CN104527501B - A kind of Phase of Electric Power Projects emergency car - Google Patents

A kind of Phase of Electric Power Projects emergency car Download PDF

Info

Publication number
CN104527501B
CN104527501B CN201410684135.4A CN201410684135A CN104527501B CN 104527501 B CN104527501 B CN 104527501B CN 201410684135 A CN201410684135 A CN 201410684135A CN 104527501 B CN104527501 B CN 104527501B
Authority
CN
China
Prior art keywords
work tool
car body
cabin
pallet fork
sides
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410684135.4A
Other languages
Chinese (zh)
Other versions
CN104527501A (en
Inventor
张磊
潘奡旻
李付林
王建中
宋惠忠
莫加杰
钱国良
李毓起
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BEIJING KAITE SPECIAL AUTOMOBILE Co Ltd
Jiaxing Hengxin Electric Building Co Ltd
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Original Assignee
BEIJING KAITE SPECIAL AUTOMOBILE Co Ltd
Jiaxing Hengxin Electric Building Co Ltd
Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BEIJING KAITE SPECIAL AUTOMOBILE Co Ltd, Jiaxing Hengxin Electric Building Co Ltd, Jiaxing Power Supply Co of State Grid Zhejiang Electric Power Co Ltd filed Critical BEIJING KAITE SPECIAL AUTOMOBILE Co Ltd
Priority to CN201410684135.4A priority Critical patent/CN104527501B/en
Publication of CN104527501A publication Critical patent/CN104527501A/en
Application granted granted Critical
Publication of CN104527501B publication Critical patent/CN104527501B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forklifts And Lifting Vehicles (AREA)

Abstract

A kind of Phase of Electric Power Projects emergency car, it includes headstock, vehicle frame and the car body on vehicle frame, the interior is disposed with cargo hold, Work tool cabin and operation platform cabin since near headstock, toward the tailstock, square door opening is offered respectively corresponding to cargo hold and Work tool cabin, in car body both sides, and each square door opening is provided with remote controlled electric curtain driving door;One pallet fork structure that can be transferred to side outside cargo hold is installed in the middle of the bilge portion of described cargo hold;The Work tool cabin Zhong Fen left and right sides is at least respectively arranged with combination Work tool case and combination Work tool shelf;Corresponding to the operation platform cabin of compartment afterbody, compartment afterbody carriage wall opening is simultaneously provided with remote controlled electric curtain driving door;It has it is rational in infrastructure, compact, it is easy to use, it is safe and reliable, it is rationally distributed, can the safely various Work tools of sorting placement and apparatus, improve Phase of Electric Power Projects recover efficiency the features such as.

