CN104537471B - 一种调度培训系统中全业务模式教案的协调制作方法 - Google Patents

一种调度培训系统中全业务模式教案的协调制作方法 Download PDF

Info

Publication number
CN104537471B
CN104537471B CN201410785348.6A CN201410785348A CN104537471B CN 104537471 B CN104537471 B CN 104537471B CN 201410785348 A CN201410785348 A CN 201410785348A CN 104537471 B CN104537471 B CN 104537471B
Authority
CN
China
Prior art keywords
msub
mrow
msubsup
delta
regional
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410785348.6A
Other languages
English (en)
Other versions
CN104537471A (zh
Inventor
钱江峰
谢旭
戴则梅
牛四清
王仲达
刘庆程
张哲�
刘健
罗亚洲
刘之滨
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
North China Grid Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Original Assignee
North China Grid Co Ltd
Nari Technology Co Ltd
NARI Nanjing Control System Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by North China Grid Co Ltd, Nari Technology Co Ltd, NARI Nanjing Control System Co Ltd filed Critical North China Grid Co Ltd
Priority to CN201410785348.6A priority Critical patent/CN104537471B/zh
Publication of CN104537471A publication Critical patent/CN104537471A/zh
Application granted granted Critical
Publication of CN104537471B publication Critical patent/CN104537471B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B9/00Simulators for teaching or training purposes

Landscapes

  • Engineering & Computer Science (AREA)
  • Theoretical Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Physics & Mathematics (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • General Physics & Mathematics (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开了一种调度培训仿真系统中全业务模式教案的协调制作方法,包括进行全业务模式培训仿真时,初始断面与负荷曲线的自动匹配计算;外网联络线的自动调节;电网内部区域联络线的协调结算。本发明提出的全业务模式下的仿真教案制作方法适用范围广,具有极强的灵活性与可操作性,可以有效的提高进行全业务培训仿真时的教案制作效率,并提高全业务培训仿真的可靠性。

