一种计及电动汽车和可控负荷的配电系统阻塞调控方法 Download PDF

Info

Publication number
CN104517158B
CN104517158B CN201410736149.6A CN201410736149A CN104517158B CN 104517158 B CN104517158 B CN 104517158B CN 201410736149 A CN201410736149 A CN 201410736149A CN 104517158 B CN104517158 B CN 104517158B
Authority
CN
China
Prior art keywords
mrow
msub
mfrac
max
munderover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410736149.6A
Other languages
English (en)
Other versions
CN104517158A (zh
Inventor
李梁
刘伟佳
俞哲人
文福拴
汪宏华
李波
陈婧韵
韩璐羽
詹燕娇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
State Grid Zhejiang Electric Vehicle Service Co Ltd
Original Assignee
Zhejiang University ZJU
State Grid Zhejiang Electric Vehicle Service Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU, State Grid Zhejiang Electric Vehicle Service Co Ltd filed Critical Zhejiang University ZJU
Priority to CN201410736149.6A priority Critical patent/CN104517158B/zh
Publication of CN104517158A publication Critical patent/CN104517158A/zh
Application granted granted Critical
Publication of CN104517158B publication Critical patent/CN104517158B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06315Needs-based resource requirements planning or analysis
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/06Energy or water supply

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Economics (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Health & Medical Sciences (AREA)
  • Theoretical Computer Science (AREA)
  • Marketing (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • Public Health (AREA)
  • Primary Health Care (AREA)
  • Water Supply & Treatment (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • General Health & Medical Sciences (AREA)
  • Game Theory and Decision Science (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Battery Electrode And Active Subsutance (AREA)
  • Supply And Distribution Of Alternating Current (AREA)

Abstract

本发明公开的一种计及电动汽车和可控负荷的配电系统阻塞调控方法,包括如下步骤:a.确定电动汽车调度特性,建立电动汽车可调度特性的模型;b.确定常见家用负荷的控制特性和能耗特性,建立可控负荷的需求和可调度模型;c.根据可控负荷代理和电动汽车代理的经济理性与需求侧负荷特性,代理商上报下一交易日的初步负荷计划;配电系统调度机构进行校验,并确定阻塞价格;各代理商根据阻塞价格,对可控负荷和电动汽车充放电负荷进行调整和协调。采用本发明的配电系统阻塞调控方法,对配电系统可能发生的阻塞计算阻塞费用,可以合理的错开电动汽车和可控负荷用电高峰,有效的避免集中用电导致的负荷尖峰和配电系统阻塞。

