CN104480976B - 一种可视化桩基静载试验远程无线监控系统 - Google Patents

一种可视化桩基静载试验远程无线监控系统 Download PDF

Info

Publication number
CN104480976B
CN104480976B CN201410674202.4A CN201410674202A CN104480976B CN 104480976 B CN104480976 B CN 104480976B CN 201410674202 A CN201410674202 A CN 201410674202A CN 104480976 B CN104480976 B CN 104480976B
Authority
CN
China
Prior art keywords
test
load test
pile
pile foundation
radio fest
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201410674202.4A
Other languages
English (en)
Other versions
CN104480976A (zh
Inventor
吴朝义
吴勇
刘东坤
王晨
李红兵
周学礼
金平
杨树良
张晓梅
吴菊慧
邬余建
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yunnan Academy of Building Sciences Co.,Ltd.
Original Assignee
YUNNAN INSTITUTE OF BUILDING RESEARCH
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YUNNAN INSTITUTE OF BUILDING RESEARCH filed Critical YUNNAN INSTITUTE OF BUILDING RESEARCH
Priority to CN201410674202.4A priority Critical patent/CN104480976B/zh
Publication of CN104480976A publication Critical patent/CN104480976A/zh
Application granted granted Critical
Publication of CN104480976B publication Critical patent/CN104480976B/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D33/00Testing foundations or foundation structures

Abstract

一种可视化桩基静载试验远程无线监控系统,包括由千斤顶(1)、双油路油泵(2)和桩基沉降跟踪器(3)与无线测控器(4A)及无线测控远程监管静力载荷测试仪(4B)形成有线连接;无线测控远程监管静力载荷测试仪(4B)通过网络与电脑控制终端(5)形成无线远程连接;视频装置(6)通过网络与电脑控制终端(5)形成无线远程连接;其中所述的千斤顶(1)与双油路油泵(2)相连,置于测试桩上。本发明提高了对测试桩的沉降监测强度,降低了技术人员的工作量,保障了安全。

