CN104537803B - One kind ground connection wire management prior-warning device - Google Patents
One kind ground connection wire management prior-warning device Download PDFInfo
- Publication number
- CN104537803B CN104537803B CN201510008116.4A CN201510008116A CN104537803B CN 104537803 B CN104537803 B CN 104537803B CN 201510008116 A CN201510008116 A CN 201510008116A CN 104537803 B CN104537803 B CN 104537803B
- Authority
- CN
- China
- Prior art keywords
- ground wire
- ground
- wire
- display screen
- warning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000008439 repair process Effects 0.000 claims abstract description 25
- 238000012790 confirmation Methods 0.000 claims description 4
- 230000006870 function Effects 0.000 abstract description 3
- 238000000034 method Methods 0.000 abstract description 2
- 230000008569 process Effects 0.000 abstract description 2
- 238000007619 statistical method Methods 0.000 abstract description 2
- 238000010606 normalization Methods 0.000 abstract 1
- 230000005540 biological transmission Effects 0.000 description 3
- 239000004020 conductor Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000008901 benefit Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 238000010297 mechanical methods and process Methods 0.000 description 1
- 230000005226 mechanical processes and functions Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000000505 pernicious effect Effects 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G08—SIGNALLING
- G08B—SIGNALLING OR CALLING SYSTEMS; ORDER TELEGRAPHS; ALARM SYSTEMS
- G08B21/00—Alarms responsive to a single specified undesired or abnormal condition and not otherwise provided for
- G08B21/02—Alarms for ensuring the safety of persons
-
- G—PHYSICS
- G07—CHECKING-DEVICES
- G07C—TIME OR ATTENDANCE REGISTERS; REGISTERING OR INDICATING THE WORKING OF MACHINES; GENERATING RANDOM NUMBERS; VOTING OR LOTTERY APPARATUS; ARRANGEMENTS, SYSTEMS OR APPARATUS FOR CHECKING NOT PROVIDED FOR ELSEWHERE
- G07C1/00—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people
- G07C1/10—Registering, indicating or recording the time of events or elapsed time, e.g. time-recorders for work people together with the recording, indicating or registering of other data, e.g. of signs of identity
Landscapes
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Emergency Management (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses one kind ground connection wire management prior-warning device, ground wire is placed in ground wire support, and display screen is placed in the top of ground wire, and credit card area and input area are arranged in ground wire support.This invention ensures that normalization and security during ground wire use, it is to avoid the confusion during ground wire use, the generation with ground wire associated safety hidden danger is prevented;The information such as the personnel during ground wire use, time, numbering are shown by display screen, play auxiliary prompting function, and to the phonetic warning that default is sent beyond the situation of repair time pointing out the repair time to arrive, and early warning short message is sent to designated person by warning level, risk present in early warning ground wire use;Relevant information during ground wire use is recorded by memory module, the service condition of earth wire is counted, in order to carry out statistical analysis afterwards, summarize ground wire using problem present in process, be easy to it is further proposed that corrective measure.
Description
Technical field
The invention belongs to electric power overhaul technical field, more particularly to a kind of ground connection wire management prior-warning device.
Background technology
In power system grid switching operation, when equipment turns maintenance, it is necessary to after each side seal hanging earthing conductor of repair apparatus,
Can start working.In end-of-job and after removing ground wire, power transmission can be recovered to repair apparatus.
The ineffective situation of ground connection wire management is there may be in actual mechanical process, in fact it could happen that Awaiting Overhaul equipment does not seal extension
Ground wire, then personnel will face the possibility of unexpected incoming call in the course of the work, loses ground protection and triggers electric shock;Work completion
Afterwards, if not removing ground wire, the pernicious operating accident of line power transmission with ground will be caused during equipment power transmission.
The use of ground wire and managerial confusion will accordingly cause the confusion during grid switching operation, virtually increase many latent
It is that power network and personal security hide some dangers in risk.Therefore, earth wire carries out safe and effective management, not only can be with specification
Behavior during grid switching operation, or Overhaul site safely provides further guarantee.
The content of the invention
The purpose of the embodiment of the present invention is to provide a kind of ground connection wire management prior-warning device, it is intended to solve the use of ground wire
The confusion during grid switching operation will be accordingly caused with managerial confusion, virtually increases the problem of many potential risks.
The embodiment of the present invention is achieved in that a kind of ground connection wire management prior-warning device, the ground connection wire management prior-warning device
Including:Display screen, ground wire, ground wire support, credit card area, input area;
Ground wire is placed in ground wire support, and display screen is placed in the top of ground wire, and credit card area and input area are arranged on
In ground wire support.
Further, ground wire support earth wire is numbered successively.
Further, display screen shows:Current time, take people, ground wire numbering, take the time, the repair time, early warning level
Other information.
Further, credit card area is easy to take people's brush personal information card when ground wire is taken.
Further, input area input repair time and confirmation.