Description

一种计及电动汽车和可控负荷的配电系统阻塞调控方法
技术领域
本发明属于电动汽车和可控负荷的市场调度技术领域,涉及一种计及电动汽车和可控负荷用电需求和阻塞费用调控的方法。
背景技术
居民用户的可控负荷和电动汽车充放电负荷均可视为配电系统中可灵活调度的资源,参与电力市场环境下的阻塞管理。现有的需求侧响应主要针对工业用户等大型负荷,而分布分散、随机性较强的居民负荷一般被认为是不可控的,这样针对居民负荷响应的研究和实践尚不多见。电动汽车普及后其充电安排会在很大程度上影响需求侧响应特性和阻塞管理效果。然而,如何协调调度居民可控负荷和电动汽车充放电负荷以规避配电系统阻塞,就我们所知尚未有研究报道。基于上述背景,本发明针对配电系统内可能发生的阻塞计算阻塞费用,之后利用阻塞费用和电动汽车和可控负荷的灵活性对阻塞进行规避。
发明内容
本发明的目的是提供一种计及电动汽车和可控负荷的配电系统阻塞调控方法。
本发明的计及电动汽车和可控负荷的配电系统阻塞调控方法,包括如下步骤:
a.确定电动汽车调度特性;根据电动汽车用户的出行习惯、电动汽车充电功率和电池特性,建立电动汽车可调度特性的模型,包括:
1)充放电负荷模型
设初始充电时刻Tstart的SoC(State of Charge,荷电状态,简写为SoC)为Sinit,充电结束时刻Tend的SoC为Sfinal,EV(Electric Vehicle,电动汽车,简写为EV)电池容量为BC,充电功率Pch(t)和EV的SoC值Sch(t)为时间的函数,充电效率为ηc,电池自放电率为ηl,则单个EV充电需满足:
当EV具备V2G(Vehicle to Grid,电动汽车向电网放电,简写为V2G),设EV放电功率为Pdch(t),电池的V2G效率为ηd,则式(1)可修正为:
在V2G模式下,EV的放电功率会增加EV的电池损耗,由单位V2G放电电能导致的额外电池损耗成本可估算为:
式中:Lpd、Blc、Ib、Dod分别为EV在V2G模式下的单位放电电能成本、电池设计的充放电循环寿命、电池成本和V2G放电深度;
2)EV充放电约束模型
为满足车主的使用需求,EV充放电需要满足下述约束条件:
Sch,min≤Sch(t)≤Sch,max (4)
Sfinal≥Sfinal,min (5)
式中:Sch,max和Sch,min均为保证电池寿命的SoC上限和下限约束,分别用于防止电池过度充电和过度放电;Sfinal,min为充电结束时车主可接受的最低SoC值;
EV充放电需要满足自身的功率约束,而且每台EV不能同时处于充电和放电状态:
0≤Pch(t)≤Pch,max (6)
0≤Pdch(t)≤Pdch,max (7)
Pch(t)Pdch(t)=0 (8)
式中:Pch,max和Pdch,max分别为EV的最大充电功率和最大放电功率。
b.确定家用负荷调度特性;结合空调、冰箱、电热水器的控制特性和能耗特性,建立可控负荷的需求和可调度模型,包括:
1)居民用户整体负荷模型
室内气温Ta、冰箱内部温度Tf和热水器蓄水温度Tw需满足下述约束:
Ta,min≤Ta≤Ta,max (9)
Tf,min≤Tf≤Tf,max (10)
Tw,min≤Tw≤Tw,max (11)
式中:Ta,max、Ta,min、Tf,max、Tf,min、Tw,max、Tw,min分别表示室内气温上限、室内气温下限、冰箱内部温度上限、冰箱内部温度下限、热水器内蓄水的温度上限及热水器内蓄水的温度下限;
此外,空调的热功率QAC、冰箱的热功率QRF和电热水器的热功率QWH必须满足电器设备自身的热功率约束,即:
0≤QAC≤QAC,max (12)
0≤QRF≤QRF,max (13)
0≤QWH≤QWH,max (14)
式中:QAC,max、QRF,max和QWH,max分别为家用空调、电冰箱和电热水器的热功率上限;
分别用ηa、ηf和ηw表示空调热功率与电功率的比值、电冰箱热功率与电功率的比值和电热水器消耗的热功率与电功率的比值,则空调的电功率PAC、电冰箱的电功率PRF和电热水器的电功率PWH分别可用式(15)-(17)计算,用户的总用电负荷可由式(18)求取。
PAC=QACa (15)
PRF=QRFf (16)
PWH=QWHw (17)
PD=Pfix+PAC+PRF+PWH (18)
式中:PD和Pfix分别表示居民总用电负荷功率和不可控用电负荷功率;
住宅内部的热容量和温度分别用Ca和Ta表示,住宅墙体的热容量和温度分别用Cs和Ts表示,假设住宅内部和外界的热传递速率为Rae,住宅墙体与外界的热传递速率为Rse,住宅内部与墙体的热传递速率为Ras,Ca和Cs与住宅面积As和高度H有关,热传递速率Rse与住宅外墙面积S和空气流通率Va相关,具体计算公式如下:
Ca=5.2×103AsH(J/K) (19)
Cs=1.44×102AsH(J/K) (20)
Rae=0.34VaAsH(W/K) (21)
Ras=7.69S(W/K) (23)
2)家用空调模型
家用空调的数学模型可简化表示为
式中:Te为外界温度;Qs和ξs分别表示太阳能辐射的热量和效率;W为住宅窗户面积;Cc、Tc和Rac分别表示空调冷凝机构的热容量、温度和空调冷凝机构与室内空气的热传递速率。
3)家用冰箱模型
冰箱箱体的热容量与温度分别用Cf1与Tf1表示,冷藏箱体的热容量与温度分别用Cf2与Tf2表示,冰箱内部的热容量与温度分别用Cf与Tf表示,制冷结构的热容量与温度分别用Cf4与Tf4表示,家用冰箱的热力学模型为
式中:Rf1f、Rf24、Rff4、Raf分别表示冰箱箱体与内部的热传递速率、冷藏箱与制冷部分的热传递速率、冰箱内部与制冷部分的热传递速率、冰箱内部与室内空气的热传递速率。
4)电热水器模型
分别用Ct与Tt表示箱体的热容量与温度,用Cw与Tw表示内部蓄水的热容量与温度,电热水器的热力学模型可表示为
式中:Rwt、Rat分别表示热水箱与内部蓄水的热传递速率、热水箱与室内空气的热传递速率。
c.利用节点边际电价和最优潮流的模型,建立配电系统阻塞费用计算模型,包括:
1)零售商代理RA(Retail Agent)的初始负荷计划
在日前市场出清之前,RA并不知道下一交易日的日前市场电价,而需要结合历史数据和下一交易日的预测信息对日前市场的电价进行估算;假设Nd为配电系统的负荷节点数,Tsum为考虑的调度时段,配电系统每个节点上有Nh位用户和Ne辆EV,估算的日前市场电价为λ(t),t=1,2,…,Tsum;RA的优化目标如下:
式中,i,t,h,e分别为配电网负荷节点、调度时段、用户和电动汽车的编号,其中i=1,2,…,Nd;t=1,2,…,Tsum;h=1,2,…,Nh;e=1,2,…,Ne;RA的优化目标要受式(1)-(8)和(9)-(18)所分别表示的电动汽车充放电负荷特性和居民负荷的约束;RA在得到各个用户的用电计划后,以节点为单位汇总并上报配电系统调度机构DSO(Distribution SystemOperator);
