CN104532997A - 一种装配式楼盖体系及其施工方法 - Google Patents
一种装配式楼盖体系及其施工方法 Download PDFInfo
- Publication number
- CN104532997A CN104532997A CN201410851552.3A CN201410851552A CN104532997A CN 104532997 A CN104532997 A CN 104532997A CN 201410851552 A CN201410851552 A CN 201410851552A CN 104532997 A CN104532997 A CN 104532997A
- Authority
- CN
- China
- Prior art keywords
- floor
- brace summer
- web
- assembly type
- precast
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000010276 construction Methods 0.000 title claims abstract description 21
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 55
- 239000010959 steel Substances 0.000 claims abstract description 55
- 239000007787 solid Substances 0.000 claims abstract description 4
- 230000002787 reinforcement Effects 0.000 claims description 17
- 210000003205 muscle Anatomy 0.000 claims description 16
- 239000004567 concrete Substances 0.000 claims description 14
- 239000008267 milk Substances 0.000 claims description 14
- 210000004080 milk Anatomy 0.000 claims description 14
- 235000013336 milk Nutrition 0.000 claims description 14
- 239000011440 grout Substances 0.000 claims description 10
- 230000003319 supportive effect Effects 0.000 claims description 7
- 238000011065 in-situ storage Methods 0.000 claims description 4
- 238000002360 preparation method Methods 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 238000003466 welding Methods 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 3
- 239000002002 slurry Substances 0.000 claims description 3
- 238000005096 rolling process Methods 0.000 claims description 2
- 230000008901 benefit Effects 0.000 abstract description 3
- 238000005192 partition Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 238000000034 method Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 238000003672 processing method Methods 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000002349 favourable effect Effects 0.000 description 1
- 239000011178 precast concrete Substances 0.000 description 1
- 230000002265 prevention Effects 0.000 description 1
- 238000009418 renovation Methods 0.000 description 1
- 238000003786 synthesis reaction Methods 0.000 description 1
Landscapes
- Buildings Adapted To Withstand Abnormal External Influences (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
Description
Claims (15)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410851552.3A CN104532997B (zh) | 2014-12-26 | 2014-12-26 | 一种装配式楼盖体系及其施工方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410851552.3A CN104532997B (zh) | 2014-12-26 | 2014-12-26 | 一种装配式楼盖体系及其施工方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104532997A true CN104532997A (zh) | 2015-04-22 |
CN104532997B CN104532997B (zh) | 2017-05-31 |
Family
ID=52848604
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410851552.3A Active CN104532997B (zh) | 2014-12-26 | 2014-12-26 | 一种装配式楼盖体系及其施工方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532997B (zh) |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105002983A (zh) * | 2015-08-12 | 2015-10-28 | 浙江绿筑建筑系统集成有限公司 | 一种大跨度、无次梁、高装配化的工业化钢结构体系 |