Description

A kind of Phase of Electric Power Projects emergency car
Technical field
The present invention relates to rationally distributed, the multi-functional power construction emergency car of one kind, category power engineering is recovered vehicle manufacture Technical field.
Background technology
Existing Phase of Electric Power Projects wrecking truck is converted with general wagon, and some carry closure compartment, have It is a little then do not have, the general cabinet space all very littles with closure compartment, it is impossible to manned, equipment needed for various Work tools, construction, Material etc. loads in mixture transport phenomena and remains unchanged presence, on the road jolted unnecessary " collision " occur unavoidably;Interior does not have yet The compartment of sorting placement Work tool, Work tool is using being substantially random placement after complete;Easily cause the loss of various Work tools And damage, can also delay emergency repair time etc. because of the instrument that a period of time can not find.
The content of the invention
It is an object of the invention to overcome the shortcomings of that prior art is present, and provide a kind of rational in infrastructure, compact, user Just, it is safe and reliable, it is rationally distributed, can the safely various instruments of sorting placement and apparatus, raising speedily carries out rescue work the power construction of efficiency Emergency car.
The purpose of the present invention is completed by following technical solution, a kind of described Phase of Electric Power Projects emergency car, It includes headstock, vehicle frame and the car body on vehicle frame, the interior since near the headstock, toward the tailstock successively Cargo hold, Work tool cabin and operation platform cabin are provided with, are offered respectively corresponding to cargo hold and Work tool cabin, in car body both sides Square door opening, each square door opening is provided with remote controlled electric curtain driving door;Being provided with one in the middle of the bilge portion of described cargo hold can The pallet fork structure outside cargo hold is transferred to side;The Work tool cabin Zhong Fen left and right sides is at least respectively arranged with combination Work tool Case and combination Work tool shelf;Corresponding to the operation platform cabin of compartment afterbody, compartment afterbody carriage wall opening is simultaneously provided with remote control electricity Dynamic rolling screen door, and be connected with by the double leval jib panel turnover mechanism of installation on the outside of the cabin inner bottom part in the operation platform cabin can be vertical With 90 degree of operation platforms of upset of horizontal direction.
Described car body middle part Work tool cabin both sides top is separately installed with the LED display of two stripe shapes, in car body Four angles in portion are mounted on yellow flashing light, and integrated warning lamp is separately provided with the top of headstock;In operation platform cabin Field lighting lamp that portion next door top is provided with least two horizontal, being pointed into the operation platform of horizontal outside compartment afterbody.
Pallet fork is installed in the middle of the anterior cargo hold in the compartment, the pallet fork mainly includes:At least parallel it is fixed on by two pieces The pallet fork fixed plate that stripe board on compartment cargo hold base plate is constituted, it is parallel in the pallet fork fixed plate to be provided with two and be fixed on Pallet fork external slideway in pallet fork fixed plate, is provided with many respectively by the bearing of bearing fixing axle on the inside of the pallet fork external slideway Roll sleeve, two pallet fork middle slideway are close to the inner side of pallet fork external slideway and are socketed on bearing roll sleeve by following chute respectively Can be with telescopic moving;There are two inner slides to be close to the inner side of pallet fork middle slideway respectively, in inner slide adjacent to pallet fork middle slideway one Side is also provided with many respectively by the bearing roll sleeve of bearing fixing axle, the chute on same pallet fork middle slideway below opposite side Being socketed on bearing roll sleeve can be with telescopic moving;One supporting plate with fixed goods shelf is fixed on above the inner slide, the support Plate bottom, between two inner slides cylinder putter is connected with, the two-level oil cylinder that the cylinder putter passes through to connect is connected to pallet fork Outermost stripe board in fixed plate.
Described fixed goods shelf mainly is mutually perpendicular to constitute an intersecting parallels bracket, the stripe board two-by-two by four stripe boards In at least two parallel arrangement the first stripe boards, offered on their both sides section surfaces connection below the first elongated slot, Be configured with first elongated slot one can be moved in the first elongated slot, upper end with the first rotary handle the first screw rod, first One piece is configured with screw rod and is placed in bar shaped plate surface, the pressing plate for compressing transformer;
