CN104532715A - Hardened road surface of low-traffic-volume road of ecologically vulnerable area and construction method of hardened road surface - Google Patents
Hardened road surface of low-traffic-volume road of ecologically vulnerable area and construction method of hardened road surface Download PDFInfo
- Publication number
- CN104532715A CN104532715A CN201410760024.7A CN201410760024A CN104532715A CN 104532715 A CN104532715 A CN 104532715A CN 201410760024 A CN201410760024 A CN 201410760024A CN 104532715 A CN104532715 A CN 104532715A
- Authority
- CN
- China
- Prior art keywords
- layer
- road
- ecologically
- hard surface
- traffic volume
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01C—CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
- E01C7/00—Coherent pavings made in situ
- E01C7/08—Coherent pavings made in situ made of road-metal and binders
- E01C7/32—Coherent pavings made in situ made of road-metal and binders of courses of different kind made in situ
- E01C7/325—Joining different layers, e.g. by adhesive layers; Intermediate layers, e.g. for the escape of water vapour, for spreading stresses
Abstract
The invention discloses a hardened road surface of a low-traffic-volume road of an ecologically vulnerable area. The hardened road surface of the ecologically low-traffic-volume road of the ecologically vulnerable area is characterized in that a lower-layer asphalt oil layer is sprayed onto a standard roadbed or road surface in sequence, and an oil core adsorption layer base cloth layer is paved on the lower-layer asphalt oil layer; an upper-layer asphalt oil layer is sprayed onto the paved base cloth layer; a complete oil core adsorption layer is formed by upward seepage of the lower-layer asphalt oil layer and downward seepage of the upper-layer asphalt oil layer; or before upper-layer asphalt oil is not cooled and condensed, one clean and dust-free bearing grain stone layer with uniform grain diameter and thickness can be scattered by adopting a synchronization method; and bearing grain stones are ground and embedded into the oil core adsorption layer to form the hardened road surface. With the adoption of the hardened road surface of the ecologically low-traffic-volume road of the ecologically vulnerable area, the hardened road surface of the ecologically low-traffic-volume road of the ecologically vulnerable area can be applied to roadbed hardening of three-high regions with high altitudes, high coldness, high temperature differences and the like, and desert regions including deserts, drought regions and the like, such as large-area desert regions including Tibet Plateau, Sinkiang and Inner Mongolia in China.
Description
Technical field
The present invention relates to asphalt pavement technique, particularly relate to the hard surface of a kind of ecologically fragile area low traffic volume road and construction method thereof and application.
Background technology
Ecologically fragile area refers generally to the high area of High aititude, high and cold, high temperature difference etc. three and the desert areas such as desert, arid, as large area desert areas such as the Qinghai-Tibet Platean of China and Inner Mongols, Xinjiang.The road surface sclerosis in these areas is general to be adopted at traditional 20-30CM cement concrete cast road surface and 4-6CM asphaltic road-mix surface course, its common shortcoming be costly, energy consumption is large, a large amount of waste gas and dust is produced in road construction and mixing station process of construction, add some regional water flowing, energising difficulty, in whole project construction process, irreversible harm is defined to ecologically fragile area.Technically, no matter be cement concrete pavement, or asphaltic road-mix surface course all can not solve the problem of waterproof, anticracking, anti-settling effectively.So, investment and maintenance cost is high, application life short disease many, be greatly the present situations that three of the existing pavement technique in ecologically fragile area is badly in need of greatly improvement to environmental disruption.
Summary of the invention
The present invention, in order to solve above-mentioned prior art, defines irreversible harm to ecologically fragile area in project construction process, no matter is cement concrete pavement, or asphaltic road-mix surface course all can not solve the problem of waterproof, anticracking, anti-settling effectively.Investment and maintenance cost is high, many, large to the environmental disruption problem of short disease in application life, the present invention proposes hard surface and the construction method thereof of a kind of ecologically fragile area low traffic volume road.
Technical scheme of the present invention is: the hard surface of a kind of ecologically fragile area low traffic volume road, it is characterized in that, the hard surface of this ecologically fragile area low traffic volume road on standard roadbed or road surface, sprays lower floor's pitch oil reservoir successively, it is laid wick adsorption layer base cloth layer, the base cloth layer completed sprays upper strata pitch oil reservoir, ooze under lower floor's coal tar blending upper strata coal tar, form complete wick adsorption layer, upper strata coal tar is uncolled solidify before, or the employing method of synchronization, spread one deck uniform particle sizes is thick, totally dustless load-bearing grain rock layers, load-bearing grain stone is embedded into wick adsorption layer formation hard surface through rolling.
