CN104534499B - Coal powder lance with combination type high-temperature-resistant structure - Google Patents

Coal powder lance with combination type high-temperature-resistant structure Download PDF

Info

Publication number
CN104534499B
CN104534499B CN201410855344.0A CN201410855344A CN104534499B CN 104534499 B CN104534499 B CN 104534499B CN 201410855344 A CN201410855344 A CN 201410855344A CN 104534499 B CN104534499 B CN 104534499B
Authority
CN
China
Prior art keywords
temperature
coal powder
ceramic
high temperature
powder lance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410855344.0A
Other languages
Chinese (zh)
Other versions
CN104534499A (en
Inventor
何伟光
杨龙寿
张群新
丘红莉
曾志华
程勇芳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Meiyan Jixiang Hydropower Co Ltd
Original Assignee
Guangdong Meiyan Jixiang Hydropower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Meiyan Jixiang Hydropower Co Ltd filed Critical Guangdong Meiyan Jixiang Hydropower Co Ltd
Priority to CN201410855344.0A priority Critical patent/CN104534499B/en
Publication of CN104534499A publication Critical patent/CN104534499A/en
Application granted granted Critical
Publication of CN104534499B publication Critical patent/CN104534499B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermal Insulation (AREA)
  • Furnace Housings, Linings, Walls, And Ceilings (AREA)

Abstract

The invention discloses a kind of coal powder lance with combination type high-temperature-resistant structure;Belong to cement plant equipment technical field;Technical points includes coal powder lance body, and some positioning stud is distributed on coal powder lance body outer wall, and the coal powder lance body upper peripheral at positioning stud has high-temperature plastic mud layer;High-temperature plastic mud layer periphery is provided with high-temp resistance prefabricated layer and ceramic wearing coat;High-temp resistance prefabricated layer is made up of some blocks of high temperature resistant clay prefabricated components, ceramic wearing coat is made up of some pieces of ceramic preform, high temperature resistant clay prefabricated component and ceramic preform one_to_one corresponding and be respectively equipped with the hole, location adapted with positioning stud on high temperature resistant clay prefabricated component and ceramic preform, high temperature resistant clay prefabricated component and ceramic preform are located on the positioning stud of correspondence and are threadeded with positioning stud by high temperature resistant securing member and fix;It is desirable to provide a kind of easy to use, respond well coal powder lance with combination type high-temperature-resistant structure;For manufacture of cement.