2)配电系统调度机构DSO阻塞管理模型
采用多时段直流最优潮流求解配电系统的节点电价DLMP(DistributionLocational Marginal Pricing),
进而确定节点i在时刻t的阻塞价格λc(i,t),目标函数为:
约束条件为:
-Fij,max≤Bijθij(t)≤Fij,max (37)
PSD,min(i,t)≤PSD(i,t)≤PSD,max(i,t) (38)
PSch,min(i,t)≤PSch(i,t)≤PSch,max(i,t) (39)
PSdch,min(i,t)≤PSdch(i,t)≤PSdch,max(i,t) (40)
式中:PG(i,t)和PG,sum(t)分别为S在时刻t由节点i注入系统的有功功率和配电系统在时刻t从上层输电系统购买的有功功率;Bij和θij(t)分别为节点i和节点j之间的线路导纳阵虚部和时刻t节点i与j之间的电压相角差;Fij,max为线路i-j的有功潮流上限;PSD(i,t)、PSch(i,t)和PSdch(i,t)分别为RA上报的以节点为单位的可控负荷、EV充电负荷和EV放电负荷的初始计划;PSD,max(i,t)、PSD,min(i,t)、PSch,max(i,t)、PSch,min(i,t)、PSdch,max(i,t)和PSdch,min(i,t)分别为时段t节点i可控负荷的上下限、电动汽车的充电负荷上下限和放电负荷上下限,式(8)的约束同样需要在该模型中考虑;
用上述模型求解出的节点电价DLMP为λm(i,t),则阻塞价格可由式(41)求得,并作为RA调整可控负荷和EV充放电负荷用电计划的依据,
λc(i,t)=λm(i,t)-λ(t) (41)
3)RA对负荷计划的修正
在DSO发布阻塞价格后,RA需要综合考虑用户购电情况,市场电价和阻塞价格,调整可控负荷和EV充放电负荷的用电计划,通过对调度结果利润的最大化实现对DSO阻塞管理信号的响应,自主规避阻塞;RA的优化目标修改如下:
RA在修正负荷计划时需要考虑的约束条件与制定初始负荷计划时相同。
本发明的有益效果是,通过采用本发明的配电系统阻塞的调控方法,对配电系统内可能发生的阻塞计算阻塞费用,可以合理的错开电动汽车和可控负荷用电高峰,有效的避免集中用电导致的负荷尖峰和配电系统阻塞。
附图说明
图1为本发明方法的具体实施流程;
图2为市场价格和根据本发明方法计算得到的阻塞价格;
图3为采用阻塞价格前后的线路负载率对比;
图4为配电系统的某节点总电动汽车在未考虑和考虑V2G模式下的电池储能曲线。
具体实施方式
首先,根据负荷用电灵活性,选取温度控制型的居民用电负荷作为可控负荷,并考虑了电动汽车充放电负荷的灵活性;根据可控负荷的热力学特性和电动汽车的充放电特性,分别建立这两类负荷的需求模型。之后,根据可控负荷代理和电动汽车代理的经济理性与需求侧负荷特性,代理商向配电系统调度机构上报下一交易日的初步负荷计划;配电系统调度机构对负荷计划进行校验,并采用最优潮流方法确定阻塞价格;各代理商则根据阻塞价格,在满足用户需求的前提下对可控负荷和电动汽车充放电负荷进行调整和协调。通过采用这样的机制,最终避免集中用电导致负荷尖峰和配电系统阻塞。如图1所示。具体实施流程如下:
a.电动汽车调度特性的确定。根据电动汽车用户的出行习惯、电动汽车充电功率和电池特性,建立电动汽车可调度特性的模型,此模型又包含如下两步,分别为1)充放电负荷模型、2)EV充放电约束模型:1)充放电负荷模型
由于EV(Electric Vehicle,电动汽车,简写为EV)的行驶里程、充电需求、接入配电系统的时间等都具有很强的不确定性,在负荷高峰时期的无序充电会加大负荷峰谷差,严重时可引起系统阻塞。以单个EV充电为例进行分析,假设用户下午回家后为EV充电,初始充电时刻Tstart的SoC(State of Charge,荷电状态,简写为SoC)为Sinit,次日上午使用EV,充电结束时刻Tend的SoC为Sfinal,EV电池容量为BC,充电功率Pch(t)和EV的SoC值Sch(t)为时间的函数,充电效率为ηc,电池自放电率为ηl,则单个EV充电需满足:
式中:Sinit、Tstart和Tend具有较强的不确定性,可由RA(Retail Agent,零售商代理,简写为RA)根据EV的历史使用情况数据进行统计分析得到。
如果EV具备V2G(Vehicle to Grid,电动汽车向电网放电,简写为V2G)功能,则EV的调度灵活性和优化空间就更大;EV可响应调度信号,在系统需要时通过V2G模式向电力系统回馈电能;或EV根据市场价格信号,在满足EV出行需求的前提下优化充放电计划并获利。假设EV放电功率为Pdch(t),电池的V2G效率为ηd,则可修正为:
在V2G模式下,EV的放电功率会增加EV的电池损耗,由单位V2G放电电能导致的额外电池损耗成本可估算为:
式中:Lpd、Blc、Ib、Dod分别为EV在V2G模式下的单位放电电能成本、电池设计的充放电循环寿命、电池成本和V2G放电深度(Depth of Discharge,DoD);
2)EV充放电约束模型
为满足车主的使用需求,EV充放电需要满足下述约束条件:
Sch,min≤Sch(t)≤Sch,max (4)
Sfinal≥Sfinal,min (5)
式中:Sch,max和Sch,min均为保证电池寿命的SoC上限和下限约束,分别用于防止电池过度充电和过度放电;Sfinal,min为充电结束时车主可接受的最低SoC值,通常由车主根据各自的实际使用情况,与RA签订相应的协议,其中明确可接受的Sfinal,min值。
EV充放电需要满足自身的功率约束,而且每台EV不能同时处于充电和放电状态:
0≤Pch(t)≤Pch,max (6)
0≤Pdch(t)≤Pdch,max (7)
Pch(t)Pdch(t)=0 (8)
式中:Pch,max和Pdch,max分别为EV的最大充电和放电功率。
b.结合空调、冰箱、电热水器的控制特性和能耗特性,建立可控负荷的需求模型和可调度模型如下1)到4):
1)居民用户整体负荷模型
考虑到用户的实际需求,空调、电冰箱和电热水器等温度控制型负荷在一定的温度范围内具有调度灵活性,超出该范围后就无法被灵活调度。可控负荷的可调范围也受相关设备的额定值约束。选取室内气温Ta、冰箱内部温度Tf和热水器蓄水温度Tw作为控制对象,在对可控负荷调度时需满足下述约束:
Ta,min≤Ta≤Ta,max (9)
Tf,min≤Tf≤Tf,max (10)
Tw,min≤Tw≤Tw,max (11)
式中:Ta,max、Ta,min、Tf,max、Tf,min、Tw,max、Tw,min分别表示室内气温、冰箱内部、热水器内蓄水的温度上下限。根据不同用户的需求,温度的限制也有所不同。
