CN104504511A - Method for increasing correct calculation rate of line loss - Google Patents
Method for increasing correct calculation rate of line loss Download PDFInfo
- Publication number
- CN104504511A CN104504511A CN201410777751.4A CN201410777751A CN104504511A CN 104504511 A CN104504511 A CN 104504511A CN 201410777751 A CN201410777751 A CN 201410777751A CN 104504511 A CN104504511 A CN 104504511A
- Authority
- CN
- China
- Prior art keywords
- operating personnel
- line loss
- region
- rate
- maintenance
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 17
- 238000012423 maintenance Methods 0.000 claims abstract description 22
- 238000012544 monitoring process Methods 0.000 claims abstract description 13
- 230000005611 electricity Effects 0.000 claims description 21
- 238000009434 installation Methods 0.000 claims description 6
- 240000007594 Oryza sativa Species 0.000 claims description 3
- 235000007164 Oryza sativa Nutrition 0.000 claims description 3
- 240000007711 Peperomia pellucida Species 0.000 claims description 3
- 235000012364 Peperomia pellucida Nutrition 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims description 3
- 235000009566 rice Nutrition 0.000 claims description 3
- 238000005192 partition Methods 0.000 abstract 2
- 230000007774 longterm Effects 0.000 abstract 1
- 230000007547 defect Effects 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000004321 preservation Methods 0.000 description 2
- 238000012360 testing method Methods 0.000 description 2
- 238000013480 data collection Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Public Health (AREA)
- Water Supply & Treatment (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention relates to a method for increasing the correct calculation rate of line loss. The method comprises the steps of region partition, region contract, field maintenance, field replacement and line monitoring. The method has the advantages that the steps of region partition, region contract, field maintenance, field replacement and line monitoring are performed, and a region contract system is adopted, so that the phenomenon of long-term unattended processing is effectively avoided, the maintenance efficiency is increased, the correct calculation rate of line loss in each region can be over 98 percent, acquired information is kept stable, and the maintenance workload is greatly reduced; through field replacement, normal running of field acquisition equipment can be ensured, and losses are reduced; through region contract, the maintenance capability and operation capability of operating personnel can be realized, and the level of the operating personnel is raised; through line monitoring, a foundation is laid for line loss analysis, check and rectification, and management of the line loss is realized.
Description
Technical field
The present invention relates to a kind of method that can improve the correct at last rate of line loss.
Background technology
It is embody the key index of " collection is copied collection and received " that platform district line loss correctly can be regarded as rate index, also be that Controlling line loss level truly reflects, the number of users need debugged due to platform district is many, equipment quality is unstable, add that employee copies equipment to collection and lacks the knowledge and experience safeguarded, manage, cause my the every data collection rate of institute relatively on the low side, thus improve the working strength of operating personnel and safeguard quantity, correctly rate is low at last for line loss, and the stability of working line is poor.
Summary of the invention
The technical problem to be solved in the present invention is just to provide a kind of method that can improve the correct at last rate of line loss, solves the existing line loss defect that correctly rate maintenance workload that is low, operating personnel is large, stability is poor at last.
In order to solve the problems of the technologies described above, the present invention is achieved by the following technical solutions: a kind of method that can improve the correct at last rate of line loss, comprises the following steps:
A) Region dividing: Electricity customers all in each district is divided into multiple different surveyed area;
B) region is contracted: carry out region contract system under being assigned to the surveyed area after step a) divides the operating personnel specified;
C) field maintemance: operating personnel carry out detection maintenance by copying equipment to the collection in regional;
D) spot replace: when mistake appears in the collecting device that the collection detected is copied in equipment, operating personnel carry out man-to-man spot replace to guarantee the normal operation of collection in worksite equipment;
E) circuit monitoring: the user of operating personnel to the end in regional or certain section of circuit carries out index monitoring.
Preferably, step a) Zhong Tai district can pass through Electricity customers electricity capacity, the geographic position of installing, the quantity of Electricity customers divides, in each surveyed area, the quantity of Electricity customers is equal, effectively can ensure the situation of each Electricity customers in each surveyed area, improve and safeguard intensity, ensure that the workload under each operating personnel is impartial, realize equivalent to divide, according to the division in the geographic position of installing, can ensure that region that each operating personnel contract is in a regional extent, effectively can reduce the working strength of operating personnel, avoid the make little runs to and fro fatigue that produces of operating personnel on different installation geographic position, be conducive to safeguarding the Electricity customers in platform district, improve security performance, and the quantity of the Electricity customers in each surveyed area is carried out equivalent division, ensure that the balance of the work of each operating personnel, avoid the difference producing working strength in the heart of operating personnel to fall, be conducive to operating personnel's work.