Description

Coal powder lance with combination type high-temperature-resistant structure
Technical field
The present invention relates to a kind of coal powder lance, more specifically, particularly relate to a kind of coal powder lance with combination type high-temperature-resistant structure.
Background technology
Cement needs in process of production through high-temperature calcination, and the fuel requirement producing high temperature is delivered to cement kiln by coal injection pipe In, owing to cement kiln temperature is higher, coal injection pipe work under bad environment, therefore coal injection pipe front end needs outside the position stretching in kiln High-temperature plastic mud layer all it is cast with, to ensure the normal work of coal injection pipe on wall.But owing to kiln temperature is higher, kiln flame and High-temperature dusts etc. do not stop to wash away high-temperature plastic mud layer, and in use for some time, high-temperature plastic mud layer local arises that breakage, Breakage once occurs, it is necessary to repair.And owing to high-temperature plastic mud layer is integrated pouring, during reparation, it is necessary to The high-temperature plastic mud layer of failure area is purged, the most integrated poured, not only cause the pole of high-temperature plastic mud material Big waste, and can normally work to equipment from starting to repair, whole process at least needs the time, has a strong impact on enterprise Normal work.
Summary of the invention
Present invention aims to above-mentioned the deficiencies in the prior art, it is provided that a kind of easy to use, respond well with combination The coal powder lance of formula high-temperature-resistant structure.
The technical scheme is that and be achieved in that: a kind of coal powder lance with combination type high-temperature-resistant structure, including coal powder lance this Body, is distributed some positioning studs on coal powder lance body outer wall, and the coal powder lance body upper peripheral at positioning stud has resistance to height Temperature clay layer;High-temp resistance prefabricated layer and ceramic wearing coat the most sequentially it is provided with in high-temperature plastic mud layer periphery;Described high temperature resistant Preformed layer is made up of the some blocks of high temperature resistant clay prefabricated components sequentially laid, and described ceramic wearing coat is by the some pieces of potteries sequentially laid Porcelain prefabricated component is constituted, high temperature resistant clay prefabricated component and ceramic preform one_to_one corresponding and at high temperature resistant clay prefabricated component and ceramics preparative Being respectively equipped with the hole, location adapted with positioning stud on part, high temperature resistant clay prefabricated component and ceramic preform are located in determining of correspondence Threaded with positioning stud on the stud of position and by high temperature resistant securing member and fix.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, the thickness of described high-temperature plastic mud layer is 4-6cm;High temperature resistant The thickness of preformed layer and ceramic wearing coat is 1/2nd of high-temperature plastic mud layer thickness.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, it is folded with between high-temperature plastic mud layer and high-temp resistance prefabricated layer High-temperature fibre cotton layer.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, described high temperature resistant securing member by integrated ceramic caps and Pottery swivel nut is constituted;Pottery swivel nut is threadeded with positioning stud, is provided with interior hexagonal counterbore in ceramic caps upper surface, at pottery Prefabricated component upper surface is provided with the deep gouge adapted with ceramic caps.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, in the location that high temperature resistant securing member is corresponding with on ceramic preform High temperature resistant location clay layer it is provided with between hole and deep gouge.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, in the hole, location on ceramic preform and pottery swivel nut periphery It is equipped with positioning threads;It is equipped with annular positioning groove bottom deep gouge inner bottom part and ceramic caps.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, high temperature resistant clay prefabricated component end face circumferentially is inclined-plane, The end face at adjacent high temperature resistant clay prefabricated component edge cooperatively forms splay first blind, fills in the first blind There is the first high temperature resistant clay.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, ceramic preform end face circumferentially is inclined-plane, adjacent pottery The end face at porcelain prefabricated component edge cooperatively forms splay second blind, is filled with second high temperature resistant in the second blind Clay.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, set at each high temperature resistant clay prefabricated component and ceramic preform edge There is the locating convex block and/or locating notch cooperated.