此外,空调的热功率QAC、冰箱的热功率QRF和电热水器的热功率QWH必须满足电器设备自身的热功率约束,即:
0≤QAC≤QAC,max (12)
0≤QRF≤QRF,max (13)
0≤QWH≤QWH,max (14)
式中:QAC,max、QRF,max和QWH,max分别为家用空调、电冰箱和电热水器的热功率上限,设备的热功率极限与设备的型号相关。
除了上述可控负荷外,居民用户还有照明负荷等其它家用负荷。这部分负荷主要受用户的选择和控制,通常被视为固定负荷或不可控负荷。居民用户的总用电负荷为不可控负荷与可控负荷之和。
式(12)-(14)对应的是电器设备的热功率约束。需要利用不同家用负荷的能耗特性,将消耗的热量转换为实际消耗的电能。例如,制冷电器实际使用的电功率和热量消耗之间关系通常用能效率(Energy Efficiency Ratio,EER)表示,而制热电器的效率则通常用性能系数(Coefficient of Performance,COP)表示。这里分别用ηa、ηf,和ηw表示空调、电冰箱和电热水器消耗的热功率与电功率的比值,则空调的电功率PAC、电冰箱的电功率PRF和电热水器的电功率PWH分别可用式(15)-(17)计算,而用户的总用电负荷可由式(10)求取。
PAC=QACa (15)
PRF=QRFf (16)
PWH=QWHw (17)
PD=Pfix+PAC+PRF+PWH (18)
式中:PD和Pfix分别表示居民总用电负荷功率和不可控用电负荷功率。
住宅内部的热容量和温度分别用Ca和Ta表示,住宅墙体的热容量和温度分别用Cs和Ts表示,假设住宅内部和外界的热传递速率为Rae,住宅墙体与外界的热传递速率为Rse,住宅内部与墙体的热传递速率为Ras,Ca和Cs与住宅面积As和高度H有关,热传递速率Rse与住宅外墙面积S和空气流通率Va相关,具体计算公式如下:
Ca=5.2×103AsH(J/K) (19)
Cs=1.44×102AsH(J/K) (20)
Rae=0.34VaAsH(W/K) (21)
Ras=7.69S(W/K) (23)
2)家用空调模型
家用空调的数学模型可简化表示为
式中:Te为外界温度;Qs和ξs分别表示太阳能辐射的热量和效率;W为住宅窗户面积;Cc、Tc和Rac分别表示空调冷凝机构的热容量、温度和空调冷凝机构与室内空气的热传递速率。
3)家用冰箱模型
冰箱箱体的热容量与温度分别用Cf1与Tf1表示,冷藏箱体的热容量与温度分别用Cf2与Tf2表示,冰箱内部的热容量与温度分别用Cf与Tf表示,制冷结构的热容量与温度分别用Cf4与Tf4表示,家用冰箱的热力学模型为
式中:Rf1f、Rf24、Rff4、Raf分别表示冰箱箱体与内部的热传递速率、冷藏箱与制冷部分的热传递速率、冰箱内部与制冷部分的热传递速率、冰箱内部与室内空气的热传递速率。
4)电热水器模型
分别用Ct与Tt表示箱体的热容量与温度,用Cw与Tw表示内部蓄水的热容量与温度,电热水器的热力学模型可表示为
式中:Rwt、Rat分别表示热水箱与内部蓄水的热传递速率、热水箱与室内空气的热传递速率。
c.利用节点边际电价和最优潮流的模型,建立了配电系统阻塞费用计算的模型。该模型又包含如下1)到3):
在未来的配电系统中,可能出现的市场主体包括分布式供电商、零售商代理(Retail Agent,缩写为RA)、大用户、EV服务商(包括家庭充放电服务和集中充换电站服务)等。
1)RA的初始负荷计划
在日前市场出清之前,RA并不知道下一交易日的日前市场电价,而需要结合历史数据和下一交易日的预测信息对日前市场的电价进行估算。假设Nd为配电系统的负荷节点数,Tsum为考虑的调度时段,配电系统每个节点上有Nh位用户和Ne辆EV,估算的日前市场电价为λ(t),t=1,2,…,Tsum;RA的优化目标如下:
式中,i,t,h,e分别为配电网负荷节点、调度时段、用户和电动汽车的编号(i=1,2,…,Nd;t=1,2,…,Tsum;h=1,2,…,Nh;e=1,2,…,Ne)。RA的优化空间要受式(1)-(8)和(9)-(18)所分别表示的电动汽车充放电负荷特性和居民负荷的约束。RA在得到各个用户的用电计划后,以节点为单位汇总并上报DSO。
2)DSO阻塞管理模型
节点i在时刻t的阻塞价格λc(i,t)需要真实反映阻塞对系统运行成本的影响。可采用多时段直流最优潮流求解配电系统的节点电价(Distribution Locational MarginalPricing,简写为DLMP),进而确定λc(i,t),优化模型为:
目标函数为:
约束条件为:
-Fij,max≤Bijθij(t)≤Fij,max (37)
PSD,min(i,t)≤PSD(i,t)≤PSD,max(i,t) (38)
PSch,min(i,t)≤PSch(i,t)≤PSch,max(i,t) (39)
PSdch,min(i,t)≤PSdch(i,t)≤PSdch,max(i,t) (40)
式中:PG(i,t)和PG,sum(t)分别为S在时刻t由节点i注入系统的有功功率和配电系统在时刻t从上层输电系统购买的有功功率;Bij和θij(t)分别为节点i和节点j之间的线路导纳阵虚部和时刻t节点i与j之间的电压相角差;Fij,max为线路i-j的有功潮流上限;PSD(i,t)、PSch(i,t)和PSdch(i,t)分别为RA上报的以节点为单位的可控负荷、EV充电负荷和EV放电负荷的初始计划;PSD,max(i,t)、PSD,min(i,t)、PSch,max(i,t)、PSch,min(i,t)、PSdch,max(i,t)和PSdch,min(i,t)分别为时段t节点i可控负荷的上下限、电动汽车的充电负荷上下限和放电负荷上下限。式(8)的约束同样需要在模型中考虑。式(38)-(40)为DSO根据RA上报的初始负荷计划得到的居民用户可控负荷和EV充放电负荷约束.
记用上述模型求解出的DLMP为λm(i,t),则阻塞价格可由式(41)求得,并作为RA调整可控负荷和EV充放电负荷用电计划的依据。
λc(i,t)=λm(i,t)-λ(t) (41)
3)RA对负荷计划的修正
在DSO发布阻塞价格后,RA需要综合考虑用户购电情况,市场电价和阻塞价格,调整可控负荷和EV充放电负荷的用电计划,通过对调度结果利润的最大化实现对DSO阻塞管理信号的响应,自主规避阻塞。RA的优化目标修改如下:
RA在修正负荷计划时需要考虑的约束条件与制定初始负荷计划时相同。
当EV采用较为快速的充放电模式下,EV集中充电时段的负荷峰值均显著提高。若不引入阻塞价格,所研究线路的过载情况会严重加剧。预测电价和采用本发明所提出的优化模型计算得到的阻塞价格如图2所示,所研究线路的负载率如图3所示,图3同时对比了不考虑V2G模式下的线路负载率。图4比较了所研究配电系统的某节点总电动汽车充放电负荷和平均SoC在未考虑和考虑V2G模式下的结果。

