Plumb line setting method Download PDFInfo
- Publication number
- CN104501789A CN104501789A CN201410555806.7A CN201410555806A CN104501789A CN 104501789 A CN104501789 A CN 104501789A CN 201410555806 A CN201410555806 A CN 201410555806A CN 104501789 A CN104501789 A CN 104501789A
- Authority
- CN
- China
- Prior art keywords
- plumb
- plumb line
- line
- weight
- lines
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/10—Plumb lines
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
The invention discloses a plumb line setting method. The plumb line setting method comprises the following steps that two same plumb lines comprising cotton ropes and a weight connected to one end of each one of the cotton ropes are selected, two position points with a level interval H are set on the same horizontal plane, the two plumb lines are respectively fixed to the two position points, the weights of the two plumb lines are vertically hung along a gravity direction, a traction connection line is arranged between the weights of the two plumb lines, a positioner with length more than H and provided with two locking slot positions is prepared, the positioner is locked between the lower parts of the two plumb lines and is located above the weights, and the two plumb lines are respectively locked at the two locking slot positions of the positioner. The plumb line setting method can fast stabilize the plumb lines. Compared with the traditional plumb line hanging method, the plumb line setting method has low construction environment requirements, effectively improves labor efficiency and reduces a construction cost.
Description
Technical field
the present invention relates to a kind of establishing method of plumb line, particularly relate to one and be applied in elevator, fast accurate places line-transect, is convenient to the establishing method of the plumb line installing cage guide accurately.
Background technology
people, when measuring the verticality of object and levelness, set up traditional sash weight sometimes, and difference environmentally then takes the highly sophisticated device such as infrared ray gradienter, transit sometimes.Traditional sash weight is comparatively simple, is realized the measurement of verticality, when the height of object being measured is larger, is then limited to execution conditions, cause error larger by cord suspension heavy weight.Though other high definition instrument has requirement equally to construction environment, when arranging line-transect track in elevator hoistways, the space due to elevator hoistways is high and narrow, and cause difficulty of construction large, cost is high.In today of elevator industry high speed development, the quality requirements of people to elevator is more and more higher.Existing elevator mounting means and technology, cannot arrange elevator fast and accurately and install line-transect, after causing elevator installation, operational effect is poor, easily breaks down, and the comfort level taken is poor, and energy consumption is high, and serviceable life is shorter.
Summary of the invention
The technical problem to be solved in the present invention is to provide a kind of establishing method of plumb line, arranges cage guide line-transect when being mainly used in lift-mounting, ensures the accuracy that cage guide is installed, and easily, accuracy is high in construction.
In order to solve the problems of the technologies described above, the present invention takes following technical scheme:
An establishing method for plumb line, comprises the following steps:
Select the plumb line that two identical, be respectively the first plumb line and the second plumb line, this plumb line comprises cotton rope and is connected to the weight of this cotton rope wherein one end;
Same level is arranged two location points that level interval is H, be respectively primary importance point and second place point, the first plumb line is fixed on primary importance point, and the second plumb line is fixed on second place point, and the weight of two plumb lines is all along gravity direction hanging;
Be provided with traction connecting line between the weight of the first plumb line and the second vertical line, traction connecting line one end is connected with the weight of the first plumb line, and this traction connecting line other end is connected with the weight of the second plumb line;
Make the steady arm that length is greater than H, this steady arm is provided with two slots;
Being installed on by steady arm between the first plumb line and the second plumb line bottom and being positioned at above weight, two plumb lines block respectively and are placed in two slots of steady arm, and after the weight of two plumb lines is stable, two plumb lines form heavy vertical planes.
The length of described traction connecting line is less than H.
Two slots on described steady arm are symmetrical arranged.
Spacing on described steady arm between two slots is greater than H.
Spacing on described steady arm between two slots equals H.
Described steady arm selects lightweight section bar to make.
The inventive method construction is simple, require lower to construction environment, can fast and accurate stable plumb line, apply when being particluarly suitable for lift-mounting in elevator, the installation accuracy of effective raising cage guide, elevator is run more energy-conservation, comfortable and safe, in the serviceable life of effective raising elevator, reduce the failure rate of elevator.
Accompanying drawing explanation
Accompanying drawing 1 to be constructed schematic diagram for the present invention;
Accompanying drawing 2 is the plan structure schematic diagram of steady arm in the present invention.
Embodiment
For the ease of the understanding of those skilled in the art, below in conjunction with accompanying drawing, the invention will be further described.
Disclosed herein a kind of establishing method of plumb line, apply when being particluarly suitable for lift-mounting in elevator.Application this method, can fast and accurate stable plumb line, thus makes the installation accuracy of cage guide obtain effective guarantee.
An establishing method for plumb line, comprises the following steps:
Step 1, selects the plumb line that two identical, is respectively the first plumb line and the second plumb line, and this plumb line comprises cotton rope and is connected to the weight of this cotton rope wherein one end.
Step 2, same level is arranged two location points that level interval is H, be respectively primary importance point and second place point, the first plumb line is fixed on primary importance point, second plumb line is fixed on second place point, and the weight of two plumb lines is all along gravity direction hanging.These two location points can move, individually can move, also can move together simultaneously, only need ensure that the spacing between these two location points is default H distance, then two plumb lines are fixed tightly on this two positions point respectively, and allow weight suspend in midair downwards.
Step 3, is provided with traction connecting line between the weight of the first plumb line and the second vertical line, traction connecting line one end is connected with the weight of the first plumb line, and this traction connecting line other end is connected with the weight of the second plumb line.The length of traction connecting line is preferably set to and is less than H, and the distance between the weight ensureing the first plumb line and the second plumb line is less than H, and usual difference is in 150 millimeter.By traction connecting line, the weight of the first plumb line with the second plumb line is connected, the tractive force between two weights of two plumb lines is made to be greater than the natural torsion of plumb line self, thus weight is no longer rotated, keep transfixion relative to ground, be convenient to the stable of plumb line.
Step 4, make the steady arm that length is greater than H, this steady arm is provided with two slots.This steady arm selects lightweight section bar to make usually, is easy to carry and takes.When arranging slot, be generally symmetrical arranged on two short sides of steady arm.Spacing on steady arm between two slots is greater than H, or equals H.Steady arm can be location-plate, or angle bar is made, or is made up of cylindrical tubing, does not limit at this.
Step 5, steady arm to be installed between the first plumb line and the second plumb line bottom and to be positioned at above weight, two plumb lines block respectively and are placed in two slots of steady arm, namely the first plumb line card is placed in one of them slot, second plumb line then blocks and is placed in another slot, and plumb line can flexible rotating in slot.Adjust the level angle of steady arm simultaneously, as required by steady arm tilted upward certain angle, make the level interval between the first plumb line above steady arm and the second plumb line equal H, obtain by actual measurement.After stablizing when heavily hanging down, fix the first plumb line and the second plumb line in the horizontal direction respectively, and plumb line still can be twitched in the vertical direction up and down.First plumb line and the second plumb line form a heavy vertical plane, with this heavy vertical plane for reference place, can construct, and keep the accuracy in heavily vertical direction.
As shown in figure 1 and 2, in the specific implementation, as lift-mounting main guide rail in elevator, be first two location point E and F of H at top setting space, first plumb line 21 and the second plumb line 22 are separately fixed at an E and put on F, the then downward hanging of weight of the first plumb line 21 and the second plumb line 22.The traction connecting line 4 that length is less than H is set between the first plumb line and the weight of the second plumb line, makes the tractive force between two weights of two plumb lines be greater than the natural torsion of plumb line self, thus weight is no longer rotated, keep transfixion relative to ground.Make steady arm 3, this steady arm 3 is provided with two slots 23 and 24, and the space D between two slots is greater than or equal to H.In the present embodiment, the space D between two slots is greater than H.First plumb line 21 card is placed in slot 23, second plumb line 22 card is placed in slot 24, adjust the level angle of steady arm simultaneously, as required by steady arm tilted upward certain angle, make the level interval between the first plumb line above steady arm and the second plumb line equal H, obtain by actual measurement.When after stable weight, just fix the first plumb line and the second plumb line in the horizontal direction, two plumb lines can not be moved in the horizontal direction, can vibration up and down in the vertical direction.Now the first plumb line and the second plumb line form a heavy vertical plane, and this heavy vertical plane is object of reference, during construction with this heavy vertical plane for object of reference is constructed, construction is simple, and precision is high when lift-mounting guide rail.
By above method, two plumb lines are set when construction, and utilize corresponding steady arm to be clamped by these two plumb lines, be limited location, make two plumb lines formation as the heavy vertical plane of object of reference, constructability.
It should be noted that, the above for arrange the technical scheme that two plumb lines realize the position determining plumb line fast simultaneously under construction environment, in different construction environments, as required, also more than four plumb lines can be set simultaneously, every two corresponding settings, realize the object determining plumb line fast.Under the prerequisite not departing from creation design of the present invention, any apparent replacement is all within protection scope of the present invention.
Claims (4)
1. an establishing method for plumb line, comprises the following steps:
Select the plumb line that two identical, be respectively the first plumb line and the second plumb line, this plumb line comprises cotton rope and is connected to the weight of this cotton rope wherein one end;
Same level is arranged two location points that level interval is H, be respectively primary importance point and second place point, the first plumb line is fixed on primary importance point, and the second plumb line is fixed on second place point, and the weight of two plumb lines is all along gravity direction hanging;
Be provided with traction connecting line between the weight of the first plumb line and the second vertical line, traction connecting line one end is connected with the weight of the first plumb line, and this traction connecting line other end is connected with the weight of the second plumb line;
Make the steady arm that length is greater than H, this steady arm is provided with two slots;
Being installed on by steady arm between the first plumb line and the second plumb line bottom and being positioned at above weight, two plumb lines block respectively and are placed in two slots of steady arm, and after the weight of two plumb lines is stable, two plumb lines form heavy vertical planes.
2. the establishing method of plumb line according to claim 1, is characterized in that, the length of described traction connecting line is less than H.
3. the establishing method of plumb line according to claim 2, is characterized in that, two slots on described steady arm are symmetrical arranged.
4. the establishing method of the plumb line according to claim 1 or 2 or 3, it is characterized in that, the spacing on described steady arm between two slots is greater than H or equals H.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410555806.7A CN104501789A (en) | 2014-10-20 | 2014-10-20 | Plumb line setting method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410555806.7A CN104501789A (en) | 2014-10-20 | 2014-10-20 | Plumb line setting method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN104501789A true CN104501789A (en) | 2015-04-08 |
Family
ID=52943215
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410555806.7A Pending CN104501789A (en) | 2014-10-20 | 2014-10-20 | Plumb line setting method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN104501789A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107367727A (en) * | 2017-08-01 | 2017-11-21 | 营口市特种设备监督检验所 | Elevator shaft wall distance-measuring equipment |
CN109186858A (en) * | 2018-09-10 | 2019-01-11 | 广州汽车集团股份有限公司 | A kind of gravity center measurement device and method |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004250198A (en) * | 2003-02-20 | 2004-09-09 | Mitsubishi Electric Corp | Damper stand installation device of elevator |
JP2005201643A (en) * | 2004-01-13 | 2005-07-28 | Shimada Chiaki | Plumb bob for leveling string |
CN101915539A (en) * | 2010-08-30 | 2010-12-15 | 中国人民解放军后勤工程学院 | Measuring tool for buckling deformation of wall of vertical and cylindrical metal storage pot and measuring method thereof |
CN202648666U (en) * | 2012-06-14 | 2013-01-02 | 北京首钢建设集团有限公司 | Double-connection line pendant |
CN103697872A (en) * | 2014-01-12 | 2014-04-02 | 任斌向 | [-shaped hanging-type template verticality inspection tool and inspection method |
CN103759721A (en) * | 2013-12-11 | 2014-04-30 | 余姚市电波机械有限公司 | Construction line pendant stabilizing device |
CN104006798A (en) * | 2014-06-16 | 2014-08-27 | 贵州路桥集团有限公司 | Measuring instrument for perpendicularity of pier column |
-
2014
- 2014-10-20 CN CN201410555806.7A patent/CN104501789A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2004250198A (en) * | 2003-02-20 | 2004-09-09 | Mitsubishi Electric Corp | Damper stand installation device of elevator |
JP2005201643A (en) * | 2004-01-13 | 2005-07-28 | Shimada Chiaki | Plumb bob for leveling string |
CN101915539A (en) * | 2010-08-30 | 2010-12-15 | 中国人民解放军后勤工程学院 | Measuring tool for buckling deformation of wall of vertical and cylindrical metal storage pot and measuring method thereof |
CN202648666U (en) * | 2012-06-14 | 2013-01-02 | 北京首钢建设集团有限公司 | Double-connection line pendant |
CN103759721A (en) * | 2013-12-11 | 2014-04-30 | 余姚市电波机械有限公司 | Construction line pendant stabilizing device |
CN103697872A (en) * | 2014-01-12 | 2014-04-02 | 任斌向 | [-shaped hanging-type template verticality inspection tool and inspection method |
CN104006798A (en) * | 2014-06-16 | 2014-08-27 | 贵州路桥集团有限公司 | Measuring instrument for perpendicularity of pier column |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107367727A (en) * | 2017-08-01 | 2017-11-21 | 营口市特种设备监督检验所 | Elevator shaft wall distance-measuring equipment |
CN109186858A (en) * | 2018-09-10 | 2019-01-11 | 广州汽车集团股份有限公司 | A kind of gravity center measurement device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204751975U (en) | Novel many hoists lift by crane supplementaryly in coordination device | |
CN102259792B (en) | Improved orthogonal automatic horizontal adjustment lifting appliance and horizontal adjustment method thereof | |
US10101142B2 (en) | Method in the installation of an elevator and tool for use in the method | |
CN105423865A (en) | Measurement appliance for installation precision of trolley conductor of bridge crane | |
CN102704915B (en) | A kind of checking table of directional tool and method of calibration | |
CN104501789A (en) | Plumb line setting method | |
CN104535045A (en) | Wall-hanging hydrostatic level mounting device and wall-hanging hydrostatic level mounting method | |
CN105910591A (en) | Method and device for detecting verticality and clearance size of elevator shaft | |
CN204495333U (en) | A kind of erecting device of wall-hanging hydrostatic level | |
CN203702139U (en) | Hole digging cast-in-place pile pore-forming quality detection device | |
CN205171388U (en) | Fine setting structure during walking frame bridge crane bridging roof beam | |
CN209557900U (en) | A kind of Steel structure equipment device for installing and leveling | |
CN103983256A (en) | Anchor mooring construction surveying method for contact network in tunnel | |
CN103775064B (en) | Digging hole filling pile hole quality detection device | |
AU2017375856B2 (en) | Apparatus and method for measuring rotational angle of sinking platform | |
CN205209408U (en) | Bridge crane wiping line installation NULL utensil | |
CN203858278U (en) | Electric energy meter support | |
CN104061920B (en) | Parallel double mobile jib bracing or strutting arrangement | |
CN111519866A (en) | Elevator shaft perpendicularity adjusting device and construction method thereof | |
CN208456533U (en) | A kind of downhole sensor mounting device | |
CN205718990U (en) | A kind of device detecting elevator perpendicularity and headroom size | |
CN206203677U (en) | Die head mounting suspension | |
CN204643451U (en) | Compensating rope of elevator tightening device | |
CN203550960U (en) | Orienting device for arrangement of displacement monitoring points with crossing method | |
CN108706483A (en) | Hydraulic lifting apparatus and its construction method for groove tank installation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20150408 |
|
RJ01 | Rejection of invention patent application after publication |