In the above-mentioned coal powder lance with combination type high-temperature-resistant structure, the cross section of high temperature resistant clay prefabricated component and ceramic preform is equal For arc, the radian of arc is 60-90 °.
After the present invention uses said structure, first pass through and pour into a mould high-temperature plastic mud layer at coal powder lance body, then at high temperature resistant clay Layer is outer the most sequentially arranges detachable high-temp resistance prefabricated layer and ceramic wearing coat.So, whole high temperature resistant in guarantee Structural thickness is identical with the high-temperature-resistant layer of existing integrated pouring, on the premise of can effectively playing protection coal powder lance purpose, enters one Step improves utilization rate and the service life of high-temperature-resistant layer.Meanwhile, limit high-temperature plastic mud layer thickness and high-temp resistance prefabricated layer and Relation between ceramic wear-resisting layer thickness, so, can improve the utilization rate of prefabricated component to greatest extent, and component wear has only to more Change that surface is relatively thin one piece.Further, for convenience of location and the handling of whole preform layer, between each prefabricated component, use location The structure location that projection and/or locating notch coordinate, and use positioning stud to coordinate high temperature resistant securing member and the mode of high temperature resistant clay It is fixed.Use the coal powder lance of the present invention, when high-temperature-resistant layer occurs that damage needs to change, it is only necessary to spend the short period Failure area is repaired and again puts into.
Accompanying drawing explanation
The present invention is described in further detail for embodiment in below in conjunction with the accompanying drawings, but is not intended that any limit to the present invention System.
Fig. 1 is the structural representation of the present invention;
Fig. 2 is the sectional structure schematic diagram in Fig. 1 at A-A;
Fig. 3 is the plan structure schematic diagram of Fig. 1;
Fig. 4 is the close-up schematic view in Fig. 2 at B.
In figure: coal powder lance body 1, positioning stud 2, high-temperature plastic mud layer 3, high temperature resistant clay prefabricated component 4, ceramic preform 5, hole 6, location, high temperature resistant securing member 7, ceramic caps 7a, pottery swivel nut 7b, high-temperature fibre cotton layer 8, interior hexagonal counterbore 9, deep gouge 10, high temperature resistant location clay layer 11, positioning threads 12, annular positioning groove the 13, first blind 14, first High temperature resistant clay the 15, second blind the 16, second high temperature resistant clay 17, locating convex block 18, locating notch 19.
Detailed description of the invention
Refering to shown in Fig. 1 to Fig. 4, a kind of coal powder lance with combination type high-temperature-resistant structure of the present invention, including coal powder lance body 1, on coal powder lance body 1 outer wall, some positioning stud 2 is distributed, at coal powder lance body 1 upper of positioning stud 2 periphery Having high-temperature plastic mud layer 3, the thickness of high-temperature plastic mud layer 3 is 4-6cm, and high-temperature plastic mud layer 3 plays protection coal powder injection in use The good action of gun body 1.High-temp resistance prefabricated layer and ceramic wearing coat the most sequentially it is provided with in high-temperature plastic mud layer 3 periphery. High-temp resistance prefabricated layer is made up of the some blocks of high temperature resistant clay prefabricated components 4 sequentially laid, and high temperature resistant clay prefabricated component 4 is circumferentially End face is inclined-plane, and the end face at adjacent high temperature resistant clay prefabricated component 4 edge cooperatively forms splay first blind 14, The first high temperature resistant clay 15 it is filled with in first blind 14.Described ceramic wearing coat is pre-by the some pieces of potteries sequentially laid Product 5 is constituted, and is provided with the deep gouge 10 adapted with ceramic caps 7a in ceramic preform 5 upper surface, at deep gouge 10 inner bottom part It is provided with annular positioning groove 13.Ceramic preform 5 end face circumferentially is inclined-plane, and the end face at adjacent ceramic prefabricated component 5 edge is joined Close and form splay second blind 16, in the second blind 16, be filled with the second high temperature resistant clay 17.This knot The blind of structure, even if having certain extendable room between adjacent two blocks of prefabricated components, prevents from causing due to high-temperature expansion The damage of prefabricated component, can be fixed high temperature resistant clay again effectively, even if pine occurs in the high temperature resistant clay in blind Dynamic, also will not come off in blind easily, effectively extend the service life of high temperature resistant clay.It addition, fill seam first Can also fill, in gap 14 and the second blind 16, other castable that this area is conventional.High temperature resistant clay prefabricated component 4 and pottery The cross section of porcelain prefabricated component 5 is arc, it is preferred that the radian of arc is 60-90 °, uses this structure, both convenient peace Dress, can improve again high temperature resistant clay prefabricated component 4 and the utilization rate of ceramic preform 5.
