CN104504217B - 一种变电站电源用dl/t860模型辅助系统及其工作方法 - Google Patents

一种变电站电源用dl/t860模型辅助系统及其工作方法 Download PDF

Info

Publication number
CN104504217B
CN104504217B CN201510007835.4A CN201510007835A CN104504217B CN 104504217 B CN104504217 B CN 104504217B CN 201510007835 A CN201510007835 A CN 201510007835A CN 104504217 B CN104504217 B CN 104504217B
Authority
CN
China
Prior art keywords
file
icd
model
ied
detection
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201510007835.4A
Other languages
English (en)
Other versions
CN104504217A (zh
Inventor
张晓花
曹淑英
巩方彬
熊建成
孟祥军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong luruan Digital Technology Co.,Ltd. smart energy branch
Original Assignee
Shandong Luneng Intelligence Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Luneng Intelligence Technology Co Ltd filed Critical Shandong Luneng Intelligence Technology Co Ltd
Priority to CN201510007835.4A priority Critical patent/CN104504217B/zh
Publication of CN104504217A publication Critical patent/CN104504217A/zh
Application granted granted Critical
Publication of CN104504217B publication Critical patent/CN104504217B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Information Transfer Between Computers (AREA)
  • Stored Programmes (AREA)

Abstract

本发明公开了一种变电站电源用DL/T860模型辅助系统及其工作方法;它包括生成ICD文件模块、在线加载模块和检测ICD模型文件模块;所述生成ICD文件模块根据用户的需求定制转发表,根据DL/T860标准生成ICD模型文件;所述在线加载模块用于对下位机实现在线升级;所述检测ICD模型文件模块是检测ICD模型文件是否符合DL/T860标准。本发明具有可以根据现场不同现象的问题使用辅助软件快速生成不同的IED模型文件优点。

