CN104502060A - 一种双墩柱局部冲刷特性的确定方法 - Google Patents

一种双墩柱局部冲刷特性的确定方法 Download PDF

Info

Publication number
CN104502060A
CN104502060A CN201410729082.3A CN201410729082A CN104502060A CN 104502060 A CN104502060 A CN 104502060A CN 201410729082 A CN201410729082 A CN 201410729082A CN 104502060 A CN104502060 A CN 104502060A
Authority
CN
China
Prior art keywords
pier
pier stud
downstream
scouring
upstream
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201410729082.3A
Other languages
English (en)
Other versions
CN104502060B (zh
Inventor
唐洪武
王浩
刘全帅
王瑶
刘震
张立
何智博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hohai University HHU
Original Assignee
Hohai University HHU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hohai University HHU filed Critical Hohai University HHU
Priority to CN201410729082.3A priority Critical patent/CN104502060B/zh
Publication of CN104502060A publication Critical patent/CN104502060A/zh
Application granted granted Critical
Publication of CN104502060B publication Critical patent/CN104502060B/zh
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本发明提供了一种双墩柱局部冲刷特性的确定方法,在可变坡循环玻璃水槽中进行简化模型试验,通过改变上下游墩柱间距及水流条件设置试验工况,以上下游墩柱局部冲刷坑深度为特征参量,分析不同间距条件下冲坑深度~水流强度的关系与单墩柱条件下的区别,进而具体分析上下游墩柱局部冲刷特性,结果表明,上游墩柱与单一墩柱规律相同,下游墩柱冲刷特性则划分为床面平整、同步冲刷、偏离过渡和完全偏离四个区。本发明通过水槽模型试验获得上下游桥墩冲坑深度随水流条件的变化规律,为桥梁的合理规划布置提供了依据,可以减轻桥墩冲刷破坏并缓解城市防洪等的压力,同时为进行桥梁等涉河工程群累积影响评估提供理论参考。

Description

一种双墩柱局部冲刷特性的确定方法
技术领域
本发明属于涉河工程技术领域,涉及桥墩冲刷问题,具体涉及一种双墩柱局部冲刷特性的确定方法。
背景技术
天然河道中桥梁的兴建必然导致桥墩附近水沙状况的变化。墩前向下水流、墩侧马蹄涡及墩后尾涡等水流结构的出现,使墩柱周围床面出现相应调整从而形成冲刷坑,危及建筑物自身的稳定和安全,并对附近河段的河势产生影响,因此桥墩冲刷在工程实践中受到特别的重视。随着近年来社会经济的发展,河流上的桥梁数量不断增多,在城市河段更为密集,使得在水沙特性变化的问题上,桥梁之间的累积影响日益凸显,这对城市防洪安全、航运问题、桥梁自身安全等都形成新的威胁。由于在以往研究中研究对象多为单个桥墩或单座桥梁,对于桥梁群的相关研究亟待展开,就桥墩冲刷问题而言,在桥梁群条件下必定表现出与单个桥墩或单座桥梁迥异的特性,因此需要予以确定。
发明内容
发明目的:为了克服现有技术中存在的不足,本发明提供一种双墩柱局部冲刷特性的确定方法,为桥梁群的合理规划及优化布置提供参考,并为揭示涉河工程群累积影响提供依据。
技术方案:为解决上述技术问题,本发明提供的一种双墩柱局部冲刷特性的确定方法,在可变坡循环玻璃水槽中进行简化模型试验,通过改变上下游墩柱间距及水流条件设置试验工况,以上下游墩柱局部冲刷坑深度为特征参量,分析不同间距条件下冲坑深度~水流强度的关系与单墩柱条件下的区别,进而具体分析上下游墩柱冲刷特性。
具体地,将不同墩间距条件下冲坑相对深度与相对流速的试验数据绘制于同一图中,根据试验点与单墩柱冲刷规律偏离程度间的不同进行分区:
1)床面平整区:整个床面均无冲坑形成。
2)同步冲刷区:上下游墩柱同时开始形成冲坑,且符合单一墩柱冲刷特性,这时上下游墩柱的冲刷特性均可由下式描述:
d s D = 2.865 U U C - 1.332
式中,ds为冲刷坑深度,D为桥墩墩径,u为来流垂线平均流速,Uc为泥沙起动流速;
3)偏离过渡区:下游墩柱冲坑深度小于相同水流条件下单墩柱冲坑的深度;过渡区范围随着间距的增大先增大后减小,在本次试验中当墩间距为3倍墩径时达到最大。
4)完全偏离区:下游墩柱冲刷特性重新回归到线性规律,且其点据分布与公式(1)的直线呈平行关系,这时下游墩柱的冲刷特性可由下式表示:
d s D = 2.865 U U C - A
其中常数A与墩间距相关。
具体地,采用外贴刻度纸的光滑透明圆柱形有机玻璃管模拟桥墩墩柱,将粒径均匀的石英砂平铺形成床面,铺砂段的两端分别设置水流渐变导板和床沙挡板,通过水泵、闸门及底坡的调节在水槽内获得恒定均匀流,用超声波流量计测量流量Q,用声学多普勒流速仪测量垂线平均流速u,通过桥墩处床面对应刻度的变化测量冲刷坑的深度。
具体地,所述变坡循环玻璃水槽长12m,宽0.42m,高0.7m,其试验段长6m设置在水槽中部;所述有机玻璃管高70cm,外径6cm,外贴刻度纸最小刻度为1mm;所述床面的石英砂粒径为0.70mm,密度为ρs=2.64g/cm3,铺沙厚度为15cm,每次试验前床面均重新铺平;试验水深h选择12cm和15cm两种,桥墩间距d选取0~15倍墩径,共进行试验141组。
具体地,所述每组试验开始前通过水泵预先小流量注入水体,以润湿泥沙并保护床面初始形态,然后通过水泵、闸门及底坡的调节获得恒定均匀流;每组试验持续冲刷至少5个小时,认为冲刷达到平衡。
具体地所述超声波流量计测量误差小于5%,所述声学多普勒流速仪在距离水面0.63h处测量平均流速
有益效果:相比现有技术,本发明的有点和有益效果为:
1.通过水槽模型试验,确定了双墩柱条件下上下游墩柱局部冲刷特性与单墩柱之间的差异,尤其对下游墩柱附近的冲刷过程进行分区。结果表明,上游墩柱冲刷特性与单一墩柱基本吻合,而下游墩柱冲刷特性则因上游墩柱的影响而存在明显的差异,根据其与单一墩柱冲刷规律的偏离程度,将下游墩柱冲刷特性划分为床面平整、同步冲刷、偏离过渡和完全偏离四个区。
2.为进行桥梁等涉河工程群累积影响评估提供理论参考,为当前河流上日益增多的桥梁的合理规划布置提供了依据,从而减轻桥墩冲刷破坏并缓解城市防洪等的压力。
除了以上所述的本发明解决的技术问题、构成技术方案的技术特征以及由这些技术方案的技术特征所带来的优点外,本发明的一种双墩柱局部冲刷特性的确定方法所能解决的其他技术问题、技术方案中包含的其他技术特征以及这些技术特征带来的优点,将结合附图做出进一步详细的说明。
附图说明
图1是本发明实施例水槽试验段的主视图;
图2是图1的俯视图;
图3为单个桥墩及双墩间距为0时的冲刷特性;
图4为水深12cm双墩柱条件时上游墩柱冲刷特性;
图5为水深15cm双墩柱条件时上游墩柱冲刷特性;
图6为墩间距d=1~3D双墩柱条件时下游墩柱冲刷特性;
图7为墩间距d=3~15D双墩柱条件时下游墩柱冲刷特性;
图中,1水槽,2墩柱,3床面,4水流渐变导板,5床沙挡板。
具体实施方式
实施例:
本实施例的水槽模型试验装置如图1和图2所示,采用变坡循环玻璃水槽。其中水槽1长12m,宽0.42m,高0.7m,试验段长6m;桥墩的墩柱2采用光滑透明的圆柱形有机玻璃管进行模拟,管高70cm,外径6cm,外贴刻度纸最小刻度为1mm;床面3采用粒径为0.70mm的均匀石英砂平铺而成,石英砂密度为ρs=2.64g/cm3,铺沙厚度为15cm,铺沙段前后两端分别设置水流渐变导板4和床沙挡板5,每次试验前床面3均重新铺平。
试验水深h选择12cm和15cm两种,上下游桥墩间距d选取0~15倍杆径,共进行141组试验,工况参数如表1所示。每组试验开始时,为防止试验初期水流破坏床面的平整形态,在试验开始前通过水泵预先向水槽内缓慢注入小流量水体,达到润湿泥沙并保护床面初始形态的目的。之后通过水泵、闸门及底坡的调节获得恒定均匀流;每组试验持续冲刷5个小时,冲刷近似达到平衡;试验中流量Q用超声波流量计进行测定,测量误差小于5%,垂线平均流速u采用声学多普勒流速仪(ADV)在距离水面0.63h处测量获得。形成冲刷坑后,通过桥墩处床面对应刻度的变化进行冲刷坑深度的测量。
为了分析双墩柱条件下上下游桥墩局部冲刷特性与单墩柱冲刷特性的差异,首先通过单墩柱试验验证试验系统的可靠性,然后对双墩柱情况按照不同墩间距进行试验,分别观测上下游墩柱的局部冲刷情况,分析其与单墩柱的差异。
单一墩柱的冲刷特性实验验证试验系统合理性的结果如图3所示,可见单一墩柱冲刷特性与经典成果Yee-Meng Chiew公式吻合较好,其具体形式如式(1)所示,需要说明的是由于这里采用的是石英砂而非天然沙,泥沙的物理特性不同,此处公式(1)中的系数比Yee-Meng Chiew提出的公式系数偏小。
d s D = 2.865 U U C - 1.332 - - - ( 1 )
其中ds为冲刷坑深度,D为桥墩墩径;u为来流垂线平均流速,uc为传统定义的清水冲刷到动床冲刷的临界值,即泥沙起动流速,此处采用沙莫夫公式进行计算,具体形式如下:
U c = 1.14 gh γ s - γ γ ( d g h ) 1 / 6 - - - ( 2 )
其中γs为泥沙重度,γ为水的重度,g为重力加速度,dg为泥沙粒径,h为水深。本次试验不同水深对应的泥沙起动流速Uc分别为28.01cm/s及29.21cm/s。
如图4和图5所示,对于双墩柱条件,当墩间距为0时,本质上是一个墩柱,只是墩柱形状不同,其冲刷特性与单一圆柱形墩柱相差不多。随着两墩间距逐渐增加,上游墩柱冲坑相对深度随相对流速的散点分布与单一墩柱冲刷曲线吻合较好,说明下游墩柱的存在并不会对上游墩柱的冲刷特性形成明显的影响。
如图6和图7所示,对于下游墩柱,由于上游墩柱的存在导致其来流条件发生明显变化,在不同的墩间距及水流强度条件下,上游墩柱所形成的马蹄涡及卡门尾涡与下游墩柱周围的水流形成不同程度的叠加,使得下游墩柱局部冲刷特性表现出与单一墩柱存在明显差异。对于某一墩间距,随着水流条件的加强,可将下游墩柱冲刷特性划分为4个阶段:
1)床面平整阶段:整个床面均无冲坑形成。
2)同步冲刷阶段:上下游墩柱同时开始形成冲坑,且符合单一墩柱冲刷特性,此时下游墩柱冲刷特性可由公式(1)描述。
3)偏离过渡阶段:由于上游墩坑泥沙的补给,下游墩柱冲坑深度小于相同水流条件下单墩柱冲坑的深度;这一阶段的范围随着间距的增大先增大后减小,在本次试验中当墩间距为3倍墩径时达到最大。
4)完全偏离阶段:下游墩柱冲刷特性重新回归到线性规律,且其点据分布与公式(1)的直线呈平行关系,这时下游墩柱的冲刷特性可由下式表示:
d s D = 2.865 U U C - A - - - ( 3 )
其中常数A与墩间距有关。
将不同墩间距条件下实验数据绘制在同一张图上,即可按照上述阶段划分的原则将墩柱冲刷特性划分为图7中的三个阶段:同步冲刷阶段、偏离过渡阶段及完全偏离阶段。
表1
以上结合附图对本发明的实施方式做出详细说明,但本发明不局限于所描述的实施方式。对本领域的普通技术人员而言,在本发明的原理和技术思想的范围内,对这些实施方式进行实施方式进行多种变化、修改、替换和变形仍落入本发明的保护范围内。

Claims (6)

1.一种双墩柱局部冲刷特性的确定方法,其特征在于:在可变坡循环玻璃水槽中进行简化模型试验,通过改变上下游墩柱间距及水流条件设置试验工况,以上下游墩柱局部冲刷坑深度为特征参量,分析不同间距条件下冲坑深度~水流强度的关系与单墩柱条件下的区别,进而具体分析上下游墩柱冲刷特性。
2.根据权利要求1所述的一种双墩柱局部冲刷特性的确定方法,其特征在于:将不同墩间距条件下冲坑相对深度与相对流速的试验数据绘制于同一图中,根据试验点与单墩柱冲刷规律偏离程度间的不同进行分区:
1)床面平整区:整个床面均无冲坑形成;
2)同步冲刷区:上下游墩柱同时开始形成冲坑,且符合单一墩柱冲刷特性,这时上下游墩柱的冲刷特性均可由下式描述:
d s D = 2.865 U U C - 1.332
式中,ds为冲刷坑深度,D为桥墩墩径,U为来流垂线平均流速,Uc为泥沙起动流速;
3)偏离过渡区:下游墩柱冲坑深度小于相同水流条件下单墩柱冲坑的深度;
4)完全偏离区:下游墩柱冲刷特性重新回归到线性规律,且其点据分布与公式(1)的直线呈平行关系,这时下游墩柱的冲刷特性可由下式表示:
d s D = 2.865 U U C - A
其中常数A与墩间距相关。
3.根据权利要求1所述的一种双墩柱局部冲刷特性的确定方法,其特征在于:采用外贴刻度纸的光滑透明圆柱形有机玻璃管模拟桥墩墩柱,将粒径均匀的石英砂平铺形成床面,铺砂段的两端分别设置水流渐变导板和床沙挡板,通过水泵、闸门及底坡的调节在水槽内获得恒定均匀流,用超声波流量计测量流量Q,用声学多普勒流速仪测量垂线平均流速U,通过桥墩处床面对应刻度的变化测量冲刷坑的深度。
4.根据权利要求3所述的一种双墩柱局部冲刷特性的确定方法,其特征在于:所述变坡循环玻璃水槽长12m,宽0.42m,高0.7m,其试验段长6m设置在水槽中部;所述有机玻璃管高70cm,外径6cm,外贴刻度纸最小刻度为1mm;所述床面的石英砂粒径为0.70mm,密度为ρs=2.64g/cm3,铺沙厚度为15cm,每次试验前床面均重新铺平;试验水深h选择12cm和15cm两种,桥墩间距d选取0~15倍墩径,共进行试验141组。
5.根据权利要求3所述的一种双墩柱局部冲刷特性的确定方法,其特征在于:所述每组试验开始前通过水泵预先小流量注入水体,以润湿泥沙并保护床面初始形态,然后通过水泵、闸门及底坡的调节获得恒定均匀流;每组试验持续冲刷至少5个小时,认为冲刷达到平衡。
6.根据权利要求3所述的一种双墩柱局部冲刷特性的确定方法,其特征在于:所述超声波流量计测量误差小于5%,所述声学多普勒流速仪在距离水面0.63h处测量平均流速。
CN201410729082.3A 2014-12-04 2014-12-04 一种双墩柱局部冲刷特性的确定方法 Expired - Fee Related CN104502060B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410729082.3A CN104502060B (zh) 2014-12-04 2014-12-04 一种双墩柱局部冲刷特性的确定方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410729082.3A CN104502060B (zh) 2014-12-04 2014-12-04 一种双墩柱局部冲刷特性的确定方法

Publications (2)

Publication Number Publication Date
CN104502060A true CN104502060A (zh) 2015-04-08
CN104502060B CN104502060B (zh) 2017-02-22

Family

ID=52943480

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410729082.3A Expired - Fee Related CN104502060B (zh) 2014-12-04 2014-12-04 一种双墩柱局部冲刷特性的确定方法

Country Status (1)

Country Link
CN (1) CN104502060B (zh)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107066735A (zh) * 2017-04-05 2017-08-18 河海大学 一种确定双桥梁壅水累积影响范围的方法
CN107561239A (zh) * 2017-07-06 2018-01-09 中山大学 一种可控制水深与水流速度的底床冲刷实验方法
CN109612685A (zh) * 2019-01-15 2019-04-12 西南交通大学 用于水槽试验的流速和深度的一体化测量装置及方法
CN110926995A (zh) * 2019-12-31 2020-03-27 黄河水利委员会黄河水利科学研究院 一种并线桥墩局部冲刷物理模型试验方法
CN111289219A (zh) * 2020-02-25 2020-06-16 李熙 一种超临界流条件下基础局部冲刷的水槽试验方法
CN112304796A (zh) * 2020-10-20 2021-02-02 交通运输部广州打捞局 一种碎石面清淤试验方法

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100077303A (ko) * 2008-12-29 2010-07-08 대림산업 주식회사 교각의 세굴방지장치
CN102087360A (zh) * 2010-11-17 2011-06-08 北京交通大学 一种桥墩局部冲刷观测系统及方法
CN102864756A (zh) * 2012-09-10 2013-01-09 重庆交通大学 一种桥梁墩台最大冲刷深度的测控方法
TW201344012A (zh) * 2012-04-17 2013-11-01 jin-song Lai 橋墩減緩局部沖刷裝置
CN103438871A (zh) * 2013-09-03 2013-12-11 中国船舶重工集团公司第七一五研究所 一种高速水流环境下桥墩冲刷监测系统及实现方法

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20100077303A (ko) * 2008-12-29 2010-07-08 대림산업 주식회사 교각의 세굴방지장치
CN102087360A (zh) * 2010-11-17 2011-06-08 北京交通大学 一种桥墩局部冲刷观测系统及方法
TW201344012A (zh) * 2012-04-17 2013-11-01 jin-song Lai 橋墩減緩局部沖刷裝置
CN102864756A (zh) * 2012-09-10 2013-01-09 重庆交通大学 一种桥梁墩台最大冲刷深度的测控方法
CN103438871A (zh) * 2013-09-03 2013-12-11 中国船舶重工集团公司第七一五研究所 一种高速水流环境下桥墩冲刷监测系统及实现方法

Non-Patent Citations (3)

* Cited by examiner, † Cited by third party
Title
周益人等: "不规则波作用下墩柱周围局部冲刷研究", 《泥沙研究》 *
李梦龙等: "潮汐河段桥墩局部冲刷深度的试验研究", 《水道港口》 *
田发美: "多级圆柱桥墩局部冲刷试验研究", 《中国优秀硕士学位论文全文数据库工程科技II辑》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107066735A (zh) * 2017-04-05 2017-08-18 河海大学 一种确定双桥梁壅水累积影响范围的方法
CN107561239A (zh) * 2017-07-06 2018-01-09 中山大学 一种可控制水深与水流速度的底床冲刷实验方法
CN109612685A (zh) * 2019-01-15 2019-04-12 西南交通大学 用于水槽试验的流速和深度的一体化测量装置及方法
CN110926995A (zh) * 2019-12-31 2020-03-27 黄河水利委员会黄河水利科学研究院 一种并线桥墩局部冲刷物理模型试验方法
CN111289219A (zh) * 2020-02-25 2020-06-16 李熙 一种超临界流条件下基础局部冲刷的水槽试验方法
CN111289219B (zh) * 2020-02-25 2021-08-27 李熙 一种超临界流条件下基础局部冲刷的水槽试验方法
CN112304796A (zh) * 2020-10-20 2021-02-02 交通运输部广州打捞局 一种碎石面清淤试验方法
CN112304796B (zh) * 2020-10-20 2024-05-14 广州打捞局 一种碎石面清淤试验方法

Also Published As

Publication number Publication date
CN104502060B (zh) 2017-02-22

Similar Documents

Publication Publication Date Title
CN104502060A (zh) 一种双墩柱局部冲刷特性的确定方法
Teraguchi et al. Effects of hydraulic structures on river morphological processes
Dey et al. Experimental study on bank erosion and protection using submerged vane placed at an optimum angle in a 180 laboratory channel bend
CN103898863B (zh) 一种研究非淹没刚性植物条件下泥沙起动的方法
CN106599374A (zh) 一种适用于径流潮汐河口段的河相关系及其推导方法
CN104933268A (zh) 一种基于一维非恒定流数值模型的洪水分析方法
Li et al. Influence of auxiliary geometric parameters on discharge capacity of piano key weirs
Heng et al. Prediction formulas of maximum scour depth and impact location of a local scour hole below a chute spillway with a flip bucket
Maleki et al. Scour due to a falling plane jet: a comprehensive approach
CN104596735B (zh) 一种桥梁群的优化布置方法
Zhang et al. Modified Saint-Venant equations for flow simulation in tidal rivers
Gong et al. Sediment transport following water transfer from Yangtze River to Taihu Basin
Yang et al. Experimental and numerical investigation of flow over a spillway bend with different combinations of permeable spur dikes
Maritz et al. Modelling of composite type variation of the Crump weir: environmental engineering
Eklund CFD modelling of ski-jump spillway in Stornnforsen
Šikšnys et al. Numerical and field investigations of local bridge abutment scour and unsteady downstream river flow from a nearby hydropower plant
Aliakbari et al. Study and simulation of hydraulic and structural changes result of changing of section from soil to concrete.
Bennett et al. Use of CFD for modelling spillway performance
Dou et al. Numerical simulations of flow and sediment transport within the Ning-Meng reach of the Yellow River, northern China
Svsndl et al. Simulation of flow behavior around bridge piers using ANSYS–CFD
Yılmaz Hydraulic characteristics of modified tyrolean type intakes
ZHAO et al. Hydrodynamic Erosion in Overtopping Breach of Cohesive Embankments
Fiorotto et al. Scour on alluvial bed downstream of falling jets
Shrestha Numerical Modelling of Hydraulics and Sediment at the Headworks of Kali Gandaki A Hydropower Plant, Nepal
Mendoza et al. Numerical modeling of dune progression in a high-amplitude meandering channel

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170222

Termination date: 20191204

CF01 Termination of patent right due to non-payment of annual fee