Meanwhile, the thickness of high-temp resistance prefabricated layer and ceramic wearing coat is 1/2nd of high-temperature plastic mud layer 3 thickness, high temperature resistant Preformed layer and ceramic wearing coat primarily serve the effect of protection high-temperature plastic mud layer 3, use the structure of suitable thickness, are beneficial to produce While, save substantial amounts of cost;High-temperature fibre cotton layer it is folded with between high-temperature plastic mud layer 3 and high-temp resistance prefabricated layer 8, high-temperature fibre cotton layer 8 plays heat insulation effect.
Further, locating convex block 18 He cooperated it is provided with at each high temperature resistant clay prefabricated component 4 and ceramic preform 5 edge / or locating notch 19, concrete fit system is determined on a case-by-case basis, and the edge of each prefabricated component can arrange locating convex block 18 simultaneously With in locating notch 19, it is also possible to be locating convex block 18 or be locating notch 19, using this structure, mainly side The most each prefabricated component location when mounted, improves installation effectiveness.
Further, high temperature resistant clay prefabricated component 4 and ceramic preform 5 one_to_one corresponding and at high temperature resistant clay prefabricated component 4 and pottery It is respectively equipped with the hole, location 6 adapted with positioning stud 2 on porcelain prefabricated component 5, sets in the hole, location 6 on ceramic preform 5 There is positioning threads 12;High temperature resistant clay prefabricated component 4 and ceramic preform 5 are located on the positioning stud 2 of correspondence and by resistance to height Temperature securing member 7 is threadeded fixing with positioning stud 2.In the hole, location that high temperature resistant securing member 7 is corresponding with on ceramic preform 5 High temperature resistant location clay layer 11 it is provided with between 6 and deep gouge 10.High temperature resistant securing member 7 is by integrated ceramic caps 7a and pottery Porcelain swivel nut 7b is constituted;Pottery swivel nut 7b is threadeded with positioning stud 2, is provided with positioning threads 12 in pottery swivel nut 7b periphery; It is provided with interior hexagonal counterbore 9 in ceramic caps 7a upper surface, bottom ceramic caps 7a, is provided with annular positioning groove 13, positioning threads 12 and annular positioning groove 13 be the shape of thread, play the effect preventing high temperature resistant location clay layer 11 from coming off.
During use, first according to the specification of each prefabricated component, coal powder lance body 1 outer wall welds positioning stud 2, then in spray Integrated poured high-temperature plastic mud layer 3 on coal gun body 1 outer wall, after high-temperature plastic mud layer 3 molding, lays high-temperature fibre cotton Layer 8, more high temperature resistant clay prefabricated component 4 is set on the positioning stud 2 of correspondence, insert first in the first blind 14 resistance to High temperature clay 15, forms high-temp resistance prefabricated layer;Then ceramic preform 5 is set on the positioning stud 2 of correspondence, at pottery Preset high temperature resistant location clay layer 11 in hole, location 6 on prefabricated component 5 and deep gouge 10, then high temperature resistant securing member 7 is rotated Clamp-on in deep gouge 10, coordinate fixing two-layer preform layer by high temperature resistant securing member 7 with positioning stud 2, simultaneously by high temperature resistant Location clay layer 11 is fixing and protects high temperature resistant securing member 7, finally inserts the second high temperature resistant clay in the second blind 16 17, form ceramic wearing coat.
In use for some time, it is damaged when the high temperature resistant clay prefabricated component 4 on coal powder lance outer wall and/or ceramic preform 5 Time, high temperature resistant securing member 7 can be backed out, change the prefabricated component damaged, again in corresponding blind, insert high-temperature plastic Mud can come into operation again.The present invention effectively extends the service life of coal powder lance, save considerably the one-tenth of manufacture of cement simultaneously This.
Embodiment provided above is the better embodiment of the present invention, is only used for the convenient explanation present invention, not appoints the present invention What pro forma restriction, has usually intellectual, if without departing from the carried technical characteristic of the present invention in any art In the range of, utilize the Equivalent embodiments that the done local of disclosed technology contents is changed or modified, and without departing from this Bright technical characteristic content, all still falls within the range of the technology of the present invention feature.

