CN104481550A CN201410569061.XA CN201410569061A CN104481550A CN 104481550 A CN104481550 A CN 104481550A CN 201410569061 A CN201410569061 A CN 201410569061A CN 104481550 A CN104481550 A CN 104481550A
Authority
CN
China
Prior art keywords
tunnel
self
support method
pipe shed
pipe canopy
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201410569061.XA
Other languages
Chinese (zh)
Inventor
许利捷
许海岩
杨飞
李修岩
郭日花
杨小荣
黄伟洪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China MCC20 Group Corp Ltd
Original Assignee
China MCC20 Group Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China MCC20 Group Corp Ltd filed Critical China MCC20 Group Corp Ltd
Priority to CN201410569061.XA priority Critical patent/CN104481550A/en
Publication of CN104481550A publication Critical patent/CN104481550A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D11/00Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
    • E21D11/04Lining with building materials
    • E21D11/10Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)

Abstract

The invention relates to a tunnel collapse treatment advance support method. The tunnel collapse treatment advance support method is implemented by combining an advance large-pipe shed and self-drilling anchor bolts as well as combining clearance limit exceeding positions of long-distance grouting of the large-pipe shed and short-distance grouting of the self-drilling anchor bolts and comprises the following steps of, firstly, setting up an operating platform with scaffolds instead of guide walls, and determining the driving angle and position of the pipe shed into rock by adjusting the connecting height of the scaffolds and supports under an equipment rail; secondly, setting the large-pipe shed along an arch 90-degree scope, and allowing the end portions of the large-pipe shed to exceed the clearance limit during construction; thirdly, arranging the advance self-drilling anchor rods at intervals in the circumferential direction of the pipe shed, and after tunnel collapse is holed, performing clearance limit exceeding position treatment through the self-drilling anchor bolts. The tunnel collapse treatment advance support method achieves a wide grouting range, has the advantages of strong support and short excavation, saves the collapse treatment cost, saves the construction schedule and has high application values.

Description

A kind of Tunnel Landslide process advanced support method
Technical field
The inventive method relates to Tunnel Landslide process advance support, particularly relates to the process occurring caving in after tunnel holing through.
Background technology
In daguanpeng construction process, be usually divided into have service depot with without two kinds, service depot.Have service depot first to set up meet machinery and avoid pipe canopy to invade the working space of limit, this working space generally outwards expands 50-80cm along tunnel excavation outline line, arranges the wall that leads together, for controlling steel tube shed angle and direction in Guan Peng termination.It is a kind of new technology utilizing Tunnel Design excavation space to carry out advance support without service depot's super-front large pipe shed.This service depot is 40cm in Tunnel Design excavation contour line, installs, finally for invading limit position, adopting pipe canopy propeller to invade and limitting section pipe canopy to be advanced into outside Tunnel Design excavation contour line by the outer limb perforate of design line pipe canopy boring of going forward side by side.
After Tunnel Landslide occurs in tunnel holing through, excavation and the supporting in tunnel complete all, now daguanpeng construction is without service depot, in such cases, can only take without service depot's construction technique of big pipe shed, but adopt pipe canopy propeller not only to expand construction cost, extend construction period simultaneously, comparatively unfavorable for sump remedy.
Summary of the invention
Patent of the present invention is intended to solve the problem, and provides a kind of Tunnel Landslide process advanced support method.The present invention can ensure to carry out advance support, for follow-up sump remedy provides safe and reliable construction environment to landslide body fast and efficiently.
The present invention is made up of following implementation step: step one, cancels guiding wall, adopts scaffold building operating platform, to be connected highly to determine that pipe canopy squeezes into angle, the position of rock mass by adjustment scaffold with equipment rail supported underneath place; Step 2, along arch, 90 ° of scopes arrange steel tube shed, allow position, termination to invade limit in work progress; Step 3, arranges advanced self-feeding anchor pile between pipe canopy hoop, after sump remedy is through, adopts self-feeding anchor pile to carry out invading the process of limit position.
The present invention changes and adopts pipe canopy propeller to be advanced into method outside Tunnel Design excavation contour line by invading limit section pipe canopy in the past, change the supporting method adopting steel tube shed to combine with advanced self-feeding anchor pile into, the long distance slip casting of steel tube shed is invaded extreme position with self-feeding anchor pile short distance injecting treatment and is combined, make range of grouting wide, save sump remedy cost, save the duration etc., embody strong supporting, the feature of short excavation, good effect is played to landslide body wall rock grouting effect, country rock is made to have certain self-stable ability, for follow-up sump remedy excavation supporting provides safety assurance.Efficiently solve without under service depot's state, utilize Tunnel Design excavation space to carry out the construction of steel tube shed advance support and cause termination to invade the situation of limit.
Operating procedure of the present invention is simple, practical, overcome without under service depot's state, in tunnel, daguanpeng construction causes a difficult problem of invading limit, optimize working procedure, save construction cost, shorten the construction period, simultaneously long and short distance slip casting combine make range of grouting wide, be evenly distributed, not only embody strong supporting, the feature of short excavation, plays good effect to landslide body wall rock grouting effect, makes country rock have certain self-stable ability, for follow-up sump remedy excavation supporting provides safety assurance, there is higher using value.
Detailed description of the invention
The present invention is made up of following implementation step:
Step one, because the construction of guiding wall is very consuming time, determine to cancel guiding wall, adopt scaffold building operating platform, drilling equipment is positioned on platform; To be connected with equipment rail supported underneath place by adjustment scaffold and highly to determine that pipe canopy squeezes into angle, the position of rock mass; Equipment and scaffold is needed reliably to fix behind accurate location.
Step 2,40cm in Tunnel Design excavation contour line, by design outer limb perforate go forward side by side line pipe canopy boring installation, steel tube shed length 12 ~ 20m(can determine by landslide scope length), reduce steel tube shed radical, along arch, 90 ° of scopes arrange 10 ~ 15 pipe canopies, reduce the subsequent treatment engineering quantity cavity depths that deeply caves in and carry out injecting treatment;
Step 3, arranges advanced self-feeding anchor pile between pipe canopy hoop, length 1.2 ~ 2.5m; Carry out short distance grouting and reinforcing by self-feeding anchor pile, process simultaneously cause because of above-mentioned daguanpeng construction invade extreme position.
Application example:
Certain project tunnel is two-way Four-Lane Road small-clear-distance tunnel, and preliminary bracing construction has occurred arch landslide after complete 18 days, and landslide section edpth of tunnel is about 58.6-68.0m, hole, left and right spacing is 29.5m, landslide length is about 40m, and estimate height about the 20m that caves in, about 10000m is measured in landslide 3left and right.Jetting cement when starting that caves in peels off, supporting type steel arch-shelf torsional deformation, and follow-up caving in expands further, and landslide body is filled with the whole band that stops in emergency.Carry out the process of landslide advance support through the inventive method, obtain good result.Specific as follows:
Step one: by scaffold building operating platform, drilling equipment is positioned on platform; Adjustment scaffold is connected with equipment rail supported underneath place highly determines that pipe canopy squeezes into angle, the position of rock mass; Equipment and scaffold is needed reliably to fix behind accurate location.
Step 2: 40cm in Tunnel Design excavation contour line, by design outer limb perforate go forward side by side line pipe canopy boring installation, steel tube shed length 12m, along arch, 90 ° of scopes arrange 13 pipe canopies.
Step 3: between pipe canopy hoop, advanced self-feeding anchor pile is set, length 1.5m; Carry out short distance grouting and reinforcing by self-feeding anchor pile, process simultaneously cause because of above-mentioned daguanpeng construction invade extreme position.

Claims (3)

1. a Tunnel Landslide process advanced support method, is characterized in that: comprising:
Step one, cancels guiding wall, takes scene to the accurate setting-out of rig to control the angle direction of steel tube shed; Specific as follows:
Adopt scaffold building operating platform, drilling equipment is positioned on platform; To be connected with equipment rail supported underneath place by adjustment scaffold and highly to determine that pipe canopy squeezes into angle, the position of rock mass; Equipment and scaffold is needed reliably to fix behind accurate location;
Step 2,40cm in Tunnel Design excavation contour line, install by the outer limb perforate of design line pipe canopy boring of going forward side by side, steel tube shed length can be determined by the scope length of caving in, and along arch, 90 ° of scopes arrange 10 ~ 15 pipe canopies;
Step 3, arranges advanced self-feeding anchor pile between pipe canopy hoop, length 1.2 ~ 2.5m; Carry out short distance grouting and reinforcing by self-feeding anchor pile, the extreme position of invading caused is in the milk simultaneously because of above-mentioned daguanpeng construction.
2. Tunnel Landslide process advanced support method according to claim 1, is characterized in that, determine pipe canopy radical and set scope in described step 2 according to tunnel clearance size, determine pipe canopy length according to landslide scope and support process.
3. Tunnel Landslide process advanced support method according to claim 1, is characterized in that, described step 3 can cause invading extreme position size according to daguanpeng construction angle and rock crusher degree determination anchor pole sets density and length.
CN201410569061.XA 2014-10-23 2014-10-23 Tunnel collapse treatment advance support method Pending CN104481550A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410569061.XA CN104481550A (en) 2014-10-23 2014-10-23 Tunnel collapse treatment advance support method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410569061.XA CN104481550A (en) 2014-10-23 2014-10-23 Tunnel collapse treatment advance support method

Publications (1)

Publication Number Publication Date
CN104481550A true CN104481550A (en) 2015-04-01

Family

ID=52756142

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410569061.XA Pending CN104481550A (en) 2014-10-23 2014-10-23 Tunnel collapse treatment advance support method

Country Status (1)

Country Link
CN (1) CN104481550A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499423A (en) * 2016-11-23 2017-03-15 中铁十八局集团有限公司 A kind of reverse daguanpeng construction method in tunnel construction
CN106801612A (en) * 2017-02-28 2017-06-06 中铁建大桥工程局集团第五工程有限公司 A kind of T76S high intensity self-drilling type barrel vault advanced support engineering method
CN107060778A (en) * 2017-06-15 2017-08-18 中铁十局集团第五工程有限公司 Pass through high-rise building group back filled region method for tunnel construction
CN108457658A (en) * 2018-03-14 2018-08-28 济南城建集团有限公司 A kind of texture stratum tunnel list hole bidirectional construction crosses section constructing method
CN109026031A (en) * 2018-06-26 2018-12-18 中铁建大桥工程局集团第五工程有限公司 A kind of macroseism after gas Tunnel Landslide section reconstruction construction method
CN110067573A (en) * 2019-04-26 2019-07-30 西和县中宝矿业有限公司 A kind of quick improvement and the construction method for passing through the crushed zone that caved in
CN112031813A (en) * 2020-09-08 2020-12-04 中交一公局第一工程有限公司 Construction method for penetrating through clay loose tunnel collapsed body
CN113187498A (en) * 2021-05-13 2021-07-30 中铁十六局集团第二工程有限公司 TBM tunnel collapsed cavity backfilling and advanced pipe shed construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090013528A (en) * 2007-08-02 2009-02-05 주식회사 스마텍엔지니어링 The prestressed tunnel support structure
CN102128038A (en) * 2011-01-26 2011-07-20 北京中铁瑞威基础工程有限公司 Quick construction method for tunnel pipe shed
CN203214081U (en) * 2013-03-26 2013-09-25 中国二十冶集团有限公司 Self-propelled hollow anchor rod
CN203441377U (en) * 2013-07-17 2014-02-19 姜凌宇 Simple-operation sliding device of pipe shed drilling machine
CN203476347U (en) * 2013-07-24 2014-03-12 中南大学 Preliminary bracing device for collapsible loess tunnel
CN203756182U (en) * 2014-04-04 2014-08-06 湖南省高速公路建设开发总公司 Support structure applied to shallow road tunnel in weak rock area
CN104100272A (en) * 2014-07-11 2014-10-15 中国路桥工程有限责任公司 Quick construction method of tunnels traversing unfavorable geology

