CN104533463A CN201510007689.5A CN201510007689A CN104533463A CN 104533463 A CN104533463 A CN 104533463A CN 201510007689 A CN201510007689 A CN 201510007689A CN 104533463 A CN104533463 A CN 104533463A
Authority
CN
China
Prior art keywords
end plate
plate
concrete lining
pipe piece
lining pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201510007689.5A
Other languages
Chinese (zh)
Inventor
王香港
周建军
沈焱
毛荣良
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SUZHOU XINGBANG CHEMICAL BUILDING MATERIALS Co Ltd
Original Assignee
SUZHOU XINGBANG CHEMICAL BUILDING MATERIALS Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SUZHOU XINGBANG CHEMICAL BUILDING MATERIALS Co Ltd filed Critical SUZHOU XINGBANG CHEMICAL BUILDING MATERIALS Co Ltd
Priority to CN201510007689.5A priority Critical patent/CN104533463A/en
Publication of CN104533463A publication Critical patent/CN104533463A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01NINVESTIGATING OR ANALYSING MATERIALS BY DETERMINING THEIR CHEMICAL OR PHYSICAL PROPERTIES
    • G01N33/00Investigating or analysing materials by specific methods not covered by groups G01N1/00 - G01N31/00
    • G01N33/38Concrete; ceramics; glass; bricks
    • G01N33/383Concrete, cement

Abstract

The invention discloses a testing mould for concrete lining segments. The testing mould for the concrete lining segments comprises a bottom panel, a front end plate, a rear end plate, a left end plate, a right end plate and an upper cover. The front end plate, the rear end plate, the left end plate and the right end plate are connected end to end to define a pouring containing cavity together with the bottom panel, the top of the front end plate and the top of the rear end plate are of circular arc structures, and the upper cover is of a circular arc structure, matched with the top of the front end plate and the top of the rear end plate and buckled to the upper portion of the pouring containing cavity. In this way, the testing mould for the concrete lining segments is manufactured by simulating a production mould and mainly used for meeting testing requirements and testing the workability of C50 concrete, the early strength under steam curing, whether the pressure can reach more than 15 MPa in stripping and whether the manufactured concrete lining segments have raised grain.