Claims (10)

1. with a coal powder lance for combination type high-temperature-resistant structure, including coal powder lance body (1), it is characterised in that at coal powder lance Some positioning stud (2) is distributed, at coal powder lance body (1) upper that positioning stud (2) is peripheral on body (1) outer wall There is high-temperature plastic mud layer (3);High-temp resistance prefabricated layer and ceramic wear-resisting the most sequentially it is provided with in high-temperature plastic mud layer (3) periphery Layer;Described high-temp resistance prefabricated layer is made up of the some pieces of high temperature resistant clay prefabricated components (4) sequentially laid, described ceramic wearing coat by Some pieces of ceramic preform sequentially laid (5) are constituted, high temperature resistant clay prefabricated component (4) and ceramic preform (5) 1 a pair The location adapted with positioning stud (2) and should be respectively equipped with on high temperature resistant clay prefabricated component (4) and ceramic preform (5) Hole (6), high temperature resistant clay prefabricated component (4) and ceramic preform (5) are located in the positioning stud (2) of correspondence and above and pass through resistance to High temperature securing member (7) is threadeded fixing with positioning stud (2).
Coal powder lance with combination type high-temperature-resistant structure the most according to claim 1, it is characterised in that described high-temperature plastic The thickness of mud layer (3) is 4-6cm;The thickness of high-temp resistance prefabricated layer and ceramic wearing coat is high-temperature plastic mud layer (3) thickness 1/2nd.
Coal powder lance with combination type high-temperature-resistant structure the most according to claim 1, it is characterised in that at high temperature resistant clay It is folded with high-temperature fibre cotton layer (8) between layer (3) and high-temp resistance prefabricated layer.
Coal powder lance with combination type high-temperature-resistant structure the most according to claim 1, it is characterised in that described high temperature resistant tightly Firmware (7) is made up of integrated ceramic caps (7a) and pottery swivel nut (7b);Pottery swivel nut (7b) and positioning stud (2) threaded, it is provided with interior hexagonal counterbore (9) in ceramic caps (7a) upper surface, in ceramic preform (5) upper surface It is provided with the deep gouge (10) adapted with ceramic caps (7a).
Coal powder lance with combination type high-temperature-resistant structure the most according to claim 4, it is characterised in that in high temperature resistant fastening Part (7) is upper with ceramic preform (5) is provided with high temperature resistant location clay layer (11) between corresponding hole, location (6) and deep gouge (10).
Coal powder lance with combination type high-temperature-resistant structure the most according to claim 5, it is characterised in that at ceramic preform (5) in the hole, location (6) on and ceramic swivel nut (7b) periphery is equipped with positioning threads (12);At deep gouge (10) inner bottom part It is equipped with annular positioning groove (13) with ceramic caps (7a) bottom.
Coal powder lance with combination type high-temperature-resistant structure the most according to claim 1, it is characterised in that high temperature resistant clay is pre- Product (4) end face circumferentially is inclined-plane, and the end face at adjacent high temperature resistant clay prefabricated component (4) edge cooperatively forms splayed The first blind (14), in the first blind (14), be filled with the first high temperature resistant clay (15).
8. according to the coal powder lance with combination type high-temperature-resistant structure described in claim 1 or 7, it is characterised in that ceramics preparative Part (5) end face circumferentially is inclined-plane, and the end face at adjacent ceramic prefabricated component (5) edge cooperatively forms splay second and fills out Fill gap (16), in the second blind (16), be filled with the second high temperature resistant clay (17).
9. according to the coal powder lance with combination type high-temperature-resistant structure described in claim 1 or 7, it is characterised in that at each resistance to height Temperature clay prefabricated component (4) and ceramic preform (5) edge are provided with the locating convex block (18) and/or locating notch cooperated (19)。
Coal powder lance with combination type high-temperature-resistant structure the most according to claim 1, it is characterised in that high temperature resistant clay The cross section of prefabricated component (4) and ceramic preform (5) is arc, and the radian of arc is 60-90 °.
CN201410855344.0A 2014-12-30 2014-12-30 Coal powder lance with combination type high-temperature-resistant structure Expired - Fee Related CN104534499B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410855344.0A CN104534499B (en) 2014-12-30 2014-12-30 Coal powder lance with combination type high-temperature-resistant structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410855344.0A CN104534499B (en) 2014-12-30 2014-12-30 Coal powder lance with combination type high-temperature-resistant structure

Publications (2)

Publication Number Publication Date
CN104534499A CN104534499A (en) 2015-04-22
CN104534499B true CN104534499B (en) 2016-08-17

Family

ID=52850078

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410855344.0A Expired - Fee Related CN104534499B (en) 2014-12-30 2014-12-30 Coal powder lance with combination type high-temperature-resistant structure

Country Status (1)

Country Link
CN (1) CN104534499B (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2816768C2 (en) * 1978-04-18 1981-11-26 Ruhrkohle Ag, 4300 Essen Coal burning
CN2508118Y (en) * 2001-11-28 2002-08-28 吴亦安 Arch wear-resistant corundun ceramic lining boiler burner tube
CN1715238A (en) * 2005-01-18 2006-01-04 陈海渊 Corundum ceramic wear-resistance lining plate structure module and its wear-resistance corundum ceramic block
CN2771617Y (en) * 2005-01-18 2006-04-12 陈海渊 Corundum ceramic anti-wear lining structure assembly
CN201462881U (en) * 2009-07-30 2010-05-12 四川利森建材集团有限公司 Cement kiln pulverized coal burner
CN202647834U (en) * 2012-07-02 2013-01-02 魏伯卿 Long heat-resistant oxygen-enriched combustion-supporting spray gun for rotary kiln
CN204007137U (en) * 2014-08-26 2014-12-10 长兴兴鹰新型耐火建材有限公司 Combination preformed bricks for the reducing of a kind of cement kiln smoke-box
CN204358762U (en) * 2014-12-30 2015-05-27 广东梅雁吉祥水电股份有限公司 A kind of coal powder lance with combined type high-temperature-resistant structure