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20090013528A (en) * 2007-08-02 2009-02-05 주식회사 스마텍엔지니어링 The prestressed tunnel support structure
CN102128038A (en) * 2011-01-26 2011-07-20 北京中铁瑞威基础工程有限公司 Quick construction method for tunnel pipe shed
CN203214081U (en) * 2013-03-26 2013-09-25 中国二十冶集团有限公司 Self-propelled hollow anchor rod
CN203441377U (en) * 2013-07-17 2014-02-19 姜凌宇 Simple-operation sliding device of pipe shed drilling machine
CN203476347U (en) * 2013-07-24 2014-03-12 中南大学 Preliminary bracing device for collapsible loess tunnel
CN203756182U (en) * 2014-04-04 2014-08-06 湖南省高速公路建设开发总公司 Support structure applied to shallow road tunnel in weak rock area
CN104100272A (en) * 2014-07-11 2014-10-15 中国路桥工程有限责任公司 Quick construction method of tunnels traversing unfavorable geology

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
许占良: "《板岩地层超大断面隧道塌方处理对策》", 《隧道/地下工程》 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106499423A (en) * 2016-11-23 2017-03-15 中铁十八局集团有限公司 A kind of reverse daguanpeng construction method in tunnel construction
CN106801612A (en) * 2017-02-28 2017-06-06 中铁建大桥工程局集团第五工程有限公司 A kind of T76S high intensity self-drilling type barrel vault advanced support engineering method
CN107060778A (en) * 2017-06-15 2017-08-18 中铁十局集团第五工程有限公司 Pass through high-rise building group back filled region method for tunnel construction
CN108457658A (en) * 2018-03-14 2018-08-28 济南城建集团有限公司 A kind of texture stratum tunnel list hole bidirectional construction crosses section constructing method
CN109026031A (en) * 2018-06-26 2018-12-18 中铁建大桥工程局集团第五工程有限公司 A kind of macroseism after gas Tunnel Landslide section reconstruction construction method
CN110067573A (en) * 2019-04-26 2019-07-30 西和县中宝矿业有限公司 A kind of quick improvement and the construction method for passing through the crushed zone that caved in
CN112031813A (en) * 2020-09-08 2020-12-04 中交一公局第一工程有限公司 Construction method for penetrating through clay loose tunnel collapsed body
CN113187498A (en) * 2021-05-13 2021-07-30 中铁十六局集团第二工程有限公司 TBM tunnel collapsed cavity backfilling and advanced pipe shed construction method

Similar Documents

Publication Publication Date Title
CN104481550A (en) Tunnel collapse treatment advance support method
CN108166981B (en) Tunnel soft rock large deformation section construction technology
CN103410527B (en) Preliminary bracing construction method for tunnel with surrounding rocks containing collapsible loess and soft rocks
CN109098733B (en) Rapid grouting reinforcement method for large-section tunnel in fracture zone rock stratum
CN101598027B (en) Tunnel connection channel construction method of shield interval
CN102536252B (en) Method for digging backward hole of tunnel with quite small clear distance
CN103147440B (en) Construction prestressed cable method
CN103775093B (en) Skew box girders bias shallow tunnel enters the construction method of hole set arch
CN109538216B (en) Tunnel construction process for crossing mining and subsidence areas
CN104963689A (en) Three-step seven-procedure excavation method for tunnel
CN202866826U (en) Shield tunnel working well outer end socket stratum reinforced structure
CN108979662A (en) Tunnel prefabrication and assembly construction lining cutting splicing structure and its method
CN102505945B (en) Construction method for enabling rectangular pipe jacking machine to enter into tunnel in existing building
CN105041333A (en) Method for treating tunnel collapse through dugand covered method
CN102174894A (en) Follow-up pipe shed construction method
CN205117357U (en) Weak surrounding rock tunnel advance support structure based on self -drilling spiral pipe canopy
CN104389608A (en) Air shaft shield crossing construction method
CN105937396A (en) Support method for ridge section extreme-high geostress soft rock tunnel construction deformation control
CN108035742A (en) A kind of passive harmonious method for protecting support of extreme rockburst tunnel master
CN106988755A (en) A kind of tunnel portal weak surrounding rock section overlength pipe shed construction method
CN104831733A (en) Arch bridge abutment tunnel type large-angle inclined pile construction method
CN104234726A (en) Internal dewatering and drainage construction method for tunnel passing through water-rich unconformable contact zone
CN109209443A (en) A kind of construction method of breaking surrounding rock tunnel structure
CN109139018A (en) The method for tunnel construction and system that deep hole sleeve valve barrel grouting is combined with horizontal jet grouting
CN109931077B (en) Support system for tunnel repair and construction method thereof

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20150401