Second stripe boards of another two parallel arrangements in the stripe board, the also company of offering on their both sides section surfaces Second elongated slot of logical lower section, has two baffle plates to be vertically disposed on the both sides section surface of the second stripe board, corresponding to described second Elongated slot, on baffle plate passed through and stretched into the second elongated slot with the second screw rod, the second screw rod is moved in the second elongated slot And driving baffle plate to be moved in parallel in the second stripe board of two parallel arrangements, the upper end of second screw rod is connected with the second rotation Change hands handle and baffle plate is fixed in second stripe board by second rotary handle.
Work tool cabin in the middle part of the compartment is divided into two spaces and is respectively provided with combination Work tool case and group from centre Work tool frame is closed, wherein combination Work tool frame includes preceding Work tool frame and rear Work tool frame, combination Work tool case includes at least wrapping The drawer box of middle Work tool case and both sides is included, and in both sides combination Work tool case and combines being respectively arranged below for Work tool frame There are at least four side by side and at least two box spaces, wherein being separately installed with keyboard in four box spaces being arranged side by side Operation supporting plate, insulated target drawer, copper bar holding clamp and an insulation drawer;In the box space that two of which is arranged side by side respectively The special drawer and asbestos mat drawer that the slender type utensil such as crow bar can be placed are installed.
The operation platform cabin both sides of the compartment afterbody have been separated out one and have been placed with refuse bag placing box space and one respectively Individual placement hydraulic power unit space, middle is the device space for placing operation platform and configured thereon;The operation platform passes through The one double leval jib panel turnover mechanism for being arranged on compartment lower rear is connected to compartment afterbody, and it includes that one is arranged on compartment lower rear Double leval jib panel turnover mechanism, being connected with one in the end of the double leval jib panel turnover mechanism can the flattened workbench bone behind compartment Frame, the workbench skeleton is installed above one piece of platform cover plate, and embossing machine, curved row are separately installed with the platform cover plate Machine, perforating press, the row's of cutting machine;The platform cover plate two sides near outer end be separately installed with it is being arranged symmetrically, be plugged on it is flat Copper bar telescope support in platform cover plate, the outer end of the copper bar telescope support is provided with copper bar back-up roller wheel carrier vertically upward, and Copper bar back-up roller wheel is installed on the copper bar back-up roller wheel carrier.
Described platform cover plate is square platform-like, is divided into left and right two parts, a portion along compartment direction thereon Row's machine, perforating press, embossing machine, another part workbench are cut by the respective axis of guide successively be set with workbench skeleton Curved row's machine is provided with by curved row's machine supporting plate on skeleton;Described double leval jib turning mechanism is fixedly mounted on compartment rear portion including one Compartment contiguous block, the compartment contiguous block is respectively connected to a cylinder rod up and down, and the outer end of two cylinder rods is connected to a hinge Chain bar, and upper connecting portion in the hinge-rod is connected to one piece of turnover panel, described workbench skeleton is fixedly installed to and turns over Above plate.
The row's of cutting machine is arranged machine supporting plate and is arranged on two axis of guides in left and right by all, it is possible to which relative moving up and down is determined Position;Described perforating press is arranged on two axis of guides in left and right also by a punching machine supporting plate, it is possible to which relative moving up and down is determined Position;Described embossing machine is arranged on two axis of guides in left and right also by an embossing machine supporting plate, it is possible to which relative moving up and down is determined Position.
The present invention is additionally provided with a layer interlayer cabin between the car body and vehicle frame, and described interlayer cabin is vertical with car body On the basis of to axis, to both sides horizontal distribution, centre sets two layer of six lattice structure space and is placed with one in every grid space Insulating ladder;Two sides set 6 independent groove grid spaces and to place various slender type objects respectively several(Group), such as safe rope branch Bar etc.;" passageway " place between groove grid space and two layer of six lattice structure space, for placing the copper bar of certain length, and is provided with solid Clamp 4.