Preferably, step b) in operating personnel be at least two, the operating personnel enriched comprising a working experience and the strong operating personnel of an ability of maintenance, preservation & testing can be conducive to, can coordinate the division of labor for two to coordinate, improve the ability of maintenance, the operating personnel that the operating personnel enriched by working experience are strong with the ability of maintenance cooperate, can the Problem under different defect appears in circuit be realized, ensure that the normal operation of circuit.
Preferably, step e) in index comprise low pressure and gather installation rate, coverage rate, electric quantity data percentage of head rice, average daily acquisition rate, line loss can be improved and correctly can be regarded as rate, be convenient to detect, be convenient to analyze follow-up line loss, check, rectify and improve, ensure the normal operation of subscriber's meter in platform district, decrease power loss.
In sum, advantage of the present invention: pass through Region dividing successively, region is contracted, field maintemance, spot replace, the method of circuit monitoring, by the system that region is contracted, effectively stop the phenomenon of long-time unmanned process, improve maintenance efficiency, line loss in each district correctly can be can be regarded as rate and reach more than 98%, the information gathered keeps stable, greatly reduce maintenance workload, the normal operation of collection in worksite equipment can be ensured by spot replace, decrease loss, and the ability of maintenance and functipnal capability that can realize operating personnel is contracted by region, be conducive to the raising of operating personnel's level, circuit monitoring achieves line loss analyzing, inspection and rectification provide the foundation, achieve the management of line loss.
Embodiment
The method that line loss correctly can be regarded as rate can be improved, comprise the following steps:
A) Region dividing: Electricity customers all in each district is divided into multiple different surveyed area;
B) region is contracted: carry out region contract system under being assigned to the surveyed area after step a) divides the operating personnel specified;
C) field maintemance: operating personnel carry out detection maintenance by copying equipment to the collection in regional;
D) spot replace: when mistake appears in the collecting device that the collection detected is copied in equipment, operating personnel carry out man-to-man spot replace to guarantee the normal operation of collection in worksite equipment;
E) circuit monitoring: the user of operating personnel to the end in regional or certain section of circuit carries out index monitoring.
Step a) Zhong Tai district can pass through Electricity customers electricity capacity, the geographic position of installing, the quantity of Electricity customers divides, in each surveyed area, the quantity of Electricity customers is equal, effectively can ensure the situation of each Electricity customers in each surveyed area, improve and safeguard intensity, ensure that the workload under each operating personnel is impartial, realize equivalent to divide, according to the division in the geographic position of installing, can ensure that region that each operating personnel contract is in a regional extent, effectively can reduce the working strength of operating personnel, avoid the make little runs to and fro fatigue that produces of operating personnel on different installation geographic position, be conducive to safeguarding the Electricity customers in platform district, improve security performance, and the quantity of the Electricity customers in each surveyed area is carried out equivalent division, ensure that the balance of the work of each operating personnel, avoid the difference producing working strength in the heart of operating personnel to fall, be conducive to operating personnel's work, step b) in operating personnel be at least two, the operating personnel enriched comprising a working experience and the strong operating personnel of an ability of maintenance, preservation & testing can be conducive to, the division of labor can be coordinated for two to coordinate, improve the ability of maintenance, the operating personnel that the operating personnel enriched by working experience are strong with the ability of maintenance cooperate, Problem under different defect appears in circuit can be realized, ensure that the normal operation of circuit, step e) in index comprise low pressure gather installation rate, coverage rate, electric quantity data percentage of head rice, average daily acquisition rate, line loss can be improved and correctly can be regarded as rate, be convenient to detect, be convenient to analyze follow-up line loss, check, rectification, ensure the normal operation of subscriber's meter in platform district, decrease power loss.
Pass through Region dividing successively, region is contracted, field maintemance, spot replace, the method of circuit monitoring, by the system that region is contracted, effectively stop the phenomenon of long-time unmanned process, improve maintenance efficiency, line loss in each district correctly can be can be regarded as rate and reach more than 98%, the information gathered keeps stable, greatly reduce maintenance workload, the normal operation of collection in worksite equipment can be ensured by spot replace, decrease loss, and the ability of maintenance and functipnal capability that can realize operating personnel is contracted by region, be conducive to the raising of operating personnel's level, circuit monitoring achieves line loss analyzing, inspection and rectification provide the foundation, achieve the management of line loss.