Claims (1)

1.一种计及电动汽车和可控负荷的配电系统阻塞调控方法,其特征在于包括如下步骤:
a.确定电动汽车调度特性;根据电动汽车用户的出行习惯、电动汽车充电功率和电池特性,建立电动汽车可调度特性的模型,包括:
1)充放电负荷模型
设初始充电时刻Tstart的SoC为Sinit,充电结束时刻Tend的SoC为Sfinal,EV电池容量为BC,充电功率Pch(t)和EV的SoC值Sch(t)为时间的函数,充电效率为ηc,电池自放电率为ηl,则单个EV充电需满足:
<mrow> <msub> <mi>S</mi> <mrow> <mi>f</mi> <mi>i</mi> <mi>n</mi> <mi>a</mi> <mi>l</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>S</mi> <mrow> <mi>i</mi> <mi>n</mi> <mi>i</mi> <mi>t</mi> </mrow> </msub> <mo>+</mo> <msubsup> <mi>B</mi> <mi>C</mi> <mrow> <mo>-</mo> <mn>1</mn> </mrow> </msubsup> <msubsup> <mo>&amp;Integral;</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>t</mi> <mi>a</mi> <mi>r</mi> <mi>t</mi> </mrow> </msub> <msub> <mi>T</mi> <mrow> <mi>e</mi> <mi>n</mi> <mi>d</mi> </mrow> </msub> </msubsup> <msub> <mi>&amp;eta;</mi> <mi>c</mi> </msub> <msub> <mi>P</mi> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> <mo>-</mo> <msubsup> <mo>&amp;Integral;</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>t</mi> <mi>a</mi> <mi>r</mi> <mi>t</mi> </mrow> </msub> <msub> <mi>T</mi> <mrow> <mi>e</mi> <mi>n</mi> <mi>d</mi> </mrow> </msub> </msubsup> <msub> <mi>&amp;eta;</mi> <mi>l</mi> </msub> <msub> <mi>S</mi> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>1</mn> <mo>)</mo> </mrow> </mrow>
当电动汽车(electric vehicle,EV)具备车联网(vehicle-to-grid,V2G),设EV放电功率为Pdch(t),电池的V2G效率为ηd,则式(1)可修正为:
<mrow> <msub> <mi>S</mi> <mrow> <mi>f</mi> <mi>i</mi> <mi>n</mi> <mi>a</mi> <mi>l</mi> </mrow> </msub> <mo>=</mo> <msub> <mi>S</mi> <mrow> <mi>i</mi> <mi>n</mi> <mi>i</mi> <mi>t</mi> </mrow> </msub> <mo>+</mo> <msubsup> <mi>B</mi> <mi>C</mi> <mrow> <mo>-</mo> <mn>1</mn> </mrow> </msubsup> <msubsup> <mo>&amp;Integral;</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>t</mi> <mi>a</mi> <mi>r</mi> <mi>t</mi> </mrow> </msub> <msub> <mi>T</mi> <mrow> <mi>e</mi> <mi>n</mi> <mi>d</mi> </mrow> </msub> </msubsup> <mrow> <mo>(</mo> <msub> <mi>&amp;eta;</mi> <mi>c</mi> </msub> <msub> <mi>P</mi> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>-</mo> <mfrac> <mrow> <msub> <mi>P</mi> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> <msub> <mi>&amp;eta;</mi> <mi>d</mi> </msub> </mfrac> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> <mo>-</mo> <msubsup> <mo>&amp;Integral;</mo> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>t</mi> <mi>a</mi> <mi>r</mi> <mi>t</mi> </mrow> </msub> <msub> <mi>T</mi> <mrow> <mi>e</mi> <mi>n</mi> <mi>d</mi> </mrow> </msub> </msubsup> <msub> <mi>&amp;eta;</mi> <mi>l</mi> </msub> <msub> <mi>S</mi> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mi>d</mi> <mi>t</mi> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>2</mn> <mo>)</mo> </mrow> </mrow>
在V2G模式下,EV的放电功率会增加EV的电池损耗,由单位V2G放电电能导致的额外电池损耗成本可估算为:
<mrow> <msub> <mi>L</mi> <mrow> <mi>p</mi> <mi>d</mi> </mrow> </msub> <mo>=</mo> <mfrac> <msub> <mi>I</mi> <mi>b</mi> </msub> <mrow> <msub> <mi>B</mi> <mi>c</mi> </msub> <msub> <mi>B</mi> <mrow> <mi>l</mi> <mi>c</mi> </mrow> </msub> <msub> <mi>D</mi> <mrow> <mi>o</mi> <mi>d</mi> </mrow> </msub> </mrow> </mfrac> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>3</mn> <mo>)</mo> </mrow> </mrow>
式中:Lpd、Blc、Ib、Dod分别为EV在V2G模式下的单位放电电能成本、电池设计的充放电循环寿命、电池成本和V2G放电深度;
2)EV充放电约束模型
为满足车主的使用需求,EV充放电需要满足下述约束条件:
Sch,min≤Sch(t)≤Sch,max (4)
Sfinal≥Sfinal,min (5)
式中:Sch,max和Sch,min均为保证电池寿命的荷电状态(SoC)上限和下限约束,分别用于防止电池过度充电和过度放电;Sfinal,min为充电结束时车主可接受的最低SoC值;
EV充放电需要满足自身的功率约束,而且每台EV不能同时处于充电和放电状态:
0≤Pch(t)≤Pch,max (6)
0≤Pdch(t)≤Pdch,max (7)
Pch(t)Pdch(t)=0 (8)
式中:Pch,max和Pdch,max分别为EV的最大充电功率和最大放电功率;
b.确定家用负荷调度特性;结合空调、冰箱、电热水器的控制特性和能耗特性,建立可控负荷的需求和可调度模型,包括:
1)居民用户整体负荷模型
室内气温Ta、冰箱内部温度Tf和热水器蓄水温度Tw需满足下述约束:
Ta,min≤Ta≤Ta,max (9)
Tf,min≤Tf≤Tf,max (10)
Tw,min≤Tw≤Tw,max (11)
式中:Ta,max、Ta,min、Tf,max、Tf,min、Tw,max、Tw,min分别表示室内气温上限、室内气温下限、冰箱内部温度上限、冰箱内部温度下限、热水器内蓄水的温度上限及热水器内蓄水的温度下限;
此外,空调的热功率QAC、冰箱的热功率QRF和电热水器的热功率QWH必须满足电器设备自身的热功率约束,即:
0≤QAC≤QAC,max (12)
0≤QRF≤QRF,max (13)
0≤QWH≤QWH,max (14)
式中:QAC,max、QRF,max和QWH,max分别为家用空调、电冰箱和电热水器的热功率上限;
分别用ηa、ηf和ηw表示空调热功率与电功率的比值、电冰箱热功率与电功率的比值和电热水器消耗的热功率与电功率的比值,则空调的电功率PAC、电冰箱的电功率PRF和电热水器的电功率PWH分别可用式(15)-(17)计算,用户的总用电负荷可由式(18)求取:
PAC=QACa (15)
PRF=QRFf (16)
PWH=QWHw (17)
PD=Pfix+PAC+PRF+PWH (18)
式中:PD和Pfix分别表示居民总用电负荷功率和不可控用电负荷功率;
住宅内部的热容量和温度分别用Ca和Ta表示,住宅墙体的热容量和温度分别用Cs和Ts表示,假设住宅内部和外界的热传递速率为Rae,住宅墙体与外界的热传递速率为Rse,住宅内部与墙体的热传递速率为Ras,Ca和Cs与住宅面积As和高度H有关,热传递速率Rse与住宅外墙面积S和空气流通率Va相关,具体计算公式如下:
Ca=5.2×103AsH(J/K) (19)
Cs=1.44×102AsH(J/K) (20)
Rae=0.34VaAsH(W/K) (21)
<mrow> <msub> <mi>R</mi> <mrow> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>=</mo> <mfrac> <mrow> <mn>7.69</mn> <mi>S</mi> <mrow> <mo>(</mo> <mn>69.05</mn> <mo>+</mo> <mn>1.07</mn> <msub> <mi>A</mi> <mi>s</mi> </msub> <mo>)</mo> </mrow> </mrow> <mrow> <mn>7.69</mn> <mi>S</mi> <mo>-</mo> <mrow> <mo>(</mo> <mn>69.05</mn> <mo>+</mo> <mn>1.07</mn> <msub> <mi>A</mi> <mi>s</mi> </msub> <mo>)</mo> </mrow> </mrow> </mfrac> <mrow> <mo>(</mo> <mi>W</mi> <mo>/</mo> <mi>K</mi> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>22</mn> <mo>)</mo> </mrow> </mrow>
Ras=7.69S(W/K) (23)
2)家用空调模型
家用空调的数学模型可简化表示为
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mi>a</mi> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mi>a</mi> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>&amp;xi;</mi> <mi>s</mi> </msub> <msub> <mi>WQ</mi> <mi>s</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>a</mi> <mi>s</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>s</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>a</mi> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>a</mi> <mi>e</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>e</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>a</mi> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>a</mi> <mi>c</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>c</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>a</mi> </msub> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>24</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mi>s</mi> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mi>s</mi> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>&amp;xi;</mi> <mi>s</mi> </msub> <msub> <mi>SQ</mi> <mi>s</mi> </msub> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>a</mi> <mi>s</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>a</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>s</mi> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>s</mi> <mi>e</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>e</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>s</mi> </msub> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>25</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mi>c</mi> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mi>c</mi> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>a</mi> <mi>c</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>a</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>c</mi> </msub> </mrow> <mo>)</mo> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>A</mi> <mi>C</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>26</mn> <mo>)</mo> </mrow> </mrow>
式中:Te为外界温度;Qs和ξs分别表示太阳能辐射的热量和效率;W为住宅窗户面积;Cc、Tc和Rac分别表示空调冷凝机构的热容量、温度和空调冷凝机构与室内空气的热传递速率;
3)家用冰箱模型
冰箱箱体的热容量与温度分别用Cf1与Tf1表示,冷藏箱体的热容量与温度分别用Cf2与Tf2表示,冰箱内部的热容量与温度分别用Cf与Tf表示,制冷结构的热容量与温度分别用Cf4与Tf4表示,家用冰箱的热力学模型为
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mrow> <mi>f</mi> <mn>1</mn> </mrow> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mrow> <mi>f</mi> <mn>1</mn> </mrow> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>f</mi> <mn>1</mn> <mi>f</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>f</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>1</mn> </mrow> </msub> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>27</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mrow> <mi>f</mi> <mn>2</mn> </mrow> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mrow> <mi>f</mi> <mn>2</mn> </mrow> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>f</mi> <mn>24</mn> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>4</mn> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>2</mn> </mrow> </msub> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>28</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mi>f</mi> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mi>f</mi> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>f</mi> <mn>1</mn> <mi>f</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>1</mn> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>f</mi> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>f</mi> <mi>f</mi> <mn>4</mn> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>4</mn> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>f</mi> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>a</mi> <mi>f</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>a</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>f</mi> </msub> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>29</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mrow> <mi>f</mi> <mn>4</mn> </mrow> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mrow> <mi>f</mi> <mn>4</mn> </mrow> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>f</mi> <mi>f</mi> <mn>4</mn> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>f</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>4</mn> </mrow> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>f</mi> <mn>24</mn> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>2</mn> </mrow> </msub> <mo>-</mo> <msub> <mi>T</mi> <mrow> <mi>f</mi> <mn>4</mn> </mrow> </msub> </mrow> <mo>)</mo> <mo>-</mo> <msub> <mi>Q</mi> <mrow> <mi>R</mi> <mi>F</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>30</mn> <mo>)</mo> </mrow> </mrow>
式中:Rf1f、Rf24、Rff4、Raf分别表示冰箱箱体与内部的热传递速率、冷藏箱与制冷部分的热传递速率、冰箱内部与制冷部分的热传递速率、冰箱内部与室内空气的热传递速率;
4)电热水器模型
分别用Ct与Tt表示箱体的热容量与温度,用Cw与Tw表示内部蓄水的热容量与温度,电热水器的热力学模型可表示为
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mi>t</mi> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mi>t</mi> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>a</mi> <mi>t</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>a</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>t</mi> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>R</mi> <mrow> <mi>w</mi> <mi>t</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>w</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>t</mi> </msub> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>31</mn> <mo>)</mo> </mrow> </mrow>
<mrow> <mfrac> <mrow> <msub> <mi>dT</mi> <mi>w</mi> </msub> </mrow> <mrow> <mi>d</mi> <mi>t</mi> </mrow> </mfrac> <mo>=</mo> <mfrac> <mn>1</mn> <msub> <mi>C</mi> <mi>w</mi> </msub> </mfrac> <mrow> <mo>(</mo> <msub> <mi>R</mi> <mrow> <mi>w</mi> <mi>t</mi> </mrow> </msub> <mo>(</mo> <mrow> <msub> <mi>T</mi> <mi>t</mi> </msub> <mo>-</mo> <msub> <mi>T</mi> <mi>w</mi> </msub> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>Q</mi> <mrow> <mi>W</mi> <mi>H</mi> </mrow> </msub> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>32</mn> <mo>)</mo> </mrow> </mrow>
式中:Rwt、Rat分别表示热水箱与内部蓄水的热传递速率、热水箱与室内空气的热传递速率;
c.利用节点边际电价和最优潮流的模型,建立配电系统阻塞费用计算模型,包括:
1)零售商代理RA的初始负荷计划
在日前市场出清之前,RA并不知道下一交易日的日前市场电价,而需要结合历史数据和下一交易日的预测信息对日前市场的电价进行估算;假设Nd为配电系统的负荷节点数,Tsum为考虑的调度时段,配电系统每个节点上有Nh位用户和Ne辆EV,估算的日前市场电价为λ(t),t=1,2,…,Tsum;RA的优化目标如下:
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>M</mi> <mi>i</mi> <mi>n</mi> <mi>i</mi> <mi>m</mi> <mi>i</mi> <mi>z</mi> <mi>e</mi> </mrow> </mtd> <mtd> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>d</mi> </msub> </munderover> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>u</mi> <mi>m</mi> </mrow> </msub> </munderover> <mrow> <mo>(</mo> <mi>&amp;lambda;</mi> <mo>(</mo> <mi>t</mi> <mo>)</mo> <mo>(</mo> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>h</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>h</mi> </msub> </munderover> <msub> <mi>P</mi> <mi>D</mi> </msub> <mrow> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>h</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>e</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>P</mi> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>e</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> <mo>-</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>e</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>P</mi> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>e</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> </mrow> <mo>)</mo> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>e</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>L</mi> <mrow> <mi>p</mi> <mi>d</mi> </mrow> </msub> <mo>(</mo> <mi>e</mi> <mo>)</mo> </mrow> <msub> <mi>P</mi> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>e</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> </mtd> </mtr> </mtable> <mo>)</mo> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>33</mn> <mo>)</mo> </mrow> </mrow>
式中,i,t,h,e分别为配电网负荷节点、调度时段、用户和电动汽车的编号,其中i=1,2,…,Nd;t=1,2,…,Tsum;h=1,2,…,Nh;e=1,2,…,Ne;RA的优化目标要受式(1)-(8)和(9)-(18)所分别表示的电动汽车充放电负荷特性和居民负荷的约束;RA在得到各个用户的用电计划后,以节点为单位汇总并上报配电系统调度机构DSO;
2)配电系统调度机构DSO阻塞管理模型
采用多时段直流最优潮流求解配电系统的节点电价DLMP,进而确定节点i在时刻t的阻塞价格λc(i,t),目标函数为:
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>M</mi> <mi>i</mi> <mi>n</mi> <mi>i</mi> <mi>m</mi> <mi>i</mi> <mi>z</mi> <mi>e</mi> </mrow> </mtd> <mtd> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mi>t</mi> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>u</mi> <mi>m</mi> </mrow> </msub> </munderover> <mi>&amp;lambda;</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <msub> <mi>P</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>s</mi> <mi>u</mi> <mi>m</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> </mrow> </mtd> </mtr> </mtable> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>34</mn> <mo>)</mo> </mrow> </mrow>
约束条件为:
<mrow> <msub> <mi>P</mi> <mrow> <mi>G</mi> <mo>,</mo> <mi>s</mi> <mi>u</mi> <mi>m</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>d</mi> </msub> </munderover> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mrow> <mi>S</mi> <mi>D</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>P</mi> <mrow> <mi>S</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>S</mi> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>=</mo> <mn>0</mn> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>35</mn> <mo>)</mo> </mrow> </mrow> 3
<mrow> <msub> <mi>P</mi> <mi>G</mi> </msub> <mrow> <mo>(</mo> <mi>i</mi> <mo>,</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <mrow> <mo>(</mo> <msub> <mi>P</mi> <mrow> <mi>S</mi> <mi>D</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>+</mo> <msub> <mi>P</mi> <mrow> <mi>S</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>-</mo> <msub> <mi>P</mi> <mrow> <mi>S</mi> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> <mo>)</mo> </mrow> <mo>=</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>j</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>d</mi> </msub> </munderover> <msub> <mi>B</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <msub> <mi>&amp;theta;</mi> <mrow> <mi>i</mi> <mi>j</mi> </mrow> </msub> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>36</mn> <mo>)</mo> </mrow> </mrow>
-Fij,max≤Bijθij(t)≤Fij,max (37)
PSD,min(i,t)≤PSD(i,t)≤PSD,max(i,t) (38)
PSch,min(i,t)≤PSch(i,t)≤PSch,max(i,t) (39)
PSdch,min(i,t)≤PSdch(i,t)≤PSdch,max(i,t) (40)
式中:PG(i,t)和PG,sum(t)分别为S在时刻t由节点i注入系统的有功功率和配电系统在时刻t从上层输电系统购买的有功功率;Bij和θij(t)分别为节点i和节点j之间的线路导纳阵虚部和时刻t节点i与j之间的电压相角差;Fij,max为线路i-j的有功潮流上限;PSD(i,t)、PSch(i,t)和PSdch(i,t)分别为RA上报的以节点为单位的可控负荷、EV充电负荷和EV放电负荷的初始计划;PSD,max(i,t)、PSD,min(i,t)、PSch,max(i,t)、PSch,min(i,t)、PSdch,max(i,t)和PSdch,min(i,t)分别为时段t节点i可控负荷的上下限、电动汽车的充电负荷上下限和放电负荷上下限,式(8)的约束同样需要在该模型中考虑;
用上述模型求解出的节点电价DLMP为λm(i,t),则阻塞价格可由式(41)求得,并作为RA调整可控负荷和EV充放电负荷用电计划的依据,
λc(i,t)=λm(i,t)-λ(t) (41)
3)RA对负荷计划的修正
在DSO发布阻塞价格后,RA需要综合考虑用户购电情况,市场电价和阻塞价格,调整可控负荷和EV充放电负荷的用电计划,通过对调度结果利润的最大化实现对DSO阻塞管理信号的响应,自主规避阻塞;RA的优化目标修改如下:
<mrow> <mtable> <mtr> <mtd> <mrow> <mi>M</mi> <mi>i</mi> <mi>n</mi> <mi>i</mi> <mi>m</mi> <mi>i</mi> <mi>z</mi> <mi>e</mi> </mrow> </mtd> <mtd> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>i</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>d</mi> </msub> </munderover> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>t</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>T</mi> <mrow> <mi>s</mi> <mi>u</mi> <mi>m</mi> </mrow> </msub> </munderover> <mrow> <mo>(</mo> <mo>(</mo> <mrow> <mi>&amp;lambda;</mi> <mrow> <mo>(</mo> <mi>t</mi> <mo>)</mo> </mrow> <mo>+</mo> <msub> <mi>&amp;lambda;</mi> <mi>c</mi> </msub> <mrow> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> </mrow> <mo>)</mo> <mo>(</mo> <mrow> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>h</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>h</mi> </msub> </munderover> <msub> <mi>P</mi> <mi>D</mi> </msub> <mrow> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>h</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>e</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>P</mi> <mrow> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>e</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> <mo>-</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>e</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>P</mi> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mrow> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>e</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> </mrow> <mo>)</mo> <mo>+</mo> <munderover> <mo>&amp;Sigma;</mo> <mrow> <mi>e</mi> <mo>=</mo> <mn>1</mn> </mrow> <msub> <mi>N</mi> <mi>e</mi> </msub> </munderover> <msub> <mi>L</mi> <mrow> <mi>p</mi> <mi>d</mi> </mrow> </msub> <mo>(</mo> <mi>e</mi> <mo>)</mo> </mrow> <msub> <mi>P</mi> <mrow> <mi>d</mi> <mi>c</mi> <mi>h</mi> </mrow> </msub> <mo>(</mo> <mrow> <mi>i</mi> <mo>,</mo> <mi>e</mi> <mo>,</mo> <mi>t</mi> </mrow> <mo>)</mo> </mrow> </mtd> </mtr> </mtable> <mo>)</mo> <mo>-</mo> <mo>-</mo> <mo>-</mo> <mrow> <mo>(</mo> <mn>42</mn> <mo>)</mo> </mrow> </mrow>
RA在修正负荷计划时需要考虑的约束条件与制定初始负荷计划时相同。
CN201410736149.6A 2014-12-07 2014-12-07 一种计及电动汽车和可控负荷的配电系统阻塞调控方法 Active CN104517158B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410736149.6A CN104517158B (zh) 2014-12-07 2014-12-07 一种计及电动汽车和可控负荷的配电系统阻塞调控方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410736149.6A CN104517158B (zh) 2014-12-07 2014-12-07 一种计及电动汽车和可控负荷的配电系统阻塞调控方法

Publications (2)

Publication Number Publication Date
CN104517158A CN104517158A (zh) 2015-04-15
CN104517158B true CN104517158B (zh) 2017-12-15

Family

ID=52792418

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410736149.6A Active CN104517158B (zh) 2014-12-07 2014-12-07 一种计及电动汽车和可控负荷的配电系统阻塞调控方法

Country Status (1)

Country Link
CN (1) CN104517158B (zh)

Families Citing this family (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107067136B (zh) * 2016-12-22 2020-11-27 国家电网公司 电动汽车充电分配方法及装置
CN108667018A (zh) * 2018-06-08 2018-10-16 河海大学 一种计及电动汽车和热泵的配电网节点电价计算方法
CN109460870B (zh) * 2018-11-08 2021-02-23 深圳供电局有限公司 考虑阻塞的集群电动汽车交互方法
CN109948954B (zh) * 2019-04-04 2021-07-13 华北电力大学 一种面向电力系统分布式资源的配电网双向阻塞调度方法
CN110797889B (zh) * 2019-11-18 2021-02-23 国电南瑞科技股份有限公司 一种解决潮流拥塞问题的储能电站布置方法

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103728881A (zh) * 2014-01-02 2014-04-16 东南大学 一种多楼宇冷热电联供系统的优化运行方法
CN104134995A (zh) * 2014-07-08 2014-11-05 东南大学 基于储能建模的空调负荷参与系统二次调频方法

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103728881A (zh) * 2014-01-02 2014-04-16 东南大学 一种多楼宇冷热电联供系统的优化运行方法
CN104134995A (zh) * 2014-07-08 2014-11-05 东南大学 基于储能建模的空调负荷参与系统二次调频方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
Identifying suitable models for the heat dynamics of buildings;Peder Bacher ..etc;《Energy and Buildings》;20110731;1511-1522 *
可中断负荷参与输电阻塞管理的模型与算法;李海英;《电力系统自动化》;20060525;第30卷(第10期);17-21 *
电动汽车对电力系统的影响及其调度与控制问题;赵俊华 等;《电力系统自动化》;20110725;第35卷(第14期);2-10,29 *

Also Published As

Publication number Publication date
CN104517158A (zh) 2015-04-15

Similar Documents

Publication Publication Date Title
Mirakhorli et al. Model predictive control for building loads connected with a residential distribution grid
Mirakhorli et al. Market and behavior driven predictive energy management for residential buildings
CN104517158B (zh) 一种计及电动汽车和可控负荷的配电系统阻塞调控方法
Ou et al. Investigating wireless charging and mobility of electric vehicles on electricity market
CN110619425B (zh) 一种考虑源网荷储差异特性的多功能区综合能源系统协同规划方法
Foster et al. Optimal power market participation of plug-in electric vehicles pooled by distribution feeder
Shang et al. Internet of smart charging points with photovoltaic Integration: A high-efficiency scheme enabling optimal dispatching between electric vehicles and power grids
Pedrasa et al. Robust scheduling of residential distributed energy resources using a novel energy service decision-support tool
Wang et al. Load curve smoothing strategy based on unified state model of different demand side resources
Mirakhorli et al. Occupant-behavior driven appliance scheduling for residential buildings
CN114862252A (zh) 可调负荷多层聚合调度潜力分析方法、系统、设备及介质
Saber et al. A user-friendly transactive coordination model for residential prosumers considering voltage unbalance in distribution networks
Li et al. Energy management model of charging station micro-grid considering random arrival of electric vehicles
Khan et al. Robust multi-objective congestion management in distribution network
Rajendhar et al. A Water Filling Energy distributive algorithm based HEMS in coordination with PEV
Roche et al. A multi-agent model and strategy for residential demand response coordination
Su Smart grid operations integrated with plug-in electric vehicles and renewable energy resources
Shao An approach to demand response for alleviating power system stress conditions due to electric vehicle penetration
Bessler et al. Energy management in microgrids with flexible and interruptible loads
Reihani et al. Scheduling of price-sensitive residential storage devices and loads with thermal inertia in distribution grid
Zhang et al. Research on large scale EV charging optimization strategy
Liao et al. The distributed energy resources operation for EV charging stations and SHEMS in microgrids
Alyami et al. Novel flexibility indices of controllable loads in relation to EV and rooftop PV
Dang et al. Energy optimization in an eco-district with electric vehicles smart charging
Medeiros et al. Real time operation in electric vehicle smart charging stations: a matheuristic approach considering demand side management, energy storage and distributed generation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
CB03 Change of inventor or designer information
CB03 Change of inventor or designer information

Inventor after: Li Liang

Inventor after: Liu Weijia

Inventor after: Yu Zheren

Inventor after: Wen Fushuan

Inventor after: Wang Honghua

Inventor after: Li Bo

Inventor after: Chen Jingyun

Inventor after: Han Luyu

Inventor after: Zhan Yanjiao

Inventor before: Guo Yunpeng

Inventor before: Liu Weijia

Inventor before: Yu Zheren

Inventor before: Wen Fushuan

Inventor before: Wang Honghua

Inventor before: Li Bo

GR01 Patent grant