Description

一种调度培训系统中全业务模式教案的协调制作方法
技术领域
本发明涉及电力系统自动化调度技术领域,具体涉及一种调度培训系统中全业务模式教案的协调制作方法。
背景技术
随着智能电网的发展,调度业务范围不断扩大,出现了许多新的需求。这些新需求的出现对仿真平台提出了新的要求。传统的电力仿真平台所含培训模块较少,已不能满足对调度各项业务仿真的需求,因此必须考虑针对调度业务的特点来考虑全业务的培训仿真。传统的培训仿真在制作教案时,对于系统运行方式调整、系统负荷调整能够提供方便可靠的手段,但对于联络线的调整,并没有有效的方法。在这种情况下进行的全业务模式培训仿真的教案制作效率、可靠性将受到很大的影响。
发明内容
针对现有技术存在的不足,本发明目的是提供一种适用范围广、具有极强灵活性及可操作性的调度培训系统中全业务模式教案的协调制作方法,能够有效的提高全业务培训仿真时的教案制作效率,并提高全业务培训仿真的可靠性。
为了实现上述目的,本发明是通过如下的技术方案来实现:
一种调度培训系统中全业务模式教案的协调制作方法,包括以下几个步骤:
(1)初始断面与发电负荷曲线的自动匹配计算;
(2)外网联络线的自动调节;
(3)电网内部区域联络线的协调计算。
前述的步骤(1)中,初始断面与发电负荷曲线的自动匹配计算包括如下步骤:
(1a)根据初始断面时刻以及系统各区域的发电负荷曲线,计算系统各区域的发电负荷曲线初始断面时刻所对应的各区域发电负荷量;
(2a)计算初始断面中的区域发电负荷量与发电负荷曲线中的区域发电负荷量的差值,并按区域对差值进行分配;
(3a)计算初始断面中的区域用电负荷量与发电负荷曲线中的区域用电负荷量的差值,并按区域对差值进行分配;
(4a)重新计算潮流,得到调整后的断面潮流分布。
前述的步骤(1a)中,在初始断面时刻t,区域发电负荷量SG按如下公式计算:
其中,t1为区域发电负荷曲线上,t之前一个点的时刻,t2为区域发电负荷曲线上,t之后一个点的时刻;为区域发电负荷曲线上,t1时的系统发电负荷;为区域发电负荷曲线上,t2时的系统发电负荷。
前述的步骤(2a)中,区域发电负荷的分配分配按如下方式进行:
初始断面中,区域的发电负荷量S'G按如下公式计算:
S'G=Sl'ine+S'g (2)
其中,Sl'ine为初始断面中的区域联络线注入量,S'g为初始断面中的区域发电总加;
设差值ΔSG为:ΔSG=SG-S'G
如果ΔSG>0,按区域中机组上备用容量进行分配,如果ΔSG<0,按区域中机组下备用容量进行分配,如下:
其中,Δwun为区域发电负荷机组调节量,为初始断面中的区域机组上备用容量,为初始断面中的区域机组上备用容量之和,为初始断面中的区域机组下备用容量,为初始断面中的区域机组下备用容量之和;
前述的步骤(3a)中,区域用电负荷的分配按如下方式进行:
设S′sloss为初始断面中区域发电机组的厂用电之和,Ssloss为经过步骤(2a)后初始断面中区域发电机组的厂用电之和,则
ΔSL=(ΔSG-(Ssloss-S'sloss))×(1.0-α) (4)
其中,ΔSL为区域用电负荷预计调节量,α为系统网损率;
则,区域中各负荷调节量按如下公式计算:
其中,Δwld为区域用电负荷机组调节量,sl'为初始断面中的区域负荷注入量,S'L为初始断面中的区域负荷注入量之和。
前述的步骤(2)中,外网联络线自动调节包括以下步骤:
(1b)计算经过所述步骤(1)后断面中的外网联络线注入量与初始断面时刻的外网联络线计划的差值,设差值为ΔP;
(2b)根据差值ΔP,调节外网机组出力,调节方式如下:
其中,为外网机组调节量,为所述步骤(1)后断面中的外网机组上备用容量,为所述步骤(1)后断面中的外网机组上备用容量之和,为所述步骤(1)后断面中的外网机组下备用容量,为所述步骤(1)后断面中的外网机组下备用容量之和;
(3b)根据差值ΔP,调节系统内机组出力,调节方式如下:
其中,为系统内机组调节量,为所述步骤(1)后后断面中的系统内机组上备用容量,为所述步骤(1)后断面中的系统内机组上备用容量之和;为所述步骤(1)后断面中的系统内机组下备用容量;为所述步骤(1)后后断面中的系统内机组下备用容量之和;
(4b)重新计算潮流,得到调整后的断面潮流分布。
前述的步骤(3)中,电网内部区域联络线的协调计算包括如下步骤:
(1c)启动AGC功能模块,计算系统内各区域的ACE;
(2c)根据各区域自身ACE的大小,调节各区域内的机组出力;
(3c)重新计算潮流,并重新计算系统内各区域ACE;
(4c)如各区域ACE的绝对值小于门槛值ε则调整结束;如大于等于ε,则进入步骤(2c),直到各区域ACE的绝对值小于门槛值ε为止。
前述的步骤(2c)中,电网内部各区域的机组调节按照如下方式进行:
其中,Δwun为电网内部各区域机组调节量,PACE为各区域ACE的值。
前述的步骤(4c)中,门槛值ε为小于1.0的正数。
本发明提出的调度培训系统全业务模式下的教案协调制作方法适用范围广,具有极强的灵活性与可操作性,可以有效的提高全业务培训仿真时的教案制作效率,并提高全业务培训仿真的可靠性。
附图说明
图1为初始断面时刻抽象电网示意图;
图2为本发明的全业务模式教案的协调制作过程流程图。
具体实施方式
为使本发明实现的技术手段、创作特征、达成目的与功效易于明白了解,下面结合附图和具体实施方式,进一步阐述本发明。
如图2所示,本发明的调度培训系统全业务模式下的教案协调制作方法包括以下三个步骤:
(1)进行全业务模式培训仿真时,初始断面与负荷曲线的自动匹配计算;
(2)进行全业务模式培训仿真时,外网联络线的自动调节;
(3)进行全业务模式培训仿真时,电网内部区域联络线的协调计算。
步骤(1)中,全业务培训仿真时,初始断面与负荷曲线的自动匹配计算按照如下步骤进行,包括:
(1a)根据初始断面时刻以及系统各区域的发电负荷曲线,计算系统各区域的发电负荷曲线在初始断面时刻所对应的各区域发电负荷量。在初始断面时刻t,区域发电负荷量SG按如下公式计算:
t1:区域发电负荷曲线上,t之前一个点的时刻;
t2:区域发电负荷曲线上,t之后一个点的时刻;
区域发电负荷曲线上,t1时的系统发电负荷;
区域发电负荷曲线上,t2时的系统发电负荷;
(2a)计算初始断面中的区域发电负荷量与发电负荷曲线中的区域发电负荷量的差值,并按区域对差值进行分配。初始断面中,区域的发电负荷量S'G按如下公式计算
S'G=S′line+S'g (2)
S′line:初始断面中的区域联络线注入量;
S'g:初始断面中的区域发电总加;
设差值ΔSG=SG-S'G,如果ΔSG>0,按区域中机组上备用容量进行分配,如果ΔSG<0,按区域中机组下备用容量进行分配,公式如下:
Δwun:区域发电负荷机组调节量;
初始断面中的机组上备用容量;
初始断面中的区域机组上备用容量之和;
初始断面中的机组下备用容量;
初始断面中的区域机组下备用容量之和;
(3a)计算初始断面中的区域用电负荷与发电负荷曲线中的区域用电负荷的差值,并按区域对差值进行分配。设S′sloss为初始断面中区域发电机组的厂用电之和,Ssloss为经过步骤(2a)后初始断面中区域发电机组的厂用电之和,则
ΔSL=(ΔSG-(Ssloss-S'sloss))×(1.0-α) (4)
ΔSL:区域用电负荷预计调节量;
α:系统网损率;
因此,区域中各负荷调节量可按如下公式计算:
Δwld:区域用电负荷机组调节量;
sl':初始断面中的区域负荷注入量;
S'L:初始断面中的区域负荷注入量之和;
(4a)重新计算潮流,得到调整后的断面潮流分布。
步骤(2)中,全业务培训仿真时,外网联络线的自动调节按照如下步骤进行,包括:
(1b)计算经过步骤(4a)后断面中的外网联络线注入量与初始断面时刻的外网联络线计划的差值,设差值为ΔP;其中,外网联络线注入量可以从步骤(4a)后的潮流断面中直接获得,初始断面时刻的外网联络线计划可以从历史计划中直接获取。
(2b)根据差值ΔP,调节外网机组出力。外网机组出力调节方式如下:
外网机组调节量;
步骤(4a)后断面中的外网机组上备用容量;