The construction method of the hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, it is characterized in that, its construction method step is as follows:
A () sprays lower floor 1.0kg/M successively on standard roadbed or road surface
2pitch oil reservoir about kilogram;
B () laid wick adsorption layer base cloth layer before coal tar cooled and solidified;
C () sprays upper strata 1.0-1.2kg/M on the base cloth completed
2the pitch oil reservoir of left and right;
(d) upper strata coal tar is uncolled solidify before, the thick 0.8-1.2CM of spread one deck uniform particle sizes, totally dustless load-bearing basalt or granite grain rock layers;
E () load-bearing grain stone is embedded into wick adsorption layer formation hard surface through rolling.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, described base cloth layer base cloth must have certain thickness 1.5-2.0mm, and density of texture is applicable to grain stone and embeds, and oil absorbency is good, and intensity is high, and resistance to acids and bases is good.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, described sprinkling lower floor coal tar thickness 1.0kg/M
2about kilogram, spray upper strata coal tar thickness 1.0-1.2kg/M
2left and right.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, described load-bearing grain rock layers adopts basalt or granite grain stone, and spread load-bearing grain rock layers particle diameter thickness is 0.8-1.2CM.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, described base cloth layer adopts polypropylene web material.
The hard surface application of a kind of ecologically fragile area of the present invention low traffic volume road, it is characterized in that, the hard surface of described a kind of ecologically fragile area low traffic volume road can be applicable to three high area and the desert areas such as desert, arid such as High aititude, high and cold, high temperature difference, hardens in the road surface as large area desert areas such as the Qinghai-Tibet Platean of China and Inner Mongols, Xinjiang.
The present invention's advantage compared to the prior art and effect
Advantage of the present invention is that expense is low, energy consumption is little, does not produce a large amount of waste gas and dust in road construction and mixing station process of construction, in some water flowing, the energising area in hardship, does not work the mischief in whole project construction process to ecologically fragile area to ecological environment.The hard surface of ecologically fragile area low traffic volume road can solve the problem of waterproof, anticracking, anti-settling effectively.Investment and maintenance cost is low, long service life disease is few, can improve the present situation of ecologically fragile area existing road, improve backward areas traffic and promote economic development.
Accompanying drawing explanation
Fig. 1 is the hard surface section structure schematic diagram of ecologically fragile area low traffic volume road.
Below in conjunction with the drawings and specific embodiments, the present invention is described in further detail.
Detailed description of the invention
With reference to shown in accompanying drawing 1, the hard surface of a kind of ecologically fragile area of the present invention low traffic volume road, it is characterized in that, the hard surface of this ecologically fragile area low traffic volume road on standard roadbed or road surface 1, sprays lower floor's pitch oil reservoir 2 successively, it is laid wick adsorption layer base cloth layer 3, the base cloth layer 3 completed sprays upper strata pitch oil reservoir 4, ooze under lower floor's coal tar blending upper strata coal tar, form complete wick adsorption layer, upper strata coal tar is uncolled solidify before, or the employing method of synchronization, spread one deck uniform particle sizes is thick, totally dustless load-bearing grain rock layers 5, load-bearing grain stone is embedded into wick adsorption layer formation hard surface through rolling.
The construction method of the hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, it is characterized in that, its construction method step is as follows:
A () sprays lower floor 1.0kg/M successively on standard roadbed or road surface 1
2pitch oil reservoir 2 about kilogram;
B () laid wick adsorption layer base cloth layer 3 before coal tar cooled and solidified;
C () sprays upper strata 1.0-1.2kg/M on the base cloth completed
2the pitch oil reservoir 4 of left and right;
(d) upper strata coal tar is uncolled solidify before, the thick 0.8-1.2CM of spread one deck uniform particle sizes, totally dustless load-bearing basalt or granite grain rock layers 5;
E () load-bearing grain stone is embedded into wick adsorption layer formation hard surface through rolling.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, described base cloth layer base cloth must have certain thickness 1.5-2.0mm, and density of texture is applicable to grain stone and embeds, and oil absorbency is good, and intensity is high, and resistance to acids and bases is good.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, the thick 1.0kg/M of described sprinkling lower floor pitch oil reservoir 2
2about kilogram, spray the thick 1.0-1.2kg/M of upper strata pitch oil reservoir 4
2left and right.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, described load-bearing grain rock layers adopts basalt or granite grain stone, and spread load-bearing grain rock layers particle diameter thickness is 0.8-1.2CM.