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE2816768C2 (en) * 1978-04-18 1981-11-26 Ruhrkohle Ag, 4300 Essen Coal burning
CN2508118Y (en) * 2001-11-28 2002-08-28 吴亦安 Arch wear-resistant corundun ceramic lining boiler burner tube
CN1715238A (en) * 2005-01-18 2006-01-04 陈海渊 Corundum ceramic wear-resistance lining plate structure module and its wear-resistance corundum ceramic block
CN2771617Y (en) * 2005-01-18 2006-04-12 陈海渊 Corundum ceramic anti-wear lining structure assembly
CN201462881U (en) * 2009-07-30 2010-05-12 四川利森建材集团有限公司 Cement kiln pulverized coal burner
CN202647834U (en) * 2012-07-02 2013-01-02 魏伯卿 Long heat-resistant oxygen-enriched combustion-supporting spray gun for rotary kiln
CN204007137U (en) * 2014-08-26 2014-12-10 长兴兴鹰新型耐火建材有限公司 Combination preformed bricks for the reducing of a kind of cement kiln smoke-box
CN204358762U (en) * 2014-12-30 2015-05-27 广东梅雁吉祥水电股份有限公司 A kind of coal powder lance with combined type high-temperature-resistant structure

Also Published As

Publication number Publication date
CN104534499A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN206662255U (en) A kind of masonry construction of ladle or ladle
CN104390461B (en) Energy-saving cement rotary kiln lining and masonry process thereof
CN103033043B (en) Method for laying refractory bricks of large variable diameter part of 12,000t/d rotary kiln
CN203964635U (en) The inner liner of rotary kiln that a kind of concrete prefabricated brick makes
CN204174222U (en) The repair structure of iron-making heat wind furnace hot air duct and repairing mould thereof
CN203347126U (en) Reinforced concrete stair step cement mortar surface layer plastering construction structure
CN104534499B (en) Coal powder lance with combination type high-temperature-resistant structure
CN106193485A (en) A kind of building wall exempts from cracking resistance technique of plastering
CN203755490U (en) Inorganic mortar heat-insulation wall
CN103587338A (en) Bearing platform waterscape
CN109652603B (en) Semi-pouring type blast furnace hot blast stove pipeline and construction method thereof
CN204358762U (en) A kind of coal powder lance with combined type high-temperature-resistant structure
CN203657444U (en) Prefabricated brick for rotary kiln and kiln liner of rotary kiln
CN204358717U (en) A kind of coal powder lance with prefabricated high-temperature-resistant structure
CN106323004A (en) Construction method for laying refractory bricks of rotary kiln through bricklaying supporting device
CN204854533U (en) Model of brick groove size is inlayed to inspection cooling wall wooden model
CN204535408U (en) A kind of prevent rotary kiln fall brick and reduce gas consumption build body structure by laying bricks or stones
CN203938642U (en) A kind of coke oven peephole string leakage device of administering
CN104059677A (en) Device and method for treating leakage of observation hole of coke furnace
CN204644307U (en) A kind of new type of airflow bed gasification furnace chilling ring
CN204286100U (en) Hopper inner and outer ring side wall masonry construction
CN203687610U (en) Toward-fire face brick building structure of gasification furnace
CN204079489U (en) A kind of acid resistant porcelain inner bag for sulfuric acid production process dry absorption tower, circulation groove
CN205035962U (en) Light pinhole hollow brick with can be in wall body pre -buried pipeline anyhow
CN201828147U (en) Combined side wall and anchoring bricks thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20160817

Termination date: 20161230

CF01 Termination of patent right due to non-payment of annual fee