CN105064511A (zh) * | 2015-08-12 | 2015-11-18 | 浙江绿筑建筑系统集成有限公司 | 预应力空心楼板与h型钢梁的连接构造及其施工方法 |
CN106638982A (zh) * | 2016-11-30 | 2017-05-10 | 中国二十二冶集团有限公司 | 钢梁与叠合板连接方法 |
CN106703270A (zh) * | 2016-11-30 | 2017-05-24 | 中国二十二冶集团有限公司 | 框架钢梁与叠合楼板的连接结构 |
CN106759855A (zh) * | 2016-12-29 | 2017-05-31 | 上海建工集团股份有限公司 | 预制混凝土空心板的连接节点及其施工方法 |
CN106968380A (zh) * | 2017-03-23 | 2017-07-21 | 广东电白建设集团有限公司 | 一种装配式大跨度组合钢桁架混凝土叠合板及其施工方法 |
CN108035433A (zh) * | 2018-01-14 | 2018-05-15 | 万华集成房屋(烟台)有限公司 | 预制装配式房屋建筑及其建造方法 |
CN109025060A (zh) * | 2018-07-09 | 2018-12-18 | 东南大学 | 防火性能良好的预制平面拼装钢混组合梁及其施工方法 |
CN109057115A (zh) * | 2018-08-15 | 2018-12-21 | 湖南大学 | 一种超高性能混凝土带肋夹芯楼板及其制造方法 |
CN109057116A (zh) * | 2018-08-15 | 2018-12-21 | 湖南大学 | 一种超高性能混凝土夹芯楼板及其制造方法 |
CN109594484A (zh) * | 2017-09-30 | 2019-04-09 | 郑州市交通规划勘察设计研究院 | 桥梁加固装置、加固结构、加固施工方法及加固修复方法 |
CN110439122A (zh) * | 2019-08-21 | 2019-11-12 | 沈阳建筑大学 | 一种预制楼板与h型钢梁连接构造及连接方法 |
CN112411843A (zh) * | 2020-10-29 | 2021-02-26 | 中建科技集团有限公司 | 一种预应力空心板连接节点构造 |
CN113445652A (zh) * | 2021-06-15 | 2021-09-28 | 南京航空航天大学 | 板端开槽孔sp空心叠合板-钢梁连接结构及其施工方法 |
CN114352053A (zh) * | 2021-12-15 | 2022-04-15 | 江苏海洋大学 | 一种预制楼板承载力加固方法 |
CN114809408A (zh) * | 2022-04-20 | 2022-07-29 | 中国建筑第八工程局有限公司 | 嵌入式钢混组合梁及其施工方法 |
CN114922332A (zh) * | 2022-06-27 | 2022-08-19 | 山东建筑大学 | 钢板夹层-混凝土装配式组合楼板及其与钢梁的连接结构 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH094118A (ja) * | 1995-06-15 | 1997-01-07 | Supankuriito Corp:Kk | プレキャストコンクリート板 |
US6442908B1 (en) * | 2000-04-26 | 2002-09-03 | Peter A. Naccarato | Open web dissymmetric beam construction |
JP2002256643A (ja) * | 2001-03-05 | 2002-09-11 | Toda Constr Co Ltd | Src造の構築方法 |
WO2006129057A1 (en) * | 2005-05-31 | 2006-12-07 | Westok Limited | Floor construction method and system |
CN203347076U (zh) * | 2013-06-09 | 2013-12-18 | 中冶建筑研究总院有限公司 | 钢混凝土组合板梁 |
CN204386002U (zh) * | 2014-12-26 | 2015-06-10 | 宝钢建筑系统集成有限公司 | 一种装配式楼盖体系 |
-
2014
- 2014-12-26 CN CN201410851552.3A patent/CN104532997B/zh active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH094118A (ja) * | 1995-06-15 | 1997-01-07 | Supankuriito Corp:Kk | プレキャストコンクリート板 |
US6442908B1 (en) * | 2000-04-26 | 2002-09-03 | Peter A. Naccarato | Open web dissymmetric beam construction |
JP2002256643A (ja) * | 2001-03-05 | 2002-09-11 | Toda Constr Co Ltd | Src造の構築方法 |
WO2006129057A1 (en) * | 2005-05-31 | 2006-12-07 | Westok Limited | Floor construction method and system |
CN203347076U (zh) * | 2013-06-09 | 2013-12-18 | 中冶建筑研究总院有限公司 | 钢混凝土组合板梁 |
CN204386002U (zh) * | 2014-12-26 | 2015-06-10 | 宝钢建筑系统集成有限公司 | 一种装配式楼盖体系 |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN105064511A (zh) * | 2015-08-12 | 2015-11-18 | 浙江绿筑建筑系统集成有限公司 | 预应力空心楼板与h型钢梁的连接构造及其施工方法 |
CN105002983A (zh) * | 2015-08-12 | 2015-10-28 | 浙江绿筑建筑系统集成有限公司 | 一种大跨度、无次梁、高装配化的工业化钢结构体系 |
CN106638982A (zh) * | 2016-11-30 | 2017-05-10 | 中国二十二冶集团有限公司 | 钢梁与叠合板连接方法 |
CN106703270A (zh) * | 2016-11-30 | 2017-05-24 | 中国二十二冶集团有限公司 | 框架钢梁与叠合楼板的连接结构 |
CN106759855A (zh) * | 2016-12-29 | 2017-05-31 | 上海建工集团股份有限公司 | 预制混凝土空心板的连接节点及其施工方法 |