The hard surface of above-mentioned a kind of ecologically fragile area low traffic volume road, is characterized in that, described base cloth layer adopts polypropylene web material.
The hard surface application of a kind of ecologically fragile area of the present invention low traffic volume road, it is characterized in that, the hard surface of described a kind of ecologically fragile area low traffic volume road can be applicable to three high area and the desert areas such as desert, arid such as High aititude, high and cold, high temperature difference, hardens in the road surface as large area desert areas such as the Qinghai-Tibet Platean of China and Inner Mongols, Xinjiang.
Claims (7)
1. the hard surface of an ecologically fragile area low traffic volume road, it is characterized in that, the hard surface of this ecologically fragile area low traffic volume road is successively in standard roadbed or road surface (1) upper sprinkling lower floor's pitch oil reservoir (2), it lays wick adsorption layer base cloth layer (3), at the base cloth layer completed (3) upper sprinkling upper strata pitch oil reservoir (4), ooze under lower floor's coal tar blending upper strata coal tar, form complete wick adsorption layer, upper strata coal tar is uncolled solidify before, or the employing method of synchronization, spread one deck uniform particle sizes is thick, totally dustless load-bearing grain rock layers (5), load-bearing grain stone is embedded into wick adsorption layer formation hard surface through rolling.
2. the construction method of the hard surface of a kind of ecologically fragile area according to claim 1 low traffic volume road, it is characterized in that, its construction method step is as follows:
A () is successively at standard roadbed or road surface (1) upper sprinkling lower floor 1.0kg/M
2kilogram pitch oil reservoir (2);
B () laid wick adsorption layer base cloth layer (3) before coal tar cooled and solidified;
C () sprays upper strata 1.0-1.2kg/M on the base cloth completed
2pitch oil reservoir (4);
(d) upper strata coal tar is uncolled solidify before, the thick 0.8-1.2CM of spread one deck uniform particle sizes, totally dustless load-bearing basalt or granite grain rock layers (5);
E () load-bearing grain stone is embedded into wick adsorption layer formation hard surface through rolling.
3. the hard surface of a kind of ecologically fragile area according to claim 1 and 2 low traffic volume road, is characterized in that, described base cloth layer base cloth thickness 1.5-2.0mm, and density of texture is applicable to grain stone and embeds, and oil absorbency is good, and intensity is high, and resistance to acids and bases is good.
4. the hard surface of a kind of ecologically fragile area according to claim 1 and 2 low traffic volume road, is characterized in that, described sprinkling lower floor pitch oil reservoir (2) thick 1.0kg/M
2kilogram, spray upper strata pitch oil reservoir (4) thick 1.0-1.2kg/M
2.
5. the hard surface of a kind of ecologically fragile area according to claim 1 and 2 low traffic volume road, is characterized in that, described load-bearing grain rock layers adopts basalt or granite grain stone, and spread load-bearing grain rock layers particle diameter thickness is 0.8-1.2CM.
6. the hard surface of a kind of ecologically fragile area low traffic volume road according to claim 1 or 2, is characterized in that, described base cloth layer adopts polypropylene web material.