The ground connection wire management prior-warning device that the present invention is provided, it is ensured that normative and safe during ground wire use
Property, it is to avoid the confusion during ground wire use, has prevented the generation with ground wire associated safety hidden danger.Ground wire is used
During the information such as personnel, time, numbering shown by display screen, play certain auxiliary prompting function, and to super
The situation for going out the repair time sends the phonetic warning of default to point out the repair time to arrive, and by warning level to nominator
Member sends early warning short message, risk present in early warning ground wire use.During memory module record ground wire use
Relevant information, can be counted with the service condition of earth wire, in order to carry out statistical analysis afterwards, summarized ground wire and used
Problem present in process, is easy to it is further proposed that corrective measure.
Brief description of the drawings
Fig. 1 is ground connection wire management prior-warning device structural representation provided in an embodiment of the present invention;
In figure:1st, display screen;2nd, ground wire;3rd, ground wire support;4th, credit card area;5th, input area.
Specific embodiment
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to embodiments, to the present invention
It is further elaborated.It should be appreciated that the specific embodiments described herein are merely illustrative of the present invention, it is not used to
Limit the present invention.
Below in conjunction with the accompanying drawings and specific embodiment is further described to application principle of the invention.
As shown in figure 1, the ground connection wire management prior-warning device of the embodiment of the present invention it is main by:Display screen 1, ground wire 2, ground connection
Line bracket 3, credit card area 4, input area 5;
Ground wire 2 is placed in ground wire support 3, and display screen 1, credit card area 4 and input area 5 are placed in the top of ground wire 2
It is arranged in ground wire support 3.
The earth wire 2 of ground wire support 3 is numbered successively, and display screen 1 shows:Current time, take people, ground wire compile
Number, take the information such as time, repair time, warning level.Meanwhile, credit card area is additionally provided with the apparatus (to be easy to take people and exist
Brush personal information card when taking ground wire) and input area (input repair time and confirmation etc.).
Work director Wang Gang is responsible for a certain item service work, and the repair time is 10:00-17:00.10:15 points, Wang Gang is complete
Power failure before being gone into operation into service work prepares operation, in addition it is also necessary to 2 groups of ground wires are taken, in the side seal hanging earthing conductor of power failure equipments two.
After Wang Gang has brushed personal information card on the apparatus, system can show takes people Wang Gang, takes the time 10:16 points, then Wang Gang
The repair time 10 is input into input area:00-17:00, and take 2 groups of ground wire group number, after acknowledgement key, ground wire mechanical lock
Open, Wang Gang can remove No. 1 and No. 2 ground wires.
Service work is completed on schedule after, Wang Gang pulls down No. 1 and No. 2 ground wires, 16:30 points, ground wire is playbacked to device
On, after mechanical lock is locked, system programming count gives back the time 16:30 points.
If to 17:After 00, ground wire does not playback yet, and device reaches one-level alert status, on a display screen will be aobvious
Show the printed words of " repair time has arrived, No. 1, No. 2 ground wires not yet give back ", " repair time has arrived, No. 1, No. 2 ground connection sending
Line is not yet given back " phonetic warning prompt tone while, can also send the " maintenance of early warning short message to the cell-phone number of Wang Gang every half an hour
Have timed out, job schedule please be ensure and ground wire is returned in time ".After Wang Gang has given back ground wire, system is by display screen
Display printed words are cancelled, and stop sending for early warning sound and early warning short message.
If to 19:After 00, ground wire does not playback yet, and device reaches two grades of alert status, on a display screen will be aobvious
Show the printed words of " repair time has arrived, No. 1, No. 2 ground wires not yet give back ", " repair time has arrived, No. 1, No. 2 ground connection sending
Line is not yet given back " phonetic warning prompt tone while, can also be every half an hour to Wang Gang and the mobile phone of power transformation specialty director Li Qiang
Number send early warning short message " repair time seriously exceeds the time limit, please ensure job schedule and return in time ground wire ".Given back in Wang Gang
After complete ground wire, system cancels display screen display printed words, and stops sending for early warning sound and early warning short message.
The operation principle of the embodiment of the present invention:
(1) ground wire is placed in special ground wire support, and earth wire is numbered successively above support, in support
Top is provided with display screen, and display screen shows:Total X group ground wires, X ground wires are taken by XXX (name) in the XX times, and
Repair time is XX:XX—XX:XX.
(2) ground wire user of service needs everyone to be equipped with ground wire and takes card, and after ad-hoc location is swiped the card, system will can be grounded
The information (name, cell-phone number etc.) that line takes people recorded system, and respective record ground wire takes the time, takes people's needs
After being input into repair time and confirmation by input keyboard, the mechanical lock of ground wire can be unlocked, so far taking people can be from support
On remove ground wire.Relevant information is also displayed on display screen.
(3) after the repair time reaches, managing device can take people and send one-level early warning short message to ground wire, while
The prompting printed words of display screen display " repair time has arrived, and X ground wires are not yet given back ", and send corresponding prompt tone.
