CN104526291B - A kind of manufacturing process of evaporator - Google Patents
A kind of manufacturing process of evaporator Download PDFInfo
- Publication number
- CN104526291B CN104526291B CN201410690381.0A CN201410690381A CN104526291B CN 104526291 B CN104526291 B CN 104526291B CN 201410690381 A CN201410690381 A CN 201410690381A CN 104526291 B CN104526291 B CN 104526291B
- Authority
- CN
- China
- Prior art keywords
- aluminum pipe
- aluminium sheet
- flat aluminum
- flat
- evaporator
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B23—MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
- B23P—METAL-WORKING NOT OTHERWISE PROVIDED FOR; COMBINED OPERATIONS; UNIVERSAL MACHINE TOOLS
- B23P15/00—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass
- B23P15/26—Making specific metal objects by operations not covered by a single other subclass or a group in this subclass heat exchangers or the like
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Devices That Are Associated With Refrigeration Equipment (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Abstract
The invention discloses a kind of manufacturing process of evaporator is provided, it comprises the following steps:The first step, according to refrigerator, the requirement of showcase heat exchange amount and product installation dimension, design aluminium sheet structure, the distribution of aluminum pipe caliber and aluminum pipe on aluminium sheet;Second step, aluminum pipe is bent into the snakelike shape aluminum pipe formed by several bending arc tube and straight tubes;3rd step, snakelike shape aluminum pipe is compressed to flat aluminum pipe;4th step, flat aluminum pipe is coated into brazing flux, flat aluminum pipe is fixedly clamped with aluminium sheet with fixture, is put into controlled atmosphere soldering oven and carries out soldering;5th step, fixture is released after the completion of welding, fixed inlet tube and outlet is respectively welded in flat aluminum pipe entrance point and the port of export;6th step, carry out processing of dusting.The manufacturing process flow of the evaporator simplifies, and improves production efficiency, and product qualification rate is high, and cost is low, suitable for batch production.
Description
Technical field:
The present invention relates to a kind of process technology of evaporator, is especially a kind of manufacturing process of evaporator.
Background technology:
At present, the refrigerating chamber of refrigerator, showcase, wine cabinet etc. generally uses inflation type evaporator, and inflation type evaporator is logical
Composite plate is formed after crossing the steps such as the annealing of aluminium sheet, roller brush, cladding plate, hot rolling, then inflation type evaporation is manufactured by way of inflation
Device.The complex manufacturing technology of this evaporator, low production efficiency, percent defective is high, and production cost is higher.
The content of the invention:
The technical problem to be solved by the invention is to provide a kind of manufacture for the evaporator that technique is simple, production efficiency is high
Technique, the evaporator heat transfer efficiency of manufacturing process manufacture are high.
The technical solution of the present invention is to provide a kind of manufacturing process of evaporator, and it comprises the following steps:
The first step, according to refrigerator, the requirement of showcase heat exchange amount and product installation dimension, design aluminium sheet structure, aluminum pipe caliber
And distribution of the aluminum pipe on aluminium sheet;
Second step, aluminum pipe is bent into the snakelike shape aluminum pipe formed by several bending arc tube and straight tubes;
3rd step, snakelike shape aluminum pipe is compressed to flat aluminum pipe;
4th step, brazing flux is coated on the flat aluminum pipe suppressed, flat aluminum pipe is fixed with aluminium sheet with fixture, is put into pricker
Soldering is carried out in brazier;
5th step, fixture is released after the completion of welding, inlet tube and outlet are fixed respectively in flat aluminum pipe entrance point and the port of export
Pipe;
6th step, carry out processing of dusting.
Preferably, the soldering oven is controlled atmosphere continuous brazing furnace.
Preferably, aluminum pipe is welded and fixed with inlet tube and outlet.
Further, after the completion of soldering, plane correction also is carried out to aluminium sheet or both ends are integrally bent.So it is adapted to not
With desired refrigeration plant.
The present invention has advantages below compared to prior art:The present invention is improved whole manufacturing process, is simplified
Manufacturing process, improves production efficiency, and obtained product design is smooth attractive in appearance, and heat exchange efficiency is high.
Brief description of the drawings
Accompanying drawing is the structural representation of evaporator produced by the present invention.
Embodiment:
With regard to embodiment, the invention will be further described below in conjunction with the accompanying drawings:
Embodiment
A kind of evaporator as depicted, its specific manufacturing process, comprises the following steps:
The first step, according to refrigerator, the requirement of showcase heat exchange amount and product installation dimension, design the structure of aluminium sheet 1, according to aluminum pipe
Specific distribution of the 2 pipe diameter determing aluminum pipes on aluminium sheet 1;
Second step, aluminum pipe 2 is bent into the snakelike shape aluminum pipe formed by several bending arc tube and straight tubes;
3rd step, snakelike shape aluminum pipe is compressed to flat aluminum pipe, flat aluminum pipe is compressed to forcing press, in the present embodiment,
The diameter of snakelike shape aluminum pipe is 8mm, in the case where occurring without defect, 2mm is depressed, so that flat aluminum pipe has enough contacts area
Contacted with aluminium sheet 1;
4th step, brazing flux is coated on the flat aluminum pipe suppressed, flat aluminum pipe is fixed with aluminium sheet with fixture, is put into pricker
Dried, preheated, heated in brazier, then carry out soldering, the soldering oven is controlled atmosphere continuous brazing furnace, flat aluminum pipe and
The drying time of aluminium sheet 1 wherein is 5-12 minutes, and drying temperature is 180-300 DEG C, and preheating time is 30-55 minutes, preheating
Temperature is 450-620 DEG C;Heat time is 4-13 minutes, and heating-up temperature is 620-680 DEG C;
5th step, fixture is released after the completion of welding, inlet tube and outlet are fixed respectively in flat aluminum pipe entrance point and the port of export
Pipe;
6th step, after the completion of soldering, according to needing to the progress plane correction of aluminium sheet 1 or both ends Integral bending for refrigeration plant
Folding, finally carries out processing of dusting, in favor of anti-corrosion and improves overall aesthetics.
Only preferred embodiments of the present invention are described above, but are not to be construed as limiting the scope of the invention.
Claims (1)
1. a kind of manufacturing process of evaporator, it is characterised in that comprise the following steps:
(1) according to refrigerator, the requirement of showcase heat exchange amount and product installation dimension, design aluminium sheet (1) structure, managed according to aluminum pipe (2)
Design specific distribution of the aluminum pipe on aluminium sheet (1) in footpath;
(2) aluminum pipe (2) is bent into the snakelike shape aluminum pipe formed by several bending arc tube and straight tubes;
(3) snakelike shape aluminum pipe is compressed to flat aluminum pipe, is compressed to flat aluminum pipe with forcing press, the diameter of snakelike shape aluminum pipe is
8mm, in the case where occurring without defect, 2mm is depressed, so that flat aluminum pipe there are enough contacts area to be contacted with aluminium sheet (1);
(4) brazing flux is coated on the flat aluminum pipe suppressed, flat aluminum pipe is fixed with aluminium sheet with fixture, is put into soldering oven
Row drying, preheating, heating, then carry out soldering, and the soldering oven is controlled atmosphere continuous brazing furnace, flat aluminum pipe and aluminium sheet (1)
Drying time wherein is 5-12 minutes, and drying temperature is 180-300 DEG C, and preheating time is 30-55 minutes, and preheating temperature is
450-620℃;Heat time is 4-13 minutes, and heating-up temperature is 620-680 DEG C;
(5) fixture is released after the completion of welding, inlet tube and outlet are fixed respectively in flat aluminum pipe entrance point and the port of export;
(6) after the completion of soldering, need integrally to bend aluminium sheet (1) progress plane correction or both ends according to refrigeration plant, finally
Processing of dusting is carried out, in favor of anti-corrosion and improves overall aesthetics.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410690381.0A CN104526291B (en) | 2014-11-26 | 2014-11-26 | A kind of manufacturing process of evaporator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410690381.0A CN104526291B (en) | 2014-11-26 | 2014-11-26 | A kind of manufacturing process of evaporator |
Publications (2)
Publication Number | Publication Date |
---|---|
CN104526291A CN104526291A (en) | 2015-04-22 |
CN104526291B true CN104526291B (en) | 2018-03-06 |
Family
ID=52842019
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410690381.0A Active CN104526291B (en) | 2014-11-26 | 2014-11-26 | A kind of manufacturing process of evaporator |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104526291B (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106196741B (en) * | 2016-08-12 | 2019-04-09 | 河南新科隆电器有限公司 | A kind of manufacturing method of tube-in-sheet evaporator |
CN112222760A (en) * | 2019-06-30 | 2021-01-15 | 合肥太通制冷科技有限公司 | Production process of brazing type plate-tube evaporator |
CN110319623A (en) * | 2019-07-03 | 2019-10-11 | 河南科隆集团有限公司 | A kind of microchannel plate-type evaporator |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102398145B (en) * | 2011-08-02 | 2014-07-09 | 罗键 | Whole near net-shape processing and manufacturing method of snake-shaped runner ice-making board |
CN102278838B (en) * | 2011-08-17 | 2016-08-31 | 海尔集团公司 | Tube-in-sheet evaporator and refrigerator |
CN203396181U (en) * | 2013-06-13 | 2014-01-15 | 澳柯玛股份有限公司 | Double-temperature cabinet adopting plate-tube type refrigerating evaporator |
-
2014
- 2014-11-26 CN CN201410690381.0A patent/CN104526291B/en active Active
Non-Patent Citations (1)
Title |
---|
管带式热交换器真空钎焊工艺及影响钎焊质量的因素;钟向阳等;《焊接》;19991115(第11期);第23-26页 * |
Also Published As
Publication number | Publication date |
---|---|
CN104526291A (en) | 2015-04-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104526291B (en) | A kind of manufacturing process of evaporator | |
CN100427257C (en) | Soft vacuum brazing process for aluminum alloy workpiece | |
WO2009050892A1 (en) | Double-pressure type condenser, and condensate reheating method | |
CN104493449A (en) | Air cooling refrigerator and freezer serpentine parallel flow condenser manufacture process | |
CN102560050A (en) | Tangential-spraying-type material coil annealing furnace | |
CN104625668A (en) | Manufacturing method of blown-up evaporator | |
CN104109833A (en) | Crucible | |
CN102920352B (en) | Apparatus for baking and method for baking food by utilizing | |
CN203837011U (en) | Flag-type heating surface structure for corner tube boiler | |
CN104456994A (en) | Production process of solar vacuum collector pipe | |
CN103551810B (en) | The preparation method of titanium alloy sawtooth flat filament | |
CN204115543U (en) | A kind of combined type heat exchanger tube | |
CN204460854U (en) | A kind of gilled radiator | |
CN209439570U (en) | The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup | |
CN209276577U (en) | A kind of silicon steel annealing furnace high pressure-temperature secondary use transfer device | |
CN104864640A (en) | Manufacturing technology for refrigerator air return pipe | |
CN202830111U (en) | Annealing furnace of copper straps for solar photovoltaic solder strip | |
CN205102533U (en) | Rapid drying device for medicine | |
CN204638820U (en) | A kind of wire-tube evaporator receives R angle apparatus | |
CN204007272U (en) | Steam radiant tube | |
CN204449541U (en) | A kind of efficient many vacuum chambers soldering furnace | |
CN112496105B (en) | Method for bending U-shaped nickel-based pipe with small bending radius | |
CN204084915U (en) | Jacket type enamel inner container | |
CN203964748U (en) | Fin-tube type heat exchanger and assembly thereof | |
CN203744666U (en) | Sonar heat insulation material drying device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
PE01 | Entry into force of the registration of the contract for pledge of patent right |
Denomination of invention: A manufacturing process of evaporator Effective date of registration: 20220704 Granted publication date: 20180306 Pledgee: Qingxi sub branch of Zhejiang Chun'an Rural Commercial Bank Co.,Ltd. Pledgor: ZHEJIANG KANGSHENG HEAT EXCHANGER CO.,LTD. Registration number: Y2022330001228 |
|
PE01 | Entry into force of the registration of the contract for pledge of patent right |