Description

一种变电站电源用DL/T860模型辅助系统及其工作方法
技术领域
本发明适用于电力系统及其相关应用环境下,网络设备的集中管理领域,适用于变电站系统的网络设备集中管理,尤其涉及一种变电站电源用DL/T860模型辅助系统及其工作方法。
背景技术
IEC61850进入工程化应用阶段后,编辑智能电子设备IED(intelligentelectronic device,以下简称IED)模型文件的工作量很大。目前IED性能描述文件都是采用手动编辑生成,其编辑工作量大,易出错,不适合在IEC61850工程化应用阶段使用。变电站站用电源装置与后台通常属于不同的供应商,在对接时出现对接不上、数据无法上送、数据上送不全等问题。原有的IED模型文件往往规模比较庞大,后台加载时速度缓慢耗时长,不利于问题的快速定位。
现有技术中存在的技术缺陷是:
1、原有的IED模型文件往往规模比较庞大,后台加载时速度缓慢耗时长,不利于问题的快速定位。
2、目前IED性能描述文件都是采用手动编辑的方式生成,其编辑工作量大,易出错。
3、变电站站用电源装置与后台通常属于不同的供应商,在对接时出现对接不上、数据无法上送、数据上送不全等各种各样的问题。
发明内容
本发明的目的就是为了解决上述问题,提供一种站用电源用DL/T860模型辅助系统及其工作方法,它具有可以根据现场不同现象的问题使用辅助软件快速生成不同的IED模型文件优点。
为了实现上述目的,本发明采用如下技术方案:
一种变电站电源用DL/T860模型辅助系统,包括生成ICD(IED capabilitydescription,以下简称ICD)文件模块、在线加载模块和检测ICD模型文件模块;
所述生成ICD文件模块根据用户的需求定制转发表,根据DL/T860标准生成ICD模型文件;
所述在线加载模块用于对下位机实现在线升级;
所述检测ICD模型文件模块是检测ICD模型文件是否符合DL/T860标准。
一种变电站电源用DL/T860模型辅助系统的工作方法,包括如下步骤:
步骤(1):读转发表和映射策略文件;
步骤(2):判断是否需要重新生成IED模型文件;如果是就进入步骤(3);如果否就进入步骤(4);
步骤(3):显示转发表,将需要生成的测点从转发表区域拖拽到生成区域;根据DL/T860标准生成IED模型文件;进入步骤(5);
步骤(4):判断下位机是否需要升级;如果是,启动在线加载,系统置“需加载”标志,设置需加载的设备的IP用户名密码或串口用户名密码;选择需要加载的文件;在线加载;结束;如果否直接退出,结束;
步骤(5):根据DL/T860标准判断检测模型文件是否成功,如果成功就进入步骤(4);如果失败就返回步骤(3)。
所述步骤(1)的转发表用于存放向后台转发的测点表的文件。
所述步骤(1)的映射策略文件用于使转发表中的测点与IED模型文件中的测点一一对应的文件。
所述ICD文件是指:IED性能描述文件。
所述IED模型文件是指:即IED性能描述文件,是从智能电子设备配置工具到系统配置工具的数据交换,该文件描述了智能电子设备的能力。为描述智能电子设备的全部能力,这个文件应确切地包含智能电子设备段落。进一步,该文件还包含有所需数据类型模板,包括逻辑节点类型规定,还可能有可选变电站段落。
本发明的有益效果:
1可以根据现场不同现象的问题使用辅助软件快速生成不同的IED模型文件。
2生成IED模型文件时只需要简单的拖拽勾选,提高IED模型文件的正确性,大幅度减少编辑时间。
3如果IED模型文件升级变化,可以使用本软件将IED模型文件在线加载到装置中。可以使用此软件实现任何文件的在线加载功能。
附图说明
图1为辅助软件系统框图;
图2为辅助软件流程图。
具体实施方式
下面结合附图与实施例对本发明作进一步说明。
直流电源IED性能描述文件DC.icd和映射文件datamap.cfg生成和加载流程,如下图所示:
首先读取IED性能描述文件DC.icd和映射文件datamap.cfg,如果需要重新生成DC.icd和datamap.cfg,显示可以转发的全部测点,将需要的测点模块电压、模块电流拖拽到生成区域,点击生成DC.icd和datamap.cfg,然后检测DC.icd和datamap.cfg。
在线加载流程:DC.icd和datamap.cfg检测成功后,设置需要加载的设备的ip(192.168.1.111)、用户名(root)、密码(dc),选择加载文件DC.icd、datamap.cfg、DC.exe,启动加载,提示加载成功后结束。
为解决上述问题,本发明提供一种站用电源用860模型辅助软件实现方法,根据转发表文件、映射策略文件生成IED模型文件。具体的流程图如图1所示:
本软件在线加载功能不仅局限于加载IED模型文件,任何文件都可以使用此软件在线加载。可以通过RS485、RS232或网络建立链接。
如图1所示:一种变电站电源用DL/T860模型辅助系统,包括生成ICD文件模块、在线加载模块和检测ICD模型文件模块;
所述生成ICD文件模块根据用户的需求定制转发表,根据DL/T860标准生成ICD模型文件;
所述在线加载模块用于对下位机实现在线升级;
所述检测ICD模型文件模块是检测ICD模型文件是否符合DL/T860标准。
如图2所示:一种变电站电源用DL/T860模型辅助系统的工作方法,包括如下步骤:
步骤(1):读转发表和映射策略文件;
步骤(2):判断是否需要重新生成IED模型文件;如果是就进入步骤(3);如果否就进入步骤(4);
步骤(3):显示转发表,将需要生成的测点从转发表区域拖拽到生成区域;根据DL/T860标准生成IED模型文件;进入步骤(5);
步骤(4):判断下位机是否需要升级;如果是,启动在线加载,系统置“需加载”标志,设置需加载的设备的IP用户名密码或串口用户名密码;选择需要加载的文件;在线加载;结束;如果否直接退出,结束;
步骤(5):根据DL/T860标准判断检测模型文件是否成功,如果成功就进入步骤(4);如果失败就返回步骤(3)。
所述步骤(1)的转发表用于存放向后台转发的测点表的文件。
所述步骤(1)的映射策略文件用于使转发表中的测点与IED模型文件中的测点一一对应的文件。
上述虽然结合附图对本发明的具体实施方式进行了描述,但并非对本发明保护范围的限制,所属领域技术人员应该明白,在本发明的技术方案的基础上,本领域技术人员不需要付出创造性劳动即可做出的各种修改或变形仍在本发明的保护范围以内。