Description

一种可视化桩基静载试验远程无线监控系统
技术领域
本发明涉及建筑桩基静载试验技术领域,具有良好的工作效率、稳定性、可控性、操作方便的特点,主要用于建筑桩基静载试验。
背景技术
随着高层建筑的大量兴建,桩基静载试验技术方法得到了较大的发展,同时,在工程实践中也相应的出现了一些问题,其中对工程建设和社会影响较严重的两类问题主要是:①试验过程中对桩体沉降变形均匀情况的观测不及时造成测试桩在加载过程中出现较大不均匀沉降,导致试验中断,继而引起上层堆载不稳定,出现更为严重的堆载倾倒事故;②试验过程中,加卸载和数据收集等工作都需要技术人员在现场进行控制和采集,不但增加了繁琐的工作量,而且由于监控仪器大多安置在堆载下面,对技术人员的安全同样构成了潜在危害。所以,本技术基于当前建筑桩基静载试验实际情况,主要目的是通过建立一套可视化远程无线监管技术对桩基静载试验进行监控。
本技术的目的是通过如下技术方案实现的:一种可视化桩基静载试验远程无线监管技术,主要由千斤顶、双油路油泵和桩基沉降跟踪器与无线测控器及无线测控远程监管静力载荷测试仪形成有线连接;无线测控远程监管静力载荷测试仪通过网络与电脑控制终端形成无线远程连接;视频装置通过网络与电脑控制终端形成无线远程连接。安装工艺步骤是:千斤顶→连接双油路油泵→桩基沉降跟踪器→连接无线测控器→连接无线测控远程监管静力载荷测试仪→无线连接电脑控制终端。
发明内容
本发明的目的,是在现有桩基静载试验的基础上,将视频装置和无线测控远程监管静力载荷测试仪以及电脑控制终端引入桩基静载试验中,达到对测试桩的沉降变形过程进行全场可视化监控以及实现远距离加卸荷、测试数据获取的目的,以解决以上问题
本发明的目的是采用如下技术方案来实现的。
一种可视化桩基静载试验远程无线监控系统,本发明特征在于:主要包括由千斤顶、双油路油泵和桩基沉降跟踪器与无线测控器及无线测控远程监管静力载荷测试仪形成有线连接;无线测控远程监管静力载荷测试仪通过网络与电脑控制终端形成无线远程连接;视频装置通过网络与电脑控制终端形成无线远程连接;其中所述的千斤顶与双油路油泵相连,置于测试桩上;本发明安装及监控主要包括以下四个步骤:
步骤1:对测试桩进行静载试验压重平台建设,在静载试验压重平台建设过程中,将视频装置、桩基沉降跟踪器安装在压重平台中;
步骤2:在静载试验压重平台建设及监控仪器安装完成后,将视频装置与电脑控制终端进行无线连接;将千斤顶与双油路油泵进行连接后,再与无线测控器进行连接;将桩基沉降跟踪器与无线测控器进行连接,置于测试桩四角;连接完成后对各仪器进行初步调试;
步骤3:在步骤2的基础上,将无线测控器与无线测控远程监管静力载荷测试仪进行连接,在连接完成后对仪器进行二次调试;调试后将无线测控远程监管静力载荷测试仪与电脑控制终端进行无线连接,置于桩基静载试验现场;连接完成后对所有仪器进行第三次调试;
步骤4:调试完成后,利用电脑控制终端对无线测控远程监管静力载荷测试仪进行远程控制以达到对静载试验过程的监控及试验数据的采集;利用电脑控制终端与视频装置的连接以达到对静载试验全过程中测试桩桩头沉降安全性的监控。
本发明所述的视频装置与电脑控制终端通过网络进行无线连接,置于次梁下侧,监测测试桩的沉降变形进程。
本发明所述的一种可视化桩基静载试验远程无线监管技术,其安装工艺步骤是:千斤顶→连接双油路油泵→桩基沉降跟踪器→连接无线测控器→连接无线测控远程监管静力载荷测试仪→无线连接电脑控制终端。
本发明的有益效果是,①保证在试验过程中对桩体沉降变形均匀情况的及时观测,避免造成测试桩在加载过程中出现较大不均匀沉降,导致试验中断,继而引起上层堆载不稳定,出现更为严重的堆载倾倒事故的情况发生;②避免了加卸载和数据收集等工作都需要技术人员在现场进行控制和采集,减少了工作量,提高了工作效率,而且保证了技术人员的安全。
附图说明
图1是本发明的横向结构示意图;
图2是本发明的纵向结构示意图;
图3是本发明的流程示意图。
具体实施方式
见图1-图3,一种可视化桩基静载试验远程无线监控系统,本发明特征在于:主要包括由千斤顶1、双油路油泵2和桩基沉降跟踪器3与无线测控器4A及无线测控远程监管静力载荷测试仪4B形成有线连接;无线测控远程监管静力载荷测试仪4B通过网络与电脑控制终端5形成无线远程连接;视频装置6通过网络与电脑控制终端5形成无线远程连接;其中所述的千斤顶1与双油路油泵2相连,置于测试桩上;本发明安装及监控主要包括以下四个步骤:
步骤1:对测试桩进行静载试验压重平台建设,在静载试验压重平台建设过程中,将视频装置、桩基沉降跟踪器安装在压重平台中;
步骤2:在静载试验压重平台建设及监控仪器安装完成后,将视频装置与电脑控制终端进行无线连接;将千斤顶与双油路油泵进行连接后,再与无线测控器进行连接;将桩基沉降跟踪器3与无线测控器4进行连接,置于测试桩四角;连接完成后对各仪器进行初步调试;
步骤3:在步骤2的基础上,将无线测控器4A与无线测控远程监管静力载荷测试仪4B进行连接,在连接完成后对仪器进行二次调试;调试后将无线测控远程监管静力载荷测试仪4B与电脑控制终端5进行无线连接,置于桩基静载试验现场;连接完成后对所有仪器进行第三次调试;
步骤4:调试完成后,利用电脑控制终端5对无线测控远程监管静力载荷测试仪4B进行远程控制以达到对静载试验过程的监控及试验数据的采集;利用电脑控制终端5与视频装置6的连接以达到对静载试验全过程中测试桩桩头沉降安全性的监控。
本发明所述的视频装置6与电脑控制终端5通过网络进行无线连接,置于次梁下侧,监测测试桩的沉降变形进程。
本发明所述的一种可视化桩基静载试验远程无线监管技术,其安装工艺步骤是:千斤顶→连接双油路油泵→桩基沉降跟踪器→连接无线测控器→连接无线测控远程监管静力载荷测试仪→无线连接电脑控制终端。