步骤(4a)后断面中的外网机组上备用容量之和;
步骤(4a)后断面中的外网机组下备用容量;
步骤(4a)后断面中的外网机组下备用容量之和;
(3b)根据差值ΔP,调节系统内机组出力。系统内机组出力调节方式如下:
系统内机组调节量;
步骤(4a)后断面中的系统内机组上备用容量;
步骤(4a)后断面中的系统内机组上备用容量之和;
步骤(4a)后断面中的系统内机组下备用容量;
步骤(4a)后断面中的系统内机组下备用容量之和;
(4b)重新计算潮流,得到调整后的断面潮流分布。
步骤(3)中,全业务培训仿真时,电网内部区域联络线的协调计算按照如下步骤进行,包括:
(1c)启动AGC(自动发电控制(Automatic Generation Control))功能模块,计算系统内各区域的ACE(区域控制误差(Area Control Error))。
(2c)根据各区域自身ACE的大小,调节各区域内的机组出力。电网内部各区域的机组调节按照如下方式进行:
Δwun为电网内部各区域机组调节量,PACE为各区域ACE的值。
(3c)重新计算潮流,并重新计算系统内各区域ACE。
(4c)如各区域ACE的绝对值小于门槛值ε(ε为小于1.0的正数),则调整结束;如大于等于ε,则进入步骤(2c),直到各区域ACE的绝对值小于门槛值ε为止。
本实施例中,以图1所示的初始断面t时刻抽象电网示意图作为例子来说明进行全业务培训仿真时,培训教案的协调制作方法。
图1是一个t时刻的抽象电网示意图,分为内网和外网。其中内网分为3个区域:区域A、区域B、区域C;外网分为2个区域:区域D、区域E。5个区域之间通过联络线相连接,分别是联络线AB、联络线BC、联络线AC、联络线AE、联络线BD。以下描述中,联络线上流动的功率用P表示,例如PAB表示A侧从A流向B的功率,若实际功率方向为从B流向A,则PAB为负值;联络线计划用Pplan表示,例如表示A侧从A流向B的计划值功率,若实际方向为从B流向A,则为负值。SG表示t时刻各区域负荷曲线上功率目标值,表示t时刻的前一时刻各区域负荷曲线上功率目标值,表示t时刻的后一时刻各区域负荷曲线上功率目标值。
全业务模式教案的协调制作过程的流程如下:
a)根据负荷曲线,对各区域进行断面自动调节,以保证调整后的负荷水平与负荷曲线一致。以区域A为例:
计算区域A负荷目标值
计算区域A负荷偏差量:
计算按区域A中机组调节量
计算区域A用电负荷偏差量:
计算区域A中各用电负荷调节量:
调节完区域A后,再分别调节区域B、区域C。完成调整后,重新计算潮流,得到新的调整后的断面,此时区域A、区域B、区域C的负荷水平达到负荷曲线的目标值。
b)调整外网联络线,使联络线输送功率与其计划值保持一致。以联络线AE为例:
计算联络线偏差
计算外网区域E机组调节量:
计算内网区域机组调节量(包括A、B、C三个区域):
调整完联络线AE后,再以同样的方法调整联络线BD。完成调整后,重新计算潮流,得到新的调整后的断面,此时联络线AE、BD的输送功率达到计划值的要求。
c)调整内网各区域,使得各区域之间联络线的输送功率与其计划值保持一致。以区域C为例:
计算区域C的ACE:
计算区域C机组调节量:
调节完区域C后,再分别调节区域A、区域B。完成调整后,重新计算潮流,得到新的调整后的断面。计算此时内网各区域的ACE,如ACE区域0,则调整结束,如偏于0,则继续重复c),直到各区域ACE都趋于0为止。
本发明提出的调度培训系统中全业务模式教案的协调制作方法适用范围广,具有极强的灵活性与可操作性,可以有效的提高全业务模式培训仿真时的教案制作效率,并提高全业务培训仿真的可靠性。
以上显示和描述了本发明的基本原理和主要特征和本发明的优点。本行业的技术人员应该了解,本发明不受上述实施例的限制,上述实施例和说明书中描述的只是说明本发明的原理,在不脱离本发明精神和范围的前提下,本发明还会有各种变化和改进,这些变化和改进都落入要求保护的本发明范围内。本发明要求保护范围由所附的权利要求书及其等效物界定。