Claims (1)

1.一种变电站电源用DL/T860模型辅助系统的工作方法,所述系统包括生成ICD文件模块、在线加载模块和检测ICD模型文件模块;所述生成ICD文件模块根据用户的需求定制转发表,根据DL/T860标准生成ICD模型文件;所述在线加载模块用于对下位机实现在线升级;所述检测ICD模型文件模块是检测ICD模型文件是否符合DL/T860标准;其特征是,所述工作方法包括如下步骤:
步骤(1):读转发表和映射策略文件;所述转发表用于存放向后台转发的测点表的文件;所述映射策略文件用于使转发表中的测点与IED模型文件中的测点一一对应的文件;
步骤(2):判断是否需要重新生成IED模型文件;如果是就进入步骤(3);如果否就进入步骤(4);
步骤(3):显示转发表,将需要生成的测点从转发表区域拖拽到生成区域;根据DL/T860标准生成IED模型文件;进入步骤(5);
步骤(4):判断下位机是否需要升级;如果是,启动在线加载,系统置“需加载”标志,设置需加载的设备的IP用户名密码或串口用户名密码;选择需要加载的文件;在线加载;结束;如果否直接退出,结束;
步骤(5):根据DL/T860标准判断检测模型文件是否成功,如果成功就进入步骤(4);如果失败就返回步骤(3)。
CN201510007835.4A 2015-01-07 2015-01-07 一种变电站电源用dl/t860模型辅助系统及其工作方法 Active CN104504217B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510007835.4A CN104504217B (zh) 2015-01-07 2015-01-07 一种变电站电源用dl/t860模型辅助系统及其工作方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510007835.4A CN104504217B (zh) 2015-01-07 2015-01-07 一种变电站电源用dl/t860模型辅助系统及其工作方法

Publications (2)

Publication Number Publication Date
CN104504217A CN104504217A (zh) 2015-04-08
CN104504217B true CN104504217B (zh) 2017-06-20

Family

ID=52945614

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510007835.4A Active CN104504217B (zh) 2015-01-07 2015-01-07 一种变电站电源用dl/t860模型辅助系统及其工作方法

Country Status (1)

Country Link
CN (1) CN104504217B (zh)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111859043A (zh) * 2020-07-30 2020-10-30 积成电子股份有限公司 一种gsp通信报文解析方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630865A (zh) * 2009-08-19 2010-01-20 江苏省电力公司淮安供电公司 数字化变电站保护组态与工程配置一体化平台
CN101989312A (zh) * 2010-11-18 2011-03-23 江苏省电力设计院 基于cad的图形化智能变电站模型设计方法
CN102495841A (zh) * 2011-11-14 2012-06-13 深圳市华力特电气股份有限公司 一种电力系统监控方法以及相关装置

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005284811A (ja) * 2004-03-30 2005-10-13 Chugoku Electric Power Co Inc:The 施設名称付与の判定方法およびその判定装置
WO2008058188A2 (en) * 2006-11-08 2008-05-15 Hunt Power, L.P. System and method for managing investments in infrastructure assets