Claims (2)

1.一种可视化桩基静载试验远程无线监控系统,其特征在于:包括由千斤顶(1)、双油路油泵(2)和桩基沉降跟踪器(3)与无线测控器(4A)及无线测控远程监管静力载荷测试仪(4B)形成有线连接;无线测控远程监管静力载荷测试仪(4B)通过网络与电脑控制终端(5)形成无线远程连接;视频装置(6)通过网络与电脑控制终端(5)形成无线远程连接;其中所述的千斤顶(1)与双油路油泵(2)相连,置于测试桩上;安装及监控包括以下四个步骤:
步骤1:对测试桩进行静载试验压重平台建设,在静载试验压重平台建设过程中,将视频装置、桩基沉降跟踪器安装在压重平台中;
步骤2:在静载试验压重平台建设及监控仪器安装完成后,将视频装置与电脑控制终端进行无线连接;将千斤顶与双油路油泵进行连接后,再与无线测控器进行连接;将桩基沉降跟踪器(3)与无线测控器(4)进行连接,置于测试桩四角;连接完成后对各仪器进行初步调试;
步骤3:在步骤2的基础上,将无线测控器(4A)与无线测控远程监管静力载荷测试仪(4B)进行连接,在连接完成后对仪器进行二次调试;调试后将无线测控远程监管静力载荷测试仪(4B)与电脑控制终端(5)进行无线连接,置于桩基静载试验现场;连接完成后对所有仪器进行第三次调试;
步骤4:调试完成后,利用电脑控制终端(5)对无线测控远程监管静力载荷测试仪(4B)进行远程控制以达到对静载试验过程的监控及试验数据的采集;利用电脑控制终端(5)与视频装置(6)的连接以达到对静载试验全过程中测试桩桩头沉降安全性的监控。
2.根据权利要求1所述的一种可视化桩基静载试验远程无线监控系统,其特征在于,所述的视频装置(6)与电脑控制终端(5)通过网络进行无线连接,置于次梁下侧,监测测试桩的沉降变形进程。
CN201410674202.4A 2014-11-21 2014-11-21 一种可视化桩基静载试验远程无线监控系统 Active CN104480976B (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410674202.4A CN104480976B (zh) 2014-11-21 2014-11-21 一种可视化桩基静载试验远程无线监控系统

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410674202.4A CN104480976B (zh) 2014-11-21 2014-11-21 一种可视化桩基静载试验远程无线监控系统

Publications (2)

Publication Number Publication Date
CN104480976A CN104480976A (zh) 2015-04-01
CN104480976B true CN104480976B (zh) 2016-04-13

Family

ID=52755574

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410674202.4A Active CN104480976B (zh) 2014-11-21 2014-11-21 一种可视化桩基静载试验远程无线监控系统

Country Status (1)

Country Link
CN (1) CN104480976B (zh)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108867719A (zh) * 2018-07-12 2018-11-23 武汉富思特创新信息技术有限公司 一种桩基静载试验远程监测系统及方法
CN111827372A (zh) * 2020-07-07 2020-10-27 广东省建设工程质量安全检测总站有限公司 一种静载试验远程检测数据采集与监控系统
CN111901560A (zh) * 2020-07-09 2020-11-06 广东省建设工程质量安全检测总站有限公司 静载试验远程检测视频采集与监控系统

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MY141356A (en) * 2005-09-23 2010-04-16 Lee Sieng Kai Instrumentation and analysis method for testing piles and other geotechnical applications
CN101994323A (zh) * 2009-08-18 2011-03-30 天津市隆安达建筑仪器科技发展有限公司 静压桩机施工过程桩基安全性监测及数据显示、记录设备
CN102061712A (zh) * 2010-12-30 2011-05-18 中交第三航务工程局有限公司 水下挤密砂桩复合地基试验系统
CN102425192A (zh) * 2011-09-22 2012-04-25 深圳思量微系统有限公司 桩基倾斜实时监测预警系统
CN202563664U (zh) * 2012-04-25 2012-11-28 贾君瑞 桩基静载荷无线测控装置
CN202627033U (zh) * 2012-04-10 2012-12-26 河南省建筑科学研究院有限公司 桩基静载试验系统