Claims (4)
1. can improve the method that line loss correctly can be regarded as rate, it is characterized in that: comprise the following steps:
A) Region dividing: Electricity customers all in each district is divided into multiple different surveyed area;
B) region is contracted: carry out region contract system under being assigned to the surveyed area after step a) divides the operating personnel specified;
C) field maintemance: operating personnel carry out detection maintenance by copying equipment to the collection in regional;
D) spot replace: when mistake appears in the collecting device that the collection detected is copied in equipment, operating personnel carry out man-to-man spot replace to guarantee the normal operation of collection in worksite equipment;
E) circuit monitoring: the user of operating personnel to the end in regional or certain section of circuit carries out index monitoring.
2. a kind of method that can improve the correct at last rate of line loss according to claim 1, it is characterized in that: step a) Zhong Tai district can be divided by the quantity of the geographic position of Electricity customers electricity capacity, installation, Electricity customers, and in each surveyed area, the quantity of Electricity customers is equal.
3. a kind of method that can improve the correct at last rate of line loss according to claim 1, is characterized in that: step b) in operating personnel be at least two, the operating personnel enriched comprising a working experience and the strong operating personnel of an ability of maintenance.
4. a kind of method that can improve the correct at last rate of line loss according to claim 1, is characterized in that: step e) in index comprise low pressure and gather installation rate, coverage rate, electric quantity data percentage of head rice, average daily acquisition rate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410777751.4A CN104504511A (en) | 2014-12-15 | 2014-12-15 | Method for increasing correct calculation rate of line loss |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410777751.4A CN104504511A (en) | 2014-12-15 | 2014-12-15 | Method for increasing correct calculation rate of line loss |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104504511A true CN104504511A (en) | 2015-04-08 |
Family
ID=52945906
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410777751.4A Pending CN104504511A (en) | 2014-12-15 | 2014-12-15 | Method for increasing correct calculation rate of line loss |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104504511A (en) |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103177341A (en) * | 2013-03-29 | 2013-06-26 | 山东电力集团公司 | Line loss lean comprehensive management system and method |
-
2014
- 2014-12-15 CN CN201410777751.4A patent/CN104504511A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103177341A (en) * | 2013-03-29 | 2013-06-26 | 山东电力集团公司 | Line loss lean comprehensive management system and method |
Non-Patent Citations (4)
Title |
---|
刘锐: "开封供电公司线损管理系统分析", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
王宇: "公共低压台区管理体制的研究", 《中国优秀硕士学位论文全文数据库 工程科技Ⅱ辑》 * |
谢娟: "淮南供电公司电网线损管理现状与对策研究", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 * |
黑晓鹏: "大东供电分公司线损管理研究", 《中国优秀硕士学位论文全文数据库 经济与管理科学辑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103874122B (en) | Special transformer terminals network signal acquisition system and acquisition method | |
CN108665186B (en) | Distribution transformer overload power failure monitoring method and device based on metering automation system | |
CN104410163B (en) | A kind of safety in production based on electric energy management system and power-economizing method | |
CN111160791A (en) | Abnormal user identification method based on GBDT algorithm and factor fusion | |
CN204288281U (en) | Industrial enterprise's electric energy management system | |
CN109038552A (en) | Distribution net equipment running state analysis method and device based on big data | |
CN106251034A (en) | Wisdom energy saving electric meter monitoring system based on cloud computing technology | |
CN104283732A (en) | Network testing method, network testing data collection method, network testing device and network testing system | |
CN115270974B (en) | Intelligent electricity larceny detection system based on big data analysis | |
CN108898239A (en) | A kind of site selection method for distribution transformer based on data analysis | |
CN107169640A (en) | A kind of power distribution network key index analysis method based on big data technology | |
CN104538957A (en) | Power grid model self-adaptive processing method for counting low-frequency low-voltage load shedding capacity | |
CN105373118A (en) | Intelligent equipment data acquisition method | |
CN114928173A (en) | Intelligent power distribution system based on power grid business middling station and electric power data safety interaction | |
CN112216061A (en) | Rainwater condition monitoring and early warning method and system | |
CN117196590B (en) | Intelligent maintenance efficiency evaluation system for operation and maintenance of communication equipment | |
CN117335570B (en) | Visual monitoring system and method for panoramic information of elastic power distribution network | |
CN105652157B (en) | Method for analyzing health state of power distribution network based on traveling wave electric quantity | |
CN104143160A (en) | Method for evaluating power grid dispatching capacity on basis of computer implementation | |
CN109946640B (en) | Special transformer terminal voltage and current loss judgment method based on metering automation system data | |
CN113471864A (en) | Transformer substation secondary equipment field maintenance device and method | |
CN104504511A (en) | Method for increasing correct calculation rate of line loss | |
CN109443395B (en) | Method and system for judging whether energy consumption intensity multipoint measurement difference value exceeds limit value | |
CN102882279A (en) | Real-time measurement and online analysis method for load of power grid | |
CN209911524U (en) | Power failure detection terminal |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150408 |