7. the hard surface application of an ecologically fragile area low traffic volume road, it is characterized in that, the hard surface of described a kind of ecologically fragile area low traffic volume road can be applicable to High aititude, high and cold, the high area of high temperature difference three and desert, Arid desert region, as the Qinghai-Tibet Platean of China and the road surface sclerosis of Inner Mongol, Xinjiang large area desert area.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410760024.7A CN104532715A (en) | 2014-12-12 | 2014-12-12 | Hardened road surface of low-traffic-volume road of ecologically vulnerable area and construction method of hardened road surface |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410760024.7A CN104532715A (en) | 2014-12-12 | 2014-12-12 | Hardened road surface of low-traffic-volume road of ecologically vulnerable area and construction method of hardened road surface |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104532715A true CN104532715A (en) | 2015-04-22 |
Family
ID=52848323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410760024.7A Pending CN104532715A (en) | 2014-12-12 | 2014-12-12 | Hardened road surface of low-traffic-volume road of ecologically vulnerable area and construction method of hardened road surface |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104532715A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH116102A (en) * | 1996-08-16 | 1999-01-12 | Mitsubishi Materials Corp | Nox-purifying pavement structure |
CN101096836A (en) * | 2006-06-27 | 2008-01-02 | 深圳市海川实业股份有限公司 | Geotextile reinforced synchronous fragmental stone sealing layer spreading method |
CN102071636A (en) * | 2010-12-07 | 2011-05-25 | 山西路桥建设集团有限公司 | Method utilizing geotextiles to dispose pavement reflection cracks |
CN102433817A (en) * | 2011-10-15 | 2012-05-02 | 交通运输部公路科学研究所 | Composite waterproof adhesive layer and preparation method thereof |
CN103334364A (en) * | 2013-06-25 | 2013-10-02 | 肇庆俊富纤网材料有限公司 | Micro-surface pavement structure and micro-surface pavement construction method |
-
2014
- 2014-12-12 CN CN201410760024.7A patent/CN104532715A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH116102A (en) * | 1996-08-16 | 1999-01-12 | Mitsubishi Materials Corp | Nox-purifying pavement structure |
CN101096836A (en) * | 2006-06-27 | 2008-01-02 | 深圳市海川实业股份有限公司 | Geotextile reinforced synchronous fragmental stone sealing layer spreading method |
CN102071636A (en) * | 2010-12-07 | 2011-05-25 | 山西路桥建设集团有限公司 | Method utilizing geotextiles to dispose pavement reflection cracks |
CN102433817A (en) * | 2011-10-15 | 2012-05-02 | 交通运输部公路科学研究所 | Composite waterproof adhesive layer and preparation method thereof |
CN103334364A (en) * | 2013-06-25 | 2013-10-02 | 肇庆俊富纤网材料有限公司 | Micro-surface pavement structure and micro-surface pavement construction method |
Non-Patent Citations (2)
Title |
---|
侯军: ""新疆地区公路沥青表面综合处治技术"", 《交通标准化》, vol. 42, no. 11, 30 June 2014 (2014-06-30) * |
陈蔚等: ""土工布增强碎石封层在乡村公路中应用的初步探讨"", 《第五届全国路面材料及新技术研讨会论文集》, 31 December 2004 (2004-12-31) * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202031001U (en) | Compound water-permeable road structure | |
CN107881858B (en) | Railway foundation bed surface layer structure and laying method thereof | |
CN202865716U (en) | Modified bituminous mixture pavement | |
CN103422414A (en) | Environment-friendly decorating water permeable pavement structure and construction method thereof | |
CN103866668A (en) | Cement water-permeable concrete ground structure with water-permeable asphalt on surface and manufacturing method thereof | |
CN104264561A (en) | A non-earthing composite structure for a waterproof pavement layer of a top plate for a road tunnel | |
CN104032639A (en) | Ice condensation resistant ultra-thin wearing course pavement and preparation method thereof | |
CN205368926U (en) | Garden way supercrust structure that water permeability is strong | |
CN104478300A (en) | Small-particle-size modified asphalt mixture thin paving material with high skid resistance | |
KR101287145B1 (en) | Elastic packaging construction structure for sports facilities and its construction method | |
CN108049279A (en) | The construction method on anti-skidding dust suppression road surface | |
CN103774518A (en) | Fiber reinforced bituminous pavement stress absorbing layer and construction method thereof | |
CN203602982U (en) | Northeast countryside ecological environment-friendly pavement | |
CN104532715A (en) | Hardened road surface of low-traffic-volume road of ecologically vulnerable area and construction method of hardened road surface | |
CN205134126U (en) | Half flexible bituminous paving basic unit structure | |
CN204803705U (en) | Concrete road surface expansion joint filleting structure | |
CN101244901A (en) | Bituminous sand and water-proof leveling coupling layer containing the bituminous sand | |
CN203741675U (en) | Ecological road | |
CN102322010A (en) | Road surface porous resin seal layer and construction method thereof | |
KR101973015B1 (en) | Eco-friendly pavement using stone sludge or soil sludge and manufacturing method thereof | |
CN204608537U (en) | A kind of overlay type in-situ heat regeneration asphalt pavement structure | |
CN100532721C (en) | High-performance water permeating and draining concrete pavement | |
CN212199918U (en) | Resistant level ground structure that passes through of city permeable pavement | |
KR100612486B1 (en) | Method for coating waste construction articles using waste rubber and its product | |
CN108755362A (en) | Base cures cold regeneration construction method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150422 |
|
RJ01 | Rejection of invention patent application after publication |