Description

A kind of concrete lining pipe piece test mould
Technical field
The present invention relates to the field of chemical building material, particularly relate to a kind of concrete lining pipe piece test mould.
Background technology
China builds underground railway from nineteen sixty-five, along with the continuous expansion of China's subway construction scale, construction of subway technology obtains development, and construction method has developed into the multiple methods such as present cut and cover method, cap excavation method, Mining Method, shield method by originally single cut and cover method and deposited.Wherein shield method is owing to having economy, safety, to ground natural conditions and the advantage such as effect on building is less, the construction period is shorter, being developed rapidly in China's subway construction.Also mainly shield method is adopted in the engineerings such as cross-river tunnel, gas transmission and municipal drainage tunnel.
Section of jurisdiction is the tunnel structure lining cutting main body of shield construction, to the quality in whole tunnel with play a part key application life.At present, the type of section of jurisdiction mainly contains ductile iron section of jurisdiction, steel pipe sheet, compound section of jurisdiction and reinforced concrete segment, and wherein reinforced concrete lining layer section of jurisdiction is the most frequently used section of jurisdiction form.
Domestic concrete design strength grade is all at C50 or more, and demoulding strength is at more than 18MPa, and most of enterprise is 20MPa.Can see from current actual tests data, 28d intensity and intensity of dispatching from the factory all can reach design strength grade, but demoulding strength is between 13-50MPa, and for the enterprise of demoulding strength at below 15MPa, major part adopts the mode of the vacuum cup demoulding, these enterprises, through production practices for many years, find that demoulding strength is smaller and do not cause damage to product.And for the hanging demoulding that current most of enterprise adopts, concrete strength controls when 20MPa, generally can not cause damage to concrete.
Summary of the invention
The technical problem that the present invention mainly solves is to provide a kind of concrete lining pipe piece test mould, this test mould imitates production mould and makes, it mainly meets the requirement of test, by the concrete workability of this mould test C50, early epistasis energy under stream curing, can reach more than 15MPa during the demoulding, whether the concrete lining pipe piece of preparation there will be ripple glaze etc.
For solving the problems of the technologies described above, the technical scheme that the present invention adopts is: provide a kind of concrete lining pipe piece test mould, comprise bottom panel, front end-plate, end plate, first member plate, right end plate and upper cover, described front end-plate, end plate, first member plate, right end plate join end to end and surround one with bottom panel and build cavity volume, described front end-plate and the top of end plate are arc-shaped structure, and described upper cover is that arc-shaped structure matches with the top of front end-plate and end plate and is fastened on the top of building cavity volume.
In a preferred embodiment of the present invention, the outer middle side part of described front end-plate and end plate is horizontally arranged with reinforcing rib respectively.
In a preferred embodiment of the present invention, cover and be provided with observation port and handle on described, described observation port is arranged on the centre position of upper cover, and described handle is separately positioned on the left and right sides of upper cover.
In a preferred embodiment of the present invention, described front end-plate and the height of end plate are 150-225mm, and the height of first member plate and right end plate is 150mm.
In a preferred embodiment of the present invention, described concrete lining pipe piece test mould adopts stainless steel material to make.
The invention has the beneficial effects as follows: concrete lining pipe piece test mould of the present invention, this test mould imitates production mould and makes, it mainly meets the requirement of test, by the concrete workability of this mould test C50, early epistasis energy under stream curing, can reach more than 15MPa during the demoulding, whether the concrete lining pipe piece of preparation there will be ripple glaze etc.
Accompanying drawing explanation
In order to be illustrated more clearly in the technical scheme in the embodiment of the present invention, below the accompanying drawing used required in describing embodiment is briefly described, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings, wherein:
Fig. 1 is the assembling assumption diagram of a preferred embodiment of concrete lining pipe piece test mould of the present invention;
Reference numeral is as follows: 1, bottom panel, and 2, front end-plate, 3, end plate, 4, first member plate, 5, right end plate, 6, upper cover, 7, reinforcing rib, 8, observation port, 9, handle.
Detailed description of the invention
Be clearly and completely described to the technical scheme in the embodiment of the present invention below, obviously, described embodiment is only a part of embodiment of the present invention, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making other embodiments all obtained under creative work prerequisite, belong to the scope of protection of the invention.
As shown in Figure 1, the embodiment of the present invention comprises:
A kind of concrete lining pipe piece test mould, comprise bottom panel 1, front end-plate 2, end plate 3, first member plate 4, right end plate 5 and upper cover 6, described front end-plate 2, end plate 3, first member plate 4, right end plate 5 join end to end and surround one with bottom panel 1 and build cavity volume, described front end-plate 2 and the top of end plate 3 are arc-shaped structure, and described upper cover 6 is that arc-shaped structure matches with the top of front end-plate 2 and end plate 3 and is fastened on the top of building cavity volume.
In above-mentioned, described front end-plate 2 and the outer middle side part of end plate 3 are horizontally arranged with reinforcing rib 7 respectively, enhance concrete lining pipe piece test mould intensity and facilitate the position of transportable concrete lining segment test mould
Further, described upper cover 6 is provided with observation port 8 and handle 9, described observation port 8 is arranged on the centre position of upper cover 6, and described handle 9 is separately positioned on the left and right sides of upper cover 6, operation easy to use.
In the present invention, described concrete lining pipe piece test mould adopts stainless steel material to make.Wherein, described front end-plate 2 and the minimum altitude of end plate 3 are 150mm, and the maximum height at front end-plate 2 and end plate 3 top is 225mm, and the height of first member plate 4 and right end plate 5 is 150mm, and surrounding one, to build cavity volume be rectangle structure with circular arc top.Because size is less, when raw material replacing or technique adjustment, test efficiency is high, and experimental cost is low.
In sum, concrete lining pipe piece test mould of the present invention, this test mould imitates production mould and makes, it mainly meets the requirement of test, by the concrete workability of this mould test C50, early epistasis energy under stream curing, can reach more than 15MPa during the demoulding, whether the concrete lining pipe piece of preparation there will be ripple glaze etc.
The foregoing is only embodiments of the invention; not thereby the scope of the claims of the present invention is limited; every utilize description of the present invention to do equivalent structure or equivalent flow process conversion; or be directly or indirectly used in other relevant technical field, be all in like manner included in scope of patent protection of the present invention.