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
MY141356A (en) * 2005-09-23 2010-04-16 Lee Sieng Kai Instrumentation and analysis method for testing piles and other geotechnical applications
CN101994323A (zh) * 2009-08-18 2011-03-30 天津市隆安达建筑仪器科技发展有限公司 静压桩机施工过程桩基安全性监测及数据显示、记录设备
CN102061712A (zh) * 2010-12-30 2011-05-18 中交第三航务工程局有限公司 水下挤密砂桩复合地基试验系统
CN102425192A (zh) * 2011-09-22 2012-04-25 深圳思量微系统有限公司 桩基倾斜实时监测预警系统
CN202627033U (zh) * 2012-04-10 2012-12-26 河南省建筑科学研究院有限公司 桩基静载试验系统
CN202563664U (zh) * 2012-04-25 2012-11-28 贾君瑞 桩基静载荷无线测控装置

Also Published As

Publication number Publication date
CN104480976A (zh) 2015-04-01

Similar Documents

Publication Publication Date Title
CN204030347U (zh) 一种环网柜一体化自承载装置
CN104480976B (zh) 一种可视化桩基静载试验远程无线监控系统
CN104678962A (zh) 一种电力抢修作业安全监控系统及基于该系统的作业方法
CN204824055U (zh) 一种高空作业自动升降平台
CN204486153U (zh) 一种电容式触摸屏的水胶贴合装置
CN204038921U (zh) 超高层塔吊附墙装置
CN102642784A (zh) 内爬塔式起重机的支撑结构
CN102383613B (zh) 发电厂主厂房钢屋架吊装施工方法及专用吊装起重装置
CN105080976A (zh) 立式轧机垫板安装方法及其装置
CN101858165B (zh) 塔桅结构分段套装、穿心抽出式整体安装技术
CN203640050U (zh) 球形网架结构的长方形整体屋顶顶升装置
CN104018657A (zh) 一种采用水平滑移平台施工高大挑檐的方法
CN204195993U (zh) 一种免基础提斗混凝土搅拌站
CN202467221U (zh) 发电厂主厂房钢屋架吊装起重装置
CN103541574B (zh) 狭小区域内炼钢放散塔快速安装工法
CN102605864A (zh) 一种拱顶罐的倒装施工方法
CN103199452B (zh) 移动外挂式临时电箱架
CN103215969B (zh) 一种用龙门架吊装风机基础环的方法
CN209099661U (zh) 一种易于设置保温层的一体化建筑用梁骨架结构
CN204940399U (zh) 装载机用骨架蒙皮式驾驶棚
CN103075015A (zh) 光伏组件的整体安装方法
CN201825672U (zh) 一种发电机定子吊装装置
CN104675140A (zh) 新增承重柱安装及屋架荷载转移方法
CN204578431U (zh) 一种双玻组件t型安装挂钩
CN204728394U (zh) 一种分层式泵站结构

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CP03 Change of name, title or address

Address after: 650223 floor 17, building C2, yingxincheng international Ginza, the third city of Economic Development Zone, Kunming area, China (Yunnan) pilot Free Trade Zone, Kunming City, Yunnan Province

Patentee after: Yunnan Academy of Building Sciences Co.,Ltd.

Address before: 650223 No. 150, Xuefu Road, Kunming, Yunnan

Patentee before: YUNNAN INSTITUTE OF BUILDING RESEARCH

CP03 Change of name, title or address
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20150401

Assignee: YUNNAN CONSTRUCTION ENGINEERING QUALITY INSPECTION STATION Co.,Ltd.

Assignor: Yunnan Academy of Building Sciences Co.,Ltd.

Contract record no.: X2023530000024

Denomination of invention: A Visual Remote Wireless Monitoring System for Static Load Testing of Pile Foundations

Granted publication date: 20160413

License type: Common License

Record date: 20230612

EE01 Entry into force of recordation of patent licensing contract