CN104502752B - A kind of integrated form simulates electric power experimental provision - Google Patents

A kind of integrated form simulates electric power experimental provision Download PDF

Info

Publication number
CN104502752B
CN104502752B CN201410767429.3A CN201410767429A CN104502752B CN 104502752 B CN104502752 B CN 104502752B CN 201410767429 A CN201410767429 A CN 201410767429A CN 104502752 B CN104502752 B CN 104502752B
Authority
CN
China
Prior art keywords
switch
load
generator
control
test
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410767429.3A
Other languages
Chinese (zh)
Other versions
CN104502752A (en
Inventor
杨书伟
曹文华
荣耀峰
卢建渠
周安东
赵平桥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGDONG JIYA ELECTRICAL Co Ltd
Original Assignee
GUANGDONG JIYA ELECTRICAL Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGDONG JIYA ELECTRICAL Co Ltd filed Critical GUANGDONG JIYA ELECTRICAL Co Ltd
Priority to CN201410767429.3A priority Critical patent/CN104502752B/en
Publication of CN104502752A publication Critical patent/CN104502752A/en
Application granted granted Critical
Publication of CN104502752B publication Critical patent/CN104502752B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Tests Of Circuit Breakers, Generators, And Electric Motors (AREA)
  • Testing Electric Properties And Detecting Electric Faults (AREA)

Abstract

The invention discloses a kind of integrated form to simulate electric power experimental provision, the control to each switch control device on experimental test circuit is realized by PC control main frames, industry control card, can sequentially it be tested according to the experimental procedure that PC control main frames are set, user only needs connecting test device, the Selection experiment content in PC control main frames, you can be automatically performed experiment, test efficiency is high, be not in mistake, using effect is good, avoids the device failure caused by experimental procedure operating mistake.

Description

A kind of integrated form simulates electric power experimental provision
Technical field
The present invention relates to a kind of integrated form to simulate electric power experimental provision.
Background technology
Tested at present for electric power experiment such as arc discharge, typically using manual wiring or the manually side of button control The step of formula is tested, and experimenter needs to keep each test firmly in mind simultaneously carries out manual test according to testing procedure, not only tests Process is slow, and easily causes entirely to test needs because of the mistake of testing procedure and reform, or even occurs due to step Operating mistake and the damage for causing device.
The content of the invention
To solve the above problems, it is an object of the invention to provide a kind of full-automatic integrated form simulation for realizing testing procedure Electric power experimental provision.
Technical scheme is used by the present invention solves its problem:
A kind of integrated form simulates electric power experimental provision, including experiment control system and experimental test circuit, the experiment control System processed includes PC control main frames and the display device, external control equipment, industry control card and the data collector cards that are connected with PC control main frames, The industry control card is connected by auxiliary reclay with the switch control device on experimental test circuit, and the Data Collection card passes through Induction module is collected to the test data of experimental test circuit, during experiment, opens the control interface in PC control main frames, choosing Select into corresponding experiment, the switch control device that industry control card is automatically controlled by auxiliary reclay on experimental test circuit is carried out Experiment, induction module is transmitted test data into PC control main frames by Data Collection card, and shows examination on the display device Test data.
Further, the experimental test circuit is the test circuit for testing arc fault detector, including exchange is defeated Entering end and arc fault detector, in addition to load circuit, the ac input end, load circuit form load access loop, The arc fault detector is attempted by between ac input end and load circuit, the arc fault detector and load circuit Between be additionally provided with arc fault generator, power switch, the arc fault detector are provided with the ac input end The detector switch for accessing arc detector is provided between ac input end, is provided with the load access loop For accessing the adjustment load access switch of load, the arc fault generator connects with arc fault detector, adjustment load Enter to be respectively arranged with the first generator access switch, the second generator access switch, the arc fault generator between switching Both ends be arranged in parallel shorting switch, the PC control main frames pass through auxiliary reclay and described power switch, visited respectively Device switch, adjustment load access switch, the first generator access switch, the second generator access switch and shorting switch is surveyed to connect Connect, ammeter and voltmeter are provided with the ac input end, the ammeter and voltmeter pass through Data Collection card and PC Control main frame connects.
Further, the arc fault generator includes carbonized path electric arc test generator, the metallicity being arranged in parallel Contact arc tests generator and point contact arc test generator, and faulty choosing is set on branch road where each testing generator Switch is selected, the PC control main frames are connected by auxiliary reclay with described failure selecting switch.
Further, the load circuit includes multiple load resistances in parallel, is set on the branch road where each load resistance Load selector switch is equipped with, the PC control main frames are connected by auxiliary reclay with described load selector switch.
The beneficial effects of the invention are as follows:A kind of integrated form simulation electric power experimental provision that the present invention uses, is controlled by PC Main frame, industry control card realize the control to each switch control device on experimental test circuit, can be set according to PC control main frames Fixed experimental procedure is sequentially tested, and user only needs connecting test device, the Selection experiment content in PC control main frames, you can Experiment is automatically performed, test efficiency is high, is not in mistake, and using effect is good, avoids because experimental procedure operates mistake Device failure caused by by mistake.
Brief description of the drawings
The invention will be further described with example below in conjunction with the accompanying drawings.
Fig. 1 is the system principle diagram of the present invention;
Fig. 2 is the circuit theory diagrams of experimental test circuit of the present invention;
Fig. 3 is the program flow diagram in the embodiment of the present invention.
Embodiment
Reference picture 1- Fig. 3, a kind of integrated form of the invention simulation electric power experimental provision, including experiment control system and examination Test circuit is tested, display device, the external control that the experiment control system includes PC control main frames and is connected with PC control main frames are set Standby, industry control card and data collector cards, the industry control card pass through the switch control device on auxiliary reclay and experimental test circuit Connection, the Data Collection card is collected by induction module to the test data of experimental test circuit, during experiment, opens PC Control interface in control main frame, selection enter corresponding experiment, and industry control card automatically controls experimental test by auxiliary reclay Switch control device on circuit is tested, and induction module is transmitted test data to PC control main frames by Data Collection card In, and test data is shown on the display device.
The present invention realizes the control to each switch control device on experimental test circuit by PC control main frames, industry control card System, can sequentially it be tested according to the experimental procedure that PC control main frames are set, user only needs connecting test device, is controlled in PC Selection experiment content on main frame processed, you can experiment is automatically performed, test efficiency is high, is not in mistake, and using effect is good, Avoid the device failure caused by experimental procedure operating mistake.
Specifically, the specific embodiment of electric power experimental provision is simulated for above-mentioned integrated form, for testing arc fault detection Device 1 whether can normal work, the experimental test circuit is the test circuit for testing arc fault detector 1, including hand over Input and arc fault detector 1, in addition to load circuit are flowed, the ac input end, load circuit form load access Loop, the arc fault detector 1 are attempted by between ac input end and load circuit, the arc fault detector 1 with Arc fault generator is additionally provided between load circuit, power switch KM1, the electric arc are provided with the ac input end The detector switch KM2 for accessing arc detector is provided between fault detector 1 and ac input end, the load connects The adjustment load access switch KM3 for accessing load, the arc fault generator and arc fault are provided with entry loop The first generator access switch KM4, the access of the second generator are respectively arranged between detector 1, adjustment load access switch KM3 KM6 is switched, the both ends of the arc fault generator have been arranged in parallel shorting switch KM5, and the PC control main frames pass through respectively Auxiliary reclay connects with described power switch KM1, detector switch KM2, adjustment load access switch KM3, the first generator Enter to switch KM4, the second generator access switch KM6 connected with shorting switch KM5, be provided with ammeter on the ac input end 2 and voltmeter 3, the ammeter 2 and voltmeter 3 be connected by Data Collection card with PC control main frames.
Specifically, the arc fault generator includes carbonized path electric arc test generator 4, the metallicity being arranged in parallel Contact arc test generator 5 and point contact arc test generator 6, are each set faulty where test generator on branch road Selecting switch KM7, the PC control main frames are connected by auxiliary reclay with described failure selecting switch KM7.The load Circuit includes multiple load resistances in parallel, and load selector switch KM8 is provided with the branch road where each load resistance, described PC control main frames are connected by auxiliary reclay with described load selector switch KM8.
Shown in reference picture 3, the specific work process of the present embodiment is as follows:Pass through the external control equipment such as mouse, keyboard, touch-screen The test control software in PC control main frames is opened, into control interface, selects arc fault detector 1 to try in control interface Test, PC control main frames trigger auxiliary reclay by industry control card and worked, and close the power switch on experimental test circuit successively KM1, adjustment load access switch KM3, the first generator access switch KM4, the second generator access switch KM6 and shorting switch KM5, at this moment load access loop conducting, load circuit access circuit, shorting switch KM5 is by arc fault generator short circuit, so Selection afterwards needs the size of load accessed, and the triggering of the electric current of adjustment circuit, i.e. auxiliary reclay, which makes to load selection accordingly, opens KM8 closures, reselection starting the arc mode are closed, auxiliary reclay triggering closes corresponding failure selecting switch KM7, and Preparatory work of experiment is just Thread, click start to test, and simulation carries out the starting the arc, disconnect adjustment load access switch KM3 first, closure detector switch KM2 makes Arc fault detector 1 accesses circuit, disconnects shorting switch KM5, the power supply of arc fault generator is started working, simulates The data feedback of test to Data Collection card is converted into data signal into PC control main frames by arc, ammeter 2 and voltmeter 3, The data of test are shown on the display device.
It is described above, simply presently preferred embodiments of the present invention, the invention is not limited in above-mentioned embodiment, as long as It reaches the technique effect of the present invention with identical means, should all belong to protection scope of the present invention.

Claims (3)

1. a kind of integrated form simulates electric power experimental provision, it is characterised in that:Including experiment control system and experimental test circuit, institute Stating experiment control system includes PC control main frames and the display device being connected with PC control main frames, external control equipment, industry control card sum According to collector cards, the industry control card is connected by auxiliary reclay with the switch control device on experimental test circuit, the data Collector cards are collected by induction module to the test data of experimental test circuit, during experiment, are opened in PC control main frames Control interface, selection enter corresponding experiment, and industry control card automatically controls the switch on experimental test circuit by auxiliary reclay Control device is tested, and induction module is transmitted test data into PC control main frames by Data Collection card, and is being shown Test data is shown in equipment;The experimental test circuit is the test circuit for testing arc fault detector (1), including Ac input end and arc fault detector (1), in addition to load circuit, the ac input end, load circuit form load Loop is accessed, the arc fault detector (1) is attempted by between ac input end and load circuit, the arc fault detection Device (1) is additionally provided with arc fault generator between load circuit, and power switch is provided with the ac input end (KM1), the arc fault detector (1) is provided between ac input end opens for accessing the detector of arc detector Close (KM2), the adjustment load access switch (KM3) for accessing load, the electric arc are provided with the load access loop The first generator is respectively arranged between faulty generators and arc fault detector (1), adjustment load access switch (KM3) to connect Enter switch (KM4), the second generator access switch (KM6), the both ends of the arc fault generator have been arranged in parallel short circuit and opened Close (KM5), the PC control main frames pass through auxiliary reclay and described power switch (KM1), detector switch respectively (KM2), adjustment load access switch (KM3), the first generator access switch (KM4), the second generator access switch (KM6) and Shorting switch (KM5) connects, and is provided with ammeter (2) and voltmeter (3) on the ac input end, the ammeter (2) and Voltmeter (3) is connected by Data Collection card with PC control main frames.
A kind of 2. integrated form simulation electric power experimental provision according to claim 1, it is characterised in that:The arc fault hair Carbonized path electric arc test generator (4), metallic contact electric arc test generator (5) and the point that raw device includes being arranged in parallel connect Electric shock arc test generator (6), each test on the branch road of generator place set faulty selecting switch (KM7), the PC controls Main frame processed is connected by auxiliary reclay with described failure selecting switch (KM7).
A kind of 3. integrated form simulation electric power experimental provision according to claim 1, it is characterised in that:The load circuit bag Multiple load resistances in parallel are included, load selector switch (KM8), the PC controls are provided with the branch road where each load resistance Main frame processed is connected by auxiliary reclay with described load selector switch (KM8).
CN201410767429.3A 2014-12-11 2014-12-11 A kind of integrated form simulates electric power experimental provision Active CN104502752B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410767429.3A CN104502752B (en) 2014-12-11 2014-12-11 A kind of integrated form simulates electric power experimental provision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410767429.3A CN104502752B (en) 2014-12-11 2014-12-11 A kind of integrated form simulates electric power experimental provision

Publications (2)

Publication Number Publication Date
CN104502752A CN104502752A (en) 2015-04-08
CN104502752B true CN104502752B (en) 2018-03-06

Family

ID=52944163

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410767429.3A Active CN104502752B (en) 2014-12-11 2014-12-11 A kind of integrated form simulates electric power experimental provision

Country Status (1)

Country Link
CN (1) CN104502752B (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105067929B (en) * 2015-08-12 2018-01-30 中国航空工业集团公司西安飞机设计研究所 A kind of IHDC fire alarms overheat functional simulation verification method and its analogue means

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539483A (en) * 2009-04-29 2009-09-23 北京航空航天大学 Electric propulsion testing platform measurement control device
CN101846714A (en) * 2010-04-23 2010-09-29 武汉理工大学 Integrated detection system of electric appliances of cab
CN203117322U (en) * 2013-01-21 2013-08-07 宁波习羽电子发展有限公司 Fault arc carbonization track testing device
CN104198862A (en) * 2014-09-17 2014-12-10 公安部沈阳消防研究所 Alternating-current fault arc simulation experiment device and control method thereof

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101539483A (en) * 2009-04-29 2009-09-23 北京航空航天大学 Electric propulsion testing platform measurement control device
CN101846714A (en) * 2010-04-23 2010-09-29 武汉理工大学 Integrated detection system of electric appliances of cab
CN203117322U (en) * 2013-01-21 2013-08-07 宁波习羽电子发展有限公司 Fault arc carbonization track testing device
CN104198862A (en) * 2014-09-17 2014-12-10 公安部沈阳消防研究所 Alternating-current fault arc simulation experiment device and control method thereof

Also Published As

Publication number Publication date
CN104502752A (en) 2015-04-08

Similar Documents

Publication Publication Date Title
CN102253333B (en) Life tester for alternating-current contactor and control method thereof
CN105223478A (en) Based on the GIS partial discharge live detection test unit of defects simulation
CN209525407U (en) A kind of camera module abnormal detection circuit, device and camera module tester
CN106774241A (en) The Auto-Test System and method of testing of high voltage transducer power unit control panel
CN205080231U (en) Electrified testing device of GIS partial discharge based on defects simulation
CN208818807U (en) Exit relay performance test apparatus and test macro
CN207096364U (en) A kind of Experiments of Electricity short circuit detection means
CN103997644A (en) Automatic LCD TV control mainboard testing device
CN104502752B (en) A kind of integrated form simulates electric power experimental provision
CN103439072B (en) A kind of electronic current mutual inductor soupling vibration test unit and method thereof
CN206248799U (en) A kind of battery test system
CN205786895U (en) A kind of inverter and charging device integrated detection system
CN108152638A (en) A kind of multistage charging aging equipment
CN205880090U (en) Alternating -current charging stake field inspection device
CN207424128U (en) For low tension switch and control device harmonic wave jamming immunity tester
CN206848324U (en) A kind of station apparatus of electronic component anti-aging test
CN103592552A (en) Instrument and method for testing characteristics of overvoltage protection device
CN208432695U (en) A kind of high temperature ageing test macro
CN104569687B (en) Capacitor group fault locator
CN206906432U (en) A kind of electric energy meter pressure test rapid wiring device
CN203759220U (en) Power supply test device and control circuit thereof
CN205786930U (en) A kind of electronic power transformer electric energy quality detection device
CN206248734U (en) Test simulation device for simulating the wet arc fault of aviation
CN206348400U (en) Multichannel small-sized household inverter efficiency detecting system
CN205826811U (en) A kind of aging testing system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of invention: An integrated analog power experimental device

Effective date of registration: 20211206

Granted publication date: 20180306

Pledgee: Industrial and Commercial Bank of China Limited Enping sub branch

Pledgor: GUANGDONG JIYA ELECTRICAL Co.,Ltd.

Registration number: Y2021980014166

PC01 Cancellation of the registration of the contract for pledge of patent right
PC01 Cancellation of the registration of the contract for pledge of patent right

Granted publication date: 20180306

Pledgee: Industrial and Commercial Bank of China Limited Enping sub branch

Pledgor: GUANGDONG JIYA ELECTRICAL Co.,Ltd.

Registration number: Y2021980014166