Claims (5)

1. a concrete lining pipe piece test mould, it is characterized in that, comprise bottom panel, front end-plate, end plate, first member plate, right end plate and upper cover, described front end-plate, end plate, first member plate, right end plate join end to end and surround one with bottom panel and build cavity volume, described front end-plate and the top of end plate are arc-shaped structure, and described upper cover is that arc-shaped structure matches with the top of front end-plate and end plate and is fastened on the top of building cavity volume.
2. concrete lining pipe piece test mould according to claim 1, is characterized in that, the outer middle side part of described front end-plate and end plate is horizontally arranged with reinforcing rib respectively.
3. concrete lining pipe piece test mould according to claim 1, is characterized in that, covers and be provided with observation port and handle on described, and described observation port is arranged on the centre position of upper cover, and described handle is separately positioned on the left and right sides of upper cover.
4. concrete lining pipe piece test mould according to claim 1, is characterized in that, described front end-plate and the height of end plate are 150-225mm, and the height of first member plate and right end plate is 150mm.
5. concrete lining pipe piece test mould according to claim 1, is characterized in that, described concrete lining pipe piece test mould adopts stainless steel material to make.
CN201510007689.5A 2015-01-08 2015-01-08 Testing mould for concrete lining segments Pending CN104533463A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510007689.5A CN104533463A (en) 2015-01-08 2015-01-08 Testing mould for concrete lining segments

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510007689.5A CN104533463A (en) 2015-01-08 2015-01-08 Testing mould for concrete lining segments

Publications (1)

Publication Number Publication Date
CN104533463A true CN104533463A (en) 2015-04-22

Family

ID=52849063

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510007689.5A Pending CN104533463A (en) 2015-01-08 2015-01-08 Testing mould for concrete lining segments

Country Status (1)

Country Link
CN (1) CN104533463A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108008118A (en) * 2017-12-31 2018-05-08 浙江大学 Seabed tunnel dynamic response experimental rig under tide simulation load action

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009083407A (en) * 2007-10-02 2009-04-23 Ishikawajima Constr Materials Co Ltd Production process of composite segment
CN201776830U (en) * 2010-07-15 2011-03-30 成都理工大学 Tunnel lining mould for model testing
CN103471917A (en) * 2013-09-18 2013-12-25 山东科技大学 Testing method for bearing capacity of cast-in-situ concrete lining of tunnel
CN204386618U (en) * 2015-01-08 2015-06-10 苏州市兴邦化学建材有限公司 A kind of concrete lining pipe piece test mould

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2009083407A (en) * 2007-10-02 2009-04-23 Ishikawajima Constr Materials Co Ltd Production process of composite segment
CN201776830U (en) * 2010-07-15 2011-03-30 成都理工大学 Tunnel lining mould for model testing
CN103471917A (en) * 2013-09-18 2013-12-25 山东科技大学 Testing method for bearing capacity of cast-in-situ concrete lining of tunnel
CN204386618U (en) * 2015-01-08 2015-06-10 苏州市兴邦化学建材有限公司 A kind of concrete lining pipe piece test mould

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108008118A (en) * 2017-12-31 2018-05-08 浙江大学 Seabed tunnel dynamic response experimental rig under tide simulation load action
CN108008118B (en) * 2017-12-31 2019-02-22 浙江大学 Seabed tunnel dynamic response experimental rig under tide simulation load action

Similar Documents

Publication Publication Date Title
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN204386618U (en) A kind of concrete lining pipe piece test mould
CN104533463A (en) Testing mould for concrete lining segments
CN204492335U (en) Construction repeats to use mobile sound barrier
CN105041340A (en) Structure and construction method for increasing arch crown concrete pouring speed in tunnel engineering
CN109610842A (en) A kind of concrete jacking pump send construction method
CN103741651B (en) A kind of concrete teeth groove stiling basin and construction method thereof
CN204941567U (en) A kind of structure accelerating construction of tunnel vault pouring concrete speed
CN204825820U (en) Utilize traffic hole to make pressure regulating well structure that goes up room
CN203808111U (en) Reinforced concrete prefabricated inspection chamber for underground pipe networks
CN203856403U (en) Matched structure of rotary jet grouting integrated drill and anchor cables
CN203924124U (en) A kind of casting well cover for sewer
CN103867210B (en) A kind of city underground list branch-cut bridge excavating construction method
CN202284334U (en) Construction joint structure of concrete wall
CN202914109U (en) Integral type lining system of light-section cable tunnel
CN205116120U (en) Assembled U -shaped channel
CN203145028U (en) Corrugated pipe water-collecting well
CN207392377U (en) Monolithic reinforced-concrete prefabricated rain sewage inspection well
CN204849808U (en) Basis is assembled in prefabrication of large -scale tower machine concrete
CN103967054A (en) Prefabricated reinforced concrete inspection shaft of underground pipe network
CN106142288A (en) Shuttering precast concrete slightly vibrates technology
CN105442592B (en) A kind of prestressed pipe pile foundation of replaceable screw rod
CN205314128U (en) Plastic power communication well of integral type
CN204658662U (en) Concrete prefabricated pipe mold
CN205046821U (en) Nozzle mechanism for mortar coating machine and mortar coating machine

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20150422