The present invention have it is rational in infrastructure, compact, it is easy to use, it is safe and reliable, it is rationally distributed, being capable of safely sorting placement Various instruments and apparatus, improve the features such as recovering efficiency.
Brief description of the drawings
Fig. 1 is integrally-built schematic top plan view of the present invention.
Fig. 2 is an integrally-built side schematic view of the present invention.
Fig. 3 is structural representation behind compartment of the present invention.
Fig. 4 is the structural representation of pallet fork of the present invention.
Fig. 5 is the structural representation of fixed goods shelf of the present invention.
Fig. 6 is the structural representation of operation platform of the present invention.
Fig. 7 is the overlooking the structure diagram of operation platform of the present invention.
Specific embodiment
Below in conjunction with accompanying drawing, the present invention will be described in detail:Shown in Fig. 1-3, a kind of power construction of the present invention Emergency car, it includes the compartment 3 on headstock 1, vehicle body frame 2 and vehicle body frame, inside the compartment 3 since near the headstock, it is past The tailstock is disposed with cargo hold 4, Work tool cabin 5 and operation platform cabin 6, corresponding to cargo hold 4 and Work tool cabin 5, in compartment two Side offers square door opening 6 respectively, and each square door opening 6 is provided with remote controlled electric curtain driving door 7;The bilge of described cargo hold 4 Centre is provided with a pallet fork structure 8 that can be transferred to side outside cargo hold;A point left and right sides is at least distinguished in the Work tool cabin 5 It is provided with combination Work tool case 9 and combination Work tool shelf 10;Corresponding to the operation platform cabin 6 of compartment afterbody, compartment afterbody railway carriage or compartment Wall opening 11 is simultaneously provided with remote controlled electric curtain driving door 12, and by the four of installation on the outside of the cabin inner bottom part in the operation platform cabin 6 Connection pole turning plate machine 13 is connected with can be in the vertically and horizontally 90 degree operation platforms 14 of upset.
The described both sides of 3 middle part Work tool cabin of compartment 5 top is separately installed with two LED displays of stripe shape 15, in compartment 3 Four angles on top are mounted on yellow flashing light 16, are separately provided with integrated warning lamp 17 at the top of headstock 1;In operation platform Cabin 6 inner partition top be provided with least two horizontal, be pointed into outside compartment afterbody the place of the operation platform of horizontal Illuminating lamp 18.
The present invention is additionally provided with a layer interlayer cabin between the car body and vehicle frame, and described interlayer cabin is vertical with car body On the basis of to axis, to both sides horizontal distribution, centre sets two layer of six lattice structure space and is placed with one in every grid space Insulating ladder;Two sides set 6 independent groove grid spaces and to place various slender type objects respectively several(Group), such as safe rope branch Bar etc.;" passageway " place between groove grid space and two layer of six lattice structure space, for placing the copper bar of certain length, and is provided with solid Clamp 4.
Shown in Fig. 4, pallet fork structure 8 is installed in the middle of the cargo hold 4 of the front portion of compartment of the present invention 3, the pallet fork structure 8 is main Including:The pallet fork fixed plate being at least made up of two pieces of parallel stripe boards 19 being fixed on compartment cargo hold base plate, in the pallet fork It is parallel in fixed plate that two pallet fork external slideway 20 being fixed in pallet fork fixed plate, the inner side peace of the pallet fork external slideway 20 are installed Equipped with many respectively by the bearing roll sleeve 22 of bearing fixing axle 21, two pallet fork middle slideway 23 are close to pallet fork external slideway 20 Inner side and be socketed on bearing roll sleeve 22 by following chute respectively can be with telescopic moving;There are two inner slides 24 to distinguish adjacent The inner side of pallet fork middle slideway 23, be also provided with many adjacent to the side of pallet fork middle slideway 23 1 in inner slide 24 passes through bearing respectively The bearing roll sleeve 22 of fixing axle, the chute on same pallet fork middle slideway 23 below opposite side is socketed on bearing roll sleeve 22 can be stretched Contracting movement;One is fixed on above the inner slide 24 with the supporting plate 26 of fixed goods shelf 25, the bottom of the supporting plate 26, in two Cylinder putter 27 is connected between slideway 24, the two-level oil cylinder 28 that the cylinder putter 27 passes through to connect is connected in pallet fork fixed plate Outermost stripe board 19.
With reference to shown in Fig. 5, described fixed goods shelf 25 mainly is mutually perpendicular to constitute an intersecting parallels two-by-two by four stripe boards Bracket 29, at least two first stripe boards 30 of parallel arrangement in the stripe board, offers on their both sides section surfaces The first elongated slot 31 below connection, be configured with the first elongated slot 31 one can be moved in the first elongated slot, upper end carry first First screw rod 33 of rotary handle 32, be configured with the first screw rod 33 one piece be placed in bar shaped plate surface, for compressing transformer Pressing plate 34;
Second stripe board 35 of another two parallel arrangements in the stripe board, also offers on their both sides section surfaces The second elongated slot 36 below connection, has two baffle plates 37 to be vertically disposed on the both sides section surface of the second stripe board 35, corresponds to Second elongated slot 36, on baffle plate 37 passed through and stretched into the second elongated slot 36 with the second screw rod 38, make the second screw rod 38 can To move in the second elongated slot 36 and baffle plate 37 is driven to be moved in parallel in the second stripe boards 35 of two parallel arrangements, described second The upper end of screw rod 38 is connected with the second rotary handle 39 and baffle plate 37 is fixed on described by second rotary handle 39 In two stripe boards 35.
Fig. 6, shown in 7, the Work tool cabin 5 in the middle part of compartment of the present invention is divided into two spaces and is respectively provided with from centre Combination Work tool case 9 and combination Work tool shelf 10, wherein combination Work tool shelf 10 include preceding instrument device frame 40 and rear work device Tool frame 41, combination Work tool case 9 includes at least including the drawer box 43 of middle Work tool case 42 and both sides, and combines work in both sides At least four and at least two box spaces that are respectively arranged below side by side of instrument box 9 and combination Work tool shelf 10, its In be separately installed with keyboard operation supporting plate 44, insulated target drawer 45, copper bar holding clamp in four box spaces being arranged side by side 46 and insulation a drawer 47;Being separately installed with the box space that two of which is arranged side by side can place the slender type utensil such as crow bar Special drawer 48 and asbestos mat drawer.
Fig. 6, shown in 7, the operation platform cabin both sides of compartment afterbody of the present invention have been separated out one and have been placed with rubbish respectively Bag placing box space 49 and a placement hydraulic power unit space 50, it is middle for the equipment for placing operation platform and configured thereon is empty Between 51;The operation platform 14 is connected to compartment afterbody by a double leval jib panel turnover mechanism 52 for being arranged on compartment lower rear, It include one be connected with double leval jib panel turnover mechanism end, can the flattened workbench skeleton 53 behind compartment, the work Platform skeleton is installed above one piece of platform cover plate 69, the platform cover plate 69 above be separately installed with embossing machine 54, curved row's machine 55, Perforating press 56, the row's of cutting machine 57;The platform cover plate 69 two sides near outer end be separately installed with it is being arranged symmetrically, be plugged on Copper bar telescope support 70 in platform cover plate, the outer end of the copper bar telescope support 70 is provided with copper bar back-up roller wheel vertically upward Frame 58, and copper bar back-up roller wheel 59 is installed on the copper bar back-up roller wheel carrier 58.
Described platform cover plate 69 is square platform-like, is divided into left and right two parts along compartment direction thereon, wherein one Divide on workbench skeleton 53 and row's machine 57, perforating press 56, embossing machine 54 are cut by the respective axis of guide 60 successively be set with, it is another Curved row's machine 55 is provided with by curved row's machine supporting plate 61 on part workbench skeleton 53;Described double leval jib turning mechanism 52 includes One be fixedly mounted on compartment Rea car body contiguous block 62, and the compartment contiguous block 62 is respectively connected to a cylinder rod 63, two gas up and down The outer end of cylinder rod 63 is connected to a hinge-rod 64, and upper connecting portion in the hinge-rod 64 is connected to one piece of turnover panel 65, described workbench skeleton 53 is fixedly installed to above turnover panel 65.
The row's of cutting machine 57 is arranged machine supporting plate 66 and is arranged on two axis of guides 60 in left and right by all, it is possible to relatively upper and lower Running fix;Described perforating press 56 is arranged on two axis of guides 60 in left and right also by a punching machine supporting plate 67, it is possible to phase To moving up and down positioning;Described embossing machine 54 is arranged on two axis of guides 60 in left and right also by an embossing machine supporting plate 68, and Relative can move up and down positioning.