CN106968380A (zh) * | 2017-03-23 | 2017-07-21 | 广东电白建设集团有限公司 | 一种装配式大跨度组合钢桁架混凝土叠合板及其施工方法 |
CN109594484A (zh) * | 2017-09-30 | 2019-04-09 | 郑州市交通规划勘察设计研究院 | 桥梁加固装置、加固结构、加固施工方法及加固修复方法 |
CN108035433A (zh) * | 2018-01-14 | 2018-05-15 | 万华集成房屋(烟台)有限公司 | 预制装配式房屋建筑及其建造方法 |
CN109025060A (zh) * | 2018-07-09 | 2018-12-18 | 东南大学 | 防火性能良好的预制平面拼装钢混组合梁及其施工方法 |
CN109057115A (zh) * | 2018-08-15 | 2018-12-21 | 湖南大学 | 一种超高性能混凝土带肋夹芯楼板及其制造方法 |
CN109057116A (zh) * | 2018-08-15 | 2018-12-21 | 湖南大学 | 一种超高性能混凝土夹芯楼板及其制造方法 |
CN110439122A (zh) * | 2019-08-21 | 2019-11-12 | 沈阳建筑大学 | 一种预制楼板与h型钢梁连接构造及连接方法 |
CN112411843A (zh) * | 2020-10-29 | 2021-02-26 | 中建科技集团有限公司 | 一种预应力空心板连接节点构造 |
CN113445652A (zh) * | 2021-06-15 | 2021-09-28 | 南京航空航天大学 | 板端开槽孔sp空心叠合板-钢梁连接结构及其施工方法 |
CN114352053A (zh) * | 2021-12-15 | 2022-04-15 | 江苏海洋大学 | 一种预制楼板承载力加固方法 |
CN114809408A (zh) * | 2022-04-20 | 2022-07-29 | 中国建筑第八工程局有限公司 | 嵌入式钢混组合梁及其施工方法 |
CN114922332A (zh) * | 2022-06-27 | 2022-08-19 | 山东建筑大学 | 钢板夹层-混凝土装配式组合楼板及其与钢梁的连接结构 |
Also Published As
Publication number | Publication date |
---|---|
CN104532997B (zh) | 2017-05-31 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204386002U (zh) | 一种装配式楼盖体系 | |
CN104532997A (zh) | 一种装配式楼盖体系及其施工方法 | |
CN107476476B (zh) | 一种大跨钢筋桁架楼承板与钢筋混凝土梁组合施工方法 | |
CN102561553B (zh) | 预制钢管混凝土边框剪力墙及其施工方法 | |
CN103572873B (zh) | 装配整体式楼板及其施工方法 | |
CN209397804U (zh) | 一种装配式钢框架-组合扁梁楼盖 | |
CN103276795B (zh) | 钢-混凝土板柱结构体系 | |
KR101228012B1 (ko) | Pc기둥 접합구조 | |
CN111962952A (zh) | 一种钢管混凝土柱-H型钢梁-钢支撑-π形连接件组合式中柱底部节点及作法 | |
CN107447901A (zh) | 抗震预制楼板及楼板抗震拼接结构 | |
CN108301545A (zh) | 一种带立体桁架临时支撑的装配式大模块叠合梁板结构 | |
CN105649249A (zh) | 内置空心圆钢管的压型钢板混凝土双向组合楼板 | |
CN203347077U (zh) | 钢混凝土组合板梁 | |
CN203383333U (zh) | 钢梁与h型钢柱连接节点及板梁与h型钢柱连接结构 | |
KR101191502B1 (ko) | 트러스근 일체형 비대칭 에이치형강 합성보 및 엔드빔을 이용한 구조 시스템 | |
CN106760036B (zh) | 一种预制钢板-混凝土组合剪力墙 | |
CN108571169B (zh) | 工厂预制钢砼叠合剪力墙装配式建筑施工方法 | |
CN215106121U (zh) | 一种单向叠合板拼缝处连接构造 | |
CN103452219A (zh) | 一种蜂窝钢暗梁组合楼盖 | |
CN202925730U (zh) | 装配整体式楼板 | |
CN203347007U (zh) | 钢-混凝土板柱结构体系 | |
CN205776898U (zh) | 整体装配式钢筋混凝土剪力墙结构体系 | |
CN214785337U (zh) | 一种预制装配式钢管混凝土叠合柱及其建筑 | |
CN212562033U (zh) | 空腔内配置大直径竖向受力钢筋的叠合暗柱及预制墙 | |
CN104878863B (zh) | 一种轻质组合楼板的施工方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20190516 Address after: 200050 No. 1118 Dingxi Road, Changning District, Shanghai Patentee after: SHANGHAI BAOGANG CONSTRUCTION ENGINEERING DESIGN CO.,LTD. Address before: 200050 3rd floor, 1229 Zhoujiazui Road, Yangpu District, Shanghai Patentee before: BAOSTEEL CONSTRUCTION SYSTEM INTEGRATION CO.,LTD. |
|
TR01 | Transfer of patent right | ||
CP01 | Change in the name or title of a patent holder |
Address after: 200050 No. 1118 Dingxi Road, Shanghai, Changning District Patentee after: Shanghai Baosteel Construction Engineering Technology Co.,Ltd. Address before: 200050 No. 1118 Dingxi Road, Shanghai, Changning District Patentee before: SHANGHAI BAOGANG CONSTRUCTION ENGINEERING DESIGN CO.,LTD. |
|
CP01 | Change in the name or title of a patent holder |