(4) after more than regulation repair time certain hour, managing device to ground wire can take people and system prestores
Upper management personnel send two grades of early warning short messages simultaneously, play reminding effect to avoid potential problems and risk.
(5) people is taken to give back ground wire, and after ground wire is locked, system automatically generates the time of giving back.
(6) statistical function:Managing device meeting earth wire service condition (is taken the time, the repair time, is taken according to keyword
Employment, gives back the time, warning level) counted, it is easy to administrative staff to carry out monthly, season and year statistics, so that specification
The use of ground wire.
Presently preferred embodiments of the present invention is the foregoing is only, is not intended to limit the invention, it is all in essence of the invention
Any modification, equivalent and improvement made within god and principle etc., should be included within the scope of the present invention.
Claims (1)
1. it is a kind of to be grounded wire management prior-warning device, it is characterised in that the ground connection wire management prior-warning device includes:Display screen, ground connection
Line, ground wire support, credit card area, input area;
Ground wire is placed in ground wire support, and display screen is placed in the top of ground wire, and credit card area and input area are arranged on ground connection
On line bracket;
Ground wire support earth wire is numbered successively;
Display screen shows:Current time, take people, ground wire numbering, take time, repair time, warning level information;
Credit card area is easy to take people's brush personal information card when ground wire is taken;
Input area is input into repair time and confirmation.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510008116.4A CN104537803B (en) | 2015-01-08 | 2015-01-08 | One kind ground connection wire management prior-warning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201510008116.4A CN104537803B (en) | 2015-01-08 | 2015-01-08 | One kind ground connection wire management prior-warning device |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104537803A CN104537803A (en) | 2015-04-22 |
CN104537803B true CN104537803B (en) | 2017-07-04 |
Family
ID=52853322
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201510008116.4A Active CN104537803B (en) | 2015-01-08 | 2015-01-08 | One kind ground connection wire management prior-warning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104537803B (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112862116A (en) * | 2021-01-10 | 2021-05-28 | 拓航科技有限公司 | Intelligent ground wire management device |
CN113036545A (en) * | 2021-03-11 | 2021-06-25 | 广东电网有限责任公司 | Management system and method for grounding wire |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2012170895A1 (en) * | 2011-06-09 | 2012-12-13 | Yeager C Douglas | Systems and methods for authorizing a transaction |
CN202183640U (en) * | 2011-08-31 | 2012-04-04 | 太平湾发电厂 | Intelligent display system of grounding wire of electric enterprise |
CN104022455A (en) * | 2013-10-24 | 2014-09-03 | 国家电网公司 | Ground wire usage condition display apparatus |
CN203596981U (en) * | 2013-11-25 | 2014-05-14 | 山东鲁能奥特科技有限公司 | Ground wire management controller housing |
CN203929958U (en) * | 2014-06-06 | 2014-11-05 | 国家电网公司 | A kind of acousto-optic prior-warning device for ground wire |
-
2015
- 2015-01-08 CN CN201510008116.4A patent/CN104537803B/en active Active
Also Published As
Publication number | Publication date |
---|---|
CN104537803A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Wan et al. | Fighting COVID-19 in Hong Kong: The effects of community and social mobilization | |
CN104661945B (en) | Method for restoring a safety system for an elevator installation | |
CN108063751A (en) | A kind of public network safety access method for new energy power plant | |
CN202472730U (en) | Fire-fighting facility detection maintenance alarm information management analysis system | |
CN106570588A (en) | WeChat official platform-based electric power monitoring and alarm system | |
CN104537803B (en) | One kind ground connection wire management prior-warning device | |
CN105836557A (en) | Device, system, and method for supporting maintenance work | |
CN202268049U (en) | Intelligent monitoring and alarming system | |
CN110070233B (en) | Emergency data processing method and system | |
CN104944239A (en) | Elevator maintenance and detection information announcement system and implementation method | |
CN110808040B (en) | System and method for controlling flow of interlocking work tickets and operation tickets based on voice | |
Cioca et al. | SMS disaster alert system programming | |
CN106791225A (en) | A kind of alarm method and device | |
CN102800036A (en) | Method and system for confirming identity of guardian | |
CN107644324A (en) | A kind of personnel's system of real name register system for project under construction | |
CN201266947Y (en) | Safety defense centralized management monitoring apparatus | |
DE102016108013B3 (en) | Method for a system for safely opening a door and system for safely opening a door | |
Iacobucci | Number of acute hospitals in England must fall for NHS to survive, says outgoing chief | |
JP5439654B2 (en) | Delivery device for delivering fire notification e-mail and fire notification system using the same | |
TW200636626A (en) | Automatic security management system | |
Brown | Mine action: the management of risk | |
CN204480420U (en) | A kind of intrusion defense supervisory system based on laser technology | |
Dzubenko et al. | Analyzing the Communication between the Public Safety Authorities and the Population in Crisis Situations | |
EP1158466A1 (en) | Method for triggering a process within a building | |
Beisert | Outage planning: Don't forget the electrical hazards! |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant |