CN209439570U - The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup - Google Patents

The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup Download PDF

Info

Publication number
CN209439570U
CN209439570U CN201821858374.7U CN201821858374U CN209439570U CN 209439570 U CN209439570 U CN 209439570U CN 201821858374 U CN201821858374 U CN 201821858374U CN 209439570 U CN209439570 U CN 209439570U
Authority
CN
China
Prior art keywords
heating
vacuum
room
vacuum cup
cooling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201821858374.7U
Other languages
Chinese (zh)
Inventor
高汉牧
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JINHUA HEMU VACUUM ELECTRONICS CO Ltd
Original Assignee
JINHUA HEMU VACUUM ELECTRONICS CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JINHUA HEMU VACUUM ELECTRONICS CO Ltd filed Critical JINHUA HEMU VACUUM ELECTRONICS CO Ltd
Priority to CN201821858374.7U priority Critical patent/CN209439570U/en
Application granted granted Critical
Publication of CN209439570U publication Critical patent/CN209439570U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Thermally Insulated Containers For Foods (AREA)

Abstract

The utility model provides a kind of heating and cooling system of full-automatic high vacuum brazing equipment of vacuum cup, belongs to vacuum cup and vacuumizes technical field of welding equipment.The utility model solves the problems such as existing vacuum cup welding equipment heating and cooling system effect is poor; the utility model includes temperature-detecting device, equipment Cooling protector and the heating tube that pre-vacuum chamber, the top of heating room and each room in welding booth, middle part, bottom and two sides is arranged in; heating tube is in a row horizontally disposed with; pre-vacuum chamber, heating room, the top of welding booth and bottom and two sides are provided with heat radiation plate, and heating tube is located at the intracavitary of each heat radiation plate formation.The utility model improves vacuum cup heating welding efficiency, and heat radiation plate set in addition, which can reflect even heat, collects the utilization rate that thermal energy is improved to the vacuum cup in welding process.

Description

The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup
Technical field
The utility model belongs to vacuum cup and vacuumizes technical field of welding equipment, and in particular to a kind of vacuum cup is automatically high The heating and cooling system of vacuum brazing equipment.
Background technique
Stainless steel vacuum cup is double-layer structure, and thermal insulation property quality is determined by the vacuum degree of interlayer.Vacuum cup is pressed Mode that it is produced is different, and being simply divided into has tail vacuum cup and anury vacuum cup, anury vacuum cup be in vacuum brazing furnace, By vacuumizing, vacuum brazing, then the cooling processes such as come out of the stove, be electrolysed, polishing, packing form.The vacuumizing of existing vacuum cup, Vacuum welding and cooling come out of the stove what usually substep carried out, due to a collection of vacuum cup of every production, require to vacuumize, take out and keep the temperature Cup carries out vacuum welding, then cooling process, not only generates in this way to the heat insulation effect of vacuum cup, soaking time and service life The quality of production of very big influence, vacuum cup is unstable, and production automation degree is low, and the batch production period is long, batch of life The production period takes around 5 hours or more, greatly reduces the production efficiency of vacuum cup.
It is therefore desirable to propose a kind of forvacuum, heating welding, the cooling brazing equipment being carried out continuously of coming out of the stove, and add Hot cooling system is one of the problem developing the equipment and must solving.
Utility model content
The purpose of this utility model is to be directed to disadvantages mentioned above present in existing thermal cup vacuum brazing equipment, and provide one Kind of heating effect is good, and have equipment Cooling protector make vacuum cup brazing equipment will not overheat in heating process outer wall and The heating and cooling system of the full-automatic high vacuum brazing equipment of the vacuum cup of damage.
The purpose of this utility model can be realized by the following technical scheme:
The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup, the full-automatic high vacuum brazing equipment packet of vacuum cup It includes and is connected with each other the pre-vacuum chamber set gradually, heating room, welding booth, cooling chamber and cup room out, which is characterized in that the heating Cooling system includes temperature-detecting device, equipment Cooling protector and pre-vacuum chamber is arranged in, heats room and each room in welding booth The heating tube on top, middle part, bottom and two sides, heating tube are in a row horizontally disposed with, the pre-vacuum chamber, heating room, welding booth Top and bottom and two sides are provided with heat radiation plate, and above-mentioned heating tube is located at the intracavitary of each heat radiation plate formation.
The full-automatic high vacuum brazing equipment of vacuum cup further includes material frame, and heating tube layering setting, the material frame of vacuum cup can also (including the first frame and the second frame setting up and down) is set with layering, when material frame is located at pre-vacuum chamber, heating room, welding booth When, the heating tube at middle part is set between the first frame and the second frame, the heating that the first frame and the second frame are subject to Environment is identical, helps to improve vacuum cup welding efficiency in this way.
Preferably, the heating tube at the middle part is provided with two rows, and two rows of heating tubes are horizontally disposed and are located at same level On face, gap is formed between two rows of heating tubes.The side of two rows of heating tubes is connect with the side wall of each room.The gap of setting be for Feed frame process.
Preferably, the serpentine-like shape of the heating tube.
Preferably, the heating device further includes five temperature controllers, the test side of each temperature controller be located at pre-vacuum chamber, It heats room, welding booth, cooling chamber and cup is indoor out.
Temperature controller is used to detect the real time temperature of each chamber.
Preferably, the equipment Cooling protector includes that pre-vacuum chamber, heating room, the locular wall of welding booth and heat is arranged in Cooling tube between radiant panel leads to coolant liquid in cooling tube.
Compared with prior art, the utility model is in top, middle part, the bottom of pre-vacuum chamber, heating room and each room in welding booth And two sides are provided with heating tube, match with the double-layer structure of material frame, so that the layered putting being located on material frame Vacuum cup heating environment having the same improves vacuum cup heating welding efficiency, and heat radiation plate set in addition can be by heat Non-uniform reflection collects the utilization rate that thermal energy is improved to the vacuum cup in welding process.
Detailed description of the invention
Fig. 1 is the full-automatic high vacuum brazing equipment top view of vacuum cup for applying the utility model;
Fig. 2 is the full-automatic high vacuum brazing equipment partial structure diagram of vacuum cup for applying the utility model.
In figure, 1, pre-vacuum chamber;2, room is heated;3, welding booth;4, cooling chamber;5, go out cup room;6, heating tube;7, expect frame;8, First frame;9, the second frame;10, gap;11, heat radiation plate.
Specific embodiment
It is specific embodiment of the utility model and in conjunction with attached drawing below, the technical solution of the utility model is made further Description, but the utility model is not limited to these examples.
As shown in Figures 1 and 2, the utility model proposes a kind of heating of the full-automatic high vacuum brazing equipment of vacuum cup is cold But system, the full-automatic high vacuum brazing equipment of vacuum cup include being connected with each other the pre-vacuum chamber 1 set gradually, heating room 2, welding booth 3, cooling chamber 4 and out cup room 5.
The utility model include temperature-detecting device, equipment Cooling protector and setting pre-vacuum chamber 1, heating room 2 and The heating tube 6 on the top of each room in welding booth 3, middle part, bottom and two sides, heating tube 6 is in a row horizontally disposed, the pre-vacuum chamber 1, Heating room 2, the top of welding booth 3 and bottom and two sides are provided with heat radiation plate 11, and above-mentioned heating tube 6 is located at each heat radiation plate 11 formed it is intracavitary.Equipment Cooling protector includes that pre-vacuum chamber 1, heating room 2, the locular wall of welding booth 3 and heat radiation is arranged in Cooling tube between plate 11, cooling tube pre-vacuum chamber 1, heating room 2, welding booth 3 locular wall be in contact, in cooling tube lead to coolant liquid.
The full-automatic high vacuum brazing equipment of vacuum cup further includes material frame 7, the layering setting of heating tube 6, the material frame 7 of vacuum cup Layering setting (material frame 7 include the first frame 8 and the second frame 9 setting up and down), when material frame 7 be located at pre-vacuum chamber 1, heat room 2, When welding booth 3, the heating tube 6 at middle part is set between the first frame 8 and the second frame 9, the first frame 8 and the second frame 9 heating environments that are subject to are identical, help to improve vacuum cup welding efficiency in this way.The heating tube 6 of middle and top part is provided with two Row, two rows of heating tubes 6 are horizontally disposed and are located in same level, are formed with gap 10 between two rows of heating tubes 6.Two rows heating The side of pipe 6 is connect with the side wall of each room (pre-vacuum chamber 1, heating room 2, welding booth 3).The gap 10 of setting is for feed frame 7 By.The serpentine-like shape of heating tube 6 respectively arranged.
Heating device further includes five temperature controllers, and the test side of each temperature controller is located at pre-vacuum chamber 1, heating room 2, welding Room 3, cooling chamber 4 and out in cup room 5.Temperature controller is used to detect the real time temperature of each chamber.
It should be understood that in claims, specification of the utility model, all " including ... " should be understood as out The meaning of formula is put, that is, its meaning is equal to " at least containing ... ", but should not be understood as enclosed meaning, i.e. its meaning It should not be construed " only including ... ".
Those skilled in the art of the present invention can do described specific embodiment various The similar mode of modify or supplement or adopt substitutes, but without departing from the spirit of the present application or surmounts appended right and want Seek range defined in book.

Claims (5)

1. the heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup, the full-automatic high vacuum brazing equipment of vacuum cup include It is connected with each other the pre-vacuum chamber set gradually, heating room, welding booth, cooling chamber and cup room out, which is characterized in that the heating is cold But system include temperature-detecting device, equipment Cooling protector and be arranged in pre-vacuum chamber, heating room and each room in welding booth it is upper The heating tube in portion, middle part, bottom and two sides, heating tube are in a row horizontally disposed with, the pre-vacuum chamber, heating room, welding booth it is upper Portion and bottom and two sides are provided with heat radiation plate, and above-mentioned heating tube is located at the intracavitary of each heat radiation plate formation.
2. the heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup according to claim 1, which is characterized in that The heating tube at the middle part is provided with two rows, and two rows of heating tubes are horizontally disposed and are located in same level, two rows of heating tubes Between be formed with gap, the side of two rows of heating tubes is connect with the side wall of each room, and the gap of setting can make vacuum cup material frame Middle part passes through.
3. the heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup according to claim 1 or 2, feature exist In every serpentine-like shape of row's heating tube.
4. the heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup according to claim 1 or 2, feature exist In, the heating and cooling system further include five temperature controllers, the test side of each temperature controller be located at pre-vacuum chamber, heating room, Welding booth, cooling chamber and cup is indoor out.
5. the heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup according to claim 1 or 2, feature exist In the equipment Cooling protector includes that pre-vacuum chamber is arranged in, heats between the locular wall and heat radiation plate of room, welding booth Cooling tube leads to coolant liquid in cooling tube.
CN201821858374.7U 2018-11-12 2018-11-12 The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup Expired - Fee Related CN209439570U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821858374.7U CN209439570U (en) 2018-11-12 2018-11-12 The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821858374.7U CN209439570U (en) 2018-11-12 2018-11-12 The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup

Publications (1)

Publication Number Publication Date
CN209439570U true CN209439570U (en) 2019-09-27

Family

ID=68010937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821858374.7U Expired - Fee Related CN209439570U (en) 2018-11-12 2018-11-12 The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup

Country Status (1)

Country Link
CN (1) CN209439570U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109175574A (en) * 2018-11-12 2019-01-11 金华市禾牧真空电子有限公司 The full-automatic high vacuum brazing equipment of vacuum cup

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109175574A (en) * 2018-11-12 2019-01-11 金华市禾牧真空电子有限公司 The full-automatic high vacuum brazing equipment of vacuum cup

Similar Documents

Publication Publication Date Title
CN104571176B (en) High-precision zone control temperature simulation device
CN103398577A (en) Samarium cobalt permanent magnet vacuum sintering furnace
CN209439570U (en) The heating and cooling system of the full-automatic high vacuum brazing equipment of vacuum cup
CN207688625U (en) A kind of vertical quartz stove
CN209567992U (en) A kind of annealing furnace with heat reclaim unit
CN109678327A (en) A kind of annealing furnace with heat reclaim unit
CN209081933U (en) A kind of steel strip annealing furnace
CN205077110U (en) Energy -saving heat treatment furnace
CN101830634B (en) High-frequency electric sealing device for solar vacuum tubes and sealing method thereof
CN205435784U (en) Stainless steel heating device
CN208687803U (en) Electromagnetic range
CN201268714Y (en) Constant temperature type annealing furnace
CN207828393U (en) A kind of residual heat insulation is brought down a fever stove
CN214551253U (en) Energy-saving catalytic distillation tower
CN204820082U (en) Sintering oven
CN203167912U (en) Production line for wafer biscuits
CN219676327U (en) Optical fiber fusion pipe heating equipment
CN211005094U (en) Precision annealing furnace for optical glass
CN214760296U (en) Integrative workstation of dish show heat preservation
CN216738636U (en) Wafer heat preservation diffusion equipment
CN201929712U (en) Constant-temperature water bath
CN203923001U (en) Armoured glass production device
CN208425455U (en) A kind of UHT sterilization machine
CN203976859U (en) A kind of energy-saving low-temperature tempering oil liquid furnace
CN211792090U (en) Heating radiant tube with waste heat utilization device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20190927

Termination date: 20201112

CF01 Termination of patent right due to non-payment of annual fee