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101630865A (zh) * 2009-08-19 2010-01-20 江苏省电力公司淮安供电公司 数字化变电站保护组态与工程配置一体化平台
CN101989312A (zh) * 2010-11-18 2011-03-23 江苏省电力设计院 基于cad的图形化智能变电站模型设计方法
CN102495841A (zh) * 2011-11-14 2012-06-13 深圳市华力特电气股份有限公司 一种电力系统监控方法以及相关装置

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
Research on Technologies in Smart Substation;Hongwei Li, et al;《Energy Procedia 12》;20111231;第113–119页 *
基于DL_T860的智能变电站一体化电源程序化控制研究与实践;王洪等;《华北电力技术》;20131231(第12期);第20-24页 *

Also Published As

Publication number Publication date
CN104504217A (zh) 2015-04-08

Similar Documents

Publication Publication Date Title
CN104360951B (zh) 一种脚本测试方法和装置
CN106228338B (zh) 一种配电工程智能化设计综合服务系统及使用方法
CN102436534B (zh) 一种电力系统仿真方法
CN104459385A (zh) 继电保护自动测试方法
CN109146253A (zh) 一种智能化自动开票和防护闭锁的交互操作系统
CN104953707A (zh) 一种用于监控操作票的智能防误方法及系统
CN109782724A (zh) 防误闭锁的控制方法及终端设备
CN104504217B (zh) 一种变电站电源用dl/t860模型辅助系统及其工作方法
CN102479359A (zh) 基于图形操作的电网检修计划编制方法
CN115328053B (zh) 一种基于核电厂安全级dcs系统的权限实现方法
CN104243218B (zh) 一种基于多调度约束的电力系统通信方式单编制方法
CN105868410A (zh) 一种模型驱动的智能变电站scd文件与调控主站cim/e文件转换工具及其方法
CN110209722A (zh) 一种用于数据交换的数据接口
CN109656589A (zh) 一种智能变电站二次设备软件管控方法及系统
CN116010398A (zh) 基于站线变户关系构建电力负荷建模数据的方法及系统
CN104036338A (zh) 基于数据库的bpa数据分布式管理的方法
CN114239195A (zh) 一种电气仿真自动建模方法、装置及可读存储介质
CN103606023A (zh) 一种电力系统设备新投资料基于图形平台的管理方法
CN207867479U (zh) 一种基于nfc的人机交互系统
CN112670942A (zh) 一种配网系统继电保护整定计算及数据管理系统
CN109800944B (zh) 一种基于云计算的调度员潮流计算方法
CN110508912B (zh) 点焊机的动态规划管理方法及管理系统
CN109657332B (zh) 一种大规模电网电磁暂态自动建模的分网解耦方法及系统
CN106451425B (zh) 一种微电网的自动建模方法和装置
CN102087506B (zh) 原油管输工艺过程模拟与自动化测试方案编制系统及其自动生成方法

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 250101 Electric Power Intelligent Robot Production Project 101 in Jinan City, Shandong Province, South of Feiyue Avenue and East of No. 26 Road (ICT Industrial Park)

Patentee after: National Network Intelligent Technology Co., Ltd.

Address before: 250101 Shandong city of Ji'nan province high tech Zone (Lixia District) Xinluo Avenue No. 2008 silver bearing building B block 626

Patentee before: Shandong Luneng Intelligent Technology Co., Ltd.

CP03 Change of name, title or address
TR01 Transfer of patent right

Effective date of registration: 20210107

Address after: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province

Patentee after: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch

Address before: 250101 power intelligent robot production project 101 south of Feiyue Avenue and east of No.26 Road (in ICT Industrial Park) in Suncun District of Gaoxin, Jinan City, Shandong Province

Patentee before: National Network Intelligent Technology Co.,Ltd.

TR01 Transfer of patent right
CP01 Change in the name or title of a patent holder

Address after: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province

Patentee after: Shandong luruan Digital Technology Co.,Ltd. smart energy branch

Address before: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province

Patentee before: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch

CP01 Change in the name or title of a patent holder