Claims (6)

1.一种调度培训系统中全业务模式教案的协调制作方法,其特征在于,包括以下几个步骤:
(1)初始断面与发电负荷曲线的自动匹配计算;包括如下步骤:
(1a)根据初始断面时刻以及系统各区域的发电负荷曲线,计算系统各区域的发电负荷曲线初始断面时刻所对应的各区域发电负荷量;
(2a)计算初始断面中的区域发电负荷量与发电负荷曲线中的区域发电负荷量的差值,并按区域对差值进行分配;
(3a)计算初始断面中的区域用电负荷量与发电负荷曲线中的区域用电负荷量的差值,并按区域对差值进行分配;
(4a)重新计算潮流,得到调整后的断面潮流分布;
(2)外网联络线的自动调节;包括以下步骤:
(1b)计算经过所述步骤(1)后断面中的外网联络线注入量与初始断面时刻的外网联络线计划的差值,设差值为ΔP;
(2b)根据差值ΔP,调节外网机组出力,调节方式如下:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <msub> <mi>un</mi> <mi>o</mi> </msub> </mrow> </msub> <mo>=</mo> <mo>-</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&amp;times;</mo> <mfrac> <msub> <mi>w</mi> <msub> <mi>b</mi> <mn>1</mn> </msub> </msub> <msub> <mi>W</mi> <msub> <mi>B</mi> <mn>1</mn> </msub> </msub> </mfrac> <mo>,</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&lt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <msub> <mi>un</mi> <mi>o</mi> </msub> </mrow> </msub> <mo>=</mo> <mo>-</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&amp;times;</mo> <mfrac> <msub> <mi>w</mi> <msub> <mi>b</mi> <mn>2</mn> </msub> </msub> <msub> <mi>W</mi> <msub> <mi>B</mi> <mn>2</mn> </msub> </msub> </mfrac> <mo>,</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&gt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>6</mn> <mo>)</mo> </mrow> </mrow>
其中,为外网机组调节量,为所述步骤(1)后断面中的外网机组上备用容量,为所述步骤(1)后断面中的外网机组上备用容量之和,为所述步骤(1)后断面中的外网机组下备用容量,为所述步骤(1)后断面中的外网机组下备用容量之和;
(3b)根据差值ΔP,调节系统内机组出力,调节方式如下:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <msub> <mi>un</mi> <mi>i</mi> </msub> </mrow> </msub> <mo>=</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&amp;times;</mo> <mfrac> <msubsup> <mi>w</mi> <msub> <mi>b</mi> <mn>1</mn> </msub> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>W</mi> <msub> <mi>B</mi> <mn>1</mn> </msub> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>,</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&gt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <msub> <mi>un</mi> <mi>i</mi> </msub> </mrow> </msub> <mo>=</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&amp;times;</mo> <mfrac> <msubsup> <mi>w</mi> <msub> <mi>b</mi> <mn>2</mn> </msub> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>W</mi> <msub> <mi>B</mi> <mn>2</mn> </msub> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>,</mo> <mi>&amp;Delta;</mi> <mi>P</mi> <mo>&lt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>7</mn> <mo>)</mo> </mrow> </mrow>
其中,为系统内机组调节量,为所述步骤(1)后后断面中的系统内机组上备用容量,为所述步骤(1)后断面中的系统内机组上备用容量之和;为所述步骤(1)后断面中的系统内机组下备用容量;为所述步骤(1)后后断面中的系统内机组下备用容量之和;
(4b)重新计算潮流,得到调整后的断面潮流分布;
(3)电网内部区域联络线的协调计算;包括如下步骤:
(1c)启动AGC功能模块,计算系统内各区域的ACE;
(2c)根据各区域自身ACE的大小,调节各区域内的机组出力;
(3c)重新计算潮流,并重新计算系统内各区域ACE;
(4c)如各区域ACE的绝对值小于门槛值ε则调整结束;如大于等于ε,则进入步骤(2c),直到各区域ACE的绝对值小于门槛值ε为止。
2.根据权利要求1所述的一种调度培训系统中全业务模式教案的协调制作方法,其特征在于,所述步骤(1a)中,在初始断面时刻t,区域发电负荷量SG按如下公式计算:
<mrow> <msub> <mi>S</mi> <mi>G</mi> </msub> <mo>=</mo> <msub> <mi>S</mi> <msub> <mi>G</mi> <mn>1</mn> </msub> </msub> <mo>+</mo> <mrow> <mo>(</mo> <msub> <mi>S</mi> <msub> <mi>G</mi> <mn>2</mn> </msub> </msub> <mo>-</mo> <msub> <mi>S</mi> <msub> <mi>G</mi> <mn>1</mn> </msub> </msub> <mo>)</mo> </mrow> <mo>&amp;times;</mo> <mfrac> <mrow> <mo>(</mo> <mi>t</mi> <mo>-</mo> <msub> <mi>t</mi> <mn>1</mn> </msub> <mo>)</mo> </mrow> <mrow> <mo>(</mo> <msub> <mi>t</mi> <mn>2</mn> </msub> <mo>-</mo> <msub> <mi>t</mi> <mn>1</mn> </msub> <mo>)</mo> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
其中,t1为区域发电负荷曲线上,t之前一个点的时刻,t2为区域发电负荷曲线上,t之后一个点的时刻;为区域发电负荷曲线上,t1时的系统发电负荷;为区域发电负荷曲线上,t2时的系统发电负荷。
3.根据权利要求1所述的一种调度培训系统中全业务模式教案的协调制作方法,其特征在于,所述步骤(2a)中,区域发电负荷的分配分配按如下方式进行:
初始断面中,区域的发电负荷量S'G按如下公式计算:
S'G=S'line+S'g (2)
