on first Upper mould 22 pushes, and ball is pressed into the installation in the hole of bracing frame 90.
Finally, each mould return, and the bracing frame assembling 90 is taken out, you can complete installation operation.Retouch from above It can be seen that the above embodiments of the present invention achieve following technique effect in stating: by back plate and side plate are wholely set energy Enough save the installation step of split type back plate and side plate, thus reaching the purpose of the efficiency of assembling improving air-conditioner.
The foregoing is only the preferred embodiments of the present invention, be not limited to the present invention, for the skill of this area For art personnel, the present invention can have various modifications and variations.All within the spirit and principles in the present invention, made any repair Change, equivalent, improvement etc., should be included within the scope of the present invention.

Claims (9)

1. a kind of ball assembly tooling, for assembling ball in the installing hole (91) of bracing frame (90) it is characterised in that described Ball assembly tooling includes:
Positioning component (10), is provided with the location hole (111) corresponding with described installing hole (91);
Assembling assembly (20), press-fits raised (211) including with described location hole (111) coordinates, to be placed on described location hole (111) ball in is pressed in described installing hole (91);
Described positioning component (10) includes:
First middle mold (11), described location hole (111) is arranged on described first middle mold (11);
Second middle mold (12), is arranged on the top of described first middle mold (11), including for guide described ball guide portion and For press-fiting, with described, the resigning hole (121) that raised (211) coordinate, described second middle mold (12) has makes described guide portion and institute State location hole (111) primary importance connecting and the second making described resigning hole (121) connect with described location hole (111) Put.
2. ball assembly tooling according to claim 1 is it is characterised in that described first middle mold (11) includes the first middle mold Body, mould body in described first is provided with the first sliding part (114), and described second middle mold (12) includes calligraphy or painting model in second Body, mould body in described second is provided with the second sliding part (124) being matched with described first sliding part (114).
3. ball assembly tooling according to claim 1 is it is characterised in that described first middle mold (11) includes the first middle mold Body and the first limiting section (112) and the second limiting section (113) that are arranged on mould body two opposed ends in described first, in institute When stating primary importance, described second middle mold (12) is abutted with described first limiting section (112), in the described second place, described Second middle mold (12) is abutted with described second limiting section (113).
4. ball assembly tooling according to claim 1 is it is characterised in that described second middle mold (12) includes the second middle mold Body, described guide portion is included the guiding groove (122) being arranged on mould body in described second and is connected with described guiding groove (122) Logical bullport (123), in described primary importance, described bullport (123) is connected with described location hole (111) to be placed on Ball in described guiding groove (122) is directed in described location hole (111).
5. ball assembly tooling according to claim 4 is it is characterised in that described ball assembly tooling also includes importing group Part (30), is connected with described guiding groove (122), and described ball is directed in described guiding groove (122).
6. ball assembly tooling according to claim 5 is it is characterised in that described ball assembly tooling is also included for depositing Store up the storage assembly (40) of described ball, the described assembly (30) that imports is away from one end of described guiding groove (122) and described storage Assembly (40) connects.
7. ball assembly tooling according to claim 1 is it is characterised in that described assembling assembly (20) includes:
Mould (21) on first, described press-fit raised (211) and are arranged at mould (21) place on described first;
Mould (22) on second, are fixedly connected with mould (21) on described first, to support mould (21) on described first.
8. ball assembly tooling according to claim 1 is it is characterised in that described positioning component (10) also includes bed die (13), it is provided with the mounting groove (131) for installing support frame as described above (90).
9. ball assembly tooling according to claim 1 is it is characterised in that described ball assembly tooling also includes protection group Part (50), is provided with the receiving space for accommodating described positioning component (10) and described assembling assembly (20).
CN201310501012.8A 2013-10-22 2013-10-22 Ball assembly fixture Expired - Fee Related CN104551611B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310501012.8A CN104551611B (en) 2013-10-22 2013-10-22 Ball assembly fixture

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310501012.8A CN104551611B (en) 2013-10-22 2013-10-22 Ball assembly fixture

Publications (2)

Publication Number Publication Date
CN104551611A CN104551611A (en) 2015-04-29
CN104551611B true CN104551611B (en) 2017-01-18

Family

ID=53069243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310501012.8A Expired - Fee Related CN104551611B (en) 2013-10-22 2013-10-22 Ball assembly fixture

Country Status (1)

Country Link
CN (1) CN104551611B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105014340A (en) * 2015-06-17 2015-11-04 河海大学常州校区 Ball assembling device
CN105149919B (en) * 2015-07-02 2018-02-27 东莞市联洲知识产权运营管理有限公司 A kind of ball inlaying equipment

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3533151A (en) * 1967-11-02 1970-10-13 Cons Foods Corp Apparatus for inserting balls in a ball bearing retainer
US6836960B2 (en) * 2000-05-15 2005-01-04 Matsushita Electric Industrial Co., Ltd. Board transfer apparatus, board transfer method, and component mounting apparatus
CN202219392U (en) * 2011-07-27 2012-05-16 东莞市石龙万通实业有限公司 Three-folding hidden sliding rail bead filling machine
CN202219391U (en) * 2011-07-27 2012-05-16 东莞市石龙万通实业有限公司 Double-layered ball mounting machine for damping sliding rails
CN202192407U (en) * 2011-07-27 2012-04-18 东莞市石龙万通实业有限公司 Double-folded hidden sliding rail bead filling machine
CN102941463A (en) * 2012-10-31 2013-02-27 昆山高晟精密机电有限公司 Roller loading mechanism for assembly production line of gearbox of electric drill
CN203526917U (en) * 2013-10-22 2014-04-09 珠海格力电器股份有限公司 Ball assembly fixture

Also Published As

Publication number Publication date
CN104551611A (en) 2015-04-29

Similar Documents

Publication Publication Date Title
CN104551611B (en) Ball assembly fixture
CN202490754U (en) Automatic powder injection cabinet
CN203517103U (en) Quick connector
CN107856040A (en) A kind of intelligent robot of battery battery easy to disassemble
CN103419022A (en) Automatic core assembling machine for core body of warm wind radiator and working method thereof
CN204366928U (en) Welding stirrup carrying case
CN203778535U (en) Full-automatic bending machine
CN203526917U (en) Ball assembly fixture
CN104197179B (en) A kind of railway switch multiple spot self-acting lubricator
CN103737280B (en) A kind of automatic sheathing device of magnet ring insulation sleeve
CN203682446U (en) Automatic feeding and discharging device with circulating table
CN208895520U (en) Jack intelligently wears pin machine
CN104466828B (en) Cable bridge convenient to install
CN105559361A (en) Portable installed integral cabinet with air exchange function
CN205790250U (en) The package machine structure of lead-acid battery package machine
CN203778533U (en) Bending machine
CN211098271U (en) Organic waste gas VOC treatment facility
CN106733954A (en) Pipeline air pressure purging system
CN103920759B (en) Bender
CN208965052U (en) Prebaked cell for aluminum-reduction hot anode scrap smoke gas collecting apparatus
CN203791408U (en) Movable type hydraulic shaping machine
CN206755339U (en) A kind of air-treatment unit mounting structure and the air-treatment unit comprising the structure
CN206825796U (en) A kind of sealing ring manufacturing equipment
CN206544220U (en) A kind of sound film die cutting device
CN203649830U (en) Automatic sleeving device for magnet ring insulation sleeves

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170118

CF01 Termination of patent right due to non-payment of annual fee