Claims (7)

1. a kind of Phase of Electric Power Projects emergency car, it includes headstock, vehicle frame and the car body on vehicle frame, and its feature exists In:Cargo hold, Work tool cabin and operation platform cabin are disposed with inside the car body since near headstock, toward the tailstock, Square door opening is offered respectively corresponding to cargo hold and Work tool cabin, in car body both sides, and each square door opening is provided with remote control Electric rolling door;One pallet fork structure that can be transferred to side outside cargo hold is installed in the middle of the bilge portion of described cargo hold;It is described The Work tool cabin Zhong Fen left and right sides is at least respectively arranged with combination Work tool case and combination Work tool shelf;Corresponding to car body tail The operation platform cabin in portion, car body afterbody carriage wall opening is simultaneously provided with remote controlled electric curtain driving door, and in the cabin in the operation platform cabin Inner bottom part outside is connected with by the double leval jib panel turnover mechanism installed can be in the vertically and horizontally 90 degree operation platforms of upset;
Described car body middle part Work tool cabin both sides top is separately installed with the LED display of two stripe shapes, on car body top Four angles are mounted on yellow flashing light, and integrated warning lamp is separately provided with the top of headstock;Operation platform cabin inside every Field lighting lamp that wall top is provided with least two horizontal, being pointed into the operation platform of horizontal outside car body afterbody;
Pallet fork is installed in the middle of the anterior cargo hold of the car body, the pallet fork mainly includes:At least parallel car is fixed on by two pieces The pallet fork fixed plate that stripe board on carriage body cargo hold base plate is constituted, it is parallel in the pallet fork fixed plate to be provided with two and be fixed on Pallet fork external slideway in pallet fork fixed plate, is provided with many respectively by the bearing of bearing fixing axle on the inside of the pallet fork external slideway Roll sleeve, two pallet fork middle slideway are close to the inner side of pallet fork external slideway and are socketed on bearing roll sleeve by following chute respectively Can be with telescopic moving;There are two inner slides to be close to the inner side of pallet fork middle slideway respectively, in inner slide adjacent to pallet fork middle slideway one Side is also provided with many respectively by the bearing roll sleeve of bearing fixing axle, the chute on same pallet fork middle slideway below opposite side Being socketed on bearing roll sleeve can be with telescopic moving;One supporting plate with fixed goods shelf is fixed on above the inner slide, the support Plate bottom, between two inner slides cylinder putter is connected with, the two-level oil cylinder that the cylinder putter passes through to connect is connected to pallet fork Outermost stripe board in fixed plate.
2. Phase of Electric Power Projects emergency car according to claim 1, it is characterised in that described fixed goods shelf is main by four Root stripe board is mutually perpendicular to constitute an intersecting parallels bracket two-by-two, two first stripe boards of parallel arrangement in the stripe board, The first elongated slot below connection is offered on the both sides section surface of the first stripe board, one is configured with the first elongated slot can be first First screw rod of moved in the elongated slot, upper end with the first rotary handle, is configured with one piece and is placed in stripe board in the first screw rod Surface, the pressing plate for compressing transformer;
Second stripe board of another two parallel arrangements in the stripe board, also offers under connection on their both sides section surfaces Side the second elongated slot, there are two baffle plates to be vertically disposed on the both sides section surface of the second stripe board, corresponding to second elongated slot, Passed through and stretched into the second elongated slot with the second screw rod on baffle plate, the second screw rod is moved and is driven in the second elongated slot Baffle plate is moved in parallel in the second stripe board of two parallel arrangements, and the upper end of second screw rod is connected with the second rotary handle And baffle plate is fixed in second stripe board by second rotary handle.
3. Phase of Electric Power Projects emergency car according to claim 1, it is characterised in that the Work tool in the middle part of the car body Cabin is divided into two spaces and is respectively provided with combination Work tool case and combination Work tool frame from centre, wherein combination Work tool frame bag Preceding Work tool frame and rear Work tool frame are included, combination Work tool case includes at least including the drawer box of middle Work tool case and both sides, And the down either side for combining Work tool case is provided with least four box spaces and at least two box spaces side by side, in group The down either side of conjunction Work tool frame is also equipped with least four box spaces and at least two box spaces side by side, wherein four Keyboard operation supporting plate, insulated target drawer, copper bar holding clamp and insulation pen is separately installed with the box space being arranged side by side to take out Drawer;The special drawer and asbestos mat drawer that can place crow bar are separately installed with the box space that two of which is arranged side by side.
4. Phase of Electric Power Projects emergency car according to claim 1, it is characterised in that the construction of the car body afterbody is put down Platform cabin both sides have been separated out one and have been placed with refuse bag placing box space and a placement hydraulic power unit space respectively, and centre is placement Operation platform and the device space for being configured thereon;The operation platform includes a double leval jib for being arranged on car body lower rear Panel turnover mechanism, the operation platform is connected to car body tail by a double leval jib panel turnover mechanism for being arranged on car body lower rear Portion, being connected with one in the end of the double leval jib panel turnover mechanism can the flattened workbench skeleton behind car body, the work Platform skeleton is installed above one piece of platform cover plate, embossing machine, curved row's machine is separately installed with the platform cover plate, perforating press, is cut Row's machine;The platform cover plate two sides near outer end be separately installed with it is being arranged symmetrically, be plugged on platform cover plate in copper Row's telescope support, the outer end of the copper bar telescope support is provided with copper bar back-up roller wheel carrier vertically upward, and in copper bar support Copper bar back-up roller wheel is installed on turning rolls.
5. Phase of Electric Power Projects emergency car according to claim 4, it is characterised in that described workbench skeleton is side Shape paralell, is divided into left and right two parts, by respective guiding on a portion workbench skeleton along car body direction Be set with cuts row's machine, perforating press, embossing machine to axle successively, is provided with by curved row's machine supporting plate on another part workbench skeleton curved Row's machine;Described double leval jib turning mechanism is fixedly mounted on car body Rea car body contiguous block including one, the compartment contiguous block A cylinder rod is respectively connected to up and down, and the outer end of two cylinder rods is connected to a hinge-rod, and in the upper company of the hinge-rod Socket part is connected to one piece of turnover panel, and described workbench skeleton is fixedly installed to above turnover panel.
6. the Phase of Electric Power Projects emergency car according to claim 4 or 5, it is characterised in that the row's of cutting machine is arranged by all Machine supporting plate is arranged on two axis of guides in left and right, it is possible to relative to move up and down positioning;Described perforating press is also by a punching Machine supporting plate is arranged on two axis of guides in left and right, it is possible to relative to move up and down positioning;Described embossing machine is also by an embossing Machine supporting plate is arranged on two axis of guides in left and right, it is possible to relative to move up and down positioning.
7. Phase of Electric Power Projects emergency car according to claim 1, it is characterised in that also set up between car body and vehicle frame There is a layer interlayer cabin, on the basis of car body longitudinal central axis line, to both sides horizontal distribution, centre sets two layer six in described interlayer cabin Lattice structure space is simultaneously placed with an insulating ladder in every grid space;It is empty that two sides in the interlayer cabin set 6 independent groove lattice Between and respectively place slender type object it is several;" passageway " place between groove grid space and two layer of six lattice structure space, for placing The copper bar of certain length, and it is provided with geometrical clamp 4.
CN201410684135.4A 2014-11-25 2014-11-25 A kind of Phase of Electric Power Projects emergency car Active CN104527501B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410684135.4A CN104527501B (en) 2014-11-25 2014-11-25 A kind of Phase of Electric Power Projects emergency car

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410684135.4A CN104527501B (en) 2014-11-25 2014-11-25 A kind of Phase of Electric Power Projects emergency car

Publications (2)

Publication Number Publication Date
CN104527501A CN104527501A (en) 2015-04-22
CN104527501B true CN104527501B (en) 2017-07-07

Family

ID=52843217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410684135.4A Active CN104527501B (en) 2014-11-25 2014-11-25 A kind of Phase of Electric Power Projects emergency car

Country Status (1)

Country Link
CN (1) CN104527501B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107031489A (en) * 2017-05-22 2017-08-11 南京电力设备质量性能检验中心 A kind of thermal power plant's Site Detection car
CN107472270B (en) * 2017-09-22 2023-10-31 中车兰州机车有限公司 Transport vehicle

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204452169U (en) * 2014-11-25 2015-07-08 国网浙江省电力公司嘉兴供电公司 Phase of Electric Power Projects wrecker car

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101515012B (en) * 2009-03-26 2011-04-27 苏州华电电气股份有限公司 External mounted electric combined test car
CN201745476U (en) * 2010-07-15 2011-02-16 何少明 Platform compartment for exhibition and sales
CN104057863B (en) * 2014-05-21 2016-08-24 国网浙江省电力公司嘉兴供电公司 A kind of Phase of Electric Power Projects is speedily carried out rescue work special-purpose vehicle
CN104029622A (en) * 2014-05-21 2014-09-10 国网浙江省电力公司嘉兴供电公司 Sliding operation platform arranged on electric power project construction emergency vehicle

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN204452169U (en) * 2014-11-25 2015-07-08 国网浙江省电力公司嘉兴供电公司 Phase of Electric Power Projects wrecker car

Also Published As

Publication number Publication date
CN104527501A (en) 2015-04-22

Similar Documents

Publication Publication Date Title
CN204057887U (en) A kind of from transmitting scissor-type movable hydraulic lift car
CN204452169U (en) Phase of Electric Power Projects wrecker car
CN102343854B (en) Alternating-current voltage-withstanding test vehicle for power cable
CN107329063A (en) A kind of electric-power safe instruments nigration car
CN202399248U (en) Special liftable multifunctional equipment maintenance vehicle
CN102315600A (en) Maintenance car of handcart type breaker equipment
CN104527501B (en) A kind of Phase of Electric Power Projects emergency car
CN112874422B (en) Shared bicycle transport vehicle based on van
CN107856686A (en) A kind of Tunnel Repair car with stopping a train at a target point function
CN104057863B (en) A kind of Phase of Electric Power Projects is speedily carried out rescue work special-purpose vehicle
CN204417047U (en) Self lighting type transport wooden handcart
CN103552494B (en) Breakdown van
CN103121617B (en) Tramcar-blocking device inside cage
CN203937554U (en) The Phase of Electric Power Projects special vehicle of speedily carrying out rescue work
CN111038557A (en) Multifunctional foldable test vehicle
CN203766783U (en) Electrified railway overhead contact system overhauling train
CN205989312U (en) Multifunctional mobile workbox
CN205239273U (en) Adjustable automobile fixing device
CN213703391U (en) Urban rail transit track circuit overhauls auxiliary device
CN204383278U (en) Be arranged on the turnover plate type service platform on Phase of Electric Power Projects wrecking car
CN201339810Y (en) Mechanical air bottle lifting platform
CN104029640A (en) Special container for supporting electric power engineering construction emergency vehicle
CN203957965U (en) Be arranged on the slide platform on Phase of Electric Power Projects wrecking car
CN207007998U (en) A kind of electric-power safe instruments nigration car
CN104029622A (en) Sliding operation platform arranged on electric power project construction emergency vehicle

Legal Events

Date Code Title Description
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant