CN104481553B - Shield duct piece and the water-stopping method of cast-in-place concrete contact site - Google Patents

Shield duct piece and the water-stopping method of cast-in-place concrete contact site Download PDF

Info

Publication number
CN104481553B
CN104481553B CN201410475893.5A CN201410475893A CN104481553B CN 104481553 B CN104481553 B CN 104481553B CN 201410475893 A CN201410475893 A CN 201410475893A CN 104481553 B CN104481553 B CN 104481553B
Authority
CN
China
Prior art keywords
ring seal
duct piece
cast
shield duct
place concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410475893.5A
Other languages
Chinese (zh)
Other versions
CN104481553A (en
Inventor
肖豫
陈晓年
王美斋
刘许超
高源�
曹怀园
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yellow River Engineering Consulting Co Ltd
Original Assignee
Yellow River Engineering Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yellow River Engineering Consulting Co Ltd filed Critical Yellow River Engineering Consulting Co Ltd
Priority to CN201410475893.5A priority Critical patent/CN104481553B/en
Publication of CN104481553A publication Critical patent/CN104481553A/en
Application granted granted Critical
Publication of CN104481553B publication Critical patent/CN104481553B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • E21D11/105Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/38Waterproofing; Heat insulating; Soundproofing; Electric insulating
    • E21D11/385Sealing means positioned between adjacent lining members

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Mining & Mineral Resources (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Lining And Supports For Tunnels (AREA)

Abstract

The invention discloses the water-stopping method of a kind of shield duct piece and cast-in-place concrete contact site, carry out as steps described below: after the first step, tunnel shield driving complete, after shield duct piece lining cutting is firm, rubber O-ring seal is placed in the ring seal groove of described shield duct piece end face, then described rubber O-ring seal is fixed with spill steel disc and expansion bolt, is pressed in described ring seal groove, it is ensured that rubber O-ring seal is fully compacted;Second step, carrying out pouring of tunnel cast-in-place concrete lining cutting, casting process makes between cast-in-place concrete lining cutting and shield duct piece end face along the most reserved seam of tunnel;3rd step, in described seam from described rubber O-ring seal one end to tunnel central axial direction successively filling polyethylene board, polysulfide sealant and cement mortar.The invention has the advantages that the sealing problem successfully solved between shield duct piece and cast-in-place concrete lining cutting, easy construction simultaneously, stagnant water effect is preferable.

Description

Shield duct piece and the water-stopping method of cast-in-place concrete contact site
Technical field
The present invention relates to water-stopping method, especially relate to the water-stopping method of shield duct piece and cast-in-place concrete contact site.
Background technology
Use Shield TBM (TBM) tunnel constructed, owing to construction requirement and tunnel structure need, it usually needs in position construction cast-in-place concrete lining cutting such as the import and export of tunnel or the junctions boring quick-fried section and shield machine construction section.This cast-in-place concrete lining cutting often to be constructed after shield duct piece is installed, and therefore, between shield duct piece and cast-in-place concrete lining cutting, sealing just becomes a difficult problem.In engineering construction, traditional water-stopping method be in concrete pre-buried copper sheet or PVC waterstop member to reach sealing purpose, but owing to shield duct piece is the sizing finished product using fixing mould to produce, impossible embedded water stop component, so traditional concrete water-stopping method is unsuitable for the sealing construction of shield duct piece and cast-in-place concrete lining cutting contact site.
Summary of the invention
Present invention aim at the water-stopping method providing a kind of shield duct piece with cast-in-place concrete contact site.
For achieving the above object, the present invention takes following technical proposals:
Shield duct piece of the present invention and the water-stopping method of cast-in-place concrete contact site, carried out as steps described below:
After the first step, tunnel shield driving complete, after shield duct piece lining cutting is firm, rubber O-ring seal is placed in the ring seal groove of described shield duct piece end face, then described rubber O-ring seal is fixed with spill steel disc and expansion bolt, is pressed in described ring seal groove, it is ensured that rubber O-ring seal is fully compacted;
Second step, carrying out pouring of tunnel cast-in-place concrete lining cutting, casting process makes between cast-in-place concrete lining cutting and shield duct piece end face along the most reserved seam of tunnel;
3rd step, in described seam from described rubber O-ring seal one end to tunnel central axial direction successively filling polyethylene board, polysulfide sealant and cement mortar.
The invention has the advantages that the sealing problem successfully solved between shield duct piece and cast-in-place concrete lining cutting, easy construction simultaneously, stagnant water effect is preferable.
Accompanying drawing explanation
Fig. 1 is the water sealing structure schematic diagram between shield duct piece and cast-in-place concrete lining cutting according to the inventive method enforcement.
Fig. 2 is the I portion structure for amplifying schematic diagram of Fig. 1.
Fig. 3 is that the tunnel section after installing shield duct piece is with reference to figure.
Detailed description of the invention
As Figure 1-3, shield duct piece of the present invention and the water-stopping method of cast-in-place concrete contact site, carry out as steps described below:
After the first step, tunnel 1 shield driving complete, after shield duct piece 2 lining cutting is firm, rubber O-ring seal 4 is placed in ring seal groove 3 on described shield duct piece 1 end face, then fix, in the ring seal groove 3 that is pressed on shield duct piece 2 end face with spill steel disc 5 and 6 rubber O-ring seals 4 of expansion bolt, it is ensured that rubber O-ring seal 4 is fully compacted;
Second step, carrying out pouring of tunnel 1 cast-in-place concrete lining cutting 7, casting process makes between cast-in-place concrete lining cutting 7 and shield duct piece 2 end face along the most reserved seam 8 wide for 10mm of tunnel 1;
3rd step, in described seam 8 from described rubber O-ring seal 4 one end to tunnel central axis 9 direction successively filling polyethylene board 10, polysulfide sealant 11 and cement mortar 12.

Claims (1)

1. a shield duct piece and the water-stopping method of cast-in-place concrete contact site, it is characterised in that: carry out as steps described below:
After the first step, tunnel shield driving complete, after shield duct piece lining cutting is firm, rubber O-ring seal is placed in the ring seal groove of described shield duct piece end face, then described rubber O-ring seal is fixed with spill steel disc and expansion bolt, is pressed in described ring seal groove, it is ensured that rubber O-ring seal is fully compacted;
Second step, carrying out pouring of tunnel cast-in-place concrete lining cutting, casting process makes between cast-in-place concrete lining cutting and shield duct piece end face along the most reserved seam of tunnel;
3rd step, in described seam from described rubber O-ring seal one end to tunnel central axial direction successively filling polyethylene board, polysulfide sealant and cement mortar.
CN201410475893.5A 2014-09-18 2014-09-18 Shield duct piece and the water-stopping method of cast-in-place concrete contact site Active CN104481553B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410475893.5A CN104481553B (en) 2014-09-18 2014-09-18 Shield duct piece and the water-stopping method of cast-in-place concrete contact site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410475893.5A CN104481553B (en) 2014-09-18 2014-09-18 Shield duct piece and the water-stopping method of cast-in-place concrete contact site

Publications (2)

Publication Number Publication Date
CN104481553A CN104481553A (en) 2015-04-01
CN104481553B true CN104481553B (en) 2016-11-16

Family

ID=52756145

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410475893.5A Active CN104481553B (en) 2014-09-18 2014-09-18 Shield duct piece and the water-stopping method of cast-in-place concrete contact site

Country Status (1)

Country Link
CN (1) CN104481553B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106050275B (en) * 2016-07-13 2018-10-26 同济大学 A kind of duct pieces of shield tunnel bolt hole sealed waterproof device
CN106703843B (en) * 2016-11-24 2019-04-02 同济大学 A kind of two pass seam waterproof device with segment bolt connector box duct pieces of shield tunnel
CN110242323A (en) * 2019-07-02 2019-09-17 黄河勘测规划设计研究院有限公司 The design method of side steel concrete shield duct piece

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001280089A (en) * 2000-03-29 2001-10-10 Ozawa Concrete Industries Co Ltd Reinforcing method when placing concrete in high- strength buried form and repairing method for tunnel wall
CN201714396U (en) * 2009-09-15 2011-01-19 中铁第四勘察设计院集团有限公司 Waterproof structure of shield tunnel segment seam
CN102733829B (en) * 2011-04-07 2015-06-17 上海市电力公司 Water-proof structure of tunnel lining joint in shield-method construction
CN203403892U (en) * 2013-06-24 2014-01-22 中铁第一勘察设计院集团有限公司 Waterproof structure of lining seam of shield tunnel in high-pressure water-rich stratum
CN203614112U (en) * 2013-12-12 2014-05-28 中铁第一勘察设计院集团有限公司 Tunnel lining joint structure of large deformation ground fissure section

Also Published As

Publication number Publication date
CN104481553A (en) 2015-04-01

Similar Documents

Publication Publication Date Title
CN104389623B (en) Shield tunnel prefabricated tunnel segment lining back stratum grouting device
CN102561405A (en) Opening treatment method for pipe-roofing continuous perforation
CN104481553B (en) Shield duct piece and the water-stopping method of cast-in-place concrete contact site
CN204004816U (en) A kind of Direct-Buried Heating Pipeline water-tight device through walls
CN105041337A (en) Seam splicing structure of underground shield tunnel lining segments and waterproof method
CN101956388A (en) Novel clamp device and fixing method for grouting risers of ocean platform
CN104047232B (en) Road and bridge concreting preformed hole or built-in fitting are from active and inactive mold stripper apparatus
CN207297034U (en) Tunnel double-lining concrete vault backfills grouting device
CN104847984A (en) Pipeline bell-and-spigot joint technology
CN103836268A (en) Construction method for mounting waterproof sleeve of external concrete wall of basement
CN103741949B (en) Treatment of juncture between vertical structure and horizontal structure
CN203939060U (en) The slight leakage plugging structure of a kind of diaphragm wall
CN208778877U (en) Non- preset water string device
CN203476340U (en) Portal sealing device of slurry shield
CN104404960B (en) A kind of underground diaphragm wall seam grouting device and constructional method
CN107503758B (en) Originating hole water stop device of miniature pipe curtain push bench
CN103133785A (en) Water-proof processing structure of tube-penetrating position on wall
CN205206847U (en) Shield constructs business turn over hole portal annular and freezes sealed sealing device
CN103343577A (en) Shear wall water stopping method of detachable butted screw rods
CN106836462B (en) Basement extends out the processing method and waterproof construction of structure construction seam
CN203784513U (en) Connection device of grouting pipe and sleeve
CN204282366U (en) A kind of diaphragm wall seam grouting device
CN104727835B (en) A kind of tunnel-liner seam crossing percolating water antipriming and water-stop processing method
CN106522230B (en) Installation and grouting construction method of pre-buried grouting pipe assembly
Ishmuratov et al. The spiral wound pipeline rehabilitation technique for pipe networks: an application and experience in Moscow city

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee after: Yellow River Survey Planning and Design Research Institute Co., Ltd.

Address before: 450003 Jinshui Road 109, Zhengzhou City, Henan Province

Patentee before: Yellow River Engineering Consulting Co., Ltd.

CP01 Change in the name or title of a patent holder