CN104501789A - Plumb line setting method - Google Patents

Plumb line setting method Download PDF

Info

Publication number
CN104501789A
CN104501789A CN201410555806.7A CN201410555806A CN104501789A CN 104501789 A CN104501789 A CN 104501789A CN 201410555806 A CN201410555806 A CN 201410555806A CN 104501789 A CN104501789 A CN 104501789A
Authority
CN
China
Prior art keywords
plumb
plumb line
line
weight
lines
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410555806.7A
Other languages
Chinese (zh)
Inventor
韦浩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201410555806.7A priority Critical patent/CN104501789A/en
Publication of CN104501789A publication Critical patent/CN104501789A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
    • G01C15/10Plumb lines

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The invention discloses a plumb line setting method. The plumb line setting method comprises the following steps that two same plumb lines comprising cotton ropes and a weight connected to one end of each one of the cotton ropes are selected, two position points with a level interval H are set on the same horizontal plane, the two plumb lines are respectively fixed to the two position points, the weights of the two plumb lines are vertically hung along a gravity direction, a traction connection line is arranged between the weights of the two plumb lines, a positioner with length more than H and provided with two locking slot positions is prepared, the positioner is locked between the lower parts of the two plumb lines and is located above the weights, and the two plumb lines are respectively locked at the two locking slot positions of the positioner. The plumb line setting method can fast stabilize the plumb lines. Compared with the traditional plumb line hanging method, the plumb line setting method has low construction environment requirements, effectively improves labor efficiency and reduces a construction cost.

Description

A kind of establishing method of plumb line
Technical field
the present invention relates to a kind of establishing method of plumb line, particularly relate to one and be applied in elevator, fast accurate places line-transect, is convenient to the establishing method of the plumb line installing cage guide accurately.
Background technology
people, when measuring the verticality of object and levelness, set up traditional sash weight sometimes, and difference environmentally then takes the highly sophisticated device such as infrared ray gradienter, transit sometimes.Traditional sash weight is comparatively simple, is realized the measurement of verticality, when the height of object being measured is larger, is then limited to execution conditions, cause error larger by cord suspension heavy weight.Though other high definition instrument has requirement equally to construction environment, when arranging line-transect track in elevator hoistways, the space due to elevator hoistways is high and narrow, and cause difficulty of construction large, cost is high.In today of elevator industry high speed development, the quality requirements of people to elevator is more and more higher.Existing elevator mounting means and technology, cannot arrange elevator fast and accurately and install line-transect, after causing elevator installation, operational effect is poor, easily breaks down, and the comfort level taken is poor, and energy consumption is high, and serviceable life is shorter.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of establishing method of plumb line, arranges cage guide line-transect when being mainly used in lift-mounting, ensures the accuracy that cage guide is installed, and easily, accuracy is high in construction.
In order to solve the problems of the technologies described above, the present invention takes following technical scheme:
An establishing method for plumb line, comprises the following steps:
Select the plumb line that two identical, be respectively the first plumb line and the second plumb line, this plumb line comprises cotton rope and is connected to the weight of this cotton rope wherein one end;
Same level is arranged two location points that level interval is H, be respectively primary importance point and second place point, the first plumb line is fixed on primary importance point, and the second plumb line is fixed on second place point, and the weight of two plumb lines is all along gravity direction hanging;
Be provided with traction connecting line between the weight of the first plumb line and the second vertical line, traction connecting line one end is connected with the weight of the first plumb line, and this traction connecting line other end is connected with the weight of the second plumb line;
Make the steady arm that length is greater than H, this steady arm is provided with two slots;
Being installed on by steady arm between the first plumb line and the second plumb line bottom and being positioned at above weight, two plumb lines block respectively and are placed in two slots of steady arm, and after the weight of two plumb lines is stable, two plumb lines form heavy vertical planes.
The length of described traction connecting line is less than H.
Two slots on described steady arm are symmetrical arranged.
Spacing on described steady arm between two slots is greater than H.
Spacing on described steady arm between two slots equals H.
Described steady arm selects lightweight section bar to make.
The inventive method construction is simple, require lower to construction environment, can fast and accurate stable plumb line, apply when being particluarly suitable for lift-mounting in elevator, the installation accuracy of effective raising cage guide, elevator is run more energy-conservation, comfortable and safe, in the serviceable life of effective raising elevator, reduce the failure rate of elevator.
Accompanying drawing explanation
Accompanying drawing 1 to be constructed schematic diagram for the present invention;
Accompanying drawing 2 is the plan structure schematic diagram of steady arm in the present invention.
Embodiment
For the ease of the understanding of those skilled in the art, below in conjunction with accompanying drawing, the invention will be further described.
Disclosed herein a kind of establishing method of plumb line, apply when being particluarly suitable for lift-mounting in elevator.Application this method, can fast and accurate stable plumb line, thus makes the installation accuracy of cage guide obtain effective guarantee.
An establishing method for plumb line, comprises the following steps:
Step 1, selects the plumb line that two identical, is respectively the first plumb line and the second plumb line, and this plumb line comprises cotton rope and is connected to the weight of this cotton rope wherein one end.
Step 2, same level is arranged two location points that level interval is H, be respectively primary importance point and second place point, the first plumb line is fixed on primary importance point, second plumb line is fixed on second place point, and the weight of two plumb lines is all along gravity direction hanging.These two location points can move, individually can move, also can move together simultaneously, only need ensure that the spacing between these two location points is default H distance, then two plumb lines are fixed tightly on this two positions point respectively, and allow weight suspend in midair downwards.
Step 3, is provided with traction connecting line between the weight of the first plumb line and the second vertical line, traction connecting line one end is connected with the weight of the first plumb line, and this traction connecting line other end is connected with the weight of the second plumb line.The length of traction connecting line is preferably set to and is less than H, and the distance between the weight ensureing the first plumb line and the second plumb line is less than H, and usual difference is in 150 millimeter.By traction connecting line, the weight of the first plumb line with the second plumb line is connected, the tractive force between two weights of two plumb lines is made to be greater than the natural torsion of plumb line self, thus weight is no longer rotated, keep transfixion relative to ground, be convenient to the stable of plumb line.
Step 4, make the steady arm that length is greater than H, this steady arm is provided with two slots.This steady arm selects lightweight section bar to make usually, is easy to carry and takes.When arranging slot, be generally symmetrical arranged on two short sides of steady arm.Spacing on steady arm between two slots is greater than H, or equals H.Steady arm can be location-plate, or angle bar is made, or is made up of cylindrical tubing, does not limit at this.
Step 5, steady arm to be installed between the first plumb line and the second plumb line bottom and to be positioned at above weight, two plumb lines block respectively and are placed in two slots of steady arm, namely the first plumb line card is placed in one of them slot, second plumb line then blocks and is placed in another slot, and plumb line can flexible rotating in slot.Adjust the level angle of steady arm simultaneously, as required by steady arm tilted upward certain angle, make the level interval between the first plumb line above steady arm and the second plumb line equal H, obtain by actual measurement.After stablizing when heavily hanging down, fix the first plumb line and the second plumb line in the horizontal direction respectively, and plumb line still can be twitched in the vertical direction up and down.First plumb line and the second plumb line form a heavy vertical plane, with this heavy vertical plane for reference place, can construct, and keep the accuracy in heavily vertical direction.
As shown in figure 1 and 2, in the specific implementation, as lift-mounting main guide rail in elevator, be first two location point E and F of H at top setting space, first plumb line 21 and the second plumb line 22 are separately fixed at an E and put on F, the then downward hanging of weight of the first plumb line 21 and the second plumb line 22.The traction connecting line 4 that length is less than H is set between the first plumb line and the weight of the second plumb line, makes the tractive force between two weights of two plumb lines be greater than the natural torsion of plumb line self, thus weight is no longer rotated, keep transfixion relative to ground.Make steady arm 3, this steady arm 3 is provided with two slots 23 and 24, and the space D between two slots is greater than or equal to H.In the present embodiment, the space D between two slots is greater than H.First plumb line 21 card is placed in slot 23, second plumb line 22 card is placed in slot 24, adjust the level angle of steady arm simultaneously, as required by steady arm tilted upward certain angle, make the level interval between the first plumb line above steady arm and the second plumb line equal H, obtain by actual measurement.When after stable weight, just fix the first plumb line and the second plumb line in the horizontal direction, two plumb lines can not be moved in the horizontal direction, can vibration up and down in the vertical direction.Now the first plumb line and the second plumb line form a heavy vertical plane, and this heavy vertical plane is object of reference, during construction with this heavy vertical plane for object of reference is constructed, construction is simple, and precision is high when lift-mounting guide rail.
By above method, two plumb lines are set when construction, and utilize corresponding steady arm to be clamped by these two plumb lines, be limited location, make two plumb lines formation as the heavy vertical plane of object of reference, constructability.
It should be noted that, the above for arrange the technical scheme that two plumb lines realize the position determining plumb line fast simultaneously under construction environment, in different construction environments, as required, also more than four plumb lines can be set simultaneously, every two corresponding settings, realize the object determining plumb line fast.Under the prerequisite not departing from creation design of the present invention, any apparent replacement is all within protection scope of the present invention.

Claims (4)

1. an establishing method for plumb line, comprises the following steps:
Select the plumb line that two identical, be respectively the first plumb line and the second plumb line, this plumb line comprises cotton rope and is connected to the weight of this cotton rope wherein one end;
Same level is arranged two location points that level interval is H, be respectively primary importance point and second place point, the first plumb line is fixed on primary importance point, and the second plumb line is fixed on second place point, and the weight of two plumb lines is all along gravity direction hanging;
Be provided with traction connecting line between the weight of the first plumb line and the second vertical line, traction connecting line one end is connected with the weight of the first plumb line, and this traction connecting line other end is connected with the weight of the second plumb line;
Make the steady arm that length is greater than H, this steady arm is provided with two slots;
Being installed on by steady arm between the first plumb line and the second plumb line bottom and being positioned at above weight, two plumb lines block respectively and are placed in two slots of steady arm, and after the weight of two plumb lines is stable, two plumb lines form heavy vertical planes.
2. the establishing method of plumb line according to claim 1, is characterized in that, the length of described traction connecting line is less than H.
3. the establishing method of plumb line according to claim 2, is characterized in that, two slots on described steady arm are symmetrical arranged.
4. the establishing method of the plumb line according to claim 1 or 2 or 3, it is characterized in that, the spacing on described steady arm between two slots is greater than H or equals H.
CN201410555806.7A 2014-10-20 2014-10-20 Plumb line setting method Pending CN104501789A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410555806.7A CN104501789A (en) 2014-10-20 2014-10-20 Plumb line setting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410555806.7A CN104501789A (en) 2014-10-20 2014-10-20 Plumb line setting method

Publications (1)

Publication Number Publication Date
CN104501789A true CN104501789A (en) 2015-04-08

Family

ID=52943215

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410555806.7A Pending CN104501789A (en) 2014-10-20 2014-10-20 Plumb line setting method

Country Status (1)

Country Link
CN (1) CN104501789A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107367727A (en) * 2017-08-01 2017-11-21 营口市特种设备监督检验所 Elevator shaft wall distance-measuring equipment
CN109186858A (en) * 2018-09-10 2019-01-11 广州汽车集团股份有限公司 A kind of gravity center measurement device and method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004250198A (en) * 2003-02-20 2004-09-09 Mitsubishi Electric Corp Damper stand installation device of elevator
JP2005201643A (en) * 2004-01-13 2005-07-28 Shimada Chiaki Plumb bob for leveling string
CN101915539A (en) * 2010-08-30 2010-12-15 中国人民解放军后勤工程学院 Measuring tool for buckling deformation of wall of vertical and cylindrical metal storage pot and measuring method thereof
CN202648666U (en) * 2012-06-14 2013-01-02 北京首钢建设集团有限公司 Double-connection line pendant
CN103697872A (en) * 2014-01-12 2014-04-02 任斌向 [-shaped hanging-type template verticality inspection tool and inspection method
CN103759721A (en) * 2013-12-11 2014-04-30 余姚市电波机械有限公司 Construction line pendant stabilizing device
CN104006798A (en) * 2014-06-16 2014-08-27 贵州路桥集团有限公司 Measuring instrument for perpendicularity of pier column

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2004250198A (en) * 2003-02-20 2004-09-09 Mitsubishi Electric Corp Damper stand installation device of elevator
JP2005201643A (en) * 2004-01-13 2005-07-28 Shimada Chiaki Plumb bob for leveling string
CN101915539A (en) * 2010-08-30 2010-12-15 中国人民解放军后勤工程学院 Measuring tool for buckling deformation of wall of vertical and cylindrical metal storage pot and measuring method thereof
CN202648666U (en) * 2012-06-14 2013-01-02 北京首钢建设集团有限公司 Double-connection line pendant
CN103759721A (en) * 2013-12-11 2014-04-30 余姚市电波机械有限公司 Construction line pendant stabilizing device
CN103697872A (en) * 2014-01-12 2014-04-02 任斌向 [-shaped hanging-type template verticality inspection tool and inspection method
CN104006798A (en) * 2014-06-16 2014-08-27 贵州路桥集团有限公司 Measuring instrument for perpendicularity of pier column

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107367727A (en) * 2017-08-01 2017-11-21 营口市特种设备监督检验所 Elevator shaft wall distance-measuring equipment
CN109186858A (en) * 2018-09-10 2019-01-11 广州汽车集团股份有限公司 A kind of gravity center measurement device and method

Similar Documents

Publication Publication Date Title
CN204751975U (en) Novel many hoists lift by crane supplementaryly in coordination device
CN102259792B (en) Improved orthogonal automatic horizontal adjustment lifting appliance and horizontal adjustment method thereof
US10101142B2 (en) Method in the installation of an elevator and tool for use in the method
CN105423865A (en) Measurement appliance for installation precision of trolley conductor of bridge crane
CN102704915B (en) A kind of checking table of directional tool and method of calibration
CN104501789A (en) Plumb line setting method
CN104535045A (en) Wall-hanging hydrostatic level mounting device and wall-hanging hydrostatic level mounting method
CN105910591A (en) Method and device for detecting verticality and clearance size of elevator shaft
CN204495333U (en) A kind of erecting device of wall-hanging hydrostatic level
CN203702139U (en) Hole digging cast-in-place pile pore-forming quality detection device
CN205171388U (en) Fine setting structure during walking frame bridge crane bridging roof beam
CN209557900U (en) A kind of Steel structure equipment device for installing and leveling
CN103983256A (en) Anchor mooring construction surveying method for contact network in tunnel
CN103775064B (en) Digging hole filling pile hole quality detection device
AU2017375856B2 (en) Apparatus and method for measuring rotational angle of sinking platform
CN205209408U (en) Bridge crane wiping line installation NULL utensil
CN203858278U (en) Electric energy meter support
CN104061920B (en) Parallel double mobile jib bracing or strutting arrangement
CN111519866A (en) Elevator shaft perpendicularity adjusting device and construction method thereof
CN208456533U (en) A kind of downhole sensor mounting device
CN205718990U (en) A kind of device detecting elevator perpendicularity and headroom size
CN206203677U (en) Die head mounting suspension
CN204643451U (en) Compensating rope of elevator tightening device
CN203550960U (en) Orienting device for arrangement of displacement monitoring points with crossing method
CN108706483A (en) Hydraulic lifting apparatus and its construction method for groove tank installation

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20150408

RJ01 Rejection of invention patent application after publication