其中,S'line为初始断面中的区域联络线注入量,S'g为初始断面中的区域发电总加;
设差值ΔSG为:ΔSG=SG-S'G
如果ΔSG>0,按区域中机组上备用容量进行分配,如果ΔSG<0,按区域中机组下备用容量进行分配,如下:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <mi>u</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>&amp;Delta;S</mi> <mi>G</mi> </msub> <mo>&amp;times;</mo> <mfrac> <msubsup> <mi>s</mi> <msub> <mi>b</mi> <mn>1</mn> </msub> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>S</mi> <msub> <mi>B</mi> <mn>1</mn> </msub> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>,</mo> <msub> <mi>&amp;Delta;S</mi> <mi>G</mi> </msub> <mo>&gt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <mi>u</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>&amp;Delta;S</mi> <mi>G</mi> </msub> <mo>&amp;times;</mo> <mfrac> <msubsup> <mi>s</mi> <msub> <mi>b</mi> <mn>2</mn> </msub> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>S</mi> <msub> <mi>B</mi> <mn>2</mn> </msub> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>,</mo> <msub> <mi>&amp;Delta;S</mi> <mi>G</mi> </msub> <mo>&lt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
其中,Δwun为区域发电负荷机组调节量,为初始断面中的区域机组上备用容量,为初始断面中的区域机组上备用容量之和,为初始断面中的区域机组下备用容量,为初始断面中的区域机组下备用容量之和。
4.根据权利要求1所述的一种调度培训系统中全业务模式教案的协调制作方法,其特征在于,所述步骤(3a)中,区域用电负荷的分配按如下方式进行:
设S'sloss为初始断面中区域发电机组的厂用电之和,Ssloss为经过步骤(2a)后初始断面中区域发电机组的厂用电之和,则
ΔSL=(ΔSG-(Ssloss-S'sloss))×(1.0-α) (4)
其中,ΔSL为区域用电负荷预计调节量,α为系统网损率;
则,区域中各负荷调节量按如下公式计算:
<mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <mi>l</mi> <mi>d</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>&amp;Delta;S</mi> <mi>L</mi> </msub> <mo>&amp;times;</mo> <mfrac> <msubsup> <mi>s</mi> <mi>l</mi> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>S</mi> <mi>L</mi> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>5</mn> <mo>)</mo> </mrow> </mrow>
其中,Δwld为区域用电负荷机组调节量,s'l为初始断面中的区域负荷注入量,S'L为初始断面中的区域负荷注入量之和。
5.根据权利要求1所述的一种调度培训系统中全业务模式教案的协调制作方法,其特征在于,所述步骤(2c)中,电网内部各区域的机组调节按照如下方式进行:
<mrow> <mfenced open = "{" close = ""> <mtable> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <mi>u</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>A</mi> <mi>C</mi> <mi>E</mi> </mrow> </msub> <mo>&amp;times;</mo> <mfrac> <msubsup> <mi>s</mi> <msub> <mi>b</mi> <mn>1</mn> </msub> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>S</mi> <msub> <mi>B</mi> <mn>1</mn> </msub> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>,</mo> <msub> <mi>P</mi> <mrow> <mi>A</mi> <mi>C</mi> <mi>E</mi> </mrow> </msub> <mo>&lt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> <mtr> <mtd> <mrow> <msub> <mi>&amp;Delta;w</mi> <mrow> <mi>u</mi> <mi>n</mi> </mrow> </msub> <mo>=</mo> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>A</mi> <mi>C</mi> <mi>E</mi> </mrow> </msub> <mo>&amp;times;</mo> <mfrac> <msubsup> <mi>s</mi> <msub> <mi>b</mi> <mn>2</mn> </msub> <mo>&amp;prime;</mo> </msubsup> <msubsup> <mi>S</mi> <msub> <mi>B</mi> <mn>2</mn> </msub> <mo>&amp;prime;</mo> </msubsup> </mfrac> <mo>,</mo> <msub> <mi>P</mi> <mrow> <mi>A</mi> <mi>C</mi> <mi>E</mi> </mrow> </msub> <mo>&gt;</mo> <mn>0</mn> </mrow> </mtd> </mtr> </mtable> </mfenced> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>8</mn> <mo>)</mo> </mrow> </mrow>
其中,Δwun为电网内部各区域机组调节量,PACE为各区域ACE的值。
6.根据权利要求1所述的一种调度培训系统中全业务模式教案的协调制作方法,其特征在于,所述步骤(4c)中,门槛值ε为小于1.0的正数。
CN201410785348.6A 2014-12-17 2014-12-17 一种调度培训系统中全业务模式教案的协调制作方法 Active CN104537471B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410785348.6A CN104537471B (zh) 2014-12-17 2014-12-17 一种调度培训系统中全业务模式教案的协调制作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410785348.6A CN104537471B (zh) 2014-12-17 2014-12-17 一种调度培训系统中全业务模式教案的协调制作方法

Publications (2)

Publication Number Publication Date
CN104537471A CN104537471A (zh) 2015-04-22
CN104537471B true CN104537471B (zh) 2017-12-01

Family

ID=52852990

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410785348.6A Active CN104537471B (zh) 2014-12-17 2014-12-17 一种调度培训系统中全业务模式教案的协调制作方法

Country Status (1)

Country Link
CN (1) CN104537471B (zh)

Family Cites Families (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102510063B (zh) * 2011-11-07 2013-11-20 国电南瑞科技股份有限公司 互联电网分级调频控制方法
CN103942613B (zh) * 2014-04-09 2017-02-15 国电南瑞科技股份有限公司 广义联络线模式下网省两级实时发电计划协调优化方法
CN103996325B (zh) * 2014-05-23 2016-09-07 国家电网公司 一种培训系统中多级调度一体化模式下的教案制作方法

Also Published As

Publication number Publication date
CN104537471A (zh) 2015-04-22

Similar Documents

Publication Publication Date Title
CN104993522A (zh) 一种基于mpc的主动配电网多时间尺度协调优化调度方法
CN109742779B (zh) 一种分布式储能调度方法和装置
CN105846461A (zh) 一种大规模储能电站自适应动态规划的控制方法和系统
CN103066626A (zh) 一种多源协调日前发电计划方法
US20160272079A1 (en) Device and method for recharging electric or hybrid vehicles
CN104300535B (zh) 一种大功率缺额事故后网内快速备用的协调优化调度方法
CN109103924A (zh) 基于柔性分析的可再生能源消纳能力关键因素的分析方法
CN105091213B (zh) 一种基于无中心网络的冷机系统、冷机控制器及控制方法
CN104037805B (zh) 一种计及电网安全约束的光伏电站可发电裕度分配方法
CN108092324A (zh) 一种风电参与调峰调频的agc控制系统和控制方法
CN105305468B (zh) 基于粒子群算法的火力发电机组一次调频参数优化方法
CN109204036A (zh) 一种充电桩有序充电管理方法及系统
CN106160000A (zh) 一种分调‑省调两级协调的风电增发控制方法
CN103514374A (zh) 电力系统在线滚动调度中不可行传输断面约束的辨识方法
CN107069835B (zh) 新能源电站实时有功的分配方法及分配装置
CN103972915A (zh) 一种用于负荷削峰填谷的储能系统最优容量计算方法
CN108512258A (zh) 一种基于改进多智能体一致性算法的风电场有功调度方法
CN103023073A (zh) 一种水电站群电站与机组混合优化调度方法
CN104538991B (zh) 互联电网联络线功率控制方法
CN102386623A (zh) 一种减小风电场网损的方法
CN103618339B (zh) 自动发电控制中总调节功率分配方法
CN117439090B (zh) 以灵活调节系数为指标的灵活性资源配置或调度方法
CN105610200A (zh) 一种基于同步协调控制的火电厂全功率控制方法
CN108256674A (zh) 一种参与电网削峰填谷的有源配电网负荷模型构建方法
CN107332277A (zh) 一种考虑源储荷运行特性的有源配电网孤岛运行方法

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information

Inventor after: Qian Jiangfeng

Inventor after: Liu Zhibin

Inventor after: Xie Xu

Inventor after: Dai Zemei

Inventor after: Niu Siqing

Inventor after: Wang Zhongda

Inventor after: Liu Qingcheng

Inventor after: Zhang Zhe

Inventor after: Liu Jian

Inventor after: Luo Yazhou

Inventor before: Qian Jiangfeng

Inventor before: Liu Zhibin

Inventor before: Lu Jinjun

Inventor before: Wang Zhongda

Inventor before: Liu Qingcheng

Inventor before: Niu Siqing

Inventor before: Zhang Zhe

Inventor before: Xie Xu

Inventor before: Liu Jian

Inventor before: Luo Yazhou

COR Change of bibliographic data
GR01 Patent grant
GR01 Patent grant